CERTIFICAT - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 2.20...
Transcript of CERTIFICAT - Rajasthanwater.rajasthan.gov.in/content/dam/water/watershed-development-a… · 2.20...
1 | P a g e
CERTIFICAT
Certified that the undersigned have proposed the appropriate and need
based activities required in the watershed project area with active participation of
beneficiaries along with consultation of Watershed Committees(WCs). Approval of
watershed project plan and DPR as been obtained from WC, Gram Sabha. The plan
and DPR document of Barmer (IWMP)- 54 project, at P.S Chohtan District
Barmer is technically sound, viable and appropriate for implementation during the period
2011-12 to 2016-17
We recommend that this plan be sanctioned and put to implementation.
Chairman Chairman Chairman
Binjasr IInd Mithe ka tala Goher ka tala
Secretary Secretary Secretary
Binjasr IInd Mithe ka tala Goher ka tala
WDT WDT WDT WDT AGG SOCIAL LIVESTOCK ENGINEERING
JUNIOR ENGINEER ASSISTANT ENGINEER PIA CHOHTAN PIA CHOHTAN
2 | P a g e
GOVERNMENT OF RAJASTHAN RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT (WATERSHED DEVELOPMENT & SOIL CONSERVATION)
NAME OF PROJECT : BARMER (IWMP) 54 EFFECTIVE AREA OF PROJECT :5714 HA
COST /HA 15000 COST OF PROJECT : 857.10 lakh
BLOCK : CHOHTAN DISTRICT: BARMER
PIA – ASSISTANT ENGINEER W.D. & S.C., P.S. CHOHTAN
PROJECT MANAGER, WCDC W.D. & S.C., DISTRICT BARMER
3 | P a g e
Detail of Project 1. Name of Project : Barmer (IWMP)‐54
2. Sanction No. & date of Project : F18(I‐51)DWDSC/IWMP/2011‐12/4800‐5087 Dated 05.08.2011
3. Macro & Micro Nos : Cluster
4. Deviation from Project Sanctioned :
Items As per Project Sanctioned As proposed in DPR
Project Area 6833 5714
Macro/Micro No ‐ ‐
Name of Gram Panchayats BINJASAR ,MITHE KA TALA ,GOHAD
KA TALA
BINJASAR ,MITHE KA TALA
,GOHAD KA TALA
Name of Villages BINJASAR ,MITHE KA TALA,IBRE K A
TALA,GOHAD K A TALA
BINJASAR ,MITHE KA TALA,IBRE
K A TALA,GOHAD K A TALA
Project Cost (Rs in Lakhs) 1024.95 LACS 857.10 LACS
Reason for Deviation‐ Reason for Deviation‐ DDP projects was sanction 500 ha per project but actual area selected more than 500 ha. The PPR was prepared keeping in view for DDP projects 500 ha per project. Boundary of DDP project marked more than 500 ha so available area for treatment in IWMP less than PPR.
4 | P a g e
DPR TEMPLATE Index
S.No Topics Page no.
1 Chapter
Location 6
General Features of watershed (Cost and Area details) 6
Climatic and Hydrological information 7
Other Development Schemes in the project area 8
Details of infrastructure in the project areas 8
Institutional arrangements (WCDC,PIA,WDT,WC) 9-10
Base line Survey Format for IWMP MIS Website 17
2 Chapter Basic Data ,Analysis and Scope
2.1 Demography Details 18
2.2 Development Indicators 18
2.3 Land use 18
2.4 Agriculture status and Productivity Gap Analysis 19
2.5 Horticulture/Vegetable/Floriculture status 19
2.6 Land holding pattern 20-22
2.7 Livestock status With Per Capita Production 23
2.8 Fodder status 23
2.9 Farm Implements 24
2.10 NREGS Status 24
2.11 Migration details 25
2.12 Livelihood Details. 25
2.13 Existing SHG 26
2.14 Ground Water details 27
2.15 Drinking Water Status 27
2.16 Water use efficiency 27
2.17 Slope details 28
2.18 Soil Details 28
2.19 Soil erosion status 29
2.20 Capacity Building 30-44
3 Chapter Proposed Development Plan 45-46
4 Chapter Activity wise Total Abstract of cost 47-52
5 Chapter Annual Action Plan 5.1 Project fund 54-61
5.2 Convergence Plan 62-71
6 Chapter Project outcomes 72
7 Technical designs and estimates for proposed activities 74-104
8 Enclosures
8 .1 Maps & khasara list
a. Khasara List 105-164
b. Location –District, block, village, watershed location map 165
c. Map of Project with Watershed Boundary demarcation in 166
5 | P a g e
cadastral map
d. Land Use Land Cover map 167
e. PRA Map (along with photos & paper drawing) 168-191
f. Treatment map ie proposed works on revenue map 192
g. Action plan for IWMP MIS Website 193‐202 18
8.2 Documents of Agreements:
Proceedings of gram sabha for EPA approval
Proceedings of gram sabha Resolution for committee constitution
Documents related to PRA exercise
Proceedings of gram sabha for DPR approval
6 | P a g e
CHAPTER – I
INTRODUCTION
Location.
Barmer(IWMP)54 Project is located in Chohan Block, of Barmer district. The project area is
between the latitudes 25° 11’ to 25° 20’ N & longitudes 70° 53’ to 71° 57’ E. It is at a distance of
45 km from its Block head quarters and 95 Kms from the district head quarters. There are 4 no. of
habitations in the Project area and other details are given below.
General features of watershed
S.No. Name of Project(as per GOI) Barmer (IWMP)‐54
(a) Name of Catchment ‐
(b) Name of watershed area(local name) ‐
© Project Area 5714
(d) Net treatable Area 5714
e) Cost of Project 857.10 lakh
f) Cost/hectare 15000
g) Year of Sanction 2011‐2012
h) Watershed Code ‐
i) No. of Gram Panchayats in project area 3
j) No. of villages in project area 4
k) Type of Project Desert
l) Elevation (metres) 130‐170
m) Major streams ‐
n) Slope range (%) 1‐15%
Name of Gram Panchayat Name of Villages
Covered
Census code
of villages
Area
Binjasar Binjasar 088879 2362
Gohad ka tala Gohad ka tala 088883 1209
Mithe ka tala
Mithe ka tala 088878 575
Ibre ka tala 088877 1568
7 | P a g e
The watershed falls in Agroclimatic Zone 14 The soil texture is sandy The average rainfall
is 23.90 cm . The temperatures in the area are in the range between 30 to 49 degree centigrade
during summer and 10 to 25 degree centigrade during winter. The major crops in the area are Bajara,
Guar , Moong, Moth, Jeera, Isabgol etc.72.03% land is under cultivation ,18.74% land fallow, 2.03%
land is wasteland. 30% land is irrigated through Tubewells.
1111 No of households are BPL(44.53% households) 600 are landless households(24.05 %
households) and 1447 household are small and marginal farmers(58%household) .Average land
holding in the area is 0.82 ha. 70% area is single cropped area and 30% is double cropped. The main
source of irrigation is Tubewells . The average annual rainfall (5 years) in the area is 239 mm. The
major festivals in the village are Deepawali,Holi,Raksha bandhan & Eid etc. At present this villages
is having 14088 population with Communities like Meghwal,Muslman,Jat,Charan and Purohit etc.
Climatic and Hydrological information 1
Average Annual Rainfall(mm)Year Average Annual Rainfall(mm)
2001 482 2002 72 2003 474 2004 182 2005 200 2006 8752007 181 2008 2942009 240 2010 563
2
Average Monthly rainfall (last ten years)
Month Rainfall(mm)i) June 56 ii) July 122 iii) August 140iv) September 38
3
Maximum rainfall intensity (mm) Duration rainfall intensity(mm)
i) 15 minute duration 8ii) 30 minute duration 21iii) 60 minute duration 34
4
Temperature (Degree C) Season Max Mini) Summer Season 49 30 ii) Winter Season 25 10iii) Rainy Season 41 29
5 Potential Evaporation Transpiration (PET) (mm/day) Season PET
8 | P a g e
i) Summer 4.70 ii) Winter 1.50 iii) Rainy 6.40
6 Runoff i) Peak Rate (cum/hr) ‐ ii) Total run off volume of rainy season
(ha.m.) ‐
iii) Time of return of maximum flood
5 years
10 years
In‐Year
iv)Periodicity of Drought in village area
( SourceTahsildar Chohtan)
Other Development Schemes in the project area
S.No Scheme Name of the department
Key interventions under the Scheme
Targeted Beneficiarie
s
Provisions under the Scheme
1 MGNREG
S
RD Construction of Tanka. Beri .
Gravel Road. Nadi etc
SC.ST.BPL
& Others
100 DAYS
Gurranted
employment
2 BRGF RD Construction of Anganwadi
.School
building.Subcenter.Communit
y center etc
Communit
y
Gap filling of
infrastructure
s for proper
use.
3 TFC RD Construction of tanka for
drinking water.
pipelines.Toilets etc
Communit
y
Drinking
water &
Sanitation
4 SFC RD Construction of Tanka for
drinking water.
pipelines.Toilets etc
Communit
y
Drinking
water &
Sanitation
(SourceBDO Chohtan) Details of infrastructure in the project areas
9 | P a g e
Parameters Status (i) No. of villages connected to the main road by an all‐
weather road 4
(ii) No. of villages provided with electricity 4 (iii) No. of households without access to drinking water(iv) No. of educational institutions : (P) (S) (HS) (VI)
Primary(P)/ Secondary(S)/ Higher Secondary(HS)/ vocational institution(VI) 12 02 nill nill
(v) No. of villages with access to Primary Health Centre 03
(vi) No. of villages with access to Veterinary Dispensary 01 (vii) No. of villages with access to Post Office 03 (viii) No. of villages with access to Banks Nill (ix) No. of villages with access to Markets/ mandis Nill
(x) No. of villages with access to Agro‐industries Nill (xi) Total quantity of surplus milk Nill (xii) No. of milk collection centres (U) (S) (PA) (O)
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O)) 0 0 0 Self
owenership
(xiii) No. of villages with access to Anganwadi Centre 09 (xiv) Any other facilities with no. of villages (please specify) Mobile fone coverage‐4 internet‐
1 (xv) Nearest KVK Barmer (xvi) cooperative society Binjasar, Gohad ka tala
(xvii) NGOs Sure sanstha (xviii) Credit institutions (i) Bank 0 (ii) Cooperative Society 02
(xix) Agro Service Centre's 0 (SourcePRA)
Institutional arrangements (SLNA,WCDC,PIA,WDT,WC, Secretary)
WCDC Details
1 2 3
S.No Particulars Details of WCDC
1. PM ,WCDC Balveer Singh
2. Address with contact no., website Zila Parishad (RDC)‐Barmer
+919414106072
3. Telephone 02982220292
4. Fax 02982222041
5. E‐mail [email protected]
10 | P a g e
PIA Particulars
WDT Particulars:
1 2 3
S.No Particulars Details of PIA
6. Name of PIA Bharmal Ram Khambhoo
7. Designation Assistant Engineer
8. Address with contact no., website WD & SC .Panchayat Samiti Chouhtan
+919950292611
9. Telephone 02989286004
10 Fax 02989286183
11 E‐mail [email protected]
1 2 3 4 5 6 7 8
S.No Name of WDT
member
M/
F Age Qualificati
on
Experience in
watershed(Yrs)
Description of
professional
training
Role/
Function
1
2
3 Dayam khan M 30 BA
(Socio)
3 DDP WDT
(Social )
4
11 | P a g e
Details of Watershed Committees (WC)
S.N. Name of WCs
Date of Gram Sabha for
WC Designation Name M/F SC/ST/OBC/Gene
ral
Landless/MF/SF/ BF
Name of UG/SHG
Educational qualification
1. Gohad ka tala
20/10/2011 President Karmu ram M SC SF UG
Tanka cons 5th
Secretary Shankar lal M SC SF UGTanka cons
12 th
Member Hakim khan M OBC BF UG
horticulture Litrate
Membe Arab ram M ST BF UG Litrate
Membe Sardar singh M General BF UG
Plantation ILLitrate
Membe Smt. Teeja devi F OBC BF SHG Litrate
Membe Smt. Dhermi devi F OBC LL SHG ILLitrate
Membe Smt. Sugani devi F OBC BF UGCrop Demo
ILLitrate
MembeHarkha singh M OBC LL
UGSand dune
stab
8 th
MembeDhanaram M OBC BF
UGSand dune
stab Litrate
Membe Smt. Tari devi F OBC BF SHG Litrate
Manad post Manoj surana M Gen. ‐ Jen. BE (Ag)
12 | P a g e
S.N. Name of WCs
Date of Gram Sabha for WC Designation Name M/F SC/ST/OB
C/General Landless/MF/SF/ BF Name of UG/SHG
Educational
qualification
2. Mithe ka tala
26/12/12 President Narna ram M SC BF UG Farm Pond 5th
Secretary Murad khan M OBC SF Secretary Senior Sec
Member Chatra ram M OBC BF UG karigar 10th
Membe Bagh singh M Genaral SF UG Tanka 5 th
Membe Meer khan M OBC BF UG Plantation illetrate
Membe Mahendra khan M OBC SF UG Crop Demonstration illetrate
Membe Shaker khan M OBC SF UG Nadi Renovation illetrate
Membe Veer singh M OBC SF UG plantetion illetrate
Membe Toga ram M OBC MF Tanka group illetrate
Membe Shera ram M SC SF SHG 5th
Membe Suman khan M OBC MF SHG 5th
Membe Bahadur khan M OBC SF Deggi group illetrate
Membe Sona ram M SC SF Deggi group 5th
Membe Deep singh M Gen. SF Horticulter group 5th
Membe Veejha ram M SC SF Tanka group 5th
Membe Smt. Shareefa Devi F ST SF SGH 8th
Membe Smt. Marual devi F OBC SF SGH illetrate
Membe Smt. Kamala devi F OBC BF SGH 8 th
Membe Smt.Naseeba devi F OBC SF SGH 8th
Membe Smt. Hurmat devi F OBC SF SGH illetrate
Membe Smt.Kasuba devi F OBC SF SHG illetrate
Membe Haji kaymer khan M OBC SF Tank group illetrate
Membe Rasul khan M OBC SF Plantation group illetrate
13 | P a g e
S.N. Name of WCs
Date of Gram Sabha for WC
Designation Name M/F SC/ST/OBC/General
Landless/MF/SF/ BF
Name of UG/SHG
Educational
qualification
3. Binjasar 2 21/10/2011 President Ramsingh dan M OBC SF UG PD Dev Litrate
Secretary Dana ram M OBC SF UG Tanka cons 10 th
Member Narana ram M OBC BF UG horticulture Litrate
Membe Smt.Dhani devi M OBC BF UG Litrate
Membe Chandana ram M ST BF UG Plantation ILLitrate
Membe Smt.Dhani devi F OBC BF UG Crop Demo Litrate
Membe Smt.Dhirahi khan F OBC LL UG Sand dune stab ILLitrate
Membe Smt.Daya devi F OBC BF UG ILLitrate
Membe Shembhu ram M ST LL UG 8 th
Membe Jasakaran dan M OBC BF UG Sand dune stab Litrate
Membe Loondan M OBC BF UGhorticulture
Litrate
Membe Shambhu khan M OBC BF UG Litrate
Membe Mahesha ram M SC BF UGSand dune stab
Litrate
Membe Jatam khan M OBC BF UG Litrate
Membe Gemar singh M Gen. MF UGhorticulture
Litrate
Membe Keshu dan M OBC MF UG Litrate
Membe Ali murad M OBC MF UGhorticulture
Litrate
Membe Ahamad khan M OBC LL UG Litrate
Membe Beejdan M OBC BF UG Litrate
Manad post Manoj surana M Gen. ‐ Jen. BE.[Ag.]
14 | P a g e
SOCIO ECONOMIC FEATURES. PROBLEMS AND SCOPE
The socio economic conditions of the area can be improved through
increased production which can be achieved through expansion in cultivated area and
productivity enhancement. 1071 ha land is arable wasteland and 110 ha is fallow can be
brought under cultivation.1556 ha is only irrigated and with efforts this can be increased to
2500 through openwells to be constructed in MNREGA. The productivity gap of major
crops in the area as compared with district and with areas in the same agro climatic zones
indicate potential to increase the productivity. The demonstration of improved package of
practices, improved varieties, increased irrigation facilities and soil conservation measures
under the project can bridge this gap. Due to small land holdings in the area focus of the
project would be on diversification in agriculture (horticulture, vegetables, Agro forestry,
fodder crops) and diversification in Livelihoods ( Agriculture, Animal husbandry, self
employment )
85987.80 Quintal fodder scarcity can be met out through Pasture development .Improved
animal Husbandry practices can increase the productivity of livestock. 515 no of persons
migrate due to job, this migration can be checked through creation of employment
opportunities in the project area through increase in production and diversification in
agriculture and Livelihoods as mentioned above.
The wind erosion is the main problem in the watershed area. The wind velocity
reaches upto more than 50 m/sec during summer. As the soil of watershed area is mainly
sandy therefore soil erosion occurs mainly due to wind & leading to land degradation. In
watershed area due to scare rainfall . runoff is very less resulting in lesser soil erosion due to
runoff. Agriculture in the watershed area is almost rainfed , although there are some tubewells
for irrigation. The runoff of the area will be harvested in Khet talai /Farm pond/Nadies and
will be used for horticulture plantation and livestock to increase the income of households. In
watershed area animals rearing is the main occupation and the need of breed improvement ,
vaccination medical camps are the key works to be looked into. People have large livestock
holding but there is problem of drinking water and fodder. To solve the drinking water
problem existing nadi , Tankas (traditional rain water harvesting structures) are to be
constructed and rennovated. About 35 ha of pasture development will be done in the project
area to meet defficiency of fodder.
15 | P a g e
Natural Resource Management :
The watershed area located in western Rajasthan desert . The ground water
depth is 75 meter. Ground water mostly contains florid and is saline. The water is not potable
for drinking. The people has to travel 4‐5 KM for drinking water. As per need and suggestions
given by the beneficiaries/ public representative. the Tanka , Talai have been proposed to
drinking water.
While socially surveying the area, it was realized that various water
harvesting structures mostly Tanka , Talai/Nadi, have been constructed in the area for storing
the water. Rainwater not be stored properly due to non availability of pucca agore of Tanka .
The main problem of the area is availability of stored water. For further development it has
been planned that all the water harvesting structures like Tanka will be constructed with
pucca catchment . The existing Tankas will be renovated by pucca cathment so that rain water
can be stored. To reduce infiltration of water existing Nadies will be renovated so that water
can be stored for longer time
The agriculture land of the area is affected by wind erosion. The problem can be
solved by vegetation , plantation on sand dunes. Therefore to protect the land, the main thrust
is given on sand dune stabilization & vegetative barriers.
Agriculture and Horticulture Productivity :
In the watershed area the production of Agriculture and Horticulture Plants are
not to that extent due to lack of improved variety and techniques. The Agriculture production
of different crops grown in Kharif/ Rabi seasons of the proposed watershed area is shown in
Table 13. The production will be increased by introduction of new varieties of different crop.
The existing horticulture area is shown above. The horticulture Plants will be provided to
farmers . Rain water harvested in farm pond will be used to horticulture plantation.
Live Stock –gap of fodder Availability :
The existing fodder area in the villages of proposed area is shown above. The
availability of fodder in the proposed watershed area is less. To meet the requirement. the
farmers of the area have to purchase from other places. The pasture development will be meet
out the fodder deficiency of the project area.
16 | P a g e
Livelihood and Micro enterprises :
The people of the area are dependent on Agriculture. In the proposed area the
landless families are fully dependent on work after introduction of NREGA. These families are
getting job in the area. But it is not to the extent to increase the livelihood. For development of
their livelihood, the various meetings were organized to know their interest and skills.
According to social survey conducted in different villages of the project area different
individual and group works/ activities like Kasidakari , Ker‐sagari Udhyog, Bhjan Mandal,
Carpentry, Mobile Repairing, Motor Cycle Repairing. Compute Hardware/ Software work and
Compost Pit were identified. According to their interest homogeneous groups have been
made. The main thrust was given for land less persons.
17 | P a g e
Base Line Survey Format for IWMP MIS website
Project Name IWMP 54 Total Geographical Area of Project (Lakh Hectares)‐ 6282 Treatable Area Wasteland (Lakh Hectares) 0.00116 Rainfed Agricultural
Land (Lakh Hectares) 0.02560
Total Cropped Area (Lakh Hectares)
0.05187 Net Sown Area (Lakh Hactares)
0.04116
Total no. of Water Storage Structure
156 Total no. of Water Extracting Units
06
Total storage capacity of water storage structures (cubic meters)
7800 Total storage capacity of water storage structures (cubic meters)
13500
No. of Household SC 894 ST 254
Others 1347
Total Population of the project Area
14088 No. of Household of Landless people
600
Total no. of BPL Household 1111 No. of Smal Farmer’s Household
1220
No. of persondays of Seasonal Migration
92700 No. of Marginal Farmer’s Household
227
Depth of Ground Water (meters) below Ground level Pre monsoon meters Postmonsoon meters
75 74.50
18 | P a g e
CHAPTER – II Socio economic Features, Problems and Scope
Table 2.1 Population & Household Details:
Total Population Male Female Total SC ST
7907 6181 14088 4517 1588 (Source‐Baseline Survey)
Household Details BPL
household L. Less Small Farmer
M. Farmer
Total household
SC household
ST household
1111 600 1220 227 2495 894 254 (Source‐Baseline Survey)
Table 2.2 Development indicators
S. No. Development Indicators State Project Area 1 Per capita income (Rs.) 33731 24000/yr 2 Poverty ratio 22.80 44.70 3 Literacy (%) 60.4 47.49 4 Sex Ratio Per 1000 male 921 900 5 Infant mortality rate Per 1000 63 78 6 Maternal mortality ratio Per
100000 388 677
(Source‐Census 2011)
The above table indicates poor socio economic conditions.
Table 2.3 Land Use
Land Use Total area in Ha.
Private Panchayat Government Community TotalAgriculture Land 5186 0 0 0 5186Temporary fallow 1071 0 0 0 1071Permanent Fallow 546 0 0 0 525 Cultivated Rainfed 2560 0 0 00 2560Cultivated irrigated 1556 0 0 00 1556Net Sown Area 4116 0 0 0 4116Net Area sown more than once
1556 0 0 0 0
Forest Land 0 0 202 0 202 Waste Land 0 0 286 0 286 Pastures 0 242 0 0 242 Others 0 164 0 0 182 Total 5186 406 488 0 6080
19 | P a g e
The project area has 1071 ha of cultivable wasteland , 110 ha of fallow land (total 546 ha) can
be brought under cultivation if some irrigation source can be provided through Construction of WHS
like Tanka, Farm ponds etc. and also through demonstration of rainfed varieties of crops.
Construction of WHS can also increase in area under irrigation which is only 30%
528 ha. (9.24 % of the project area)is under wastelands and can be brought under vegetative cover,
with reasonable effort. Activities like WHS (Johad) Afforestation of wastelands and Pasture
development will be taken up on these lands.
Pasture development the land use table shows that there is 242 hectare pasture land (4.23%). This
emphasizes the need for taking up pastureland development works through sowing of promising
species of grasses and plantation
Table 2.4 .a Agriculture and Horticulture status and fuel availability. Cropping Status S No
season Crop sown
Rain Fed Irrigated Total
Varieties
Area ( ha)
Production (Ton)
Productivity (Kg/ha)
Varieties
Areaha
Production (Ton)
Productivity (Kg/ha)
Area(ha)
Production (Ton)
1 Kharif Bajara Desi 2548 382.2 150 Desi 1056 1584.00 350 3604 1966.20
Gaur Desi 777 283.605 158 777 139.86
Moong Desi 518 155.40 98 518 51.80
2 Rabi Jeera Desi Desi 939 422.55 450 939 422.55
Isabgol Desi Desi 313 156.50 500 313 156.50
Arandi Desi Desi 157 102.05 650 157 102.05
3 Zaid
Total 573.86 2265.10 2838.96
(SourceTehsildar Chohtan)
Bajara: The farmers are using Desi varieties of Bajra, whereas varieties like RH67, can increase the production. Guar: The Farmers are using Desi variety of Guar whereas varieties like RGC1017 can increase the production. Moong: The Farmers are using Desi variety of Moong whereas varieties like RAMG 268 can increase the production.
Table 2.4.b Abstract of cropped Area(ha) Area under Single crop 2560Area under Double crop 1556Area under Multiple crop
20 | P a g e
Moth: The Farmers are using Desi variety of Moth whereas varieties like RMO 40 can increase the production. Jeera: The Farmers are using Desi variety of Jeera whereas varieties like GC4 can increase the production. Isabgol: The Farmers are using Desi variety of Isabgol whereas varieties like GI 2 can increase the production. Arandi: The Farmers are using Desi variety of Arandi whereas varieties like RSC 2( 2002) can increase the production.
Crop Rotation
Bajra ‐ Jeera Guar ‐ Isabgol Arandi ‐ Isabgol Moth ‐ Fallow
The table 2.4.b shows that only 1556 ha is (30%) is double cropped area. Also the crop
rotation shows that fallow lands are there. This indicates that there is scope for change in crop
rotation in fields where there are fallow lands through Soil and Water conservation measures, crop
demonstration and diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under cultivation can
change the area under single cropping to double and multiple cropping.
Table 2.4.c Productivity Gap Analysis (The table can also be given in bar chart form)
Analysis of the above table indicate that besides national gap there is wide gap in
productivity within state and even within same agro climatic zones.
The reasons for this variation are
Bajara: The farmers are using Desi varieties of Bajra, whereas varieties like RH67, can increase the production.
Guar: The Farmers are using Desi variety of Guar whereas varieties like RGC1017 can increase the production.
Moong: The Farmers are using Desi variety of Moong whereas varieties like RAMG 268 can increase the production.
Name of the crop
Productivity kg/ha India Highest
Average in Rajasthan
Highest Average of Agro climatic zone
District Project Area
Bajra 738 645 525 173 150 Moong 410 338 305 107 100 Moth 315 198 195 194 175 Guar 465 305 295 207 180 Jeera 738 645 525 475 450 Isabgol 775 675 650 525 500 Arandi 815 760 710 675 650
21 | P a g e
Moth: The Farmers are using Desi variety of Moth whereas varieties like RMO 40 can increase the production.
Jeera: The Farmers are using Desi variety of Jeera whereas varieties like GC4 can increase the production.
Isabgol: The Farmers are using Desi variety of Isabgol whereas varieties like GI 2 can increase the production.
Arandi: The Farmers are using Desi variety of Arandi whereas varieties like RSC 2( 2002) can increase the production.
Lack of Availability of good quality seeds of desired crop and variety in adequate quantities and
time to the farmers.
Availability of water for cultivation(30% is irrigated table2.4.a)
The productivity gap and reasons of it indicate potential to increase the productivity
through crop demonstration. Crop demonstrations would be carried out on improved crops/
varieties, improved agronomic practices. INM, IPM, Mixed cropping, distribution of fodder seed mini
kit. Demonstration of improved methods and economics of fodder crops cultivation and also
distribution foundation seeds of Forage Crops for further multiplication, introduction of fodder crops
in the existing crop rotations.
Table 2.5 Existing area under horticulture/Vegetables/Floriculture (ha)
Activity Area Species Varieties Recommended varieties Production
Horticulture 0 0 0 Gola & sewa Bair 10.50 qtl/Ha
Lemon kagji 12.5 Qtl/ Ha Vegetables 0 0 0 Tinda s-48, 3.5 qtl/Ha,
Gourd pusa chikni 2.5 qtl/Ha,
Tomato pusa ruby 5qtl/Ha.
Floriculture Medicinal Plants 939ha Jeera Desi Jeera GC‐4 . 6qtl/ha Medicinal Plants Isabgol Desi
Isabgol avani‐19 6qtl/ha
Table 2.6 Land holding Pattern in project area
Type of Farmer Total Households
Land holding (ha) irrigation source wise
Land holding (ha)Social group wise
Irrigated (source)
Rainfed Total General
SC ST OBC BPL
(i)Large farmer 448 1872 1532 3404 37 79 59 273 64(ii) Small farmer
1220 1058 3174 4232 139 615 23 443 466
(iii) Marginal farmer
227 0 2124 2124 39 85 49 54 166
22 | P a g e
(iv) Landless person
600 0 0 0 92 115 123 270 415
(V)No. of BPL households
1111 24 771 795 162 439 125 385 1111
Total 2495 2930 6830 9760 307 894 254 1040 1111 ( Source‐BPL Census 2002 )
58% land holdings belong to small and marginal farmers who own 65% of total
cultivated area. Horticulture/vegetables could be more economical to Small and Marginal farmers
with irrigation source. For Large farmers with no irrigation facility Horticulture/vegetables will be
promoted in a part of land with farm pond/Tanka construction.
The following activities will be more beneficial for small land holdings and for diversification and
income for large farmers.
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed earlier .
Horticulture/vegetables could be more economical to Small and marginal farmers with irrigation
source. Also the project area has good potential for medicinal & aromatic crops like Sonamukhi,
Isabgol, Ashwagandha, Khus, Mehandi etc.
Agro forestry plantation: To increase the income of farmers and also for shelter belt plantation as
wind velocity is high in the project area.
Setting of Compost Units ‐ Keeping in view the side effect of residues of chemicals and fertilizers on
human health the emphasis would be on cultivation of organic produce through motivating farmers
and providing assistance for production of organic input, vermi compost.
Production and distribution of quality seed – There is need to ensure that good quality seed is
available for cultivators for which adequate seed production would be initiated in watershed areas
with the assistance of private sector and agriculture department technologies
Sprinklers and pipelines for efficient water management practices emphasis on demonstration of
sprinklers with adequate financial support and convergence/private partnership.
Establishment of Green House ‐ For growing off season vegetables seedlings and other horticultural
crops under controlled atmospheric conditions of green house.
Establishment of nurseries: Most of the planting material is procured from other parts of the State/
country. The procurement of planting material from distant places causes damage to the planting
material and often results in untimely supply. Hence nursery development activity can be promoted in
the area.
Innovative hitech/ export oriented activities: innovative hi‐tech/ export oriented projects like
mushroom cultivation, floriculture, etc which are in negligible existence at present, can be
implemented by individual farmers / private companies.
23 | P a g e
Drip irrigation Drip irrigation will be promoted in all horticulture plantations, vegetables, green
houses and in nurseries for rational use of irrigation higher yields and quality produce.
Table 2.7 Livestock Status animals/milk production / average yield.
S.No. Description of animals
Population in No.
Yield(milk/mutton/Wool)
Equ. cow units
Dry matter requirement per year (7Kg per animal.)
Total requirement
in M.T.
1 Cows ‐ Indigenous 950 Milk 950 2427250 2427.25 Crossbreed
2 Buffaloes 50 Milk 50 127750 127.75 3 Goat 6122 Milk,meat 3061 7820855 7820.85 4 Sheep 3689 Milk ,wool 1845 4713975 4713.97 5 Camel 90 Milk ,wool 90 229950 229.95 6 Poultry ‐ ‐ ‐ ‐ ‐ 7 Piggery ‐ ‐ ‐ ‐
Total 10901 5996 15319780 15319.78 In spite of the large number of livestock, production is less hence increase in productivity across
all species, is a major challenge. To enhance production of unproductive cattle and improve the
productivity following activities will be taken up:‐
,Demonstration of improved methods of conservation and utilization of Forage crops are proposed.
Table 2.8 Existing area under fodder (ha) S.No Item Unit Area/Quantity1 Existing Cultivable area under
Fodder Ha 110
2 Production of Green fodder Tonns/year 220
3 Production of Dry fodder Tonns/ Year 4627
4 Area under Pastures Ha 937
5 Production of fodder Tonns/year 1874
6 Existing area under Fuel wood Ha 324
7 Supplementary feed Kgs/ day 8400
8 Silage Pits No ‐
9 Availability of fodder quintals 67210
10 Deficiency/excess of fodder
quintals 85987.80
24 | P a g e
The table above shows there is fodder deficiency (Requirement is 15319.78 Tons and
availability 6721 Tons)
To minimize the large and expanding gap between feed and fodder resource availability and
demand there is need for
Increase in area under fodder crops
Increase in productivity of fodder crops
Development of pastures
And reduction in large number of livestock production through replacement by few but productive
animals
Table 2.9 Agriculture implements
( Source‐Baseline Survey)
Farm mechanization and seed banks: As discussed earlier 48.90% land holdings belong to small
and marginal farmers who own only 9.10% of total cultivated area so owning of big farm
implements by individual farmers is not economical so SHG would be promoted to buy farm
implements and rent to farmer
Table 2.10 NREGA Status No. of Card Holder, activities taken so far, employment
status.
Sr. no. Name of village Total No .of job cards Employment Status
Activity taken up so far
1 Gohad ka tala 785 546 1.Excavation of Talab / Nadi2.Constraction of Gravel Road 3.Constraction of Tanka
2 Mithe ka tala 918 719 1.Excavation of Talab / Nadi2.Constraction of Gravel Road 3. Constraction of Tanka
3 Ebre ka tala
298 191 1.Excavation of Talab / Nadi2.Constraction of Gravel Road 3. Constraction of Tanka
4 Binjasar 1065 905 1.Excavation of Talab / Nadi2.Constraction of Gravel Road 3. Constraction of Tanka
Total 3066 2361 (Source‐ NAREGA Chohtan)
S. No Implements Nos.
1 Tractor 43
2 Sprayers‐manual/ power 101
3 Cultivators/Harrows 43
4 Seed drill 43
5 Any Other ‐
25 | P a g e
Table 2.11 Migration Details
Name of village
No. of persons migratin
g
No. of days per year of
migration
Major reason(s) for migrating
Distance of destination
of migration from the village (km)
Occupation during migration
Income from such occupation (Rs. in lakh)
Gohad ka tala
185 180 Scarcity of labour&fodder
300 Labour 0.45
Mithe ka tala 125 180 Scarcity of labour&fodder
320 Labour 0.45
Ebre ka tala
80 180 Scarcity of labour&fodder
320 Labour 0.45
Binjasar 125 180 Scarcity of labour&fodder
320 Labour 0.45
(Source‐ Baseline Survey)
The migration can be check by creation of employment opportunities, enhancing farm level economy, increases the income of the people engaged in animal husbandry by dairy, poultry and marketing and value addition. (As discussed earlier) and diversification in livelihoods .
The existing livelihoods activities are given below
Table 2.12 (a)Major activities (On Farm)
Name of activity No of House holds Average annual income Rs.in lakh
Cultivators 1895 0.50 Dairying 0 0 Poultry 0 0 Piggery 0 0 Goatry 244 0.12 Landless Agri. Labourers
600 0.18
Others 0 0
26 | P a g e
Table 2.12(b)Major activities (Off Farm)
Name of activity Households/individuals Average annual income Rs.in lakhArtisans 80 0.24 Carpenter 61 0.96 Blacksmith 03 0.48 Leather Craft 01 0.36 Porter 07 0.84 Mason 62 0.96 Others specify (Cycle Repair ,STD,Craft etc)
09 0.48
Others(kashidakari) 151 0.12 (Source‐ Baseline Survey) The efforts for increase in income through off farm activities will be made under livelihood component through assistance to SHG or individuals Table 2.13( a ) Status of Existing SHG
S.No Name of SHG Members
Activity involved
Monthly income
Fund available
Assistance available
Source of assistance
Training received
1 Amrawati SHG (mithe ka tala)
06 kashidakari 15000 3000 ‐ ‐ ‐
2 Sarswati SHG (Mithe ka tala)
07 kashidakari 15000 5000 ‐ ‐ ‐
3 Soni SHG (Mithe ka tala)
06 kashidakari 20000 6000 ‐ ‐ ‐
4 Janani SHG (Mithe ka tala)
06 kashidakari 24000 6000 ‐ ‐ ‐
5 Deval SHG (binjasar2) 05 kashidakari 22000 5000 ‐ ‐ ‐
6 Mataji SHG (Binjasar2) 05 kashidakari 21000 5000 ‐ ‐ ‐
7 Karani SHG (binjasar2) 05 kashidakari 15000 4000 ‐ ‐ ‐
8 Thakari ma SHG (Binjasar2)
05 kashidakari 18000 5000 ‐ ‐ ‐
9 Jama SHG (Binjasar2) 05 kashidakari 15000 3000 ‐ ‐ ‐
10 Muhar SHG (Binjasar2) 05 kashidakari 20000 4000 ‐ ‐ ‐
The table indicates existence of number of groups in the area also these need to be strengthened through trainings and financial assistance
27 | P a g e
II. Technical Features Table 2.14 Ground Water S.No Source No. Functiona
l depth Dry Area
irrigated Water availability(days)
i) Dug wells 101 75M ‐ 1556 365 ii) Shallow tube wells ‐ ‐ ‐ ‐ ‐ iii) Pumping sets iv) Deep Tube Wells Total 101 1556 (Source‐ PHED Chohtan)
Table 2.15 Availability of drinking water
S.N.
Name of the
village
Drinking water requirement Ltrs/day
Present availability of drinking water Ltrs/day
No. of drinking water sources available
No. functional
No. requires repairs
No. defunct
1 Ghohar ka tala
163196 105000 3 3 0 0
1 Mithe ka tala
138609 70000 5 2 3 3
3 Ebre ka tala
86977 70000 3 2 1 1
4 Binjasar 2
194513 140000 18 4 14 14
(Source‐ PHED Chohtan)
Table 2.16 Water Use efficiency
Name of major crop
Area (Hectare)
through water saving
devices(Drip/Sprinklers)
through water
conserving agronomic practices#
Any other (pl. specify) Total
Bajara 1056 2548 0 3604 Jeera 939 0 0 939 Isabgol 313 0 0 313 Aradi 157 0 0 157 (Source Baseline Survey)
The tables above indicate need for judicious use of available Water. Encouraging optimum use of water through installation of sprinklers on every operational wells
28 | P a g e
Table 2.17 Slope details. Slope of Watershed
S.No. Slope percentage
Area in hectares
1 0 to 3% 41302 3 to 8% 912 3 8 to 25% 4754 > 25% 197
As most of the area sandy and the problem of wind erosion in agriculture fields and
vegetative barriers are proposed to protect top soil and manures/fertilisers.
Table 2.19 Soil details A Major Soil Classes Area in hectares 1 sandy
5200 2 Sandy loam 514 3 Rocky 0 Soil Depth : B. Depth (Cms.) Area in hectares
1 0.00 to 7.50 750 2 7.50 to 45.00 4850 3 > 45.00 114 C Soil fertility Status Kg/ha Recommended N 60 120 P 12 80 K 1.50 40 Micronutrients PPM
The analysis of table shows need to improve and maintain soil fertility. Soil health card to
every farmer every crop season will be provided, which will include the recommendation for
Application micro nutrient and fertilizers
Table 2.20 Erosion details
Erosion status in project Area
Cause Type of erosion
Area affected (ha)
Run off(mm/ year)
Average soil loss (Tonnes/ ha/ year)
Total Soil loss per year
Water erosion a Sheet ‐ 1.25 b Rill ‐ 1.50 c Gully 197 2.50 492.50
Sub‐Total 197 492.50Wind erosion 5883 1.75 10295.00Total for project 6080 10787.50
29 | P a g e
The need is:
To check land degradation To reduce excessive biotic pressure by containing the number and increase of livestock To check cultivation on sloping lands without adequate precautions of soil and water conservation
measures To discourage cultivation along susceptible nallah beds To check Faulty agriculture techniques To check Uncontrolled grazing and developed cattle tracks To check Deforestation of steep slopes For Flat lands & cluster projects appropriate intervention shall be mentioned.
30 | P a g e
CHAPTER III
Proposed Development Plan: The Activities are indicative addition /deletion in activities will be as per local conditions
A) Preparatory phase activities Capacity Building Trainings and EPA
The IEC activities like Kalajathas, Group meetings, door to door campaign, slogans and wall
writings etc. were carried out in all the habitations of Villages. A series of meetings were
conducted with GP members, community and discussed about the implementation of IWMP
programme. User groups were also formed.
Grama Sabhas were conducted for approval of EPA (Village), for selecting the watershed
committee and approval of DPR.
S.no Name of the Gram Panchayat Date on which Grama
Sabha approved EPA
1 Gohad ka tala 20/10/2011
2 Mithe ka tala 26/12/2012
3 Binjasar 2 21/10/2011
1 4 5 6 7 8 9 10 11
S. No.
Names of village
Amount earmarked for EPA
Entry Point Activities planned
Estimated cost
Expenditure incurred Balance Expected
outcome Actual outcome
1 Gohad ka
tala
7.254 Water harvesting Tanka for Drinking
7.25 6.92 0.33 Increase the availability of drinking
water 270000 lts
Increase the
availability of drinking
water 270000 lts
2 Mithe ka
tala
3.450 GLR & Repair of water
harvesting structure Tanka
3.45 3.45 0 Increase the availability of drinking
water 270000 lts
Increase the
availability of drinking
water 270000 lts
3 Ibre ka tala 9.408 GLR & water
harvesting structure Tanka
9.40 9.20 0.208 Increase the availability of drinking
water 270000 lts
Increase the
availability of drinking
water 270000 lts
4 Binjasar 2 14.172 Water harvesting Tanka for Drinking
14.00 14.00 0.172 Increase the availability of drinking
water 270000 lts
Increase the
availability of drinking
water 270000 lts
34.284 34.10 33.57 0.71
31 | P a g e
The PRA exercise was carried out in all the villages on the dates shown below:
S.no Name of the
village/Habitation
Date on which PRA
conducted
1 Gohad ka tala 24/10/2012 to25/10/2012
2 Mithe ka tala 22/10/2012 to23/10/2012
3 Binjasar 2 22/10/2012 to23/10/2012
Transact walk were carried out involving the community for Social mapping,
Resource mapping. Detailed discussions and deliberations with all the primary stakeholders were
carried out. Socio‐economic survey was carried out during march 2012 to Augst 2012 (dates)
period covering all the households and primary data on demography, Land holdings, Employment
status, Community activities etc. was collected as mentioned in chapter 2.
32 | P a g e
. CAPACITY BUILDING Table List of approved Training Institutes@ for Capacity Building in the project area
1 2 3 4 5 6 7 8
S. No.
Name of Stakehold
ers Name of the Training Institute
Full Address with contact no., website
& e‐mail
Name & Designation of the Head of Institute
Type of Institute#
Area(s) of speciali‐zation$ Accredita‐tion details
1 PIAs IGPRS Jaipur Indira Gandhi Panchayatiraj sansthan , Tonk Road Jodhpur
Dr. Vimlesh Choudhary
Goverment Capacity Building for Panchayatiraj Elected Persons & employees
2 WDTs IGPRS Jaipur Indira Gandhi Panchayatiraj sansthan , Tonk Road Jodhpur
Dr. Vimlesh Choudhary
Goverment Capacity Building for Panchayatiraj Elected Persons & employees
3 UGs Garib Nawaz Mahila avam Bal kalayan Samiti Ajmer
Hamidia Cottage Ander Kot , Ajmer ‐305001 [email protected] Tel No. 01452626726
Sagufta khan NGO Capacity Building,Agriculture, Horticulture,Animal Husbandry,livelihoods, Education & Women welfare , Child labour,
4 SHGs
5 WCs
6 GPs
7 Community
8 PM/SLNA
# Central govt. Dept./ State govt. Dept./ Autonomous Body/ Research Institutes/ Universities/ Others (pl. specify)
$ Capacity Building/ Agriculture/ Horticulture/ Animal Husbandry/ Pisciculture/ Remote Sensing/ Water conservation/ Ground water/ Forestry/ livelihoods/ entrepreneurship development/ others (pl. specify)
@ The training institutes must fulfill the conditions mentioned in the operations guidelines.
33 | P a g e
Table Capacity Building activities in the project (PHYSICAL & FINANCIAL) *4% OF TOTAL PROJECT COST. 1 2 3 5 6 7
S. No.
Project Stakeholders
Total no. of persons
No. of persons to be trained during project period
No. of Training to be organized during project period
No. of person days to be trained during project period
I year
II year
III year
IV year
V year
Total I year
II year
III year
IV year
V year
Total I year
II year
III year
IV year
V year
Total
1 PIAs 2 2 0 0 0 0 2 1 1 0 0 0 2 6 0 0 0 6 2 WDTs 4 2 2 0 0 0 4 1 1 0 0 0 2 6 6 0 0 12 3 UGs 1885 380 400 500 605 0 1885 2 20 5 3 0 30 300 3000 750 450 4500 4 SHGs 2047 380 450 550 667 0 2047 2 22 5 1 0 30 300 3300 750 150 4500 5 WCs 36 15 21 0 0 0 36 2 1 0 0 0 3 120 60 0 0 180 6 GPs 30 5 10 5 10 0 30 1 1 5 4 0 11 10 20 50 80 160 7 Community 2495 420 560 690 825 0 2495 2 2 4 1 0 9 200 200 400 100 900 8 EXPOSURE
TOUR (INTER STATE)
150 50 100 0 0 0 150 1 1 1 0 0 3 300 600 0 0 900
9 EXPOSURE TOUR (INTRA STATE)
50 0 50 0 0 0 50 0 1 0 0 0 1 0 750 0 0 750
10 PM/SLNA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 TOTAL
PHYSICAL 6699 1254 1593 1745 2107 0 6699 12 50 20 9 0 91 1242 7936 1950 750 11908
12 TOTAL FINANCIAL
34.284 3.57 24.56 3.904 2.25 0 34.284 3.57 24.56 3.904 2.25 0 34.284 3.57 24.56 3.904 2.25 0 34.284
34 | P a g e
35 | P a g e
Table, Education & Communication (IEC) activities in the project area (1% of total Project cost.)
1 2 3 4 5 6
S. No. Activity Executing agency
Allocation out of 1% of total Project cost
Allocation in lacs Expected Outcome (may quantify, wherepossible)
I year II year III year vI year V year Total
1 ekWMy #QVkWi okVj
gkjosZfVx LVªDplZ ¼iapk;r
lfefr, jktho xkW/kh lsok
dsUnz ;k vU; iapk;r lfefr
Lrjh; utnhdh ljdkjh
Hkou ½A
PIA 1.714 0.857 0.857 0 0 0 1.714
2 tyxzg.k {ks= xfrfof/k;kas dks
n’kkZrk gqvk POP / CLAY /
WOOD / PLASTIC ls cuk gqvk
ekWMyA
PIA
0.857
0.86 00
0
0
0 0857
3 MhLiys cksMZs@IysxDlh
cksMZ@
4 okWy isfUVax&tyxzg.k
xfrfof/k;ksa] y{;ks o izkfIr
vkfn dks n’kkZrh gqbZ A
PIA 2.143 0.43 0.43 0.43 0.43 0.43 2.143
36 | P a g e
5 tyxzg.k fodkl laca/kh eqfnzr iEiysVl@fyQ ysVl@pkVZ@iksLVj@vkfnA
PIA
6 Ukkjk ys[ku PIA
7 lQyrk dh dgkuh;ksa dh
ohfM;ksaxzkQh@QksVksxzkQh@
y?kqfQYe ,oa d`"kdks ls
lk{kjkrdkj @ okrkZ A
PIA
1.286 0.43
043 0.43 1.286
8 fucU/k o okn&fookn
izfr;ksfxrk
PIA
9 jsfM;ksa@nwjn’kZu ij okrkZ o foKkiu
PIA
10 lkaLd`frd R;kSgkj @ esys vkfn ds volj ij iznZ’kuh
PIA 0.857 0.43 0.43 0.857
11 uqDdM+ ukVd
PIA
12 dViqryh izn’kZu PIA
37 | P a g e
13 jkf= xks"Bh PIA 1.714 0.43 0.43 0.43 0.43 1.714
14 Hkw laj{k.k lIrkg PIA
15 psruk jSyh PIA
16 tyxzg.k fodkl dk lans’k
nsus okys lkaLd`frd dk;ZØe
PIA
17 d`"kd fnol dk vk;kstu ,oa {ks= Hkze.k fnol dk vk;kstu bR;kfn
PIA
18 dqy 8.571 3.428 2.571 1.286 0.857 0.429 8.571
38 | P a g e
State Remote Sensing Application Centre agency was assigned the work of preparing
various thematic layers using Cartosat‐1 and LISS‐3 imageries for Creation, development and
management of geo‐spatial database depicting present conditions of land (terrain), water and
vegetation with respect to watershed under different ownerships at village level
Various thematic layers provided by SRSAC are :
Digitised Khasara maps of the villages falling in project area. Network of Drainage lines, existing water bodies, falling in the project area. Base maps (transport network, village/boundaries, and settlements). Land Use / Land cover map.
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as
discussed in chapter 2) final Treatment plan on revenue map for implementation has been
framed. Thus each intervention identified has been marked on revenue map. PRA based
intervention map are annexed .
B)Livelihood Action Plan (LAP):
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing the funds
under the livelihood component. LAP has been prepared by the PIA in consultation with WDT, WC &
the members of SHG,SC/ST, women, landless/ assetless households. Details of funds available & their
utilisation is as under :
(i) Total project cost Rs.857.10Lacs.
(ii) Funds available under livelihood component is 9% of total project cost= Rs.77.139 Lacs.
(a) Seed money for SHGs as revolving fund = Rs.49.00 Lacs.
(minimum 60% of livelihood component)
No. Of SHG to be formed 196 Nos.
(b) Seed money for enterprising individuals = Rs.7.50 Lacs.
persons enterprising individuals 30 Nos.
(c) Seed money for SHG Fedration = Rs.20.639 Lacs
(maximum 30% of livelihood component)
SHG Fedration 12 Nos.
39 | P a g e
S.
Item Numbers
Revolving
fund/Seed
money % of LAP
1 SHG
63.52%
a Existing 10 2.50
b New 186 43.75
Sub Total 196 49.00
2 Enterprising individuals 30 7.50 9.72%
3
Enterprising SHG/Federations
of SHG 12 20.64 26.76%
Total 238 77.14 100
Proposed Activities (On Farm)*
Name of activity* No of SHGs Revolving fund
Dairying 5 1.250
Poultry 2 0.50
Goatry 45 11.25
Maize dehusker 5 1.25
Ata Mill 10 2.50
Total 67 16.75
Proposed Major activities (Off Farm)**
Name of activity* No of SHGs Revolving fund
Artisans 4 1.00
Mason 5 1.25
Sewing / Knitting 35 11.25
General Store 15 3.75
Mobile repair 4 1.00
Embrodary Handicraft 61 15.25
Total 129 32.25
40 | P a g e
List of persons & Proposed Activities. ( 10% of (9%)
S. No. Activity Proposed Name of Person viillage Category
SC /ST
/Others
Project fund
Revolving
Contri
bution
1 MOTER WIRING PRAKASH / DANARAM BINJASAR others 25000 25000
2 CARPANTER CHATRARAM / GOPARAM BINJASAR others 25000 25000
3 MOBILE REPAIRING AMOLAKHDAN /JASKARANDAN
BINJASAR others 25000 25000
4 LIGHT FITTING CHUNARAM / RUKHAMANARAM
BINJASAR others 25000 25000
5 MOBILE REPAIRING POKAR RAM /KOSHALARAM BINJASAR others 25000 25000
8 MOBILE REPAIRING FUSARAM / MULARAM BINJASAR others 25000 25000
9 POULTRY NUR MOH. / SHAHMEER BINJASAR others 25000 25000
10 POULTRY AYUB KHAN / SHER MOH. BINJASAR others 25000 25000
11 HALWAI UMEDARAM / VISHNARAM BINJASAR others 25000 25000
12 MOBILE REPAIRING MOHAN / ASHARARAM BINJASAR others 25000 25000
13 MOBIE L REPAIRING GULAM / SALIM BINJASAR others 25000 25000
14 CAMEL CART ARABAB / SUMAR BINJASAR others 25000 25000
15 BARBER ESARA RAM / MEHARA RAM BINJASAR others 25000 25000
16 TAYAR PANCHING MOHAN LAL / DEDARAM GOHAD KA TALA
SC 25000 25000
17 MOBILE REPAIRING MARURAM / DEDARAM GOHAD KA TALA
SC 25000 25000
18 CARPANTER KARNARAM / HAMEERARAM GOHAD KA TALA
SC 25000 25000
19 CARPANTER DEEPARAM /VIRDARAM GOHAD KA TALA
SC 25000 25000
20 POULTRY GANNI KHAN / AMIN KHAN GOHAD KA TALA
others 25000 25000
21 POULTRY ALI KHAN / TAGARAM GOHAD KA TALA
others 25000 25000
22 CARPANTAR JEEWARAJ SINGH / DUR SINGH
GOHAD KA TALA
others 25000 25000
23 TAILORING SUBHAN / KARIM MITHE KA TALA others 25000 25000
24 TAILORING JAMIN / ACHAR MITHE KA TALA others 25000 25000
25 ELECTRICIAN MUBARAK / NURA MITHE KA TALA others 25000 25000
26 POULTRY NAGAR /NASIR MITHE KA TALA others 25000 25000
27 CARPANTRY JOHARA / SATAR MITHE KA TALA others 25000 25000
28 TAILORING HUSEN / SAACHCHU MITHE KA TALA others 25000 25000
29 POULTRY JAM / SATTAR MITHE KA TALA others 25000 25000
30 MOTER WINDING DANARAM / MITHTHURAM MITHE KA TALA SC 25000 25000
TOTAL 750000 750000
41 | P a g e
(c) Funds for Enterprising SHG/Federations of SHG
(Maximum 30 % of livelihood activities)= Rs. 20.639 Lacs
The funding for major livelihood activities will enable the enterprising SHGs/SHG federation to
avail a composite loan for undertaking major livelihood activities or to upscale activities as
recommended by the WC & approved by WCDC in consultation with line departments.
Details of enterprising SHG/federation is given below :
S.No. Name of SHG/ SHG federation Project
Name
Project
Cost in lacs
Grant in aid 50%
of project cost or
2 lacs whichever
is less
Bank loan
1 SHG fedration Binjasar Embrodary 4.00 1.72 2.28
2 SHG fedration Mithe ka tala Embrodary 4.00 1.72 2.28
3 SHG fedration Goher ka tala Embrodary 4.00 1.72 2.28
4 SHG fedration Binjasar
Meghwalon ka pada
Tailoring 4.00 1.72 2.28
.5 SHG fedration Binjasar
Musalmanon ka pada
Tailoring 4.00 1.72 2.28
6 SHG fedration Binjasar
Charanon ka pada
Tailoring 4.00 1.72 2.28
7 SHG fedration Mithe ka tala
Meghwalon ka pada
Embrodary 4.00 1.72 2.28
8 SHG fedration Mithe ka tala
Musalmanon ka pada
Embrodary 4.00 1.72 2.28
9 SHG fedration Imbre ka tala Embrodary 4.00 1.72 2.28
10 SHG fedration Goher ka tala
Meghwalon ka pada
Embrodary 4.00 1.72 2.28
11 SHG fedration Goher ka tala
Musalmanon ka pada
Embrodary 4.00 1.72 2.28
12 SHG fedration Goher ka tala
Rajputon ka pada
Embrodary 4.00 1.72 2.28
Total 48.00 20.64 27.36
* Details of project activities can be prepared in coming years after formation of SHG federation or as
the case may be.
42 | P a g e
C) Production Plan:
An awareness programme has been undertaken at Gram Sabha for communication & sensitization of
the target beneficiaries. Production System & micro enterprises Action Plan is pre‐requisite for
availing the funds under the Production System & micro enterprises component. Production plan has
been prepared by the PIA in consultation with WDT, WC & the members of Users Group. Details of
funds available & their utilisation is as under :
(iii) Total project cost Rs.857.10 Lacs.
(iv) Funds available under Production System & Micro enterprises component is 10% of total
project cost= Rs.85.71 Lacs.
Proposed Activities for production system & Micro enterprises
s.no. Name of activity* No. of
households
Cost of
activity
Total
Cost in
Lacs
WDF
A Production System
1 Crop Demontration
Kharif crop 453 5000 22.65 3.40
Rabi crop 94 8000 7.52 1.12
2 Fodder production 45 2000 0.90 0.13
3 Agro Horticulture 69 15000 10.35 1.55
4 Organic farming (Green
Manuaring, Nadep Compost)
92 10000 9.20 1.38
5 Home stead kitchen graden 329 500 1.65 0.25
c Para Vetnery services
1 Demo. Urea Molasis 85 1000 0.85 0.13
2 Manger 101 5200 5.25 0.78
3 Animal Shed 85 12000 10.20 1.53
4 Livestock Development
Activities
17.14 0
Total 1167 ‐ 85.72 10.27
43 | P a g e
Awareness Programme
‐Slogan Wall Painting,
Scientific Animal Husbandry Practices ; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally
Broadcasting / Telecasting Film Show
Visit‐ intra/ inter/ out of State/ Abroad
Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.
Creation Of Disease Free Zone: Livestock’s health coverage
Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)
Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)
Distribution of mineral mixture. (Convergence with peer department)
Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.
Ensure Hygenic measures to check Zonosis.(DAH/ IWMP)
Construction of Animal Sheds with Manger and Portable Manger With accessories
Provision of Cattle Water Troughs.
Infertility Management: To ensure Livestock’s Productivity
Expansion of AI Coverage/ reduction in no.of infertile females.
PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT
Breed Improvment: To ensure Livestock’s Productivity enhancement
Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.
Registration of bulls (Convergence with peer department)
Bull / Buck Distribution for NS‐.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks Should Be Distributed For 3yrs 6 (3 In Each Iwmp Area, Where Ever A.I. Facility Is Not Available Round’s O Clock. On 100% Subsidized Rate To WC.
Financial Incentive to the Inseminator for Calf Borns.
Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva
An Assistance to control Malnutrition: Protein Supplementation
Feed & fodder production enhancement.
44 | P a g e
ANNUAL ACTION PLAN : PIA will prepare annual action plan in the month of January indicating
outgoing liabilities as well as new projects which they wish to take during next financial years & will
submit to PM(WCDC). These plans will be placed for approval at P.S. (Standing Committee of
Production and Agriculture) & Z.P. (Standing Committee of Production) level every year. While
preparing Annual Action Plan (AAP) if rates of labour or material in DPR increased or decreased
changed rates will be applicable for preparing AAP & the effect of same can be met by converging the
remaining works with other schemes.
45 | P a g e
CHAPTER – III PROPOSED DEVELOPMENT PLAN
Name of the project BARMER(IWMP)-54 Block CHOHTAN District. BARMER
ACTIVITYWISE ABSTRACT OF COST S. N.
NAME OF ACTIVITY Unit
Unit cost
GP-BINJASAR 2362 354.30
Beneficiary Contribution
Quantity Total Cost
Cost from Project Fund Convergence Fund
Quantity Labour Material Total Quantity Amt.
I. Administration - 10% - 35.43 - 0.00 35.43 35.43 - - 0.00 II Monitoring - 1% - 3.54 - 0.00 3.54 3.54 - - 0.00 III Evaluation - 1% - 3.54 - 0.00 3.54 3.54 - - 0.00 IV Entry point activity - 4% - 14.17 - 0.00 14.17 14.17 - - 0.00 V Inst. & Capacity Building - 5% - 17.72 - 0.00 17.72 17.72 - - 0.00 VI DPR Preparation - 1% - 3.54 - 0.00 3.54 3.54 - - 0.00 TOTAL (A) - 22% - 77.95 - 0.00 77.95 77.95 - 0.00 W/S WORK PHASE
VII NRM 56% 198.41 0.00 0.00 1 Conservation measures for areable land
(private land) (i) Farm Pond Nos 200000 2 4.00 0 0.00 0.00 0.00 2 4.00 0.00 (ii) Khadeen Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 142 213.00 87 34.80 95.70 130.50 55 82.50 9.79 (v) Earthen Bund m 225 3850 8.66 2430 5.47 0.00 5.47 1420 3.20 0.41 (vi) Renovation of Existing Tanka Nos 0 0.00 0 0.00 0 0.00 0.00 (vii) Agro Forestry 20 25000 5.00 23620 0.00 4.72 4.72 1380 0.28 0.35
2 Conservation measures for non areable land 0 0.00 0.00
(i) Pasture develoment Ha 102150.0 10 10.22 10 6.45 3.77 10.22 0 0.00 0.00
46 | P a g e
(ii) WHS pacca (Nadi) Nos 2000000 3 60.00 2 11.80 28.20 40.00 1 20.00 0.00 (iii) stangle Trenches Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 10 15.00 5 2.00 5.50 7.50 5 7.50 0.00 3 Drainage line treatment 0 0.00 0.00
(ii) LSCD Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (i) Drop Spilway Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (ii) Anicuts Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
TOTAL (B) 315.88 60.52 137.89 198.41 0 117.47 10.55 VIII Production System and micro enterprise 10% 35.43 0 2.66
1 Crop Demonstration 0 0.00 i Single Crop No. 5000 202 10.10 170 0.00 8.50 8.50 32 1.60 1.28 ii Inter Cropping No. 8000 34 2.72 34 0.00 2.72 2.72 0 0.00 0.41
2 Dry land Horticulture No. 15000 36 5.40 30 0.00 4.50 4.50 6 0.90 0.68 3 Homestead Kitchen Garden No. 500 286 1.43 148 0.00 0.74 0.74 138 0.69 0.114 Compost Pit No. 10000 56 5.60 42 0.00 4.20 4.20 14 1.40 0.635 Sprinklers and Drip irrigation No. 30000 5 1.50 0 0.00 0.00 0.00 5 1.50 0.00 6 Small Live Stock – Goat and Sheep Rearing No. 10000 25 2.50 0 0.00 0.00 0.00 25 2.50 0.00 7 Live Stock Management No. 0 0.00 0.00
(i) Fodder Demonstration No. 2000 150 3.00 20 0.00 0.40 0.40 130 2.60 0.06 (ii) Mangers Distribution No. 5200 82 4.26 40 0.00 2.08 2.08 42 2.18 0.31 (iii) Livestock Development activities No. 10.63 0 0.00 7.09 7.09 0 3.54 1.06 (iv) Cattel shed No. 12000 40 4.80 40 0.00 4.80 4.80 0 0.00 0.72 (v) Urea Molasis No. 1000 40 0.40 40 0.00 0.40 0.40 0 0.00 0.06
TOTAL (C) 956 52.34 564 0 35 35.43 392 16.92 5.314 IX Household Production System (For
Marginal Farmer and landless Labour ) 9% 31.89 0 0.00 2.39 1 Seed moeney to SHG No. 25000 82 20.50 82 0.00 20.50 20.50 0 0.00 3.08 2 Seed moeney to Microenterprise No. 25000 38 9.50 12 0.00 3.00 3.00 26 6.50 0.45 3 Grant in aid to Federation of SHG individual (10 %
maximum of 9% amount) No. 200000 6 12.00 5 0.00 8.39 8.39 1 3.61 1.26 Total 126 42.00 99 0.00 31.89 31.89 27 10.11 7.18 X CONSOLIDATED PHASE 3% 10.63 10.63 0.00 0.00 GRAND TOTAL 498.80 60.52 283.15 354.30 144.50 23.04
47 | P a g e
S. N.
NAME OF ACTIVITY Unit
Unit cost
GP-MITHE KA TALA 2143 321.45 Beneficiary Contribution Quantity Total
Cost Cost from Project Fund Convergence
Fund Quantity Labour Material Total Quantity Amt.
I. Administration - 10% - 32.15 - 0.00 32.15 32.15 - - 0.00II Monitoring - 1% - 3.21 - 0.00 3.21 3.21 - - 0.00III Evaluation - 1% - 3.21 - 0.00 3.21 3.21 - - 0.00 IV Entry point activity - 4% - 12.86 - 0.00 12.86 12.86 - - 0.00 V Inst. & Capacity Building - 5% - 16.07 - 0.00 16.07 16.07 - - 0.00 VI DPR Preparation - 1% - 3.21 - 0.00 3.21 3.21 - - 0.00 TOTAL (A) - 22% - 70.72 - 0.00 70.72 70.72 - 0.00 W/S WORK PHASE
VII NRM 56% 180.01 0.00 0.00 1 Conservation measures for areable land
(private land) (i) Farm Pond Nos 200000 8 16.00 8 5.02 10.98 16.00 0 0.00 1.20 (ii) Khadeen Nos 600000 1 6.00 0 0.00 0.00 0.00 1 6.00 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 75 112.50 64 25.60 70.40 96.00 11 16.50 7.20 (v) Earthen Bund m 225 5000 11.25 2671 6.01 0.00 6.01 2329 5.24 0.45 (vi) Renovation of Existing Tanka Nos 35 0.00 0 0.00 35 0.00 0.00(vii) Agro Forestry Nos 20 25000 5.00 21430 0.00 4.29 4.29 3570 0.71 0.32
2 Conservation measures for non areable land 0 0.00 0.00
(i) Pasture develoment Ha 102150.0 50 51.08 10 6.45 3.77 10.22 40 40.86 0.00 (ii) WHS pacca (Nadi) Nos 2000000 2 40.00 2 11.80 28.20 40.00 0 0.00 0.00 (iii) stangle Trenches Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 15 22.50 5 2.00 5.50 7.50 10 15.00 0.00 3 Drainage line treatment 0 0.00 0.00
48 | P a g e
(ii) LSCD Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (i) Drop Spilway Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (ii) Anicuts Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
TOTAL (B) 264.33 56.88 123.13 180.01 0 84.31 9.17 VIII Production System and micro enterprise 10% 32.15 0 2.41
1 Crop Demonstration 0 0.00 i Single Crop No. 5000 502 25.10 178 0.00 8.90 8.90 324 16.20 1.34 ii Inter Cropping No. 8000 72 5.76 40 0.00 3.20 3.20 32 2.56 0.48
2 Dry land Horticulture No. 15000 55 8.25 25 0.00 3.75 3.75 30 4.50 0.56 3 Homestead Kitchen Garden No. 500 240 1.20 138 0.00 0.69 0.69 102 0.51 0.10 4 Compost Pit No. 10000 40 4.00 30 0.00 3.00 3.00 10 1.00 0.45 5 Sprinklers and Drip irrigation No. 30000 5 1.50 0 0.00 0.00 0.00 5 1.50 0.00 6 Small Live Stock – Goat and Sheep Rearing 10000 250 25.00 0 0.00 0.00 0.00 250 25.00 0.00 7 Live Stock Management
(i) Fodder Demonstration 2000 45 0.90 15 0.00 0.30 0.30 30 0.60 0.05 (ii) Mangers Distribution 5200 150 7.80 38 0.00 1.98 1.98 112 5.82 0.30 (iii) Livestock Development activities 9.64 0 0.00 6.43 6.43 0 3.21 0.96 (iv) Cattel shed No. 12000 40 4.80 30 0.00 3.60 3.60 10 1.20 0.54 (v) Urea Molasis No. 1000 36 0.36 30 0.00 0.30 0.30 6 0.06 0.05
TOTAL (C) 1435 94.31 0 32 32.15 62.17 4.82 IX Household Production System (For
Marginal Farmer and landless Labour ) 9% 28.93 0 0.00 2.17 1 Seed moeney to SHG No. 25000 74 18.50 74 0.00 18.50 18.50 0 0.00 2.78 2 Seed moeney to Microenterprise No. 25000 34 8.50 12 0.00 3.00 3.00 22 5.50 0.45 3 Grant in aid to Federation of SHG individual (10 %
maximum of 9% amount) 200000 6 12.00 4 0.00 7.43 7.43 2 4.57 1.11 Total 114 39.00 90 0.00 28.93 28.93 24 10.07 4.34X CONSOLIDATED PHASE 3% 9.64 9.64 0.00 0.00 GRAND TOTAL 478.00 56.88 254.92 321.45 156.55 18.33
49 | P a g e
S. N.
NAME OF ACTIVITY Unit
Unit cost
GP-GOHER KA TALA 1209 181.35 Beneficiary Contribution Quantity Total
Cost Cost from Project Fund Convergence
Fund Quantity Labour Material Total Quantity Amt.
I. Administration - 10% - 18.14 - 0.00 18.14 18.14 - - 0.00 II Monitoring - 1% - 1.81 - 0.00 1.81 1.81 - - 0.00 III Evaluation - 1% - 1.81 - 0.00 1.81 1.81 - - 0.00 IV Entry point activity - 4% - 7.25 - 0.00 7.25 7.25 - - 0.00 V Inst. & Capacity Building - 5% - 9.07 - 0.00 9.07 9.07 - - 0.00 VI DPR Preparation - 1% - 1.81 - 0.00 1.81 1.81 - - 0.00 TOTAL (A) - 22% - 39.90 - 0.00 39.90 39.90 - 0.00 W/S WORK PHASE
VII NRM 56% 101.56 0.00 0.00 1 Conservation measures for areable land
(private land) (i) Farm Pond Nos 200000 2 4.00 0 0.00 0.00 0.00 2 4.00 0.00 (ii) Khadeen Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 97 145.50 47 18.80 51.70 70.50 50 75.00 5.29 (v) Earthen Bund m 225 8500 19.13 1570 3.53 0.00 3.53 6930 15.59 0.26 (vi) Renovation of Existing Tanka Nos 34 0.00 0 0.00 34 0.00 0.00 (vii) Agro Forestry 20 15000 3.00 12090 0.00 2.42 2.42 2910 0.58 0.18
2 Conservation measures for non areable land 0 0.00 0.00
(i) Pasture develoment Ha 102150.0 25 25.54 5 3.23 1.88 5.11 20 20.43 0.00 (ii) WHS pacca (Nadi) Nos 2000000 2 40.00 1 5.90 14.10 20.00 1 20.00 0.00 (iii) stangle Trenches Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 7 10.50 0 0.00 0.00 0.00 7 10.50 0.00 3 Drainage line treatment 0 0.00 0.00
(ii) LSCD Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
50 | P a g e
(i) Drop Spilway Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (ii) Anicuts Nos 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
TOTAL (B) 247.66 31.46 70.10 101.56 0 146.10 5.73 VIII Production System and micro enterprise 10% 18.14 1.36
1 Crop Demonstration 0 0.00 i Single Crop No. 5000 262 13.10 105 0.00 5.25 5.25 157 7.85 0.79 ii Inter Cropping No. 8000 27 2.16 20 0.00 1.60 1.60 7 0.56 0.24
2 Dry land Horticulture No. 15000 27 4.05 14 0.00 2.10 2.10 13 1.95 0.32 3 Homestead Kitchen Garden No. 500 57 0.29 43 0.00 0.22 0.22 14 0.07 0.03 4 Compost Pit No. 10000 52 5.20 20 0.00 2.00 2.00 32 3.20 0.30 5 Sprinklers and Drip irrigation No. 30000 15 4.50 0 0.00 0.00 0.00 15 4.50 0.00 6 Small Live Stock – Goat and Sheep Rearing 10000 250 25.00 0 0.00 0.00 0.00 250 25.00 0.00 7 Live Stock Management 0 0 0.00 0.00
(i) Fodder Demonstration 2000 45 0.90 10 0.00 0.20 0.20 35 0.70 0.03 (ii) Mangers Distribution 5200 51 2.65 23 0.00 1.20 1.20 28 1.46 0.18 (iii) Livestock Development activities 5.44 0 0.00 3.63 3.63 0 1.81 0.54 (iv) Cattel shed No. 12000 18 2.16 15 0.00 1.80 1.80 3 0.36 0.27 (v) Urea Molasis No. 1000 19 0.19 15 0.00 0.15 0.15 4 0.04 0.02
TOTAL (C) 823 65.64 265 0 18 18.14 558 47.50 2.72 IX Household Production System (For
Marginal Farmer and landless Labour ) 9% 16.32 1 Seed moeney to SHG No. 25000 40 10.00 40 0.00 10.00 10.00 0 0.00 1.50 2 Seed moeney to Microenterprise No. 25000 19 4.75 6 0.00 1.50 1.50 13 3.25 0.23 3 Grant in aid to Federation of SHG individual (10 %
maximum of 9% amount) 200000 4 8.00 3 0.00 4.82 4.82 1 3.18 0.72 Total 63 22.75 49 0.00 16.32 16.32 14 6.43 2.45 X CONSOLIDATED PHASE 3% 5.44 5.44 0.00 0.00 GRAND TOTAL 381.39 31.46 144.46 181.35 200.03 10.90
51 | P a g e
S. N.
NAME OF ACTIVITY Unit
Unit cost
TOTAL 5714 857.10 Beneficiary Contribution Quantity Total
Cost Cost from Project Fund Convergence
Fund Quantity Labour Material Amt. Quantity Amt.
I. Administration - 10% - 85.71 - 0.00 85.71 85.71 - - 0.00 II Monitoring - 1% - 8.57 - 0.00 8.57 8.57 - - 0.00 III Evaluation - 1% - 8.57 - 0.00 8.57 8.57 - - 0.00 IV Entry point activity - 4% - 34.28 - 0.00 34.28 34.28 - - 0.00 V Inst. & Capacity Building - 5% - 42.86 - 0.00 42.86 42.86 - - 0.00 VI DPR Preparation - 1% - 8.57 - 0.00 8.57 8.57 - - 0.00 TOTAL (A) - 22% - 188.56 - 0.00 188.56 188.56 - 0.00 W/S WORK PHASE
VII NRM 56% 479.98 0.00 0.00 1 Conservation measures for areable land
(private land) (i) Farm Pond Nos 200000 12 24.00 8 5.02 10.98 16.00 4 8.00 1.20 (ii) Khadeen Nos 600000 1 6.00 0 0.00 0.00 0.00 1 6.00 0.00 (iii) Repair of existing Khadeen Nos 300000 0 0.00 0 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 314 471.00 198 79.20 217.80 297.00 116 174.00 22.28 (v) Earthen Bund m 210 17350 39.04 6671 15.01 0.00 15.01 10679 24.03 1.13 (vi) Renovation of Existing Tanka Nos 50000 69 0.00 0 0.00 69 0.00 0.00 (vii) Agro Forestry Nos 20 65000 13.00 57140 0.00 11.43 11.43 7860 1.57 0.86
2 Conservation measures for non areable land
(i) Pasture develoment Ha 198600.0 85 86.83 25 16.13 9.41 25.54 60 61.29 0.00 (ii) WHS pacca (Nadi) Nos 2000000 7 140.00 5 29.50 70.50 100.00 2 40.00 0.00 (iii) stangle Trenches Nos 324 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (iv) Tanka Nos 150000 32 48.00 10 4.00 11.00 15.00 22 33.00 0.00 3 Drainage line treatment
(ii) LSCD Nos 15000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
52 | P a g e
(i) Drop Spilway Nos 165000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00 (ii) Anicuts Nos 800000 0 0.00 0 0.00 0.00 0.00 0 0.00 0.00
TOTAL (B) 827.87 148.86 331.12 479.98 0 347.89 25.46 VIII Production System and micro enterprise 10% 162.85 12.21
1 Crop Demonstration i Single Crop No. 5000 966 48.30 453 0.00 22.65 22.65 513 25.65 3.40 ii Inter Cropping No. 8000 133 10.64 94 0.00 7.52 7.52 39 3.12 1.13
2 Dry land Horticulture No. 15000 118 17.70 69 0.00 10.35 10.35 49 7.35 1.55 3 Homestead Kitchen Garden No. 500 583 2.92 329 0.00 1.65 1.65 254 1.27 0.25 4 Compost Pit No. 10000 148 14.80 92 0.00 9.20 9.20 56 5.60 1.38 5 Sprinklers and Drip irrigation No. 30000 25 7.50 0 0.00 0.00 0.00 25 7.50 0.00 6 Small Live Stock – Goat and Sheep Rearing 10000 525 52.50 0 0.00 0.00 0.00 525 52.50 0.00 7 Live Stock Management 0 0 0.00 0.00
(i) Fodder Demonstration 2000 240 4.80 45 0.00 0.90 0.90 195 3.90 0.14 (ii) Mangers Distribution 5200 283 14.72 101 0.00 5.25 5.25 182 9.46 0.79 (iii) Livestock Development activities 25.71 0 0.00 17.14 17.14 0 8.57 2.57 (iv) Cattel shed No. 12000 98 11.76 85 0.00 10.20 10.20 13 1.56 1.53 (v) Urea Molasis No. 1000 95 0.95 85 0.00 0.85 0.85 10 0.10 0.13
TOTAL (C) 3214 212.29 1353 0 86 85.71 1861 126.59 12.86 IX Household Production System (For
Marginal Farmer and landless Labour ) 1 Seed moeney to SHG No. 25000 196 49.00 196 0.00 49.00 49.00 0 0.00 7.35 2 Seed moeney to Microenterprise No. 25000 91 22.75 30 0.00 7.50 7.50 61 15.25 1.13 3 Grant in aid to Federation of SHG individual (10 %
maximum of 9% amount) 200000 16 32.00 12 0.00 20.64 20.64 4 11.36 3.10 Total 303 103.75 238 0.00 77.14 77.14 65 26.61 11.57 X CONSOLIDATED PHASE 3% 25.71 25.71 0.00 0.00 GRAND TOTAL 1358.18 148.86 682.53 857.10 501.09 49.89
Project Manager, WCDC Distt. Barmer
53 | P a g e
CHAPTER – IV ACTIVITYWISE ABSTRACT OF COST
Name of the project BARMER(IWMP)-54 Block CHOHTAN District. BARMER
ACTIVITYWISE ABSTRACT OF COST S. N.
NAME OF ACTIVITY Unit
Unit cost
TOTAL 5714 857.10
Beneficiary Contribution
Quantity Total Cost Cost from Project Fund
Convergence Fund
Quantity Amt. Quantity Amt.
I. Administration - 10% - 85.71 - 85.71 - - 0.00 II Monitoring - 1% - 8.57 - 8.57 - - 0.00 III Evaluation - 1% - 8.57 - 8.57 - - 0.00 IV Entry point activity - 4% - 34.28 - 34.28 - - 0.00 V Inst. & Capacity Building - 5% - 42.86 - 42.86 - - 0.00 VI DPR Preparation - 1% - 8.57 - 8.57 - - 0.00 TOTAL (A) - 22% - 188.56 - 188.56 - 0.00 W/S WORK PHASE
VII NRM 56% 0.00 479.98 0.00 0.00 1 Conservation measures for areable land (private land)
(i) Farm Pond Nos 200000 12 24.00 8 16.00 4 8.00 1.20 (ii) Khadeen Nos 600000 1 6.00 0 0.00 1 6.00 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0 0.00 0 0.00 0.00 (iv) Waterharvesting st.(tanka) Nos 150000 314 471.00 198 297.00 116 174.00 22.28 (v) Earthen Bund m 225 17350 39.04 6671 15.01 10679 24.03 1.13 (vi) Renovation of existing Tanka Nos 69 0.00 0 0.00 69 0.00 0.00 (vii) Agro Forestry No. 20 65000 13.00 57140 11.43 7860 1.57 0.86
2 Conservation measures for non areable land 0 0.00 0.00 (i) Pasture develoment Ha 102150.0 85 86.83 25 25.54 60 61.29 0.00 (ii) WHS pacca (Nadi) Nos 2000000 7 140.00 5 100.00 2 40.00 0.00 (iii) stangle Trenches Nos 0 0.00 0 0.00 0 0.00 0.00 (iv) Waterharvesting st.(tanka) Nos 150000 32 48.00 10 15.00 22 33.00 0.00
54 | P a g e
3 Drainage line treatment 0 0.00 0.00 (i) LSCD Nos 0 0.00 0 0.00 0 0.00 0.00 (ii) Drop spillway Nos 0 0.00 0 0.00 0 0.00 0.00 (iii) Anicut Nos 0 0.00 0 0.00 0 0.00 0.00
TOTAL (B) 827.87 479.98 0 347.89 25.46 VIII Production System 10% 10% 162.85 0 12.21 (1) Crop Demonstration 0 0.00 i Single Crop No. 5000 966 48.30 453 22.65 513 25.65 3.40 ii Inter Cropping No. 8000 133 10.64 94 7.52 39 3.12 1.13
(2) Dry land Horticulture No. 15000 118 17.70 69 10.35 49 7.35 1.55 (3) Homestead Kitchen Garden No. 500 583 2.92 329 1.65 254 1.27 0.25 (4) Compost Pit No. 10000 148 14.80 92 9.20 56 5.60 1.38 (5) Sprinklers and Drip irrigation No. 30000 25 7.50 0 0.00 25 7.50 0.00 (6) Small Live Stock – Goat and Sheep Rearing No. 10000 525 52.50 0 0.00 525 52.50 0.00 (7) Live Stock Management 0 0 0.00 0.00 (i) Fodder Demonstration No. 2000 240 4.80 45 0.90 195 3.90 0.14 (ii) Mangers Distribution No. 5200 283 14.72 101 5.25 182 9.46 0.79 (iii) Livestock Development activities No. 10000 0 25.71 0 17.14 0 8.57 2.57 (iv) Cattel shed No. 12000 98 11.76 85 10.20 13 1.56 1.53 (v) Urea Molasis No. 1000 95 0.95 85 0.85 10 0.10 0.13
TOTAL (C) 3214 212.29 85.71 126.59 12.86 IX lielyhood and micro enterprise 9% 0.00 0 0.00 0.00 (1) Seed moeney to SHG 25000 196 49.00 196 49.00 0 0.00 7.35 (2) Seed moeney to Microenterprise individuals 25000 91 22.75 30 7.50 61 15.25 1.13 (3) Grant in aid to Federation of SHG individual (10 %
maximum of 9% amount) 200000 16 32.00 12 20.64 4 11.36 3.10 TOTAL (D) 103.75 1579 77.14 1922 26.61 11.57
X CONSOLIDATED PHASE 3% 3% 25.71 25.71 0.00 0.00 GRAND TOTAL 1358.18 857.10 501.09 49.89
Project Manager, WCDC Distt. Barmer
55 | P a g e
CHAPTER – V
Name of the Project BARMER (IWMP)-54
Macro/Micro CLSTER Geographical Area
2633 Ha
G.P. BINJASAR
Scheme IWMP Effective Area
2362 Ha
Block CHOHTAN
Date of Sanction 05.08.2011 Total Arable land
2100 Ha
District. BARMER
Date of Appoval of the work plan
1. Irrigated 630 Ha
Village Covered 1 NO.
2. Unirrigated
1470 Ha
Project outlay 354.30 LAC
No. of SHG's formed 3 Total Nonarable land
262 Ha
Total Area 2362 Hactare
No. of UG's formed 6 1. Pasture
193 Ha
No. of WC's formed 1
2. Govt. / waste /OTHER LAND 69 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S. N. NAME OF ACTIVITY Unit QTY. Unit
cost AMOUNT
2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 35.43 7.086 7.086 7.086 7.086 7.086 10% 35.43 II Monitoring 1% 3.543 0.709 0.709 0.709 0.709 0.709 1% 3.54 III Evaluation 1% 3.543 1.772 1.772 1% 3.54 IV Entry point activity 4% 14.172 14.172 4% 14.17 V Inst. & Capacity Building 5% 17.715 6.200 5.315 4.429 0.886 0.886 5% 17.72 VI DPR Preparation 1% 3.543 1.417 2.126 1% 3.54
TOTAL (A) 77.95 29.584 15.235 13.995 8.680 10.452 77.95
W/S WORK PHASE VII NRM 56% 198.41 26.57 100.44 71.39
1 Conservation measures for areable land (private land)
(i) Farm Pond/Khet talai Nos 0 200000 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 87 150000 130.50 0.00 0.00 15.00 22.50 45 67.50 27 40.50 0.00 0.00 87 130.50 (v) Earthen Bund m 2430 225 5.47 0.00 0.00 0.00 0.00 1255 2.82 1175 2.64 0.00 0.00 2430 5.47 (vi) Renovation of existing Tanka Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (vii) Agro Forestry No. 23620 20 4.72 0 0.000 3000 0.60 15000 3.000 5620 1.12 0.00 0.00 23620 4.72
56 | P a g e
2 Conservation measures for non areable land 0.00 (i) Pasture develoment Ha 10 102150.0 10.22 0.00 0.00 10.00 5.00 0 0.00 0 5.22 0.00 0.00 10 10.22 (ii) WHS pacca (Nadi) Nos 2 2000000 40.00 0.00 0.00 1.00 20.00 1 20.00 0 0.00 0.00 0.00 2 40.00 (iii) stangle Trenches Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 5 150000 7.50 0.00 0.00 1.00 1.50 3 4.50 1 1.50 0.00 0.00 5 7.50 3 Drainage line treatment 0 0.00 0.00 0.00 0 0.00 (i) LSCD Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
TOTAL (B) 26154 198.41 0.00 0.00 3027.00 49.60 16304 97.82 6823 50.98 0.00 0.00 26154 198.41 VIII Production System 10% 35.43 3.54 24.80 7.09 (1) Crop Demonstration
i Single Crop No. 170 5000 8.50 0 0.000 40 2.00 80 4.000 50 2.50 0.00 0.00 170 8.50
ii Inter Cropping No. 34 8000 2.72 0 0.000 4 0.32 20 1.600 10 0.80 0.00 0.00 34 2.72 (2) Dry land Horticulture No. 30 15000 4.50 0 0.000 6 0.90 20 3.000 4 0.60 0.00 0.00 30 4.50 (3) Homestead Kitchen Garden No. 148 500 0.74 0 0.000 63 0.32 40 0.200 45 0.23 0.00 0.00 148 0.74 (4) Compost Pit No. 42 10000 4.20 0 0.000 15 1.50 20 2.000 7 0.70 0.00 0.00 42 4.20 (5) Sprinklers and Drip irrigation No. 0 30000 0.00 0 0.000 0 0.00 0 0.000 0 0.00 0.00 0.00 0 0.00 (6) Small Live Stock – Goat and Sheep Rearing No. 0 10000 0.00 0 0.000 0 0.00 0 0.000 0 0.00 0.00 0.00 0 0.00 (7) Live Stock Management 0 0.00 0.00 0.00 0 0.00 (i) Fodder Demonstration No. 20 2000 0.40 0 0.000 5 0.10 10 0.200 5 0.10 0.00 0.00 20 0.40 (ii) Mangers Distribution No. 40 5200 2.08 0 0.000 10 0.52 20 1.040 10 0.52 0.00 0.00 40 2.08 (iii) Livestock Development activities 2% 7.086 0 1.772 1.77 1.772 0 1.77 0.00 0.00 0 7.09 (iv) Cattel shed No. 40 12000 4.80 0 0.000 1 0.12 3 0.360 36 4.32 0.00 0.00 40 4.80 (v) Urea Molasis No. 40 1000 0.40 0 0.000 10 0.10 30 0.300 0 0.00 0.00 0.00 40 0.40
TOTAL (C) 250 35.43 0.00 1.77 154.00 7.65 243.00 14.47 167.00 11.54 0.00 0.00 564.00 35.43 IX lielyhood and micro enterprise 9% 31.89 3.54 17.72 10.63 (1) Seed moeney to SHG 82 25000 20.500 0 0.000 15 3.750 25 6.250 42 10.50 0.00 0.00 82 20.50 (2) Seed moeney to Microenterprise individuals 12 25000 3.000 0 0.000 2 0.500 5 1.250 5 1.25 0.00 0.00 12 3.00 (3) Grant in aid to Federation of SHG individual
(10 % maximum of 9% amount) 5 167800 8.390 0 0.000 0 0.000 2 1.890 3 6.50 0.00 0.00 5 8.39 TOTAL (D) 99 31.890 0.000 0.000 17.000 4.250 32.000 9.390 50.000 18.250 0.000 0.000 99.0 31.890
X CONSOLIDATED PHASE 3% 10.629 0.000 0.000 6.377 4.252 3% 10.63
GRAND TOTAL 354.30 0.00 31.36 3198.00 76.73 16579.00 142.06 7040.00 93.70 0.00 14.70 26817.03 354.30
57 | P a g e
CHAPTER-V
Name of the Project BARMER (IWMP)-54 Macro/Micro CLUSTER Geographical Area
2193 Ha
G.P. MITHE KA TALA Scheme IWMP Effective Area
2143 Ha
Block CHOHTAN Date of Sanction 05.08.2011 Total Arable land
2095 Ha
District. BARMER Date of Appoval of the work plan
1. Irrigated 631 Ha
Village Covered 2 NO. 2. Unirrigated
1464 Ha
Project outlay 321.45 LAC No. of SHG's formed 5 Total Nonarable land
48 Ha
Total Area 2143 Hactare No. of UG's formed 8 1. Pasture
41 Ha
No. of WC's formed 1 2. Govt. / waste /OTHER LAND 7 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S. N. NAME OF ACTIVITY Uni
t QTY. Unit cost AMOUNT
2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 32.145 6.429 6.429 6.429 6.429 6.429 10% 32.15 II Monitoring 1% 3.215 0.643 0.643 0.643 0.643 0.643 1% 3.21 III Evaluation 1% 3.215 1.607 1.607 1% 3.21
IV Entry point activity 4% 12.858 12.85
8 4% 12.86 V Inst. & Capacity Building 5% 16.073 5.625 4.822 4.018 0.804 0.804 5% 16.07 VI DPR Preparation 1% 3.215 1.286 1.929 1% 3.21
TOTAL (A) 70.719 26.84
1 13.82
2 12.69
7 7.876 9.483 70.72
W/S WORK PHASE VII NRM 56% 180.01 0.00 24.11 91.13 64.77
1 Conservation measures for areable land (private land)
(i) Farm Pond Nos 8 200000 16.00 0 0 0 0.00 0 0.00 8 16.00 0.00 0.00 8 16.00 (ii) Khadeen Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 64 150000 96.00 0 0 10 15.00 40 60.00 14 21.00 0.00 0.00 64 96.00 (v) Earthen Bund m 2671 225 6.01 0 0 0 0.00 2588 5.82 83 0.19 0.00 0.00 2671 6.01 (vi) Renovation of existing Tanka Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(vii) Agro Forestry No.
21430 20 4.29 0 0.000 3000 0.60 15000 3.000 3430 0.69 0.00 0.00 21430 4.29
58 | P a g e
2 Conservation measures for non areable land 0 0.00 0.00 0.00 0 0.00
(i) Pasture develoment Ha 10
102150.0 10.22 0 0 0 6.00 4 3.61 6 0.61 0.00 0.00 10 10.22
(ii) WHS pacca (Nadi) Nos 2 2000000 40.00 0 0 0 0.00 1 20.00 1 20.00 0.00 0.00 2 40.00 (iii) stangle Trenches Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 5 150000 7.50 0.00 0.00 2.00 3.00 0 0.00 3 4.50 0.00 0.00 5 7.50 3 Drainage line treatment 0 0.00 0.00 0.00 0 0.00 (i) LSCD Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
TOTAL (B) 24182 180.01 0 0 3012 24.60 17633 92.43 3537 62.98 0.00 0.00 24190 180.01 VII
I Production System 10% 32.145 3.21 22.50 6.43
(1) Crop Demonstration
i Single Crop No. 178 5000 8.90 0 0.000 40 2.00 110 5.500 28 1.40 0.00 0.00 178 8.90
ii Inter Cropping No. 40 8000 3.20 0 0.000 10 0.80 25 2.000 5 0.40 0.00 0.00 40 3.20 (2) Dry land Horticulture No. 25 15000 3.75 0 0.000 5 0.75 15 2.250 5 0.75 0.00 0.00 25 3.75 (3) Homestead Kitchen Garden No. 138 500 0.69 0 0.000 20 0.10 80 0.400 38 0.19 0.00 0.00 138 0.69 (4) Compost Pit No. 30 10000 3.00 0 0.000 5 0.50 20 2.000 5 0.50 0.00 0.00 30 3.00 (5) Sprinklers and Drip irrigation No. 0 30000 0.00 0 0.000 0 0.00 0 0.000 0 0.00 0.00 0.00 0 0.00 (6) Small Live Stock – Goat and Sheep Rearing No. 0 10000 0.00 0 0.000 0 0.00 0 0.000 0 0.00 0.00 0.00 0 0.00 (7) Live Stock Management 0 0.00 0.00 0.00 0 0.00 (i) Fodder Demonstration No. 15 2000 0.30 0 0.000 5 0.10 10 0.200 0 0.00 0.00 0.00 15 0.30 (ii) Mangers Distribution No. 38 5200 1.98 0 0.000 8 0.42 25 1.300 5 0.26 0.00 0.00 38 1.98 (iii) Livestock Development activities 2% 6.429 0 1.607 1.61 1.607 0 1.61 0.00 0.00 0 6.43 (iv) Cattel shed No. 30 12000 3.60 0 0.000 1 0.12 20 2.400 9 1.08 0.00 0.00 30 3.60 (v) Urea Molasis No. 30 1000 0.30 0 0.000 10 0.10 20 0.200 0 0.00 0.00 0.00 30 0.30
TOTAL (C) 221 32.145 0.00 1.61 104.00 6.49 325.00 17.86 95.00 6.19 0.00 0.00 524.00 32.15 IX lielyhood and micro enterprise 9% 28.93 3.21 16.07 9.64 (1) Seed moeney to SHG 74 25000 18.500 0 0.000 15 3.750 25 6.250 34 8.50 0.00 0.00 74 18.50 (2) Seed moeney to Microenterprise individuals 12 25000 3.000 0 0.000 3 0.750 5 1.250 4 1.00 0.00 0.00 12 3.00 (3) Grant in aid to Federation of SHG individual
(10 % maximum of 9% amount) 4 185750 7.430 0 0.000 0 0.000 2 1.930 2 5.50 0.00 0.00 4 7.43 TOTAL (D) 90 28.930 0.000 0.000 18.000 4.500 32.000 9.430 40.000 15.000 0.000 0.000 90.0 28.930
X CONSOLIDATED PHASE 3% 9.644 0.000 0.000 5.786 3.857 3% 9.64
GRAND TOTAL 321.45 0.00 28.45 3134.0
0 49.42 17990.0
0 132.4
2 3672.00 97.83 0.00 13.34 24804.0
3 321.45
59 | P a g e
CHAPTER-V
Name of the Project BARMER (IWMP)-54 Macro/Micro CLUSTER Geographical Area
1254 Ha
G.P. GOHER KA TALA Scheme IWMP Effective Area
1209 Ha
Block CHOHTAN Date of Sanction 05.08.2011 Total Arable land
991 Ha
District. BARMER Date of Appoval of the work plan
1. Irrigated 295 Ha
Village Covered 1 NO. 2. Unirrigated
696 Ha
Project outlay 181.35 LAC No. of SHG's formed 6 Total Nonarable land
218 Ha
Total Area 1209 Hactare No. of UG's formed 8 1. Pasture
8 Ha
No. of WC's formed 1 2. Govt. / waste /OTHER LAND 210 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S. N. NAME OF ACTIVITY Unit QTY. Unit
cost AMOUNT
2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR
PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 18.135 3.627 3.627 3.627 3.627 3.627 10% 18.14 II Monitoring 1% 1.814 0.363 0.363 0.363 0.363 0.363 1% 1.81 III Evaluation 1% 1.814 0.907 0.907 1% 1.81 IV Entry point activity 4% 7.254 7.254 4% 7.25 V Inst. & Capacity Building 5% 9.068 3.174 2.720 2.267 0.453 0.453 5% 9.07 VI DPR Preparation 1% 1.814 0.725 1.088 1% 1.81
TOTAL (A) 39.897 15.143 7.798 7.163 4.443 5.350 39.90 W/S WORK PHASE
VII NRM 56% 101.56 0.00 13.60 51.41 36.54
1 Conservation measures for areable land (private land)
(i) Farm Pond Nos 0 200000 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Khadeen Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 47 150000 70.50 0 0 10 15.00 30 45.00 7 10.50 0.00 0.00 47 70.50 (v) Earthen Bund m 1570 225 3.53 0 0 0 0.00 1255 2.82 315 0.71 0.00 0.00 1570 3.53 (vi) Renovation of existing Tanka Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
(vii) Agro Forestry No. 12090 20 2.42 0 0.000 3000 0.60 5000 1.000 4090 0.82 0.00 0.00
12090 2.42
60 | P a g e
2 Conservation measures for non areable land 0 0.00 0.00 0.00 0 0.00
(i) Pasture develoment Ha 5 102150.0 5.11 0 0 0 2.50 0 2.00 5 0.61 0.00 0.00 5 5.11 (ii) WHS pacca (Nadi) Nos 1 2000000 20.00 0 0 0 0.00 0 0.00 1 20.00 0.00 0.00 1 20.00 (iii) stangle Trenches Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 0 150000 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 3 Drainage line treatment 0 0.00 0.00 0.00 0 0.00 (i) LSCD Nos 0 0.00 0 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0 0 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
TOTAL (B) 13713 101.56 0 0 3010 18.10 6285 50.82 4418 32.63 0.00 0.00 13713 101.56
VIII Production System 10% 18.14 1.81 12.69 3.63 (1) Crop Demonstration
i Single Crop No. 105 5000 5.25 0 0.000 30 1.50 40 2.000 35 1.75 0.00 0.00 105 5.25
ii Inter Cropping No. 20 8000 1.60 0 0.000 5 0.40 15 1.200 0 0.00 0.00 0.00 20 1.60 (2) Dry land Horticulture No. 14 15000 2.10 0 0.000 2 0.30 10 1.500 2 0.30 0.00 0.00 14 2.10 (3) Homestead Kitchen Garden No. 43 500 0.22 0 0.000 10 0.05 20 0.100 13 0.07 0.00 0.00 43 0.22 (4) Compost Pit No. 20 10000 2.00 0 0.000 5 0.50 10 1.000 5 0.50 0.00 0.00 20 2.00 (5) Sprinklers and Drip irrigation No. 0 30000 (6) Small Live Stock – Goat and Sheep Rearing No. 0 10000 (7) Live Stock Management 0 0.00 0.00 0.00 0 0.00 (i) Fodder Demonstration No. 10 2000 0.20 0 0.000 5 0.10 5 0.100 0 0.00 0.00 0.00 10 0.20 (ii) Mangers Distribution No. 23 5200 1.20 0 0.000 10 0.52 10 0.520 3 0.16 0.00 0.00 23 1.20 (iii) Livestock Development activities 2% 3.627 0 0.907 0.91 0.907 0 0.91 0.00 0.00 0 3.63 (iv) Cattel shed No. 15 12000 1.80 0 0.000 1 0.12 12 1.440 2 0.24 0.00 0.00 15 1.80 (v) Urea Molasis No. 15 1000 0.15 0 0.000 5 0.05 10 0.100 0 0.00 0.00 0.00 15 0.15
TOTAL (C) 96 18.14 0.00 0.91 73.00 4.45 132.00 8.87 60.00 3.92 0.00 0.00 265.0
0 18.14
IX lielyhood and micro enterprise 9% 16.32 1.81 9.07 0 -10.88 0.00 0.00 0 0.00 (1) Seed moeney to SHG 40 25000 10.000 0 0.000 15 3.750 25 6.250 0 0.00 0.00 0.00 40 10.00 (2) Seed moeney to Microenterprise individuals 6 25000 1.500 0 0.000 2 0.500 3 0.750 1 0.25 0.00 0.00 6 1.50 (3) Grant in aid to Federation of SHG individual (10
% maximum of 9% amount) 3 160650 4.820 0 0.000 0 0.000 1 1.570 2 3.25 0.00 0.00 3 4.82 TOTAL (D) 49 16.320 0.000 0.000 17.000 4.250 29.000 8.570 3.000 3.500 0.000 0.000 49.0 16.320
X CONSOLIDATED PHASE 3% 5.441 0.000 0.000 3.264 2.176 3% 5.44
GRAND TOTAL 181.35 0.00 16.05 3100.00 34.59 6446.00 75.42 4481.00 47.76 0.00 7.53 14027.03 181.35
61 | P a g e
CHAPTER-V
Name of the Project BARMER (IWMP)-54 Macro/Micro CLUSTER Geographical Area
6080 Ha
G.P. - MITHE KA TALA , BINJASAR, GOHER KA TALA Scheme IWMP Effective Area
5714 Ha
Block CHOHTAN Date of Sanction 05.08.2011 Total Arable land
5186 Ha
District. BARMER Date of Appoval of the work plan
1. Irrigated 1556 Ha
Village Covered 4 NO. 2. Unirrigated
3630 Ha
Project outlay 857.10 LAC No. of SHG's formed 14 Total Nonarable land
528 Ha
Total Area 5714 Hactare No. of UG's formed 22 1. Pasture
242 Ha
No. of WC's formed 3 2. Govt. / waste /OTHER LAND 286 Ha
ANNUAL ACTION PLAN THROUGH PROJECT
S. N. NAME OF ACTIVITY Uni
t QTY. Unit cost AMOUNT
2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 85.71 17.14
2 17.14
2 17.14
2 17.142 17.142 10% 85.71 II Monitoring 1% 8.571 1.714 1.714 1.714 1.714 1.714 1% 8.57 III Evaluation 1% 8.571 4.286 4.286 1% 8.57
IV Entry point activity 4% 34.284 34.28
4 4% 34.28
V Inst. & Capacity Building 5% 42.855 14.99
9 12.85
7 10.71
4 2.143 2.143 5% 42.86 VI DPR Preparation 1% 8.571 3.428 5.143 1% 8.57
TOTAL (A) 188.56 71.57 36.86 33.86 21.00 25.28 188.56
W/S WORK PHASE
VII NRM 60% 479.98 0.00 64.28 242.9
9 172.71
1 Conservation measures for areable land (private land)
(i) Farm Pond Nos 8 200000 16.00 0.00 0.00 0 0.00 0 0.00 8 16.00 0 0.00 8 16.00 (ii) Khadeen Nos 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
(iv) Waterharvesting st.(tanka) Nos 198 150000 297.00 0.00 0.00 35 52.50 115
172.50 48 72.00 0 0.00 198 297.00
(v) Earthen Bund m 6671 225 15.01 0.00 0.00 0 0.00 5098 11.47 1573 3.54 0 0.00 6671 15.01 (vi) Renovation of existing Tanka Nos 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (vii) Agro Forestry No. 5714 20 11.43 0 0.000 3000 0.60 42000 8.400 12140 2.43 0.00 0.00 57140 11.43
62 | P a g e
0
2 Conservation measures for non areable land
(i) Pasture develoment Ha 25
102150.0 25.54 0.00 0.00 10 13.50 4 5.61 11 6.43 0 0.00 25 25.54
(ii) WHS pacca (Nadi) Nos 5 2000000 100.00 0.00 0.00 1 20.00 2 40.00 2 40.00 0 0.00 5 100.00 (iii) stangle Trenches Nos 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 10 150000 15.00 0.00 0.00 3 4.50 3 4.50 4 6.00 0 0.00 10 15.00 3 Drainage line treatment 0 0.00 0 0.00 0 0.00 0 0 0.00 (i) LSCD Nos 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00
TOTAL (B) 64049 479.98 0.00 0.00 3049.00 91.10 47222 242.48 13778 146.39 0.00 0.00 64057 479.98 VIII Production System 10% 85.71 8.57 60.00 17.14 (1) Crop Demonstration
i Single Crop No. 453 5000 22.65 0 0.000 110 5.50 190 11.50 113 5.65 0 0.000 413 22.65
ii Inter Cropping No. 94 8000 7.52 0 0.000 19 1.52 60 4.80 15 1.20 0 0.000 94 7.52 (2) Dry land Horticulture No. 69 15000 10.35 0 0.000 13 1.95 45 6.75 11 1.65 0 0.000 69 10.35 (3) Homestead Kitchen Garden No. 329 500 1.65 0 0.000 93 0.47 140 0.70 96 0.48 0 0.000 329 1.65 (4) Compost Pit No. 92 10000 9.20 0 0.000 25 2.50 50 5.00 17 1.70 0 0.000 92 9.20 (5) Sprinklers and Drip irrigation No. 0 30000 0.00 0 0.000 0 0.00 0 0.00 0 0.00 0 0.000 0 0.00 (6) Small Live Stock – Goat and Sheep Rearing No. 0 10000 0.00 0 0.000 0 0.00 0 0.00 0 0.00 0 0.000 0 0.00 (7) Live Stock Management 0 0.00 0 0.00 0 0.00 0 0.00 0 0 0.00 (i) Fodder Demonstration No. 45 2000 0.90 0 0.000 15 0.30 25 0.50 5 0.10 0 0.000 45 0.90 (ii) Mangers Distribution No. 101 5200 5.25 0 0.000 28 1.46 55 2.86 18 0.94 0 0.000 101 5.25 (iii) Livestock Development activities 2% 17.14 0 4.286 4.29 4.286 0 4.29 0.00 0.00 0 17.14 (iv) Cattel shed 85 12000 10.20 0 0.000 3 0.36 35 4.20 47 5.64 0 0.000 85 10.20 (v) Urea Molasis 85 1000 0.85 0 0.000 25 0.25 60 0.60 0 0.00 0 0.000 85 0.85
TOTAL (C) 1353 85.71 0.00 4.29 331.00 18.59 660.00 41.20 322.00 21.64 0.00 0.00 1313.00 85.71
IX lielyhood and micro enterprise 9% 77.14 0 6.76 0 33.79 0 20.27 (1) Seed moeney to SHG 196 25000 49.00 0 0.000 45 11.25 75 18.75 76 19.00 0 0.000 196 49.00 (2) Seed moeney to Microenterprise individuals 30 25000 7.50 0 0.000 7 1.75 13 3.25 10 2.50 0 0.000 30 7.50 (3) Grant in aid to Federation of SHG individual
(10 % maximum of 9% amount) 12 171996 20.64 0 0.000 0 0.000 5 5.39 7 15.25 0.00 0.00 12 20.64 TOTAL (D) 1895 77.14 0.00 0.00 52.00 13.00 93.00 27.39 93.00 36.75 0.00 0.00 238.00 77.14
X CONSOLIDATED PHASE 3% 25.713 0.000 0.000 15.428 10.285 3% 25.71
GRAND TOTAL 857.10 0.00 75.85 3432.0
0 159.5
4 47975.0
0 344.9
2 14193.0
0 241.21 0.00 35.57 65608.0
3 857.10
63 | P a g e
CHAPTER-5.1
Name of the Project BARMER (IWMP)-54
Macro/Micro CLSTER Geographical Area
2633 Ha
G.P. BINJASAR
Scheme IWMP Effective Area
2362 Ha
Block CHOHTAN
Date of Sanction 05.08.2011 Total Arable land
2100 Ha
District. BARMER
Date of Appoval of the work plan
1. Irrigated 630 Ha
Village Covered 1 NO.
2. Unirrigated
1470 Ha
Project outlay 354.30 LAC
No. of SHG's formed 3 Total Nonarable land
262 Ha
Total Area 2362 Hactare
No. of UG's formed 6 1. Pasture
193 Ha
No. of WC's formed 1
2. Govt. / waste /OTHER LAND 69 Ha
ANNUAL ACTION PLAN THROUGH CONVERGENCE
S. N. NAME OF ACTIVITY Unit QTY. Unit
cost AMOUNT
2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL
FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 10% 0.00 II Monitoring 1% 1% 0.00 III Evaluation 1% 1% 0.00 IV Entry point activity 4% 4% 0.00 V Inst. & Capacity Building 5% 5% 0.00 VI DPR Preparation 1% 1% 0.00
TOTAL (A) 0.000 0.000 0.000 0.000 0.000 0.00
W/S WORK PHASE VII NRM 56% 198.41 0.00 26.57 100.44 71.39
1 Conservation measures for areable land (private land)
(i) Farm Pond/Khet talai Nos 2 200000 4.00 0.00 0.00 0.00 0.00 0 0.00 2 4.00 0.00 0.00 2 4.00 (ii) Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 55 150000 82.50 0.00 0.00 0.00 0.00 45 67.50 10 15.00 0.00 0.00 55 82.50 (v) Earthen Bund m 1420 225 3.20 0.00 0.00 0.00 0.00 1255 2.82 165 0.37 0.00 0.00 1420 3.20 (vi) Renovation of existing Tanka Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (vii) Agro Forestry No. 1380 20 0.28 0 0.000 500 0.10 500 0.100 380 0.08 0.00 0.00 1380 0.28
64 | P a g e
2 Conservation measures for non areable land
0 (i) Pasture develoment Ha 0 102150.0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) WHS pacca (Nadi) Nos 1 2000000 20.00 0.00 0.00 0.00 0.00 1 20.00 0 0.00 0.00 0.00 1 20.00 (iii) stangle Trenches Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 5 150000 7.50 0.00 0.00 1.00 1.50 3 4.50 1 1.50 0.00 0.00 5 7.50 3 Drainage line treatment 0 (i) LSCD Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
TOTAL (B) 2861 117.47 0.00 0.00 501.00 1.60 1804 94.92 556 20.95 0.00 0.00 2863 117.47 VII
I Production System 10% 35.43 3.54 24.80 7.09
(1) Crop Demonstration
i Single Crop No. 32 5000 1.60 0 0.000 10 0.50 20 1.000 2 0.10 0.00 0.00 32 1.60
ii Inter Cropping No. 0 8000 0.00 0 0.000 0 0.00 0 0.000 0 0.00 0.00 0.00 0 0.00 (2) Dry land Horticulture No. 6 15000 0.90 0 0.000 2 0.30 4 0.600 0 0.00 0.00 0.00 6 0.90 (3) Homestead Kitchen Garden No. 138 500 0.69 0 0.000 0 0.00 0 0.000 138 0.69 0.00 0.00 138 0.69 (4) Compost Pit No. 14 10000 1.40 0 0.000 0 0.00 0 0.000 14 1.40 0.00 0.00 14 1.40 (5) Sprinklers and Drip irrigation No. 5 30000 1.50 0 0.000 0 0.00 0 0.000 5 1.50 0.00 0.00 5 1.50
(6) Small Live Stock – Goat and Sheep Rearing No. 25 10000 2.50 0 0.000 3 0.30 4 0.400 18 1.80 0.00 0.00 25 2.50
(7) Live Stock Management 0 0 0.00 0.00 0.00 0 0.00 (i) Fodder Demonstration No. 130 2000 2.60 0 0.000 5 0.10 25 0.500 100 2.00 0.00 0.00 130 2.60 (ii) Mangers Distribution No. 42 5200 2.18 0 0.000 5 0.27 0 0.000 37 1.91 0.00 0.00 42 2.18 (iii) Livestock Development activities No. 3.54 0 0.000 1.18 1.181 1.18 0.00 0.00 0 3.54 (iv) Cattel shed No. 0 12000 0.00 0 0.000 0 0.00 0 0.000 0 0.00 0.00 0.00 0 0.00 (v) Urea Molasis No. 0 1000 0.00 0 0.000 0 0.00 0 0.000 0 0.00 0.00 0.00 0 0.00
TOTAL (C) 354 16.92 0.00 0.00 25.25 2.65 53.00 3.68 313.75 10.58 0.00 0.00 392.00 16.92 IX lielyhood and micro enterprise 9% 31.89 3.54 17.72 10.63 (1) Seed moeney to SHG 0 25000 0.000 0 0.000 0 0.000 0 0.000 0 0.00 0.00 0.00 0 0.00 (2) Seed moeney to Microenterprise
individuals 26 25000 6.500 0 0.000 0 0.000 0 0.000 26 6.50 0.00 0.00 26 6.50 (3)
Grant in aid to Federation of SHG individual (10 % maximum of 9% amount)
2 180500 3.610 0 0.000 0 0.000 1 1.890 1 1.72 0.00 0.00 2 3.61
65 | P a g e
TOTAL (D) 28 10.110 0.000 0.000 0.000 0.000 1.000 1.890 27.000 8.220 0.000 0.000 28.0 10.110
X CONSOLIDATED PHASE 3% 0.000 0.000 0.000 0.000 0.000 3% 0.00
GRAND TOTAL 144.50 0.00 0.00 526.25 4.25 1858 100.49 897 39.75 0.00 0.00 3283 144.50
66 | P a g e
CHAPTER-V
Name of the Project BARMER (IWMP)-54 Macro/Micro CLUSTER Geographical Area
2193 Ha
G.P. MITHE KA TALA Scheme IWMP Effective Area
2143 Ha
Block CHOHTAN Date of Sanction 05.08.2011 Total Arable land
2095 Ha
District. BARMER Date of Appoval of the work plan
1. Irrigated 631 Ha
Village Covered 2 NO. 2. Unirrigated
1464 Ha
Project outlay 321.45 LAC No. of SHG's formed 5 Total Nonarable land
48 Ha
Total Area 2143 Hactare No. of UG's formed 8 1. Pasture
41 Ha
No. of WC's formed 1 2. Govt. / waste /OTHER LAND 7 Ha
ANNUAL ACTION PLAN THROUGH CONVERGENCE
S. N. NAME OF ACTIVITY Unit QTY. Unit
cost AMOUNT 2012-13 2013-14 2014-15 2015-16 2016-17
TOTAL FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 10% 0.00 II Monitoring 1% 1% 0.00 III Evaluation 1% 1% 0.00 IV Entry point activity 4% 4% 0.00 V Inst. & Capacity Building 5% 5% 0.00 VI DPR Preparation 1% 1% 0.00
TOTAL (A) 0.00 W/S WORK PHASE
VII NRM 56% 180.01 0.00 24.11 91.13 64.77
1 Conservation measures for areable land (private land)
(i) Farm Pond Nos 0 200000 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Khadeen Nos 1 600000 6.00 0.00 0.00 0.00 0.00 0 0.00 1 6.00 0.00 0.00 1 6.00 (iii) Repair of existing Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 11 150000 16.50 0.00 0.00 0.00 0.00 5 7.50 6 9.00 0.00 0.00 11 16.50 (v) Earthen Bund m 2329 225 5.24 0.00 0.00 0.00 0.00 1255 2.82 1074 2.42 0.00 0.00 2329 5.24 (vi) Renovation of existing Tanka Nos 35 0.00 0.00 0.00 0.00 0.00 0 0.00 35 0.00 0.00 0.00 35 0.00 (vii) Agro Forestry No. 3570 20 0.71 0 0.000 500 0.10 500 0.100 2570 0.51 0.00 0.00 3570 0.71
2 Conservation measures for non areable land
67 | P a g e
(i) Pasture develoment Ha 40 102150 40.86 0.00 0.00 0.00 0.00 0 0.00 40 40.86 0.00 0.00 40 40.86 (ii) WHS pacca (Nadi) Nos 0 2000000 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) stangle Trenches Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 10 150000 15.00 0.00 0.00 1.00 1.50 3 4.50 6 9.00 0.00 0.00 10 15.00 3 Drainage line treatment (i) LSCD Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
TOTAL (B) 5995 84.31 0.00 0.00 501.00 1.60 1763 14.92 3731 67.79 0.00 0.00 5996 84.31 VIII Production System 10% 32.15 3.21 22.50 6.43 (1) Crop Demonstration
i Single Crop No. 324 5000 16.20 0 0.000 10 0.50 20 1.000 294 14.70 0.00 0.00 324 16.20
ii Inter Cropping No. 32 8000 2.56 0 0.000 4 0.32 0 0.000 28 2.24 0.00 0.00 32 2.56 (2) Dry land Horticulture No. 30 15000 4.50 0 0.000 2 0.30 4 0.600 24 3.60 0.00 0.00 30 4.50 (3) Homestead Kitchen Garden No. 102 500 0.51 0 0.000 0 0.00 0 0.000 102 0.51 0.00 0.00 102 0.51 (4) Compost Pit No. 10 10000 1.00 0 0.000 0 0.00 0 0.000 10 1.00 0.00 0.00 10 1.00 (5) Sprinklers and Drip irrigation No. 5 30000 1.50 0 0.000 0 0.00 0 0.000 5 1.50 0.00 0.00 5 1.50
(6) Small Live Stock – Goat and Sheep Rearing No. 250 10000 25.00 0 0.000 3 0.30 4 0.400 243 24.30 0.00 0.00 250 25.00
(7) Live Stock Management 0 0.00 0.00 0.00 0 0.00 (i) Fodder Demonstration No. 30 2000 0.60 0 0.000 5 0.10 25 0.500 0 0.00 0.00 0.00 30 0.60 (ii) Mangers Distribution No. 112 5200 5.82 0 0.000 14 0.73 0 0.000 98 5.10 0.00 0.00 112 5.82 (iii) Livestock Development activities No. 3.21 0 0.000 1.07 1.072 1.07 0.00 0.00 0 3.21 (iv) Cattel shed No. 10 12000 1.20 0 0.000 0 0.00 0 0.000 10 1.20 0.00 0.00 10 1.20 (v) Urea Molasis No. 6 1000 0.06 0 0.000 0 0.00 0 0.000 6 0.06 0.00 0.00 6 0.06
TOTAL (C) 509 62.17 0.00 0.00 38.00 3.32 53.00 3.57 820.00 55.28 0.00 0.00 911.00 62.17 IX lielyhood and micro enterprise 9% 28.93 3.21 16.07 9.64 (1) Seed moeney to SHG 0 25000 0.000 0 0.000 0 0.000 0 0.000 0 0.00 0.00 0.00 0 0.00 (2) Seed moeney to Microenterprise
individuals 22 25000 5.500 0 0.000 0 0.000 0 0.000 22 5.50 0.00 0.00 22 5.50 (3) Grant in aid to Federation of SHG
individual (10 % maximum of 9% amount) 2 228500 4.570 0 0.000 0 0.000 1 1.890 1 2.68 0.00 0.00 2 4.57 TOTAL (D) 24 10.070 0.000 0.000 0.000 0.000 1.000 1.890 23.000 8.180 0.000 0.000 24.0 10.070
X CONSOLIDATED PHASE 3% 0.000 0.000 0.000 0.000 0.000 3% 0.00
GRAND TOTAL 156.55 0.00 0.00 539.00 4.92 1817 20.39 4574 131.25 0.00 0.00 6931 156.55
68 | P a g e
CHAPTER-V
Name of the Project BARMER (IWMP)-54 Macro/Micro CLUSTER Geographical Area
1254 Ha
G.P. GOHER KA TALA Scheme IWMP Effective Area
1209 Ha
Block CHOHTAN Date of Sanction 05.08.2011 Total Arable land
991 Ha
District. BARMER Date of Appoval of the work plan
1. Irrigated 295 Ha
Village Covered 1 NO. 2. Unirrigated
696 Ha
Project outlay 181.35 LAC No. of SHG's formed 6 Total Nonarable land
218 Ha
Total Area 1209 Hactare No. of UG's formed 8 1. Pasture
8 Ha
No. of WC's formed 1 2. Govt. / waste /OTHER LAND 210 Ha
ANNUAL ACTION PLAN THROUGH CONVERGENCE
S. N. NAME OF ACTIVITY Unit QTY. Unit
cost AMOUNT 2012-13 2013-14 2014-15 2015-16 2016-17
TOTAL FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 10% 0.00 II Monitoring 1% 1% 0.00 III Evaluation 1% 1% 0.00 IV Entry point activity 4% 4% 0.00 V Inst. & Capacity Building 5% 5% 0.00 VI DPR Preparation 1% 1% 0.00
TOTAL (A) 0.000 0.000 0.000 0.000 0.000 0.000 0.00
W/S WORK PHASE VII NRM 56% 101.56 0.00 13.60 51.41 36.54
1 Conservation measures for areable land (private land)
(i) Farm Pond Nos 2 200000 4.00 0.00 0.00 0.00 0.00 0 0.00 2 4.00 0.00 0.00 2 4.00 (ii) Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Repair of existing Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 50 150000 75.00 0.00 0.00 0.00 0.00 45 67.50 5 7.50 0.00 0.00 50 75.00 (v) Earthen Bund m 6930 225 15.59 0.00 0.00 0.00 0.00 1255 2.82 5675 12.77 0.00 0.00 6930 15.59 (vi) Renovation of existing Tanka Nos 34 0.00 0.00 0.00 0.00 0.00 0 0.00 34 0.00 0.00 0.00 34 0.00 (vii) Agro Forestry No. 2910 20 0.58 0 0.000 500 0.10 500 0.100 1910 0.38 0.00 0.00 2910 0.58
2 Conservation measures for non areable land
69 | P a g e
(i) Pasture develoment Ha 20 102150 20.43 0.00 0.00 0.00 0.00 0 0.00 20 20.43 0.00 0.00 20 20.43 (ii) WHS pacca (Nadi) Nos 1 2000000 20.00 0.00 0.00 0.00 0.00 1 20.00 0 0.00 0.00 0.00 1 20.00 (iii) stangle Trenches Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 7 150000 10.50 0.00 0.00 1.00 1.50 3 4.50 3 4.50 0.00 0.00 7 10.50 3 Drainage line treatment 0 (i) LSCD Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0.00 0.00 0 0.00
TOTAL (B) 9952 146.10 0.00 0.00 501.00 1.60 1804 94.92 7647 49.58 0.00 0.00 9954 146.10 VIII Production System 10% 18.14 1.81 12.69 3.63 (1) Crop Demonstration
i Single Crop No. 157 5000 7.85 0 0.000 10 0.50 20 1.000 127 6.35 0.00 0.00 157 7.85
ii Inter Cropping No. 7 8000 0.56 0 0.000 1 0.07 0 0.000 6 0.49 0.00 0.00 7 0.56 (2) Dry land Horticulture No. 13 15000 1.95 0 0.000 2 0.30 4 0.600 7 1.05 0.00 0.00 13 1.95 (3) Homestead Kitchen Garden No. 14 500 0.07 0 0.000 0 0.00 0 0.000 14 0.07 0.00 0.00 14 0.07 (4) Compost Pit No. 32 10000 3.20 0 0.000 0 0.00 0 0.000 32 3.20 0.00 0.00 32 3.20 (5) Sprinklers and Drip irrigation No. 15 30000 4.50 0 0.000 0 0.00 0 0.000 15 4.50 0.00 0.00 15 4.50
(6) Small Live Stock – Goat and Sheep Rearing No. 250 10000 25.00 0 0.000 3 0.30 4 0.400 243 24.30 0.00 0.00 250 25.00
(7) Live Stock Management 0 0 0.00 0.00 0.00 0 0.00 (i) Fodder Demonstration No. 35 2000 0.70 0 0.000 5 0.10 25 0.500 5 0.10 0.00 0.00 35 0.70 (ii) Mangers Distribution No. 28 5200 1.46 0 0.000 4 0.18 0 0.000 25 1.27 0.00 0.00 28 1.46 (iii) Livestock Development activities No. 0 0 1.81 0 0.000 0.60 0.605 0.60 0.00 0.00 0 1.81 (iv) Cattel shed No. 3 12000 0.36 0 0.000 0 0.00 0 0.000 3 0.36 0.00 0.00 3 0.36 (v) Urea Molasis No. 4 1000 0.04 0 0.000 0 0.00 0 0.000 4 0.04 0.00 0.00 4 0.04
TOTAL (C) 374 47.50 0.00 0.00 24.38 2.06 53.00 3.10 480.63 42.34 0.00 0.00 558.00 47.50 IX lielyhood and micro enterprise 9% 16.32 1.81 9.07 5.44 (1) Seed moeney to SHG 0 25000 0.000 0 0.000 0 0.000 0 0.000 0 0.00 0.00 0.00 0 0.00 (2) Seed moeney to Microenterprise
individuals 13 25000 3.250 0 0.000 0 0.000 0 0.254 13 3.00 0.00 0.00 13 3.25 (3) Grant in aid to Federation of SHG
individual (10 % maximum of 9% amount) 2 159000 3.180 0 0.000 0 0.000 1 1.890 1 1.29 0.00 0.00 2 3.18
TOTAL (D) 15 6.430 0.000 0.000 0.000 0.000 1.000 2.144 14.000 4.286 0.000 0.000 15.0 6.430 X CONSOLIDATED PHASE 3% 0.000 0.000 0.000 0.000 0.000 3% 0.00
GRAND TOTAL 200.03 0.00 0.00 525.38 3.66 1858 100.17 8142 96.21 0.00 0.00 10527 200.03
70 | P a g e
CHAPTER-V
Name of the Project BARMER (IWMP)-33 Macro/Micro CLUSTER Geographical Area
6080 Ha
G.P. -MITHE KA TALA , BINJASAR, GOHER KA TALA Scheme IWMP Effective Area
5714 Ha
Block CHOHTAN Date of Sanction 05.08.2011 Total Arable land
5186 Ha
District. BARMER Date of Appoval of the work plan
1. Irrigated 1556 Ha
Village Covered 4 NO. 2. Unirrigated
3630 Ha
Project outlay 857.10 LAC No. of SHG's formed 14 Total Nonarable land
528 Ha
Total Area 5714 Hactare No. of UG's formed 22 1. Pasture
242 Ha
No. of WC's formed 3 2. Govt. / waste /OTHER LAND 286 Ha
ANNUAL ACTION PLAN THROUGH CONVERGENCE
S. N. NAME OF ACTIVITY Unit QTY. Unit
cost AMOUNT 2012-13 2013-14 2014-15 2015-16 2016-17
TOTAL FIRST YEAR SECOND YEAR THIRD YEAR FOURTH YEAR FIFTH YEAR PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN PHY FIN
I. Administration 10% 10% 0.00 II Monitoring 1% 1% 0.00 III Evaluation 1% 1% 0.00 IV Entry point activity 4% 4% 0.00 V Inst. & Capacity Building 5% 5% 0.00 VI DPR Preparation 1% 1% 0.00
TOTAL (A) 0.00
W/S WORK PHASE VII NRM 60% 479.98 0.00 64.28 242.99 172.71
1 Conservation measures for areable land (private land)
(i) Farm Pond Nos 4 200000 8.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 8.00 0.00 0.00 4 8.00 (ii) Khadeen Nos 1 600000 6.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 6.00 0.00 0.00 1 6.00 (iii) Repair of existing Khadeen Nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 116 150000 174.00 0.00 0.00 0.00 0.00 95.00 142.50 21.00 31.50 0.00 0.00 116 174.00 (v) Earthen Bund m 10679 225 24.03 0.00 0.00 0.00 0.00 3765.00 8.47 6914.00 15.56 0.00 0.00 10679 24.03 (vi) Renovation of existing Tanka Nos 69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.00 0.00 0.00 0.00 69 0.00 (vii) Agro Forestry No. 7860 20 1.57 0.00 0.00 1500.00 0.30 1500.00 0.30 4860.00 0.97 0.00 0.00 7860 1.57
2 Conservation measures for non areable land
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
71 | P a g e
(i) Pasture develoment Ha 60 102150.0 61.29 0.00 0.00 0.00 0.00 0.00 0.00 60.00 61.29 0.00 0.00 60 61.29 (ii) WHS pacca (Nadi) Nos 2 2000000 40.00 0.00 0.00 0.00 0.00 2.00 40.00 0.00 0.00 0.00 0.00 2 40.00 (iii) stangle Trenches Nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 (iv) Waterharvesting st.(tanka) Nos 22 150000 33.00 0.00 0.00 3.00 4.50 9.00 13.50 10.00 15.00 0.00 0.00 22 33.00 3 Drainage line treatment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (i) LSCD Nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 (ii) Drop spillway Nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 (iii) Anicut Nos 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00
TOTAL (B) 18808 347.89 0.00 0.00 1503.00 4.80 5371.00 204.77 11939.00 138.32 0.00 0.00 18813 347.89 VIII Production System 10% 85.71 8.57 60.00 17.14 (1) Crop Demonstration
i Single Crop No. 513 5000 25.65 0.00 0.00 30.00 1.50 60.00 3.00 423.00 21.15 0.00 0.00 513 25.65
ii Inter Cropping No. 39 8000 3.12 0.00 0.00 4.88 0.39 0.00 0.00 34.13 2.73 0.00 0.00 39 3.12 (2) Dry land Horticulture No. 49 15000 7.35 0.00 0.00 6.00 0.90 12.00 1.80 31.00 4.65 0.00 0.00 49 7.35 (3) Homestead Kitchen Garden No. 254 500 1.27 0.00 0.00 0.00 0.00 0.00 0.00 254.00 1.27 0.00 0.00 254 1.27 (4) Compost Pit No. 56 10000 5.60 0.00 0.00 0.00 0.00 0.00 0.00 56.00 5.60 0.00 0.00 56 5.60 (5) Sprinklers and Drip irrigation No. 25 30000 7.50 0.00 0.00 0.00 0.00 0.00 0.00 25.00 7.50 0.00 0.00 25 7.50
(6) Small Live Stock – Goat and Sheep Rearing No. 525 10000 52.50 0.00 0.00 9.00 0.90 12.00 1.20 504.00 50.40 0.00 0.00 525 52.50
(7) Live Stock Management 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 (i) Fodder Demonstration No. 195 2000 3.90 0.00 0.00 15.00 0.30 75.00 1.50 105.00 2.10 0.00 0.00 195 3.90 (ii) Mangers Distribution No. 182 5200 9.46 0.00 0.00 22.75 1.18 0.00 0.00 159.25 8.28 0.00 0.00 182 9.46 (iii) Livestock Development activities No. 0 27400 8.57 0.00 0.00 0.00 2.86 0.00 2.86 0.00 2.86 0.00 0.00 0 8.57 (iv) Cattel shed 13 12000 1.56 0.00 0.00 0.00 0.00 0.00 0.00 13.00 1.56 0.00 0.00 13 1.56 (v) Urea Molasis 10 1000 0.10 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.10 0.00 0.00 10 0.10
TOTAL (C) 1260 126.59 0.00 0.00 87.63 8.03 159.00 10.36 1614.38 108.20 0.00 0.00 1861.00 126.59 IX lielyhood and micro enterprise 9% 77.14 0.00 6.76 0.00 33.79 0.00 20.27 (1) Seed moeney to SHG 0 25000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 (2) Seed moeney to Microenterprise
individuals 61 25000 15.25 0.00 0.00 0.00 0.00 0.00 0.25 61.00 15.00 0.00 0.00 61 15.25 (3)
Grant in aid to Federation of SHG individual (10 % maximum of 9% amount)
6 189333 11.36 0.00 0.00 0.00 0.00 3.00 5.67 3.00 5.69 0.00 0.00 6 11.36
TOTAL (D) 2246 26.61 0.00 0.00 0.00 0.00 3.00 5.92 64.00 20.69 0.00 0.00 67.00 26.61
X CONSOLIDATED PHASE 3% 0.00 0.00 0.00 0.00 0.00 3% 0.00
GRAND TOTAL 501.08 0.00 0.00 1590.63 12.83 5533.00 221.05 13617.38 267.20 0.00 0.00 20741 501.08
72 | P a g e
CHAPTER – VI EXPECTED OUT COMES
S. No. Item Unit of
measurement Preproject Status
Expected Postproject Status
Remarks
1 Status of water table (Depth to Ground water level)
Meters 75 74.00
2 Ground water structures repaired/ rejuvenated
No. ‐ 18
3 Quality of drinking water Description saline good4 Availability of drinking water Description 140000 lt/day 200000 lt/day5 Change in irrigated Area Ha 1556 23506 Change in cropping/ land use pattern Description 7 Area under agricultural crop Ha
I Area under single crop 2560 2160Ii Area under double crop 1556 2350Iii Area under multiple crop 0 1050
8 Change in cultivated Area Ha 4116 45109 yield of major crops of area
Yield of Bajra q/ha 1.50 2.00Yield of Jeera q/ha 4.50 5.00Yield of Isabgol q/ha 5.00 5.50Yield of Arandi q/ha 6.50 7.00
10 production of major crops of area
Production of Bajra ton 382.20 509.60Production of Jeera ton 422.55 469.50Production of Isabgol ton 156.50 172.15Production of Arandi ton 102.05 109.90
11 Area under vegetation Ha 0 3512 Area under horticulture Ha 0 5013 Area under fuel Ha 0 514 Area under Fodder Ha 0 3515 Fodder production Q 67210 15500016 Milk production Litres/day 1910 300017 SHGs Active No. 10 9218 No. of enterprising individuals No. 0 9219 Income Rs.in la 24000 3600020 Migration No. 504 20021 SHG Federations formed No. 0 4
73 | P a g e
Critical Assumption
No severe droughts/ unexpected floods/ natural disasters
Adequate funds are allocated for the same and released on time.
There is no significant pest/ disease attack, and if so, then it will have been contained before
irreversible damage is done.
Adverse market conditions do not persist long.
Sound macro‐economic and growth conditions continue and the benefits are widely distributed
particularly in the rural areas.
Facilitating agencies and resource providers have the required competent staff so that timely and
appropriate technical advice and services are provided to farmers whenever required.
The Capacity Building Plan is implemented, monitored and modified to address evolving needs
and feedback from participants.
Means of Verification of indicators
Baseline surveys like household income ,expenditure, health and nutrition etc at the beginning,
mid‐term and end of the project period
Annual participatory assessment by communities during project period.
Regular project monitoring reports prepared by project monitoring teams/ agencies.
Membership and other Records, Minutes of Meetings maintained by the SHGs, WCs/ Individual
beneficiaries/project‐related village and local bodies/PRIs.
External review missions
Data maintained by Government department (Revenue, Agriculture, Groundwater, Irrigation,
Animal Husbandry
74 | P a g e
CHAPTER VII TECHNICAL DESIGNS AND ESTIMATES
MODEL ESTIMATE OF WATERHARVESTING STRUCTURE TANKA
Name of Work Construction of waterharvesting str. Tanka
Name of Project Barmer(IWMP)-54
Name of Block Chohtan
S.NO.
PARTICULARS
QTY
RATE AMOUNT
LAB. TOTAL LAB. TOTA
L
1 Excavation For fundation tranches or drains including loading unloading disposal and dressing of excavated material within initial lead
Hard soil
3.14 / 4 x ( 13.5
0 )2 x
13.50 = 1932.37
1.00 x 3.14 x 48.0
0 x 1.50 x 2.0 = 452.39
2384.76 67.49 100 100 6749 6749 Extra lift 5 ft 10 ft
3.14 / 4 x ( 13.5
0 )2 x 5.00 = 715.69 20.25 12 12 243 243
10ft to 15 ft
3.14 / 4 x ( 13.5
0 )2 x 3.50 = 500.99 14.18 24 24 340 340
2 cement concerete well mixed in cement mortor (1:5:10) laying in position complete including carring with maximum sixe aggrigare upto 20mm
Botum of tanka 3.141
6 / 4 x ( 13.5
0 )2 x 0.50 = 71.57
71.57 2.03 358 1759 725 3563
75 | P a g e
3 Floor base with cement concerete well mixed in cement mortor (1:6:12) laying in position complete including carring with maximum sixe aggrigare upto 20mm
Angle 18.0 x
( 0.45
2
+ 0.30 2
)
x 0.5 x 0.30
= 1.32
Catchment 3.141
6 / 4 x ( 46.5
0 2 - 14.5
0
2
) x 0.17 = 255.52
256.83 7.23 358 1633 2589 1180
8 4 Centering shuttering for construction of tanka
3.141
6 x 12.5
0 x 14.5
0 = 569.41
3.141
6 x 14.5
0 x 1.50 = 68.33
637.74 59.25 78.10 126 4627 7465 5 cement concerete well mixed in cement mortor (1:3:6) laying in position complete
including carring with maximum sixe aggrigare upto 20mm
WALL 3.141
6 / 4 x ( 13.5
0 2 - 12.5
0
2
) x 13.0 = 265.46
WALL 3.141
6 / 4 x ( 14.5
0 2 - 12.5
0
2
) x 1.50 = 63.62
329.08 9.31 358 2498.
0 3334 2326
4 6 R/R stone masonary in cm 1:6 for foundation
agor protection wall
3.142 x
47.25 x 0.75 x
1.00 = 111.33 3.15 525 2338 1654 7366
7 Precast cement concrete Brick masonary
agor protection wall
3.142 x
46.83 x 0.33 x
0.50 = 24.27
24.27 0.69 993.0
0 4056 682 2786 8 S/F stone asslet fo lintel in cm(1:4)
2 x 12 x 1.00 x 0.75 18.00
76 | P a g e
18.00 0.51 406 7965 207 4057 9 S/F stone patties in CM ( 1:3) 50mm thick flooring in CC ( 1:2:4)
3.141
6 / 4 x (14.5
0)2 = 165.13
Deduction for cover 2 x 2 - 4.00
161.13 14.97 201 1127 3009 1687
0 10 50mm thick flooring in CC ( 1:2:4)
Botum of tanka
3.1416 / 4 x (
12.50
)2 = 122.72
122.72 11.40 101 243 1151 2770 11 Cement plaster 25/20/12 mm thick in cm(1:6)
25 mm 3.141
6 x12.5
0 x14.5
0 = 569.41 52.90 88 151 4655 7988
20 mm 3.141
6 x 14.5
0 x 2.00 = 91.11 8.46 52 100 440 846
12 mm
3.1416 x
30.50 x
16.00 = 1533.10
142.42 52 81 7406
11536
12 S/F Tanka cover /door 1.00 1.00 50 500 50 500 12 S/F wire mesh jali
= 835.38 77.64 0 182 0 1413
0 13 S/F angle iron 35x35x5 mm 1.50 m in lenth = 18.00 68.85 6.90 55.45 475 3818 13 S/F grill gate 30.00 30.00 11.90 62.10 357 1863 14
S/F inlet
3 x1.500 x
1.000 = 4.500 0.42 332 1322 139 553
15 Tranportation
Sand 155 km 14.60 0 850.5
0 0 1241
9
Agg 40 mm 60 km 8.33 0 272.0
0 0 2266
Agg 20 mm 60 km 10.59 0 272.0
0 0 2880 Contigency 3 percent 1165 4228
77 | P a g e
39998
150310
39998
150310
LABOUR
40000
MATERIAL
110000
TOTAL
150000
Material lkexh dk uke lhesUV ctjh fxVVh 40
,e ,e eqfxa;k 20 ,e
,e iRFkj ifVV;ka fyaVy ,sxy jks"kunk
u tkyh
bdkbZ begs cum cum cum cum sqm cum kg No. sqm ek=k
98 14.60 8.33 10.59 3.15 14.97 0.51 68.85 3 77.6
4
Design of Catchment area of Waterharvesting Structure Tanka Capacity of Waterharvesting structure Tanka= = 1594.53 cft = 45.125 cum Diameter of Agore= = 14.17 m Intenscity of Rainfall = 23.9 cm Coefficeint of Runoff = 0.90 Catchment Area(agore) of Tanka A= = Q/CI = 209.79 sqm Diameter of Cathment area ( agore) = 14.48 m = 47.52 ft
78 | P a g e
79 | P a g e
MODEL ESTIMATE OF FARM POND 1 Name of work - Farm Pond ( capacity 200000 ltrs)
2 Name of project - Barmer(IWMP)-54
3 Name of watershed- Chohtan
Detail & absract of work
SN
WORK MEASUREMENT QTY QTY RATE AMOUNT
NO. LENGTH WIDTH HEIGHT CUFT/SQRFT CUM/SQRM LABOUR TOTAL
LABOUR TOTAL
1 Excavation For fundation tranches or drains including loading unloading disposal and dressing of excavated material within initial lead
0.5 x(
1849 + 225 )x
7.00
= 7259.00 Cft
1 x
167.00
x 2.00 x 1.00
= 334.00 Cft
1 x 55.00 x 2.00 x
0.50
= 55.00 Cft
1 x 75.00 x 3.50 x
3.00
= 787.50 Cft
8435.50 Cft =238.76 Cum 100 100
23876 23876
3 R/R stone massonary in cement mortor (1:8)(a) for fundation, 4 x 28.5 x 1.00 x
1.50
= 171.000 Cft
1 x 15.5 x 1.00 x
1.00
= 15.500 Cft
186.500 Cft = 5.28 Cum 525 2240 2771 11825 2 cement concerete well mixed in
cement mortor (1:5:10) laying in position complete including carring with maximum sixe aggrigare upto 20mm
4 x 29.00 x18.8
5 x
0.50
= 1093.188 Cft
1 x 15.00 x
15.00
x 0.50
= 112.500 Cft
1205.688 Cft =
34.13 Cum 358.0 1759 1221
7 60028
80 | P a g e
3 copping in Cement concerete well mixed in cement mortor (1:2:4)laying in position complete including carring with maximum size aggrigare upto 20mm 4 x 43.00 x 1.00 = 172.000 Sft = 15.99 Sqm
101.00
243.00 1614 3884
4 Cement plaster 25 mm thick in cm (1:6)
4 x 29.00 x18.8
5 = 2186.377 Sft
1 x 15.00 x
15.00
= 225.000 Sft
4 x 45.00 x 1.00 = 180.000 Sft
2591.377 Sft =240.83 Sqm 88 151
21193 36366
5 S/F wire mesh jali 3.14
x 100 x 4 = 1256.0 Sft =116.73 Sqm 0 182 0 21245
6 S/F angle iron 35x35x5 mm 1.50 m in lenth 30 x 1.5 x 2.55
= 114.8 kg
= 114.8 kg 6.90 55.45 792 6363
7 S/F grill gate
= 25.0 kg
= 25 kg 11.90 62.10 298 1553
8 Transportation of Materials
Sand
=25.01 Cum 0.00
882.00 0 22056
Aggrigates 40 mm =
30.71 Cum 0.00 189.0
0 0 5805 Aggrigates 20 mm
=0.72 Cum 0.00
189.00 0 136
Stone =
5.28 Cum 0.00 189.0
0 0 998 9 Contigency 3 % 5823
Total
62762
200000
Grand Total 20000
0
Labour 62800
Material 13720
0
Total 20000
81 | P a g e
0
MODEL ESTIMATE OF FARM POND Material Consuption Statement
1 Cement 134 Bag
2 Sand 25.01
Cum
3 Agg 40 mm 30.71
Cum
4 Agg 20 mm 0.72
Cum
5 Soling 5.28
Cum
82 | P a g e
83 | P a g e
Estimate of Pasture Development GKN + FOREST BSR 1.4.2013 1. Plantation Unit& 5. Periferi Length -1400 m
2. Plantation - Per Ha 400 6. Periferi Lenth per Ha -140 m
3. Planting Distance - 5 m X 5 m 7. Labor Rate- 147 Per day
4. Model Calculation - 10 Ha 8. Total -Five Year
Forest Year & 0 Year 10 Ha
No of Angles/Blocks 311 1400 RM
S.NO Work Particulars Unit Qty Labour Total Labour Total
1 Survey of the area by chain and compass, demarcation, layout and lien cutting and making kachhi muddis Ha 10 121.04 121.04 1210.4 1210.40
2 Jungle clearance, removing of local bushes stone pebbles etc. Sqm 50000 1.50 1.50 75000 75000.00
3 Jungle clearance, removing of useless tress of 30 cm girth completely from root etc. Sqm 50000 1.80 1.90 90000 95000.00
4
Making cement, Bajri, Concrete block of size ((25*25)+(15*15))/2x30 cubic cm near water wource and curing 6 times in three days. (Cement, Bajri, Concret mixture 1:4:8) with 20 mm agg size
NO. 311 4.56 29.04 1418.16 9031.44
5 Suply of iron angle 35x35x5 mm of 1.5 m Kg 1400 0.00 46 0.00 64377.00 6 Drilling of holes in the angles NO. 1244 0.82 0.82 1020.08 1020.08
7
Cutting of lower 10 cm of angle iron post and bent it in shape of fork or welding 10-15 cm long angle piece on lower portion of prepared angle
NO. 311 2.53 2.53 786.83 786.83
8 Suply of Barbed wire Kg 840 0.00 65 0 54600.00 9 Suply of Binding wire Kg 8.40 0.00 65 0 546.00 10 Cement, Bajri, concrete block transport by camel cart 0 to 5 km NO. 311 0 9.25 0 2876.75 11 Loading and unloading of cement concrete block in vehicle NO. 311 1.85 1.85 575 575.35
12 Fixing of cement concrete block in a pit of size 30cm x 30cm x 40cm. ( Including local transport and pit digging) NO. 311 11.00 11.00 3421 3421.00
13 Strenching of barbed wire and fixing it with the post with thin wire NO. 5600 1.24 1.24 6944 6944.00
84 | P a g e
14 Interlacing the barbed wire with (a) Locally available bushy material at 15 cm spacing Rm 1610 7.40 7.40 11914 11914.00 (b) Barbed wire at 15 cm spacing Rm 0 10.07 10.07 0 0.00
15
Mulching on shifting sand dunes usig locally available material against the wind direction in parallel lines (including cutting and trasnport of local shrubs upto a distance of 500 meters). Height of mulching should not be less than 30cms.
Rm 467 7.40 7.40 3455.8 3455.80
16 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment for plants NO. 4000 6.60 6.60 26400 26400.00
17 Cost of Plant NO. 4000 0 8.00 0 32000.00
18 Loading of plants from beds to vehical or unloading of plants from vehicle and arranging them in beds. 12.5x30 cm size
NO. 4000 0.18 0.18 720 720.00
19 Transportation of plants from nursery to plantation site by camel cart ( as per bill) NO. 4000 0 2.52 0 10080.00
20 Treatment of plants in nurseries using insectcides NO. 4000 0.28 0.28 1120 1120.00 21 Cost of insecticide ( as per bill) NO. 4000 0 0.50 0 2000.00 22 Planting of plants on normal land NO. 4000 3.20 3.20 12800 12800.00 23 Construction of thawala of 50 cm semicircle on normal land NO. 4000 1.92 1.92 7680 7680.00 24 Watering to plants ( 15 ltrs per plant) just after watering NO. 4000 2.00 2.00 8000 8000.00 25 Water transportation from upto 2km NO. 4000 0.00 1.57 0 6280.00 26 Suply/ Collection of sewan Grass @ 6kg/Ha kg 60 0 67.5 0 4050.00 27 Construction of cattle hut NO. 1 3000 5000 3000 5000.00 28 Construction of pillars of RR Stone masonry in cement mortar (1:6) NO. 2 750 2500 1500 5000.00 29 Plantation Board NO. 1 500 3000 500 3000.00 30 Plantation Gate kg 100 11.9 62.10 1190 6210.00 31 Construction of Tanka NO. 1 37500 150000 37500 150000.00 32 Providing & laying of enamel paint on pillar & gate on new surface Sqm 11.25 32.20 82.00 362.25 922.50
;ksx%& 295798 603021
Forest Plantation- First year 10 Ha
85 | P a g e
32 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment for plants NO. 800 3.30 3.30 2640 2640
33 Making of Thawala and first watering to gap filled plants NO. 800 2.96 2.96 2368 2368 34 Cost of gap filled Plants 80 Plants per ha NO. 800 0 8.00 0 6400 35 Planting of gap filled plants NO. 800 3.20 3.20 2560 2560
36 Loading of plants from beds to vehical or unloading of plants from vehicle and arranging them in beds. 12.5x30 cm bag size
NO. 800 0.18 0.18 144 144
37 Transportation of plants from nursery to plantation site by camel cart ( as per bill)
NO. 800 0.00 2.52 0 2016
38 Treatment of plants with insecticide NO. 800 0.28 0.78 224 624 39 Seed sowing By tractor Ha 10 456 869 4560 8690 40 Watering to( 400 plants per ha) four times in a year. NO. 16000 2.00 2.00 32000 32000 41 Water transportation from upto 2km NO. 16000 0.00 1.57 0 25120
42 One Hoeing and weeding after rain and 3 times hoeing after watering
NO. 4000 6.84 6.84 27360 27360
43 Afterlook and Protection Mont
h 12 4471.25 4471.25 53655 53655
Total 125511 163577
Forest Platation- second year 10 Ha
32 Digging of pits of size (0.50+0.40)/2m x (0.50+0.40)/2m x 0.45m including alignment for plants NO. 800 3.30 3.30 2640 2640
33 Making of Thawala and first watering to gap filled plants NO. 800 2.96 2.96 2368 2368
34 Cost of gap filled Plants 80 Plants per ha NO. 800 0 8.00 0 6400
35 Planting of gap filled plants NO. 800 3.20 3.20 2560 2560
36 Loading of plants from beds to vehical or unloading of plants from vehicle and arranging them in beds. 12.5x30 cm bag size
NO. 800 0.18 0.18 144 144
37 Transportation of plants from nursery to plantation site by camel cart ( as per bill)
NO. 800 0.00 2.52 0 2016
38 Treatment of plants with insecticide NO. 800 0.28 0.78 224 624
39 Watering to( 400 plants per ha) four times in a year ONLY 70% NO. 11200 2.00 2.00 22400 22400
86 | P a g e
40 Water transportation from upto 2km NO. 11200 0.00 1.57 0 17584
41 One Hoeing and weeding after rain and 3 times hoeing after watering
NO. 2800 6.84 6.84 19152 19152
42 Afterlook and Protection Mont
h 12 4471.25 4471.25 53655 53655
Total 103143 129543
Forest Platation- third year 10 Ha
43 Water transportation from upto 2km NO. 2800 0 1.57 0 4396 44 70 percent watering of Plants NO. 2800 2.00 2.00 5600 5600 45 Hoeing and weeding of 70 percent plants NO. 2800 2.4 2.4 6720 6720 46 Prooning of 20 percent Plants NO. 800 1.20 1.20 960 960
47 Afterlook and Protection Mont
h 12 4471.25
4471.25
53655 53655
Total 66935 71331
Forest Platation- four year 10 Ha
48 Repair of fencing Rm 1400 0.22 0.33 308 462
49 Afterlook and Protection Mont
h 12 4471.25
4471.25
53655 53655
Total 53963 54117 Grant Total 645350 1021589
87 | P a g e
ESTIMATE Nameof work :- Pucca Waterharvesting Structure( Nadi)
Name of scheme :- IWMP Name of Watershed Project :Barmer(IWMP)-54
****************************** DETAILS OF MEASUREMENTS AND ABSTRACT OF COST
S.No.
ITEMS No. L W D QTY. Unit RATE AMOUNTLab Total Lab Total
1 Earth work in excavation over areas (exceeding 30 Cm. In depth, 1.5 Mtr. in width as well as 10 Sqm. on plan) including disposal of excavated earth lead up to 50 M and lift up to 1.5 Mtr. disposed earth to be leveled and neatly dressed:All kinds of soil.
Pond 1 42.00 42.00 0.40 705.60 Cum Wall 4 50.60 0.60 0.90 109.30 Cum 4 34.00 0.60 0.90 73.44 Cum Weir 4 2.00 0.60 0.90 4.32 Cum Weir 2 7.00 0.60 0.90 7.56 Cum 900.22 Cum 100.00 100.00 90022 90022
2 Add extra for every additional lift of 1.5 Mtr. or part thereof : In all kind of soils. 900.22 Cum 12.00 12.00 10803 10803
3 Add extra for lead including loading, unloading beyond 50 Mtr. With additional 150 Mtr. lead.
Qty. sameas per above item No.1 900.22 Cum
36.75 36.75 33083 33083
4 Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level 1:5:10 (1Cement :4 Course Sand :8 Graded stone aggregate 40 mm nominal size
For side slope 4 42.00 8.60 0.125 180.60
Cum
Bottom 1 34.00 34.00 0.125 86.70
Cum
Top 2 50.00 0.30 0.125 3.75 Cu
88 | P a g e
m
4 50.60 0.30 0.125 7.59 Cum
4 34.00 0.30 0.125 5.10
Cum
278.64 Cum
358.00 1759.00 99753 490128
5 Cement concrete flooring grade 1:2:4 (1-Cement:2-Coarse sand:4-graded stone aggregate) rounding off edges etc. but excluding the cost of nosing of steps etc. complete : 50 mm thick with 20 mm thick nominal size aggregate.
For side slope 4 42.00 8.60
1444.80
Sqm
Bottom 1 34.00 34.00
1156.00
Sqm
Top 2 50.00 0.30 30.00 Sqm 2 50.60 0.30 30.36 Sqm
2661.1
6 Sqm 101.00 243.00 268777 646662
6 Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth level 1:5:10 (1Cement :5 Course Sand :10Graded stone aggregate 40 mm nominal size
Weir 4 2.00 0.60 0.15 0.72
Cum
Weir 2 7.00 0.60 0.15 1.26
Cum
Total 1.98
Cum
358.00 1759.00 709 3483
7 Random Rubble stone masonary for foundation and plinth in Cement Sand Mortar above 30 Cm. thick wall in : Cement Mortar 1:6 (1-Cement:6-Sand).
Wall 4 50.60 0.45 0.30 27.32
Cum
89 | P a g e
Wall 4 50.00 0.30 1.05 63.00
Cum
Wall 4 34.00 0.45 0.30 18.36
Cum
Wall 4 33.40 0.30 0.30 12.02
Cum
Weir 4 2.00 0.45 0.30 1.08
Cum
Weir 4 2.00 0.30 0.60 1.44
Cum
Weir 2 7.00 0.45 0.30 1.89
Cum
Weir 2 7.00 0.30 0.60
2.52 Cum
Deduct 2 5.80 0.30 0.60 -2.09
Cum
Deduct 2 7.60 0.30 0.33 -1.50
Cum
Total 124.05
Cum
525.00 2338.00 65124 290018
8 Supply and fixing lintels 2 7.60 0.30 0.33 1.50
Cum
772.60 7965.60 1163 11987
9 Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finished: 20 mm thick.
8 50.60 0.60 242.88 Sqm
Deduct 4 5.80 0.60 -13.92 Sqm 228.96 Sqm 52.00 100.00 11906 22896
10 Structural steel work in single section fixed without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete above plinth level up to 4.5 mtr. Height in joist flats, tees, angles and chhanels. Angle 35x35x5mm with drillling holes 3 nos per angle
50 wt.
@3.0kg/m
675.00 Kg 6.90 55.45 4658 37429
11 Supply and fixing galvanized barbed wire instead of black barbed wire for each wire line.
4 50.60 4.00 121.44 Kg 0.00 65.00 0 7894
12 Strenching of barbed wire and fixing it with the post with thin wire 4 50.60 4.00 809.60 m 1.00 1.00 810 810
90 | P a g e
13 Supply and fixing Direction and place identification sign board made out of 2mm thick M.S. sheet framed to angle iron 40x40x5mm and two vertical posts of angle iron of size 65x65x6mm 3meter long with hold fasts, stove enameled paint reflective letter symbol complete of size 120x75 cm.
1 No. 5000.00 0 5000
14 Supply and fixing angle iron gate with enameled paint complete of size 120x90cm.
1 0.90 1.20 wt.
@20kg/sqm 21.60 Kg 11.70 61.90 253 1337
15 Transportation of Material 16 Sand from Sindhary 160 km 222.66 0.00 837.90 0 186569 Stone , Agg 40& 20 mm From Dudhwa 65
km 509.66 0.00 204.00 0 103971
17 Contigency 58263
GRAND TOTAL 587058 2000351
Labour 590000.00 Material 1410000.00 Total 2000000.00
Material Consumption Statement
Name of work :- Renovation of Nadi
Name of scheme :- IWMP
Name of Watershed Project :Barmer(IWMP)-54
Material CEMENT SAND AGGR 40 AGGR20
STONE Angel Barbed wire
Quantity
1925 223 252.56 133.0
6 124.05 675.00 121.44 Unit Begs Cum Cum Cum Cum Kg Kg
91 | P a g e
DESIGN OF RAIN WATER HARVESTING STRUCTURE (NADI) 1 Total catchment area 6.00
Where A1= cultivated land= 6.00 A2 = Hilly area= 0.00
2 Average annual rainfall 23.90
3 Rainfall intesity 5.00 7 Runoff cofficient of the catchment area is calculated by the formula as follow
A1*C1+A2*C2 C= A1+A2 Where A1= cultivated land= 6.00 A2 = Hilly area= 0.00 C1= cofficient of Runoff of cultivated area= 0.30 C2=cofficient of Runoff of hilly area= 0.40 Therefor C= 0.30
8 Expected runoff from catchment area in cum
Q= C I A 4302
9 Capacity of rain water harvesting structure Nadi
Botum area of Nadi 1156 FTL area of Nadi 2500 Ht. of FTL from Botom of Nadi 1.5
Capacity of Waterharvesting Structure (Nadi) 2742 Hence Capacity of Nadi is less than Expected Runoff
92 | P a g e
93 | P a g e
MODEL ESTIMATE OF EARTHEN BUND
Name of Work Earthen Bund
Name of Project Barmer(IWMP)-54
Name of Block Chohtan
S.NO. PARTICULARS NO. LENTH WIDTH HT. QTY UNIT RATE AMOUNT
LAB. TOTAL LAB. TOTAL
1 Cutting and clearing at ordinary jungl including bushes,shurbs grasses on khadeen bund.
1 10.00 10.0 sqm 4 4 40 40 2 Dag Billing
1 3.75 3.75 sqm 0.28 0.28 1.05 1.052 Earth work forbund in hard soil dry
or moist soil inciuding laying in layers of 15cm breaking of ciods dressing to required profile with manual compaction initial lad of 30m and lift 15m( 1
(3.75 + 0.60)/2 0.90 1.96 Cum 91 91 178 178
3 Contigency 3 % 0 7 219 226
LABOUR 219
MATERIAL 7
TOTAL 226
94 | P a g e
NAME OF WORK‐: Modal estimate of Guar crop demonstration (kharif) Farmers 1 No DAP 90 KG UREA 25 KG Seed Qnty 10 KG DETAILED ESTIMATE FOR (1 Ha) S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Guar seed of variety RGC‐1070.
1 10 kg 280 2800
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer DAP 1 90 kg 18 1620 UREA 1 25 kg 6 150
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 125 kg 4 500
5 Supply of Weedicides 500 6 Supply of Weedicides 600 7 Transportation of material 1000 TOTAL 7215
NAME OF WORK‐: Modal estimate of Moong crop demonstration (kharif) Farmers 1 No DAP 25 KG UREA 50 KG Seed Qnty 10 KG DETAILED ESTIMATE FOR (1 Ha) S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Moong seed of variety RMAG‐268.
1 10 kg 140 1400
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer DAP 1 25 kg 18 450 UREA 1 50 kg 6 300
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 125 kg 4 500
5 Supply of Weedicides 500 6 Supply of Weedicides 600 7 Transportation of material 1000 TOTAL 4795
95 | P a g e
NAME OF WORK‐: Modal estimate of Moth crop demonstration (kharif)
Farmers 1 No DAP 0 KG UREA 50 KG Seed Qnty 10 KG DETAILED ESTIMATE FOR (1 Ha) S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Moong seed of variety RMAG‐268.
1 10 kg 100 1000
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer DAP 1 0 kg 18 0 UREA 1 50 kg 6 300
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
5 Supply of Weedicides 700 6 Supply of Pesticides 1000 7 Transportation of material 1000 TOTAL 5045
NAME OF WORK‐: Modal estimate of Bazara crop demonstration (kharif) Farmers 1 No DAP 90 KG UREA 0 KG Seed Qnty 4 KG DETAILED ESTIMATE FOR (1 Ha) S No
Item NO QUANTITY UNIT RATE AMOUNT
1 Supply of Moong seed of variety RMAG‐268.
1 4 kg 100 400
2 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
3 Supply of fertilizer DAP 1 90 kg 18 1620 UREA 1 0 kg 6 0
4 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 125 kg 4 500
5 Supply of Weedicides 700 6 Supply of Pesticides 700 7 Transportation of material 1000 TOTAL 4965
96 | P a g e
NAME OF WORK‐: Modal estimate of Jeera crop demonstration (Rabi)
Farmers 1 No DAP 50 KG UREA 50 KG Seed Qnty 10 KG DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GC‐4. 1 10 kg 280 2800
Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer DAP 1 50 kg 18 900 SULPHUR 1 10 kg 30 300 UREA 1 50 kg 6 300 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 700 Supply of Pesticide 900 Transportation of material 1000 TOTAL 7945 NAME OF WORK‐: Modal estimate of Isabgol crop demonstration
(Rabi) Farmers 1 No DAP 50 KG UREA 50 KG Seed Qnty 6 KG DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GI‐2. 1 6 kg 120 720 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer DAP 1 50 kg 18 900 UREA 1 50 kg 6 300 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 1000 Supply of Pesticide 1000 Transportation of material 1000 TOTAL 5965
97 | P a g e
NAME OF WORK‐: Modal estimate of Jeera crop demonstration
(Rabi) Farmers 1 No DAP 50 KG UREA 50 KG Seed Qnty 10 KG DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GC‐4. 1 10 kg 280 2800
Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer DAP 1 50 kg 18 900 SULPHUR 1 10 kg 30 300 UREA 1 50 kg 6 300 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 700 Supply of Pesticide 900 Transportation of material 1000 TOTAL 7945 NAME OF WORK‐: Modal estimate of Isabgol crop demonstration
(Rabi) Farmers 1 No DAP 50 KG UREA 50 KG Seed Qnty 6 KG DETAILED ESTIMATE FOR (1 Ha) Item NO QUANTITY UNIT RATE AMOUNT
Supply of Guar seed of variety GI‐2. 1 6 kg 120 720 Treatment of seeds with Rhizobium culture (600x3)
1 1.8 kg 25 45
Supply of fertilizer DAP 1 50 kg 18 900 UREA 1 50 kg 6 300 Supply of Micro Nutrients like Ca Mg,Co,Ni etc
1 250 kg 4 1000
Supply of Weedicides 1000 Supply of Pesticide 1000 Transportation of material 1000 TOTAL 5965
98 | P a g e
NAME OF WORK- Modal Estimate of Horticulture Plantation (Grafted Bair) No Plants/Pits 277 No FYM Quantity 20 kg Plant to Plant
Spacing 6x6 Rm
Row to Row Spacing
6x6 Rm
DETAILED ESTIMATE FOR (1 Ha) S No
Item NO LENGTH WIDTH DEPTH QUANTITY UNIT RATE AMOUNT
1 Digging of pits in ordinary soil for plantation
250 0.90 0.90 0.90 182.25 cum 82 14944.5
2 Supply of FYM (20 kg/pit) 250 - - - 5000 kg 1.5 7500
3 Cost of horticulture plants 277 - - - 277 No 20 5540
4 Supply of SINGLE SUPER PHOSPHATE
- - - - 250 kg L.S 1000
5 Transportation of plants,SSP including loading & unloading
- - - - 277 - 2 554
6 Supply of insecticide - - - - 12.5 kg L.S 500
TOTAL 30038.5
SAY 30039
99 | P a g e
NAME OF WORK-: Modal Estimate of Horticulture Plantation (Grafted Lemon) No Plants 277 No FYM Quantity 20 kg 25 Plant to Plant Spacing 6x6 Rm Row to Row Spacing 6x6 Rm DETAILED ESTIMATE FOR (1 Ha) S No
Item NO LENGTH WIDTH DEPTH QUANTITY UNIT RATE AMOUNT
1 Digging of pits in ordinary soil for plantation
250 0.90 0.90 0.90 182.25 cum 82 14944.50
2 Supply of FYM (20 kg/pit)
250 - - - 5000 kg 1.5 7500
3 Cost of horticulture plants
277 - - - 277 No 20 5540
4 Supply of SINGLE SUPER PHOSPHATE
- - - - 250 kg L.S 1000
5 Transportation of plants,SSP including loading & unloading
- - - - 277 - 2 554
6 Supply of insecticide
- - - - 12.5 kg L.S 500
TOTAL 30038.50
SAY 30039
100 | P a g e
MODEL ESTIMATE OF CATTLE SHED Name of Work Construction of cattleshed Name of Project Barmer(IWMP)-54 Name of Block Chohtan S No
Item NO LENGTH WIDTH DEPTH QUANTITY FPS
QUANTITY MKS
UNIT LAB RATE
LAB AMNT
TOTAL RATE
TOTAL AMOUNT
1 Digging of pits in ordinary soil for foundation
4 1.50 1.50 2.00 18.00 0.51 cum 82 41.77 82 41.77
2 Providing and laying of cement concrete (1:5:10) with 40mm Agg size
4 1.50 1.50 0.50 4.50 0.13 cum 358 45.59 1759 224.01
3 R/R Stone masonry in cement mortar (1:6) in foundation.
4 1.50 1.50 1.50 13.50 0.38 cum 525 200.58 2338 893.23
4 R/R Stone masonry for pillars in cement mortar (1:6) in super structure .
2 1.25 1.25 7.50 23.44 0.66
2 1.25 1.25 7.00 21.88 0.62
1.28 cum 1029 1319.53 2952 3785.48
5 Providing and laying of Ruled tip pointing in cement mortar (1:3).
16 1.25 - 7.25 145 13.48 sqm 51 687.27 62.4 840.89
6 Supply Fixing of 0.8mm thick 20 guage ribbed GI sheet including hook bolts & washer.
1 10 10 - 100 9.29 sqm 49 455.39 648 6022.30
7 Supply Fixing of wooden bans rod of dia 4.50 inches
2 - - - - 2.00 no 0 0.00 100 200.00
TOTAL 2750.13 12007.69
SAY 2750.00 12008.00
101 | P a g e
MODEL ESTIMATE OF MANGER ( FOR TWO ANIMALS) SNo Item No Length Width Depth/Height Qnty
FPS Qnty MKS
Unit RATE AMOUNT LAB Rate
Total Rate
Lab Amnt
Total Amnt
1 Excavation of earthwork in foundation in ordinary soil
Pillar 4 1 1 0.75 3 LW 2 5 1 0.75 7.5 SW 2 1 1 0.75 1.5 12 0.34 CUM 82 82 27.85 27.85
2 RRStone masonry in cement mortar (1:6) for foundation & plinth
Pillar 4 1 1 0.75 3 LW 2 5 1 0.75 7.5 SW 2 1 1 0.75 1.5 12 0.34 CUM 525 2166 178.29 735.57
3
RR Cement Brick masonry in cement mortar (1:3) including cement plaster in cement mortar (1:3) for foundation & plinth
Pillar Back 2 1 1 2.75 5.5 Front 2 1 1 2.25 4.5 LW Back 1 6 0.5 2.75 8.25 Front 1 6 0.5 2.25 6.75 SW 2 2 0.5 2.5 5 30 0.85 CUM 993 3961 843.06 3362.89
4 Cement Concrete in cement mortar (1:4:8) with 40 mm Agg size 1 6 2 0.25 3 0.08 CUM 358 1918 30.39 162.84
5 12 mm thick cement plaster in cement mortar (1:6).
Pillar 8 1 ‐ 2.75 22
102 | P a g e
8 1 ‐ 2.25 18 LW 2 6 ‐ 2.75 33 2 6 ‐ 2.25 27 SW 4 2 ‐ 2.5 20 120 11.15 sqm 52 80 579.93 892.19 1660 5181 1660 5181 SAY 1660 5200
LABOUR 1700 MATERIAL 3500 TOTAL 5200
103 | P a g e
MODEL ESTIMATE OF COMPOST PIT SNo Item No Length Width Depth/Height Qnty
FPS Qnty MKS
Unit RATE AMOUNT LAB Rate
Total Rate
Lab Amnt
Total Amnt
1 Excavation of earthwork in foundation in ordinary soil
LW 2 11 0.75 1 16.5 SW 2 4 0.75 1 6 22.5 0.64 CUM 82 82 52.21 52.21
2
Cement Brick masonry in cement mortar (1:3) including cement plaster in cement mortar (1:3) for foundation & plinth
LW 2 11 0.5 1 11 SW 2 4 0.5 1 4 15 0.42 CUM 993 3961 421.53 1681.44
3
Cement Brick masonry in cement mortar (1:3) including cement plaster in cement mortar (1:3) for super structure
LW 1 11 0.5 4 22 SW 2 4 0.5 4 16 38 1.08 CUM 993 3961 1067.87 4259.66
5 12 mm thick cement plaster in cement mortar (1:6).
LW 2 11 ‐ 4 88 LW 2 9 ‐ 4 72 SW 2 4 ‐ 4 160 SW 2 3 ‐ 4 232 552 51.3 SQM 52 80 2668 4104 4209 10097 4209 10000
104 | P a g e
LABOUR 4300 MATERIAL 5700 TOTAL 10000
105 | P a g e
CHAPTER VIII Enclosures
chatkljdz-l- uke [kkrsnkj e; firk@ifr dk uke [kljk la- jdck u-
1 lrkjke ] eksrhjke] xqykjke fi- xksikjke tkfr lqFkkj lk- nsg [kkrsnkj 616/162 71.00
2 dLrwjh ifR eFkjnku tkfr pkj.k lk- nsg [kkrsnkj uk-d-la-14503 617/163 61.08
3 [kewnku ] Hkxokunku fi- rxnku tkfr pkj.k lk-nsg [kkrsnkj 618/163 61.08
4 gkfg;k iq= vkEck tkfr es?koky lk-nks- fMxh tg- iwaxy [kkrsnkj 631/175 42.00
5 eksguyky iq= 'ks[kkjke tkfr es?koky lk- nsg [kkrsnkj 1010/175 21.00
6 Hksjflag oq= exflag tkfr jktiqr lk- xqekus dk ryk [kkrnskj 176 59.08
7 r[kwnsoh tksts [kwenku 2@3 izHkwnku iq= lkoarnku tkfr pkj.k lk- nsg [kkrsnkj 181 29.06
8 [kwenku iq= lkaornku tkfr pkj.k 1@2 esok iq= Hkkm tkfr eqlyeku 638/182 33.07
9 izHkwnku iq= lkoarnku tkfr pkj.k lk- nsg [kkrsnkj 639/182 16.14
10 fldw ] getk fi- 'ksjk 1@2 mej] jk;/ku lqekj firk vkyw lwjh csck vkyw tkfr eslyeku 183 38.16
11 fldw iq= djuk lkaornku tkfr lkj.k - lk nsg [kkrsnkj 184 30.12
12 jok iq= djuk tkfr ykSgkj lk- nsg [kkrsnkj 1084/147 10.00
13 fcyk dCtk xSj eqefdu /kksjk 1085/147 27.06
14 [khjk oYn HkkMk tkfr es?koky lk- nsg [kkrsnkj 607/149 41.00
15 geyk] tokjk fi- djuk veh;k csok fo'kuk tkfr es?koky lk- nsg [kkrsnkj 608/149 40.00
16 lqekj iq= Qrk tkfr es?koky lk- nsg [kkrsnkj 609/149 41.00
17 Hkaojkjke] jkmjke] jkorkjke firk HkqxM+k gyh] lhrk iqf='k HkwxM+k lkjks ifRu HkqxM+k tkfr es?koky lk- nsg [kkrsnkj
610/149 41.00
106 | P a g e
18 g;kr ] gchc eks-vyh firk lqyseku ] bZnk ifRu flyseku utj] cpy firk ehjk tkfr eqlyeku lk- nsg [kkrsnkj uk-d-3171 ]1471]1521
150 56.14
19 ewykjke] ykykjke ] ghjkjke] exkjke]nsjktjke firk [kwekjke ] xq.ks'kkjke] xqlkbZjke firk jkorkjke ] ds'kh ifRu jkorkjke tkfr tkV lk- y[kokjk [kkrsnkj uk-d-la 1525
151 82.02
20 rqylnku iq= iwjnku tkfr pkj.k lk- nsg [kkrsnkj 611/152 56.04
21 jkeflag iq= iwjnku tkfr pkj.k lk-nsg [kkrsnkj 615/152 24.00
22 tsBwnku iq= iwjnku tkfr pkj.k lk- nsg [kkrsnkj 613/152 42.00
23 tslwnku] eFkjnku firk iwjnku tkfr pkj.k lk- nsg [kkrsnkj 614/152 42.00
24 psuk ] dq'kyk firk ekuk 2@3 exk ] ghjk ] ewyk firk [kwek 1@3 vtk iq= dwEHkk 1@6 tkfr tkV lk-y[kokjk [kkrsnkj
640/185 216.00
25 lksuk ] Hkxk firk ekuk 1@2 fgLlk ykyk ] nsjkt firk [kwek xq.ks'kk ] xkslkbZ firk jkork ] ds'kh ifRu jkork 1@3 fgLlk] iwuek iq= gqdek 1@3 fgLLkk tkfr tkV lk- y[kokjk [kkrsnkj uk-d-k-1536
641/151 150.14
26 [kwenku ] izHkwnku firk lkaornku tkfr pkj.k lk- y[kokjk [kkrsnkj 186 42.16
27 tksjkjke iq= xksj/kujke tkfr tkV lk- y[kokjk [kkrsnkj 642/187 30.08
28 lkdj ] uwjk ] tksjk firk xksj/ku tkfr tkV lk- y[kokjk [kkrsnkj 643/187 81.00
29 jkew] psru ] tskjk firk xksj/ku tkfr tkV lk- y[kokjk [kkrsnkj 644/187 91.20
30 fcyk dCtk eqefdu 645/188 0.11
31 ykNhnsoh csok izrkinku ] dslwnku iq= izrkcnku tkfr pkj.k lk- nsg [kkrsnkj 646/188 0.05
32 HkqxM+k iq= pRik tkfr es?koky lk- nsg [kkrsnkj 647/189 6.05
33 ykNhnsoh csok izrkinku ] dslwnku iq= izrkcnku tkfr pkj.k lk- nsg [kkrsnkj 648/189 3.02
34 ykNhnsoh csok irkinku tkfr pkj.k lk--nsg [kkrsnkj c-l-ua-682@218 649/190 21.10
107 | P a g e
35 psukjke iq= ekukjke tkfr tkV lk- y[kokjk [kkrsnkj c-l-u- 683@218] 885@386 650/190 21.09
36 vkbZNku ] nqtkjke firk 'kadjkjke ujlk iq= Fkkuk chtk iq= xwykck vyhe iq= cw<k tkfr es?koky lk- nsg [kkrsnkj
191 51.00
37 [keh'kk iq= lqxkyk tkfr es?koky tkfr es?koky lk-nsg [kkrsnkj jgu lEiw.kZ Hkwfe ,lchchts pkSgVu ds i{k esa
192 67.00
38 vjck] tqEek Msdw tkfr es?koky c-l-u- 158 194 30.05
39 jk.kkjke iq= dkywjke tkfr es?koky lk-nsg [kkrsnkj 651/195 41.02
40 jk.kkjke iq= dkywjke tkfr es?koky lk-nsg [kkrsnkj 652/195 15.00
41 geyk i= djuk tkfr es?koky lk- nsg [kkrsnkj 653/195 15.00
42 Hkkjey] mdjM+k firk glu tkfr es?koky c-la-ua- 118 [kkrsnkj 654/195 10.00
43 jk.kkjke iq= dkywjke tkfr es?koky lk-nsg [kkrsnkj 655/195 10.00
44 mdk iq= /kuk tkfr Hkhy lk- nsg [kkrsnkj 656/195 42.00
45 dLrwjk iq= Hkhek tkfr es?koky lk- nsg [kkrnkj ca-la-ua- 203 ] 680@216 657/195 15.00
46 v[kkjke iq= Hkh[kkjke tkfr es?koky lk- nsg [kkrsnkj 1095/195 44.12
47 fcyk dCtk lEi.kZ Hkwfe 658/195 0.08
48 tyky iq= vejk tkfr es?koky lk- nsg [kkrsnkj c-la-u- 658@361 196 15.00
49 v[kkjke iq= Hkh[kkjke tkfr es?koky lk- nsg [kkrsnkj 1030/197 9.00
50 xksenk ] rwktw firk meyk tkfr es?koky lki-nsg [kkrsnku c-la-ua- 663@200 ] 665@200 uk-d-la- 1345] 1034@217
1031/197 19.10
51 yw.kk iq= lqekj ucw ifRu psru tkfr es?koky lk- nsg [kkrsnkj 1031/197 6.03
52 egsUnzk ] Qwyk firk vejk tkfr es?koky lk-nsg [kkrsnkj 1032/197 28.02
53 xSj eqefdu lM+d ihMCY;qMh 660/197 0.05
108 | P a g e
54 yw.kk iq= lqekj ucw ifRu psru tkfr es?koky lk- nsg [kkrsnkj c-l-u- 1031@191 198 21.17
55 fcyk dCtk xSj eq-jkLrk 661/199 21.01
56 xSj eqefdu lM+d ihMCY;qMh 662/199 0.02
57 xksenk ] rwktw firk meyk tkfr es?koky lki-nsg [kkrsnku c-la-ua- 1030@197 663/200 10.12
58 xSj eqefdu lM+d ihMCY;qMh 664/200 1.10
59 xksenk ] rwktw firk meyk tkfr es?koky lki-nsg [kkrsnku c-la-ua- 1030@197 665/200 11.19
60 fcyk dCtk xSj eqefdu /kksjk 201 35.00
61 lknd ] okgnk vkgen firk y[kkuk tkuw] bczkghe firk jetku tkfr eqlyeku lk- nsg [kkrsnkj uk-d-la- 1370
202 8.14
62
63 guhQ ] esgjkt fi- vyh eskgen lfnd [kqnkcDl jk;/ku fi- bZLekbZy tkfr eqlyeku lk- nsg [kkrsnkj
204 22.10
64 [keh'kk oYn okyk dkSe Hkhy lk- nsg [kkrsnkj 666/205 30.00
65 rkjkjke ] xkjs/kujke pkUnkjke firk puk tkfr Hkhy lk- nsg [kkrsnkj jgu rkjke xksj/kujke firk puk dk fgLlk ,lchchts [kk[kk pkSgVu ds i{k esa
667/205 48.02
66 feljh oYn okyk dkSe Hkhy lk- nsg [kkrsnkj 668/205 30.00
67 lokbZ ] fxj/kkjh ] firk js'kek tkfr Hkhy lk- nsg [kkrsnkj jgu lokbZ oYn js'kek ds fgLls dh Hkwfe ,lchchts 'kk[kk pkSgVu ds i+k esa
669/205 39.12
68 lEiw.kZ Hkwfe jktLFkku ljdkj 1067/667 8.08
69 Nxu oYn lktu] djhek cso NqVk ] uhEck ] vkEck firk NqVk ] fugky ] dew ] pUnyk firk vk'kk dkSe Hkhy lk- nsg [kkrsnkj jgu fugky] pUnyk firk vk'kk dks fgLlk 2@9 chbZbZch 'kk[kk pkSgVu ds i+{k esa uk-d-l-1406] 1142
206 25.19
109 | P a g e
70 chtyk ] flyy firk y[kw cDlh csok y[kw ] Hkwjk vkbZNku firk l[kh ktuh ifRUk l[kh 1@2 js[kk ifRu Hkk.kthjke 1@2 dkSe Hkhy lk- nsg [kkrsnkj c-l-u- 405
207 64.03
71 lEiw.kZ Hkwfe jktLFkku ljdkj 1093/208 2.00
72 djuk ] 'kadjk ] lrjke firk dqpVk ewa- dsdw csok dwpVk 'kajk ] lrjke dh oyh dsadw ifUr dwpVk lfr;kjke iq= ik#jkjke tkfr Hkhy lk- nsg [kkrsnkj uk-d-k- 1379] 1380] 1387] 1498] 1524
1094/208 29.09
73 Nxu oYn lktu dkSe Hkhy lk- nsg [kkrsnkj 672@210] 673@210] 214 670/209 0.10
74 fcyk dCtk eqefdu jkT; ljdkj 671/209 0.10
75 Nxu oYn lktu dkSe Hkhy c-l-au- 670@209 lk- nsg [kkrsnkj 672/210 21.00
76 cljn ] lnj ] nxu firk lktu 673/210 21.11
77 etuk ] nsok firk euth dkSe Hkhy 1@72 Bkj eksgen utjvyh] bczkghe[kkau ] ehjeksgen firk nks"k eksgen ] lyhe ] twlc firk ifj;k[kku 1@2 'kkgehj v;wc firk 'ksj eksgen 1@4 utjvyh iq= nks"k eksgen 1@8 dkSe eqlyeku lk- nsg [kkrsnkj jgu utjvyh ehjeksgen fi- nks"k eksgen dk [kkrsnkj jgu chlhlhch 'kk[kk ckyksrjk ds i{k esa jgu Bkjeksgen iq= nks"k eksgen dk fgLlk chlhlhch pkSgVu jgu 'kkgehj v;wc firk 'ksjeksgen dk fgLlk chlhlhc pkSgVu esa
674/211 131.10
78 fcyk dCtk eqefdu 675/211 9.01
79 fcyk dCtk eqefdu 676/211 4.01
80 fj?kqckbZ tksts iqj[knku dkSe pkj.k lk- nsg [kkrsnkj 212 66.04
81 Nxu oYn lktu oxSjk tkfr Hkhy c-la-u- 206 [kkrsnkj 213 170.02
82 Nxu oYn lktu oxSjk tkfr Hkhy c-la-u- 670@209 [kkrsnkj 214 104.06
83 oyheksgen ] lkgq[kkau firk [kkuw bZnk csok [kuw dkSe eqlyeku lk- nsg [kkrsnkj uk-d-l- 1337 677/215 46.08
84 fcyk dCtk eqefdu /kksjk 678/215 10.00
110 | P a g e
85 veksy[k oYn ouh dkSe es?koky lk- nsg [kkrsnkj 679/249 45.00
86 dLrwjk oYn ouh Hkhek tkfr es?koky c- 27 u-256@195 [kkrsnkj 680/216 14.08
87 ujlnku ] pUnunku firk gj[knku dkSe pkj.k lk- nsg [kkrsnkj 681/216 45.00
88 Bkdjkjke firk Hkh[kkjke ] Nxukjke firk lsgrk dkSe es?koky lk- nsg [kkrsnkj jgu lEiw.kZ 1033/217 28.00
89 xksenk ] rktw fi- veyk tkfr es?koky c-l-u- 1030@197 [kkrsnkj 1034/217 42.08
90 ykNhnsoh tksts izrkcnku tkfr pkj.k c-l-u- 649@190 [kkrsnkj 682/218 16.12
91 psukkjke oYn ekukjke tkfr tkV c-l-u- 650@190 [kkrsnkj 683/218 16.13
92 lksuhnsoh ifRu eaxykjke dkSe es?koky lk-nsg [kkrnskj 219 53.03
93 feljh oYn ehj[kku dkSe eqlyeku lk-nsg [kkrsnkj jgu ,lchchts 'kk[kk pkSgVu ds i{k esa 684/220 44.02
94 ykNhnsoh tksts izrkkcnku dslwnku iq= izrkcnku dkSe pkj.k ca-l-u- 646@186 [kkrsnkj 685/220 22.02
95 nksLrvyh oxSjk eqlyeku c-l-u- 9 [kkrsnkj 686/221 8.06
96 pkdj[kku oxSjk eqlyeku c-l-u- 620@164 [kkrsnkj 687/221 5.10
97 'kjhQ[kka oYn nksnk[kka dkSe eqlyeku lk- nsg [kkrsnkj 688/222 25.04
98 eywd ] iuw nkSyk firk deyk lksuh csok deyk dkSe eqlyeku lk- nsg [kkrsnkj 689/222 55.05
99 'kknh[kka oYn vyu[kka dkSe eqlyeku lk- nsg [kkrsnkj 690/222 36.00
100 xSj eqefdu lM+d ihMCY;qMh 691/222 16.16
101 ohjek] usuw firk iwjk tkfr tkV 1@3 fgLlk eywd iUuk nkSyk firk deyk ] lksuh csok deyk 1@3 ethn oYn oyh eksgen lgh oYn [kkueksgen 2@9 fgLlk tqek oYn ykyw 1@9 fgLlk dkSe eqlyeku lk- nsg [kkrsnkj
692/222 181.01
102 yPNkjke iq= enjke firk ihjkjke tkfr tkV lk- nsg [kkrsnkj 693/222 90.00
103 bUnzksnsoh tksts ujlhaxknku dkSe pkj.k lknh[kka iq= vty[kka dkSe eqlyeku lk- nsg [kkrsnkj 694/222 48.00
104 etuk ] nsok firk euth c-l-u- dkSe Hkhy lk- nsg 918@901 [kkrsnkj 695/223 13.02
111 | P a g e
105 nsok iq= euth dkSe Hkhy lk- nsg [kkrsnkj 696/223 13.03
106 ykyw] jQhd ] dkth firk tkuw laxkj ifRu tkuw ] twek vknw fcyky firk ykyw 1@3 lqyseku oYn cw<k 1@3 cpw[kka ekrk eywdh 1@3 dkSe eqlyeku lk- nsg [kkrsnkj c-lu- 400
224 54.11
107 glu iq= gscr oyh eksgen lkgq[kk firk [kkuw bZnk csok [kkuw dkSe eqlyeku lk-nsg [kkrsnkj o-l-u- jgu glu iq= gscr 699@275 dk fgLlk ,lchchts 'kk[kk pkSgVu ds i{k esa
697/225 22.05
108 xSj eqefdu lM+d ihMCY;qMh 698/225 3.17
109 glu iq= gscr dkSe eqlyeku c-l-u- 697@225 [kkrsnkj 699/225 35.05
110 fcyk dCtk xSj eqefdu vkcknh 226 46.10
111 fcyk dCtk xSj eqefdu lkj.k 227 0.05
112 ljdkj 1@4 Bkjeksgen ] utjvyh ifj;k[kka] bczkghe ehjeksgen firk nks"k eksgen gkth[kka] [kkueksgen firk 'kksHkkj[kku 1@4 ldhy[kka] 'ksjeksgen firk yky[kka 1@4 [kkueksgen oYn 'ksjk 1@4 dkSe eqlyeku
228 0.04
113 fcyk dCtk xSj eqefdu vokM+k 229 0.12
114 xzke iapk;r chatklj xkSpj 0700/230 20.01
115 xSj eqefdu lM+d ihMCY;qMh 701/203 2.14
116 jk-izk-fo Hkkjs dk ryk uk-d-la- 1341 1025/720 5.00
117 xzke iapk;r chatklj 1026/720 9.19
118 [k.M eq[; fpfdRlk vf.kdkjh lkeqnkf;d Lok- dsUnz pkSgVu uk-d-la- 1502 1094/230 1.00
119 xzke iapk;r chatklj 703/230 1.05
120 fcyk dCtk jkLrk xSj eqefdu jkLrk 231 1.08
121 lhrk csok jketh js'kek ifRu jkeyky foj/kk iq= jkeyky ] lq[kk iq= f'koth dkSe Hkhy lk- nsg gktjksa ifRu j.kNk dSke Hkhy lk lS;n ekSt vyh dk ryk [kkrsnkj uk-d-l- 1405
232 12.05
112 | P a g e
122 'kkgehj ] v;qc firk 'ksjeksgen eq- fHkjkebZ csok 'ksjeksge ] lkgsjkc oYn ldhy [kku ] vkye[kku oYn cpy[kku ] ojh;ke oYn jlwy] vkye oYn cpy[kka dkSe eqlyeku lk- nsg [kkrsnkj
704/233 6.04
123 xSj eqefdu lM+d ihMCY;qMh 705/233 4.04
124 vkye[kka iq= cpy[kka dkSe eqlyeku lk- nsg [kkrsnkj uk-d-la- 706/233 33.01
125 Bkjeksgen oxSjk eqlyeku o0l0u0 510@40 [kkrsnkj 707/234 39.04
126 xSj eqefdu lM+d ihMCY;qMh 708/234 2.11
127 Qkny[kka ] lkgsck[kka] flnhd[kka firk gkth[kka ] tuh oyh] gkth[kka dkSe eqlyeku lk- nsg [kkrsnkj jgu c0l0 Hkw0fo0 cSad
709/234 1.04
128 cljn lnj dqvka 1 710/234 35.09
129 /kukjke iq= ykykjke dkSe tkV c-l-u-lk- usrjkM+ [kkrsnkj 235 5.02
130 xzke iapk;r chatklj 711/236 516.06
131 jktdh; izkFkfed fo|ky; chatklj 712/236 5.00
132 lkoZ- Vkadk xzke iapk;r chatklj 713/236 0.10
133 lkoZ- Vkadk xzke iapk;r chatklj 714/236 0.10
134 xzke iapk;r chatklj 715/236 10.00
135 fcyk dCtk xSj eqefdu jkLrk 716/237 27.14
136 xSj eqefdu lM+d ihMCY;qMh 717/237 0.02
137 fcyk dCtk xSj eqefdu jkLrk 238 1.02
138 xSj eqefdu xkSpj xzke iapk;r chatklj 239 68.14
139 Bkdjk ] ghjk ] xq.kslk firk prjk dkSe tkV lka- Hkwfe;k [kkrsnkj 290 44.06
140 fcyk dCtk eqefdu 761/292 0.15
113 | P a g e
141 nkukjke oYn nsnkjke 1@2 iwjksa ifRu nkukjke 1@2 dkSe tkV lk- nsg [kkrsnkj 293 71.03
142 tqek ] tokjk firk lkyw lkdj ] prjk nsly firk lqjtu dLrwwjh ifRu lwjtu lksek ] [kkdw vkpkj fi- ltu dkSe Hkhy lk- nsg [kkrsnkj
297 100.12
143 fcyk dCtk eqefdu 792/313 35.00
144 ekSgEen vdyw firk 'ksaHkw dkSe eqlyeku lk- feBs dk ryk [kkrsnkj 793/313 0.12
145 eksgen oYn 'ksaHkw dkSe eqlyeku lk- feBs dk ryk [kkrsnkj 314 29.08
146 eksgen oYn 'ksaHkw dkSe eqlyeku lk- feBs dk ryk [kkrsnkj 794/315 42.00
147 vdyw oYn 'ksaHkw dkSe eqlyeku lk- feBss dk ryk [kkrsnkj 795/315 42.14
148 lyhe oxsjk fi0 ljknhu tkfr eqlyeku o-l-u- 792@313 [kkrsnkj jgu ,lchchts 'kk[kk pkSgVu ds i{k esaA
316 51.04
149 y{e.knku iq= tokjnku tkfr pkj.k lk- xqekus dk ryk 796/317 44.04
150 fcyk dCtk xSj eqefdu dqvak 797/317 4.00
151 gSnj iq= vtht tkfr eqlyeku lk- feBs dk ryk [kkrsnkj 798/318 11.04
152 lkdwnsoh ifRu y{e.knku pkj.k c0l0u0 787@310 [kkrsnkj 799/318 27.00
153 y{e.knku iq= tokjnku tkfr pkj.k lk- xqekus dk ryk 800/318 43.00
154 gSnj iq= vtht tkfr eqlyeku c0;0u0 789@311 801/318 27.00
155 tsBkjke iq= isekjke tkfr tkV lk- nsg [kkrsnkj 319 21.05
156 feagckbZ ifRu tslkjke 1@2 ljhQ ifRu ns'kyjke 1@2 tkfr Hkhy lk- feBs dk ryk 803/320 50.00
157 tqek iq= lkyw tkfr Hkhy lk0 nsg [kkrssnkj 804/320 50.00
158 lkdj ] pwrjk ns'ky firk lqjtu dLrwjh ifRu lqjtu tkfr Hkhy lk0 nsg [kkrsnkj 805/320 50.00
159 fcyk dCtk eqefdu 806/320 50.00
114 | P a g e
160 vkjck ] tqek firk Msdw tkfr es?koky lk0 nsg [kkrsnkj jgu tqek iq= Msdw dk 1@2 fgLlk ch0lh0lh0ch0 'kk[kk pkSgVu ds i{kesa ukdlk0 1430
807/320 50.00
161 fcyk dCtk eqefdu 808/320 50.00
162 lksek ] pkkdw vkpkj firk ltu tkfr Hkhy lk0 nsg ][kkrsnkj 809/320 50.00
163 tokjk iq= lkyw tkfr Hkhy lk0 nsg [kkrsnkj 810/320 46.00
164 Hkwjk] vkbZnku firk l[kh ] ltuh ifRu l[kh tkfr Hkhy lk0 nsg [kkrsnkj 811/320 60.00
165 flU/ky iq= y[kw tkfr Hkhy lk0 nsg [kkrsnkj 812/320 40.00
166 gsejkt ] lfr;k firk dkNck 1@2 eklhaxk iq= oLkUr 1@2 tkfr Hkhy lk0 ckcM+h dyk [kkrsnkj
813/320 20.00
167 fcyk dCtk eqefdu 814/320 4.00
168 gsejkt ] lfr;k firk dkNck 1@2 eklhaxk iq= oLkUr 1@2 tkfr Hkhy lk0 ckcM+h dyk [kkrsnkj
321 76.08
169 thek iq= xkth 1@2 eykj ]iwuek ckny vkbZnku /kks/kk firk jru /kkiw csok jru 1@2 tkfr Hkhy lk0 nsg [kkrsnkj
322 48.05
170 puk iq= ewck tkfr eqlyeku lk0 feBs dk ryk [kkrsnkj 460/323 58.05
171 rkjk iq= lkjax /khjk firk lqjtu mrek ] fe;katy firk vklh;k 1@2 lktu ek/kq hek [ksrk firk lrkj ] ykfN;k ] v.knk firk y[kq jktk ] vpyk dsljk firk iwueka 1@2 tkfr Hkhy lk0 feBs dk ryk [kkrsnkj
323 180.08
172 'kkgehj iq= Hkksek tkfr eqlyeku lk0 nsg [kkrsnkj c0l0u0 325] 329]330 853@368 324 11.04
173 'kkgehj iq= Hkksek tkfr eqlyeku lk0 nsg [kkrsnkj c0l0u0 324 325 21.02
174 nksLrvyh ] bLekbZy ] g;kr firk gqlSu ] ckbZ csok gqlSu ] ckyyw xwyeksgen firk desyh ] Qkreka ifRu desyh ] pkdj uwjk ] dkthg firk fldk[kka ljh;r ifRu fldk[kka flfn[kka oYn pkdj[kka tkfr eqlyeku lk0 nsg [kkrsnkj
815/326 53.05
115 | P a g e
175 okxk ] rktk ] nsnk tsBh;k firk eeMk rqyNh csok eMk] mek ] Hksjk firk isek tkfr tkV lk0 nsg [kkrsnkj
816/326 17.15
176 jghe] lwjk firk pkdj[kka tkfr eqlyeku lk0 nsg [kkrskj 817/326 17.14
177 ujlhaxkjke iq= gjpUnjke tkfr tkV lk0 Hkwf.k;k [kkrsnkj 327 86.04
178 fcyk dCtk xSj eqefdu jkLrk 328 14.04
179 'kkgehj iq= Hkksek tkfr eqlyeku c0l0u0 324 [kkrsnkj 329 27.00
180 cljg lnj 330 28.00
181 nskLrvyh oxSjk eqlyeku c0l0u0 815@326 [kkrsnkj 818/331 32.18
182 okxk ] rktk nsnk tsBh;k firk enk tkfr tkV 816@326 [kkrsnkj 819/331 10.14
183 jghe oxSjk eqlyeku c0l0u0 820/331 11.04
184 ywEck oYn gjth nwnk oYn iSykn dkSe tkV lk0 usrjkM+ 5@6 ujlhaxk oYn gjpaun 1@6 dkSe tkV lk0 lk0 Hkwf.k;k [kkrsnkj c0l0u0 823@352
821/332 79.12
185 ywEck oYn gjth nwnk oYn iSykn dkSe tkV lk0 [kkrsnkj 822/332 50.00
186 ywEck oYn gjth nwnk oYn iSykn dkSSe tkV lk0 nsg [kkrsnkj 823/332 29.12
187 ywEck oYn gjth oxSjk dkSe tkVk c.l0u0 821@332 824/333 62.10
188 psykjke oYn ek[ku ukckfyx dh oyh lHkkbZ csok ek[kku 1@4 yk/kqjke iq= Hkaojkjke 1@4 #eky psru firk lqjrk 1@4 eFkjh ifRu tokjk 1@3 dkSe Hkhy lk0 ehBs dk ryk
825/333 23.12
189 Hkhekjke oYn fo'kukjke dkSe Hkh lk0 feBs dk ryk uk0d0l0 1413 1061/825 0.08
190 lEiw.kZ Hkwfe jktLFkku ljdkj 826/334 51.08
191 vkbZnku iq= ohtk dkSe Hkhy lk0 ckcM+h dyk [kkrsnkj 827/334 51.01
192 tokjk oYn fldk dkSe Hkhy lk0 feBs dk ryk [kkrsnkj 335 185.02
193 fcyk dCtk xSj eqefdu 'kelku 336 9.02
116 | P a g e
194 psykjke oYn ek[ku ukckfyd dh oyh lHkkbZ csok ek[kku 1@4 yk/kqjke iq= Hkaojkjke 1@8 pkSFkkjke iq= fldk 1@8 vfy;k oUn xwyk 1@2 dkSe Hkhy lk0 feBs dk ryk [kksrnkj uk0d0l0 1501
337 102.02
195 psykjke oYn ek[ku ukckfyd dh oyh lHkkbZ csok eek[ku vyh;k oYn xwyk eax oYn esgjk.k dkSe Hkhy
338 28.14
196 lksuk oYn flfd;k dkSe Hkhy lk0 feBs dk ryk [kkrsnkj 828/328 34.13
197 veuk ] Hkaojk ] tokjk pkSFkk ] lksuk firk fldk dkSe Hkhy lk0 nsg [kkrsnkj uk0d0l0 831@344
829/342 34.14
198 [kq'kky ] enw firk rksxk dkSe es?koky lk0 nsg [kkrsnkj uk0d0l0 1404 830/344 20.09
199 veuk ] Hkaojk ] tokjk pkSFkk ] lksuk firk fldk dkSe Hkhy lk0 nsg [kkrsnkj 831/344 74.17
200 Hkaojk oYn flfd;k dkSe Hkhy lk0 feBs dk ryk [kkrsnkj 832/344 35.08
201 fcyk dCtk eqefdu 833/344 1.00
202 lksukjke iq= oukjke dkSe es?koky lk0 feBs dk ryk [kkrsnkj jgu lEiw.kZ Hkwfe chlhlhch 'kk[kk pkSgVu ds i}k uk-d-la- 1440
1008/344 18.00
203 Mstw oYn lkjax dkSe es?koky c0l0u0 569@121 [kkrsnkj 852/368 25.00
204
205 'ksj[kku ] vyh[kku ] ehj[kku firk vej jlhnk csok vej dkSe eqlyeku lk0 feBs dk ryk [kkrsnkj
369 44.10
206 cljg lnj 370 68.17
207 eaxw oYn esgj.k dkSe Hkhy lk0 feBs dk ryk lksukjke oYn lxrkjke dkSe Hkhy lk0 cykm r0 ckM+esj [kkrsnkj
371 54.10
208 vjtu oYn [kkuw dkSe es?koky lk0 feBs dk ryk [kkrsnkj 854/372 33.05
117 | P a g e
209 lR;ukjk;.k dkywjke ] /kukjke firk Hkaojyky xhxh csok Hkaojyky iqj[kjkt vxzoky ysgjhnsoh ifRu lksukjke dkSe es?koky lk0 feBs dk ryk [kkrsnkj
855/372 33.05
210 djuhnu oYn ukFkwnku dkSe pkj.k lk0 nsg [kkrsnkj c0l0ua0 972@446 856/373 34.06
211 fpfu;k oYn iuk dkSe Hkh lk0 nsg [kkrsnkj 857/373 60.00
212 [kkuw oYn chtyk ] psuk oYn [kkuw ] ouk oUn [kkuw ] vtZu oYn [kkuw dkSe es?koky lk0 feBs dkryk
858/373 42.00
213 pkdj[kkau ] uwjk[kku dkth[kka 859/374 47.00
214 vjckc iq= dkEHkw dkSe eqlyeku lk0 feBs dk ryk 860/374 23.17
215 lR;ukjk;.k ] dkywjke ] /kukjke firk Hkaojyky xhxh csok Hkaojyky ] iq[kjkt ] eksguyky ] jkefd'kksj firk ykypUn dkSe vxzoky lk0 pkSgVu [kkrsnkj
861/374 47.05
216 usuw csok esgkjkt] lqjtkjke ] vpykjke ][ksjktjke ] nekjke firk esgjke dkSe tkV lk0 iksdjklj ekgch oYn beke dkSe eqlyeku lk0 feBs dk ryk [kkrsnkj
375 84.02
217 fcyk dCtk xSj qefdu vkcknh 376 13.08
218 fcyk dCtk xSj eqefdu lkj.k 377 0.08
219 BkjeksgEen ] utjvyh] bczkghe ehjeksgen fi- nks"keksgen lyhe ] tqlc firk ifj;k[kku 1@8 Qkny[kka] lkgsc[kka] flfnd[kka firk gkth[kka] tuh ifRu gkth[kka [kkueksgEen oYn 'kksHkkj[kku 1@8 ljdkj 1@4 tkuh[kka oYn vyw[kka 1@4 eksle[ka oYn ifj;k[kka 1@4 dkSe eqlyeku lk0 nsg [kkrsnkj
378 0.03
220 fcyk dCtk xSj eqefdu vokM+k 379 0.13
118 | P a g e
221 tkuh[kku] jetku firk vyq[kka 1@8 dUnw[ka lksuk firk xqyke ] vyheqjkn oYn ehjglu] xkoj fnyw firk tyky 1@8 eqjknvyh tqek jkgevyh firk eka>kh 1@6 eqjknvyh oYn tkM+k 1@16 egktu 1@16 ljdkj 1@16 vynkj jghe] lqjk ] fldk] flnhd firk pkdj 1@16 ukth ifRu ehjglu eqjknh ifRu vgen tsuh ifRu eqjknh 'ksjeksgEen xksjke ykyh ewjknh firk eukbZ 1@8 erq[kka oYn vyh[kka ] vyh[kku oYn nkm[kku 1@16 yksxk ehBky vgenglu firk xqykevyh vyw oYn Qrk 1@16 dkSe eqlyeku lk0 nsg [kkrsnkj
380 0.09
222 oljg lnj 381 0.03
223 oljg lnj 382 0.06
224 fcyk dCtk xSj eqefdu vkcknh 383 166.14
225 xSj eqefdu xSpj xzke iapk;r chatklj 864/384 14.08
226 xSj eqefdu xSpj xzke iapk;r chatklj 865/384 366.09
227 ou foHkkx 866/384 625.00
228 ou foHkkx 867/384 625.00
229 ih,pbzMh- ftyk [k.M nf{k.k ckM+esj 864/384 1.05
230 xzke iapk;r chatklj 867/384 9.00
231 xzke iapk;r chatklj 870/384 2.05
232 xzke iapk;r chatklj 871/384 30.10
233 xzke iapk;r chatklj 872/384 8.05
234 oljg lnj 873/384 3.00
235 oljg lnj 874/384 2.00
236 Hksjkjke oYn jkekjke lqjrkjke oYn jkekjke] gjthjke oYn ohjekjke dkSe tkV lk0 nsg [kkrsnkj jgu gjth ds fgLls dh Hkwfe ,lchchts 'kk[kk pkSgVu ds i{k esa
875/385 30.00
119 | P a g e
237 xSj eqefdu lM+d ihMCY;qMh 876/385 9.18
238 [ksrkjke iq= uhEckjke dkSe tkV lk0 nsg [kkrsnkj uk0d0l0 1344 ] 1352 c0l0u0 1049 ] 879 1027/877 14.00
239 txkjke iq= uhEckjke dkSe tkV lk0 nsg [kkrsnkj uk0d0l0 1344] 1352 c0l0l 1048@879 1028/877 14.00
240 [kwekjke iq= uhEckjke dkSe tkV lk0 nsg [kkrsnkj uk0d0la0 1352 c0l0ua0 1045@879 1029/877 14.00
241 iqj[kkjke i= uhEckjke dkSSe tkV lk0 nsg [krsnkj uk0d0la0 1352 c0l0u0 1045@879 1040/878 8.15
242 Hksjkjke iq= jkorkjke dkSe tkV lk nsg [kkrsnkj uk0d0la0 1352 c0l0u0 1045@879 1041/878 8.15
243 xaxkjke iq= jkorkjke dkSe tkV lk0 nsg [kkrsnkj c0l0ua0 1046@879 uk0d0la0 1352 1042/879 1046/879
8.15 21.13
244 txjke iq= uhWEckjke dkSe tkV c0l0ua0 1028@877 1043/878 26.05
245 iqj[kkjke iq= jkorkjke dkSsSe tkV lk0 nsg [kkrsnkj c0l0ua0 1046@878 1044/879 21.13
246 Hksjkjke iq= jkorkjke dkSe tkV lk nsg [kkrsnkj c0l0ua0 104@878 1045/879 21.13
247 txjke iq= uhWEckjke dkSe tkV c0l0ua0 1028@877 1047/879 4.11
248 [kwekjke iq= uhEckjke dkSe tkV lk0 nsg [kkrsnkj c0l0ua0 1027@877 1048/879 29.14
249 [ksrkjke iq= uhEckjke dkSe tkV lk0 nsg [kkrsnkj c0l0u0 1027@877 1049/879 29.14
250 nyk iq= djuk 2@3 dkS'kykjke iq= djukjke 1@3 tkfr tkV lk0 nsg [kkrsnkj 880/385 42.00
251 Hksjkjke ] lqjrkjke firk jkekjke 1@2 gjth iq= ohjekjke 1@2 tkfr tkV lk0 nsg [kkrsnkj jgu gjthjke ds fgLls dh Hkwfe ,lchchts 'kk[kk pkSgVu ds i{k esa
881/385 12.02
252 oljg lnj 882/385 52.00
253 jkxkik- rklyh ukMh c0l0ua0 1007@586 chbZbZvks iapk;r lfefr pkSgVu 1006/385 1.10
254 lkgehj oxSjk eqlyeku c0l0ua0 704@233 [kkrsnkj 883/386 12.16
255 psuk iq= ekuk tkfr tkV c0l0ua0 650@190 lk0 nsg [kkrsnkj 885/386 46.09
256 gMqeku iq= nyk ] jk;ey iq= ykyk tkfr tkV lk0 usrjkM+ [kkrsnkj 886/386 38.00
257 Hkejk] xkth ] psyk] [keh'kk firk Qwyq tkfr es?koky lk0 nsg [kkrsnkj 387 24.13
120 | P a g e
258 /kuk ] dkyw ] [kek.kk firk ehjk] dudksa ifRu ehjk tkfr Hkhy lk0 nsg [kkrsnkj uk0d0la0 1470
915/395 21.08
259 uhEcnku iq= jk.khnku tkfr pkj.k lk0 nsg [kkrsnkj 916/395 50.00
260 lkgehj ] v;wc firk 'ksjeksgen tkfr eqlyeku c0l0u0 704@233 396 32.07
261 lhrk csok jketh dkSe Hkhy c0la0u0 232 [kkrsnkj 397 29.13
262 vehjcDl iq= gSnj tkfr eqlyeku c0l0ua0 39 [kkrsnkj 398 57.02
263 fcyk dCtk xSj eqefdu jkLrk 399 8.02
264 ykyw] jQhd ] dkth firk tkuw dkSe eqlyeku c0l0ua0 424 [kkrsnkj 400 5.13
265 veh;k csok fo'kuk tkfr es?koky lk0 nsg [kkrsnkj jgu lEiw.kZ Hkwfe chlhlhch 'kk[kk pkSgVu ds i{k esa uk0d0la0 1480
917/401 11.13
266 etuk ] nsok firk euth tkfr Hkhy lk0 nsg [kkrsnkj 918/401 11.13
267 usuw tksts yk/kqnku tkfr pkj.k izdk'kpUn iq= x.ks'key lksuh lk0 pkSgVu ] ehjeksgen iq= nksleksgen 1@2] izdk'kpUn iq= x.ksley lksuh lk0 pkSgVu v;qc iq= 'ksj ekgen ] fHkjkbZ csok 'ksjeksa ] utjvyh iq= nksleksa0 dkiM+h] vktkn firk uckc 1@8 eywd ] iuw nksyk firk deyk lksuh csok deyk lksuh csok deyk 1@8 tkfr eqlyeku lk0 [kksrsnkj jgu uwuw ifRu yk/kqqnku dk fgLlk chlhlhch 'kk[kk pkSgVu
919/402 45.01
268 fcyk dCtk eqefdu 920/402 1.09
269 bUnzknsoh tksts cq/kkjke 1@2 dkSe Hkhy lk0 vkafV;k ] lq[kk iq= f'koth tkfr Hkhy lk0 nsg bUnzknsoh ifRu cq/kkjke lk0 vakfV;k] [ksrwnsoh ifRu 'kadjyky 1@2 tkfr Hkhy lk0 y[kokjk uk0d0la0 1398 ] 1405 ] 1419
403 49.07
270 pkS[kkjke iq= flejFkkjke tkft es?koky lk0 nsg [kkrsnkj 404 43.00
271 chtyk ] flyy firk y[kw ccjh csok Hkwjk ]vkbZnku firk l[kh ] ltuh ifRu l[kh 1@2 js[kk ifRu Hkk.kthjke 1@2 dkSe Hkhy lk0 nsg [kkrsnkj
405 45.00
121 | P a g e
272 eksguyky ] jes'k iq= hs[kkjke ukckfyd dk oyh 'ks[kkjke iq= xM+lkjke 1@2 /kukjke iq= esgdk 1@2 tkfr eqlyeku lk0 nsg [kkrsnkj
406 82.12
273 vjtu] teky deyk firk vtk ikjk firk dyk tkfr Hkhy lk0 nsg [kkrsnkj jgu vjtu iq= vtk dk fgLlk chlhlhch 'kk[kk pkSgVu ds i{k esa
407 120.12
274 prw iq= ohjk tkfr Hkhy lk0 nsg [kkrskj jgu lEiw.kZ Hkwfe cSd vkWQ cM+kSnk ds i{k esa uk0d0la0 1370
921/408 39.07
275 ik# iq= dyk tkfr Hkhy lk0 nsg [kkrsnkj 922/408 39.07
276 [kehlk iq= ouk 1@4 #ik] rksrk firk xtw 1@4 fdjrk dwEHkk firk gjth ] >heksa ifRu gjth 1@4 tkfr Hkhy lk0 nsg [kkrsnkj jgu #ik iq= xwyq dk fgLlk chlhlhch ;kk[kk pkSgVu ds Ik{k esa jgu fdjrkj] dwEHkk firk gjth ] <heksa ifRu gjth dk fgLlk ,lchchts 'kk[kk pkSgVu ds i{k esa jgu [keh'kk iq= ouk dk fgLlk chlhlhch 'kk[kk pkSgVu ds i{k esa
409 97.01
277 [kkueksgen iq= 'kksHkkj[kka tkfr eqlyeku ca0l0u0 511@40 [kkrsnkj 923/410 80.00
278 rstkjke ] fo'kukjke xaxkjke ] inekjke ] fo'kukjke isekjke ] xksj/kujke ] y{e.kjke firk lkekjke tkfr tkV lk0 xksajksa dk ryk [kkrsnkj
924/410 90.00
279 puslj] nfj;k[kka] xuh firk Qs#[kka tkfr eqlyeku lk0 nsg [kkrsnkj 925/410 89.19
280 lqYrku[jjau oYn lkgq[kka ] clk;k ] lkghnkn ] djhenkn firk guhQ[kka glu ifRu guhQ[kka tkfr eqlyeku lk0 nsg [kkrsnkj ek;knsoh ifRu 'kadjflag jktiqjksfgr lk0 pkSgVu lHkkbZ csok nknk[kka ihjcDl ] dkys[kka firk dsj[kka] deh csok dsgj[kka tkfr eqlyeku lk0 nsg [kkrsnkj jgu ihjcDl iq= dsgj[kka ds fgLlk chlhlhch 'kk[kk pkSgVu ds i{k esa
926/410 30.00
281 ghjnku ] djuhnku firk iqj[knku ] fj?kqckbZ csok iqj[knku tkfr pkj.k lk0 nsg [kkrsnkj jgu ghjnku iq= iqj[knku iq= dk fgLlk chlhlhch 'kk[kk pkSgVu ds i{k esa uk0d0la0 1436
927/410 60.00
282 oljg lnj 928/410 30.00
122 | P a g e
283 iSykn ] Jksjk ukuth ] teky firk galk tkfr Hkhy lk0 nsg [kkrsnkj jgu Hksjk iq= galk dk fgLlk chlhlhch 'kk[kk pkSgVu ds i{k esa uk0d0la0 1427
929/411 931/411
46.15 2307
284 oljg lnj 930/411 23.08
285 fdjik iq= izHkw 1@2] tqek jk;/ku ] pfu;k ] #?kk puw firk iwuw /kkaf/k;k iq= feBw 1@3 ] vjtu ] etky deky fir vtk 1@3 QksVk fdjik e?kq firk jk.kk 1@4 tkfr Hkhy lk0 nsg [kkrsnkj
412 2.14
286 ik# iq= dyk ] vjtu ] teky ] deky firk vtk tkfr Hkhy lk0 nsg [kkrsnkj 413 0.08
287 QksVk [ fdjik e?kq] firk jk.kk /kkaf/k;k iq= feBw ] tqek iq= iuw 1@2 lkseth iq= xwykc 1@2 tkfr Hkhy lk0 nsg [kkrsnkj
414 105.08
288 eksgen jghe iq= erq[kka oxSjk tkfr ealyeku c0l0u0 139 [kkrsnkj 415 170.08
289 vyh[kka iq= /kk/kq[kka tkfr eqlyeku lk0 nsg [kkrsnkj 416 86.06
290 facyk dCtk xSj eqefdu 'kelku 417 2.05
291 vjckc iq= y[kkuk 1@2 c0l.u0 933@418 [kaxkj iq= y[kkuk 1@2 tkfr eqlyeku lk0 nsg [kkrsnj
932/418 63.00
292 oljg lnj 933/418 97.10
293 fcyk dCtk xSj eqefdu ukMh 419 1.13
294 fcyk dCtk xSj eqefdu vkxksj 420 17.12
295 /khjkjke oYn Hkha;kjke tkfr es?koky lk0 'kksHkky tSr rg0 xwM+kekykuh 934/421 9.00
296 feJh ] jkek eaxyk firk okyk tkfr Hkhy lk0 nsg [kkrsnkj jgu feJh ds fgLls dh Hkwfe cSad vkWQ cM+ksnkj ds i+k esa jgu jkek iq= okyk dk fgLlk dh Hkwfe ,lchchts 'kk[kk pkSgVu ds i{k esa
935/421 58.04
297 gsekjke ] Hkksekjke firk ekukjke tkfr tkV lk0 fclkj.kh;'k [kkrsnkj 936/422 40.04
298 gM+weku iq= ohjek ] js[kk iq= lksuk tkfr tkV lk0 usrjkM+ o Hkwwf.k;k [kkrsnkj o fgLlk cjkoj jgu ,lchchts 'kk[kk pkSgVu ds i{k esa js[kk ds fgLlk dh Hkwfe jgu uk0d0la0 1354
737/422 80.00
123 | P a g e
299 eksgen jghe iq= er[kka jk.k[kka] nhuk[kka firk cow[kka l[kh csok cpw[kka buk;r[kka 'ksjk] bZ/ky firk gkth[kka ] lksuw csok gkth[kka 'kghnk csok erw[kka ] eks0 ulhj firk vyw eksgen oyheks0 firk yksx tkfr eqlyeku lk0 nsg [kkrsnkj
462/423 35.15
300 eken] vkgen ] lyhe ] vjckc uckc[kka ] ekslu firk lqekj bZfr;ka ifRu lqekj 2@3] fiuy iq= eh# 1@3 tkfr eqlyeku lk0 nsg [kkrsnkj uk0d0la0 1531
423 282.12
301 bLer iq=h cpk;k ] yk[kk iq= gsek mQZ bsly ] they iq= ckny jgeku ] jghe firk nhuw tkfr eqlyeku lk0 feBs dk ryk [kkrsnkj uk0d0la0 1422
424 170.14
302 eken] vkgen ] lyhe ] vjckc uckc[kka ] ekslu firk lqekj bZfr;ka ifRu lqekj fiuy ] fe;kty uwjk firk dh# 1@2 tyky iq= HkkbZ[kka ] veu csok HkkbZ[kka ] vyheqjkn ] deky ] jgerqyk firk g;kr [kka ] ejh;e ifRu g;kr [kka ] ika/kh[kka iq= teky[kka 1@2 tkfr eqlyeku lk0 nsg [kkrsnkj ika/kh iq= teky [kka dk fgLlk chlhlhch 'kk[kk pkSgVu d i{k esa jgu uk0d0la0 1447]1485] 1531iq= eh# 1@3 tkfr eqlyeku lk0 nsg [kkrsnkj uk0d0la0 1531
1003/425 101.03
303 jkxkik eh# dk ryk chbZbZvks iapk;r lfefr pkSgVu 1004/425 3.00
304 xwyke ] gchc firk eqlk iq= vehj ] [kkueks0 ehj[kka] vehj[kka ,ye[kka firk vkjc ] y[keksa csok vjckc ewlk iq= vehj tkfr eqlyeku lk0 feBs dk ryk
426 55.19
305 otknhu iq= fe;kty tkfr eqlyeku lk0 l#is dk ryk lkSdr vyh iq= vn#i ] jetku oq= geku djhe iq= vCnwyl ] tek ] leu] veu ] [keh'kk firk ok;n the;r ifRu ok;n tkfr eqlyeku lk0 feBs dk ryk ] gdhe ] dkle firk ewchu tkfr eqlyeku lk0 l#is dk ryk [kkrsnkj
427 90.12
306 tyky iq= HkkbZZZZZZZZZZZZ[kka ] veu csok HkkbZ[kka tkfr eqlyeku lk nsg [kkrsnkj 428 31.18
307 ewgjk.k oYn gdhe tkeh] cgknwj dpjk firk bZ'kkd ] 'kjknhu oYn nhuk ewjknh csok nhuk dkSe eqlyeku lk0 feBs dk ryk [kkrsnkj jgu ,sglku oYn gdhe o tkehu oYn bZlkd ds fgLls dh Hkwfe chlhlhch 'kk[kk pkSgVu ds i{k esa
429 66.12
124 | P a g e
308 ldwj oYn lkcnkjdkSe Hkhy lk0 nsg [kkrsnkj 938/430 25.00
309 [ksekjke oYn Hksjkjke dkSe Hkhy lk0 dkstk rglhy xwM+kekykuh [kkrsnkj 939/430 30.00
310 Hkejk] xkth ] psyk ] [keh'kk firk Qwyq tkfr es?koky lk0 nsg [kkrsnkj 940/430 19.14
311 gdheka csok jruk dkSe Hkhy lk0 nsg [kkrsnkj 431 70.03
312 djheka oYn vCnwyk dkSe eqlyeku lk0 nsg [kkrsnkj 941/432 86.12
313 nksyw oYn djhe dkstk oYn [kaxkj 1@2 djhe oYn vCnwyk 1@2 dkSe eqlyeku lkfdu feBs dk ryk
942/442 44.00
314 fcyk dCtk xSj eqefdu /kksjk 433 184.08
315 lyhe iq= vyh dkSe eqlyeku lk0 feBs dk ryk xSj [kkrsnkj uk0d0la0 1496 1090/435 10.00
316 eken] vkgen] lyhe ] uckc] esklu firk lqekj bZfr;k ifRu lqekj] fiuy fegkty uwjk fir uqjek 1@2 ykyw ] jQhd dkth[kka firk tku lq?kkj ifRu tqek ] vknq foyky firk ykyw olk;k oYn lqyseku eqlyeku xksekjke ] etukjke ] gjnkujke ] fdjrkjke firk e/kkjke t;jke iq= nykjke dkSe tkV 1@2 lk0 nsg [kkrsnkj
434 192.14
317 vyh iq= lkscnkj dkSe eqlyeku lk0 feBs dk ryk lk0 [kkrssnkj 943/435 9.13
318 gknh[kka ] ckcw[kka ] vljQ[kka ] jgeku[kka jghe[kka ] bLekbZy [kka firk they[kka dkSe eqlyeku lk0 feBs dk ryk
944/435 77.01
319 vn#i ] uckc ] vjckc firk ehjk dkSe eqlyeku lk0 feBs dk ryk [kkrsnkj jgu vn#i oYn ehjk dk 1@3 fgLlk chlhlhch 'kk[kk pkSgVu ds i{k esa
945/435 38.10
320 ewjknk /keZifRu daHkhj] 'kjknhu ] otknhu firk lkscnkj dkSe eqlyeku lk0 feBs dk ryk [kkrsnkj uk0d0la0 1349
946/435 28.18
321 fcyk dCtk xSj eqefdu /kksjk 947/436 8.00
322 xzke iapk;r chatklj 948/436 260.02
323 eks0 jghe iq= erq[kka oxSjk eqlykeu c0la0u0 60 [kkrsnkj 437 46.14
125 | P a g e
324 dsadwnsoh ifRu lkdjjke dkSe es?koky lk0 nsg [kkrsnjk uk0d0la0 1451 1069/438 18.00
325 Qwlk oYn xwyk dkSe es?koky lk0 nsg [kkrsnkj 1070/438 37.08
326 gchc oYn xM+lk dkSe es?koky lk0 nsg [kkrsnkj jgu lEiw.kZ Hkwfe ,lchchts 'kk[kk pkSgVu ds i{k esa
949/439 28.01
327 iqj[kk oYn xM+lk dkSe es?koky lk0 nsg [kkrsnkj jgu lEiw.kZ Hkwfe ,lchchts 'kk[kk pkSgVu ds i{k esa
950/439 50.01
328 eksgu] psuk firk exw dkSe Hkhy lk0 nsg [kkrsnkj uk0d0la0 1517 951/439 34.00
329 gsek oYn dslkjke 1@3 dkSe tkV ckNM+km] Hkxrkjke ] nykjke ] /kukjke ] rxkjke] Hkk#jke ] dkNqjke firk [kha;kjke v.knkjke oYn tlksrkjke eqlyeku lkeksa csok [kh;kajke 1@3 dkSe tkV lk0 xksjksa dk ryk ¼/kukm½
440 96.02
330 lyhe iq= ifj;ka[kk 1@21 lQH oYn cpw 8@21 lyhe ] tqlc firk ij;k[kka 11@56 dkSe eqlyeku e?kkjke iq= [kh;kajke dkSe tkV 3@8 lk0 nsg [kkrsnkj uk0d0la0 1361] 1534
952/441 82.15
331 Hksjkjke oYn isekjke dkSe tkV lk0 usrkjkM+ [kkrsnkj 953/441 32.09
332 ewykjke ] vejkjke ] xq.kslkjke firk nekjke dkSe tkV lk0 nsg [kkrsnkj 954/441 21.11
333 okxk ] rktk ] nsjk tsBh;k firk enkjke ] Hksjkjke nekjke firk isekjke dkSe tkV lk0 usrjkM+ [kkrsnkj
955/441 28.15
334 'kadjnku iq= ukFkwnku dkSe pkj.k lk0 nsg [kkrsnkj 956/442 18.00
335 ekaxhnsoh ifRu vejkjke dkSe tkV lk0 nsg [kkrsnkj uk0d0la0 1469 1073/442 6.00
336 vthrnku ] ukFkwflag] uhEcnku firk xksj/kunku dkSe pkj.k lk0 /kukm [kkrsnkj 957/442 63.01
337 uwjeksgen ] lyhe[kka gchcyk firk [kaxkj dkSe eqlyeku lk0 feBs dk ryk [kkrsnkj 958/442 48.00
338 [kaxkj oYn y[kkuk ] uwjeksgen ] lyhe ] gchcqyk vehj firk [kaxkj dkSe eqlyeku lk0 nsg [kkrsnkj
959/4424 54.00
339 ewykjke] vejkjke firk nekjke dkSe tkV lk0 nsg [kkrsnkj 960/442 26.00
126 | P a g e
340 feJh oYn okyk tkfr Hkhy lk0 nsg [kkrsnkj jgu feJh ds fgLls dh Hkwfe cSad ckWQ cM+ksnk ds i{k esa uk0d0l0 1373
961/442 7.18
341 vyh[kka ] gkth[kka firk xQwj[kka dkSe eqlyeku lk0 feBs dk ryk [kkrsnkj uk0d0la0 1410 962/442 69.12
342 lEiw.kZ Hkwfe jkt0 ljdkj 1057/962 0.08
343 dwEHkkjke ] vpykjke firk lksukjke dkSe tkV lk0 nsg [kkrsnkj 963/442 47.03
344 jkepUnnku oYn ykynku dkSe pkj.k lk0 nsg [krsnkj jgu 964/443 54.04
345 ik# oYn l#Ik dkSe Hkhy lk0 nsg [kkrsnkj c0la0u0 976@448 965/443 7.00
346 [ksrw ifRu Vhdekjke dkSe es?koky lk0 nsg [kkrsnkj jgu lEiw.kZ Hkwfe chlhlhch 'kk[kk pkSgVu ds i{k esa uk0d0la0 1347]1479
966/443 15.00
347 jkepUnnku oYn ykynku dkSe pkj.k lk0 nsg [krsnkj jgu ,lchchts 'kk[kk pkSgVu 967/443 50.00
348 eugjnku oxSjk pkj.k c0l0ua0 897@390 [kkrsnkj 968/444 19.15
349 lqjtk ] vpyk ]ksjkt nek firk esgkjke dkSe tkV lk0 iksdjklj [kkrsnkj 969/444 40.00
350 tks/kkjke oYn vjtu dkSe es?koky lk0 nsg [kkrsnkj 1347 970/444 35.15
351 y{e.knku oYn ljnkjnku dkSe pkj.k ;k0 lkrk [kkrsnkj 971/444 14.00
352 ewykjke] vejkjke ] xq.kslkjke firk nekjke tkV @2 fpus'kj ] nfj;k[kka xuh firk Qs#[kka 1@2 dkSe eqlyeku lk0 nsg [kkrsnkj
445 50.08
353 djuhnku oYn ukFkwnku dkSe pkj.k c0l0ua0 856@373 [kkrsnkj 972/446 17.00
354 yhyk doaj /keZifRu ls.khnku ] nfj;k doaj ifEu es?knku dkSe pkj.k lk0 nsg [kkrsnkj uk0d0la0 1366
973/446 54.01
355 fcyk dCtk eqefdu 974/446 1.00
356 bUnznku ] jkepUnnku firk eywdnku dkSe pkj.k lk0 nsg [kkrsnkj 975/446 36.00
127 | P a g e
357 bUnznku oYn HkkbZ[kka ] vet csok HkkbZ[kka ] vyheqjkn] deky ] jsgerqy firk g;kr[kka ejh;e ifRu g;kr[kka] ika/kh[kka oYn teky[kka 1@4 esgjkyh ] gkth[kka] guhQ ] eywd forl erkjk] dk;ek ifRU etkjk1@4 xwyke oYn lqyseku] dkstk oYn [kaxkj 1@2 dkSr eqlyeku lk0nsg [kkrsnkj jgu&tyky iq= HkkbZ[kka dk fgLlk chlhlhch 'kk[kk pkSgVu ] jgu& esgjk] dk fgLlk chlhlhch 'kk[kk pkSgVu ds i{k esa jgu xwyke oYn eyksxu dkstk iq= [kaxkj dk 1@2 fgLlk chlhlhch 'kk[k pkSgVu ds i{k esa
447 300.14
358 esok oYn vk'kk dkSe Hkhy lk0 nsg [kkrsnkj jgu ,lchchts 'kk[kk pkSgVu ds i+k esa jgu uk0d0la0 1374
977/448 53.04
359 eh# oYn ckadk dkSe Hkhy lk0 nsg [kkrsnkj 978/448 40.00
360 'ksEHkw ] gkde ] gek ] ewds'k firk izrkck ] yw.kh ifRu izrkck ] lkdkj ] lkdkj iq= vkjc ] e#vk ifRu vkjc dkSe es?koky lk0 nsg [kkrsnkj
979/448 40.00
361 eshjeksgen oYn ckth dkSe eqlyeku lk0 nsg [kkrsnkj 980/449 19.03
362 ewykjke ] fpekjke ] cakdkjke ] ekxkjke firk nekjke tkfr tkV lk0 fclkjf.k'k [kkrsnkj jgu ekaxkjke oYn nkukjke chlhlhch 'kk[kk pkSgVu esa uk0d0la0 1490
981/449 34.10
363 okckjke ] gMqekujke firk 'ksjkjke ccwnsoh csok vukje ] psru iq= vukjke ukckfyx dh oyh ccwnsoh tkfr tkV lk0 nsg [kkrsnkj
982/449 34.11
364 ewykjke ] fpekjke ] cakdkjke ] ekxkjke firk nekjke ] uksth ifRu nkukjke tkfr tkV lk0 nsg [kksrsnkj jgu ekaxkjke oYn nkukjke chlhlhch 'kk[kk pkSgVu esa uk0d0la0 1490
983/449 25.00
365 okxkjke iq= 'ksjkjke eq0 ccwnsoh csok vukjke ] psru iq= vukjke oyh eq0 ccwnsoh tkfr tkV k0 nsg [kkrsnkj
984/449 25.00
366 fdjik iq= QksVkjke tkfr Hkhy lk0 nsg [kkrsnkj 985/450 37.10
367 'ksEHkw iq= QksVkjke tkfr Hkhy lk0 nsg [kkrsnkj 886/450 38.00
368 cljg lnj 987/450 17.00
128 | P a g e
369 cknyhnsoh tksts v[kkjke c0l0ua0 455@134 [kkrsnkj 963/450 38.02
370 tkeyk iq= b'kkd tkfr eqlyeku lk0 nsg [kkrsnkj 987/450 25.00
371 tqek iq= iuw tkfr Hkhy lk0 nsg [kkrsnkj 989/450 60.00
372 fcyk dCtk eqefdu 990/450 50.00
373 eBkjjke iq= xkth ] djekbZ ifRu xkth ] lekuh ifRu Mkgqjke okjh ifRu Vhdekjke tkfr es?koky lk0 nsg [kkrsnkj uk0d0la0 1472
951/451 35.00
374 isek iq= xaxkjke tkfr es?koky lk0 nsg [kkrsnkj 992/451 38.08
375 lqjrk ] veksy[k enk firk mnk ] [kha;k ifRu mdk tkfr es?koku lk0 nsg [kkrsnkj 993/451 35.00
376 [keh'kk iq= ouk tkfr Hkhy lk0 nsg [kkrsnkj uk0d0la0 1350 1039/994 25.06
377 Hkaojkjke iq= Mkejkjke tkfr Hkhy lk0 fyfMh;kyk [kkrsnkj uk0 1038/994 18.00
378 lkdjjke iq= vkjcjke tkfr es?kokyu lk0 nsg [kksnkj c0l0u0 1000@452 jgu lEiw.kZ Hkwfe ,lchchts 'kk[kk pkSgVu ds i{k esa uk0d0la0 1540
995/452 19.00
379 lokbZ ] fxj/kkjh firk js'kek tkfr Hkhy c0l0u0 669@205 [kkrsnkj 996/452 15.00
380 vkye] jes'k firk lkaxk tkfr Hkhy c0l0ua0 476@5 [kkrsnkj 997/452 15.00
381 eBkjjke ] ojtkaxkjke firk xkth ] djekbZ ifRu xkth tkfr es?koky lk0 nsg [kkrsnkj 998/452 15.00
382 vkbZnku iq= 'kadj tkfr es?koky lk0 nsg [krsnkj 999/452 38.06
383 lkdjjke iq= vkjcjke tkfr es?koky c0l0u0 995@452 1000/452 21.00
384 fcyk dCtk eqefdu 1001/453 129.14
385 fd'kuk oYn ik#ey tkfr yksgkj lk0 nsg [kkrsnkj 1002/453 45.00
129 | P a g e
xkSgM+ dk ryk dz-l-
uke dk'rdkj e; ofYn;r tkfr [kljk jdck fo fdLe
1 Hksjkjke oYn Hkkstkjke es?koky 618/116 50.00 ck-lks-
2 dkyk oYn feJh es?koky 619/116 53.08 ck-lks-
3 dsadw snsoh ifEu lkdjjke es?koky 620/116 25.00 ck-lks-
4 lwekj oYn lkek es?koky 621/117 26.02 ck-lks-
5 mrek ] e?kk] jruk] nspUn firk jk;eyes?koky 622/117 44.00 ck-lks-
6 t;jke] Jo.k] lkyejke firk rkjkjke] <syh nsoh ifRu rkjkjkees?koky 623/118 20.05 ck-lks-
7 mrek] e?kk] jruk nspan firk jk;eyes?koky 624/118 30.00 ck-lks-
8 ekVk ] xtk] jktk firk esgwyk es?koky 625/119 54.04 ck-lks-
9 v'kkkds dqekj iq= gLrhey vksloky 425/119 38.02 ck-lks-
10 xksj/ku oYn vuksik es?koky 626/119 5404.00 ck-lks-
11 fcyk dCtk ] jkLrk 120 6.10 xS-eq-jkLrk
12 vljQ] dknw ] otknhu] djhe lqHkku ] ewchu fi- lhnhd e[k.kh csok gkQn eqlyeku 632/123 183.06 ck-lks-
13 vljQ] dknw ] otknhu] djhe] lwHkku ewchu] firk lhnhd 1@2 fgLlk cpk;k tkne] vkne firk gkQn] 1@2 fgLlk
eqlyeku 633/123 179.07 ck-lks-
14 fcyk dCtk ] ewedhu 634/123 1.00 ck-lks-
130 | P a g e
15 jk--xk-- ik-- gkQr dh <k.kh chbZbZvks ia-l- pkSgVu 635/123 3.00 xSj eqefdu Ldwy
16 vesnk oYn vkEck es?koky 582/109 50.00 ck-lks-
17 eywdk oYn euth es?koky 583/109 50.00 ck-lks-
18 rhtk ifRu rksxk es?koky 584/109 72.18 ck-lks-
19 geFkk oYn jkew es?koky 585/109 25.00 ck-lks-
20 Hkhekjke oYn lrjkenkl es?koky 586/109 25.00 ck-lks-
21 rktw oYn vkEck es?koky 587/109 30.00 ck-lks-
22 dpjk oYn vkEck es?koky 780/109 30.00 ck-lks-
23 vdyh] lkjh firk Mkejk 30.00 ck-lks-
24 gM+oUflag ] egkflag] #iflag firk pUnuflag /kuckbZ csok pUnuflagjktiqr 589/109 75.00 ck-lks-
25 mreflag oYn vkbZZnkuflag jktiqr 590/109 60.00 ck-lks-
26 xwekuk ] ukFkk firk jk?kk ] cMw ifRu jk?kk] irq iq=h jk?kkes?koky 591/109 50.00 ck-lks-
27 feJh oYn ewyk es?koky 593/110 50.00 ck-lks-
28 ,sfygkl] eksgenvyh] fi- csjly] gdhe ] ekj[k] lsjk[kka fi- nhuw vklh;r ifRu nhuw dslj ifRu nhuw
eqlyeku 594/110 14.16 ck-lks-
29 ,sfygkl] eksgenvyh] fi- csjly] gdhe ] ekj[k] lsjk[kka fi- nhuw vklh;r ifRu nhuw dslj ifRu nhuw
eqlyeku 595/111 14.16 ck-lks-
30 vljQW] dknw ] otknhu ] djhe lwHkku ] ewchu firk lhnhd ] e[k.kh csok gkQn ] opk;k] tkne] vkne fi- gkQr
eqlyeku 596/111 22.11 ck-lks-
131 | P a g e
31 ,sfygkl oYn osjly eqlyeku 596/111 72.09 ck-lks-
32 tokuflag oYn vs[ksflag jktiqr 597/111 72.00 ck-lks-
33 fcyk dCtk eqedhu 298/112 0.02 ck-lks-
34 uch;k ] veksy[k fi- tyky Qwyk csok tykyes?koky 599/112 40.00 ck-lks-
35 ljnkjk] Hkkxw] dkyw] psru fi- eksVk es?koky 600/112 34.02 ck-lks-
36 vjtu oYn [khagjk es?koky 601/112 9.00 ck-lks-
37 fcyk dCtk eqedhu 602/112 10.17 ck-lks-
38 Jo.k dslk fi- pkUnk ] ukeh ifRu pknka ] eywdk ] vkyk ] fi- >ew ] ccjh ifRu >ew
es?koky 778/112 10.18 ck-lks-
39 xsejk oYn [ksrk es?koky 603/112 73.00 ck-lks-
40 leu daoj ifRu y[kflag jktiqr 604/112 45.03 ck-lks-
41 [kkuw iq= lkbZnkn eqlyeku 636/124 17.07 ck-lks-
42 ck-lks-
43 v'kksd dqekj iq= gLrhey vksloky 638/125 5.18 ck-lks-
44 yk[kk] nspUn firk jkepUn es?koky 639/125 50.00 ck-lks-
45 ojtw ifRu oxrkjke es?koky 126 10.12 ck-lks-
46 djew ] lokbZ ] lxjk] lsEHkw fi- rksxk] deh ifRu rksxkes?koky 127 66.12 ck-lks-
47 oknk ] lkbZnkn fi- tkek eqlyeku 428/127 37.02 ck-lks-
132 | P a g e
48 ljnkjflag iq= lqjrflag jktiqr 128 65.13 ck-lks-
49 fcyk dCtk eqedhu 129 18.18 ck-lks-
50 pkank iq= chatk es?koky 783/129 23.00 ck-lks-
51 gktjh ifRu panw ] djek] chlk] firk pUnw ] eUkth iq=h pUnwes?koky 130 30.03 ck-lks-
52 fcyk dCtk eqedhu 131 2.06 ck-lks-
53 Hkaojk ] 'kadjk] fi- lky[kk Hkhy 133 0.08 ck-lks-
54 Qrsgflag iq= Hkaojflag jktiqr 132 45.02 ck-lks-
55 ink oYn Hkhek es?koky 640/134 41.11 ck-lks-
56 ruwjke oYn fdjrk othj 641/134 49.12 ck-lks-
57 fcyk dCtk eqedhu 755/134 0.08 ck-lks-
58 rxk lkdj] fi- lkcjk eqlyeku 642/134 91.11 ck-lks-
59 t+M+k daoj ifRu eqxyflag jktiqr 135 7.12 ck-lks-
60 facyk dCtk eqefdu 643/136 55.00 ck-lks-
61 facyk dCtk eqefdu 644/136 53.04 ck-lks-
62 bUnzflag oYn ekuflag jktiqr 645/137 41.06 ck-lks-
63 fcyk dCtk eqedhu 646/137 22.00 ck-lks-
64 eaxyflag oYn Hkwjflag jktiqr 137 60.19 ck-lks-
133 | P a g e
65 rxk lkdj] fi- lkcjk eqlyeku 647/139 5.17 ck-lks-
66 vus doaj tksts gjhflag jktiqr 648/139 29.08 ck-lks-
67 ,sfygkl] eksgenvyh ] fi- osjlky] gdhe ekj[k ]'ksj[kku fi- nhuw] vklh;r iq- nhuw dslu ifRu nhuw
eqlyeku 649/140 80.14 ck-lks-
68 ,sfygkl] eksgenvyh ] fi- osjlky] gdhe ekj[k ]'ksj[kku fi- nhuw] vklh;r iq- nhuw dslu ifRu nhuw
eqlyeku 650/140 80.15 ck-lks-
69 652/141 ck-lks-
70 /kkiw ifRu rekph ] ykyk iq=h rekph ] nekjk pkUnk firk vkjces?koky 653/141 40.00 ck-lks-
71 /kkiw ifRu rekph ] ykyk iq=h rekph es?koky 654/141 40.00 ck-lks-
72 d`".k nsoh ifRu cyoUrflg es?koky 654/141 44.00 ck-lks-
73 lokbZflag ] nhiflag] vxjflag ]prjflag fi- eaxyflagjktiqr 142 25.13 ck-lks-
74 djhe ] ekj[k ] fldUn fi- jghe eqlyeku 655/143 10.16 ck-lks-
75 y{eh tksts dsljnku pkj.k 656/143 10.15 ck-lks-
76 fcyk] dCtk xzsQ jkLrk 144 15.14 xS-eq-jkLrk
77 fcyk dCtk xs-eq- jkLrk 145 6.02 xS-eq-jkLrk
78 gktjh ifRu prqjke es?koky 146 19.04 ck-lks-
79 fcyk dCtk eqedhu 147 0.08 ck-lks-
134 | P a g e
80 cxrkjke oYn mxk ] lkY;k csok mxk] Hkkuk ] rekph] fi- dLrwjk] 'kadj ] Jo.k ]izd'k fi- xksj/ku] ekjh;r ifRu xks/ku] djepan folkjke fi-prwjke] gktjh csck prwjke
es?koky 148 12.00 ck-lks-
81 ojtwnsoh ifRu djepan es?koky 657/149 19.00 ck-lks-
82 djepan ] ohlkjke fi- prwjke es?koky 658/149 12.00 ck-lks-
83 ,stuk nsoh ifRu jk.kkjke es?koky 659/149 32.07 ck-lks-
84 nspUn oYn jk.kk es?koky 150 26.14 ck-lks-
85 Hkyk ] vknk ] etuk] eulw[k] f'kok] foje fi- 'ksjk 1@2 fgLlk ] dyh csok gewM+k tsrk ] gjx.k firk dyk ] yw.kk Ukanyky ihFkkjke firk iwuk y{eh ifRu iwuk fo'kuk oYn jkedk] d`".k oYn ihjk] ojlk ] ikapk] fi-esgUnzk 1@2 fgLlk
es?koky 151 110.07 ck-lks-
86 'kadjyky n;kjkenkl vksloky 660/152 6.12 ck-lks-
87 'kadjyky n;kjkenkl vksloky 661/152 26.14 ck-lks-
88 ohlk oYn oyh es?koky 662/152 11.14 ck-lks-
89 rkjk oYn oyh es?koky 663/152 11.14 ck-lks-
91 dLrwjk oYn oyh es?koky 665/152 11.14 ck-lks-
92 ohlk] dLrwjk] ekalhxk ] rkjk fi- oyh ] jktk eaxyk] psyk fi- [ksek ] jxw ifRu ] [ksek ] veksy[k oYn eywdk] dpjk oYn egslk] [kkrw oYn egslk] tkyw ] ckadk ]fi- galk
es?koky 154 6.17 ck-lks-
93 dLrwjk oYn oyh es?koky 155 3.16 ck-lks-
135 | P a g e
94 cxrkjke oYn mxk ] lkY;k csok mxk] Hkkuk ] rekph] fi- dLrwjk] 'kadj ] Jo.k ]izd'k fi- xksj/ku] ekjh;r ifRu xks/ku] djepan folkjke fi-prwjke] gktjh csck prwjke
es?koky 156 29.12 ck-lks-
95 gqdeflag oYn Hkwjflag jktiqr 666/157 20.12 ck-lks-
96 rxk lkdj] fi- lkcjk eqlyeku 667/157 20.12 ck-lks-
97 oknk ] lkbZnkn fi- tkek eqlyeku 668/157 8.11 ck-lks-
98 fcyk dCtk eqedhu 669/157 12.05 ck-lks-
99 gdhe oYn nhuw eqlyeku 784/158 5.00 ck-lks-
100 ,syh;kl eksgenvyh fi- osjlky] gdhe ekj[k 'ksj[kku fi- nhuw] vklh;r iq- nhuw ] dslj ifRu fnuw
eqlyeku 670/158 8.11 ck-lks-
101 fcyk dCtk xS- eq- dwvka 159 0.13 xSj eqefdu dqvka
102 vkjc] usgky firk gsek Hkhy 160 28.12 ck-lks-
103 xSj eqedhu vkcknh 161 21.08 xSj eqefdu vkcknh
104 fcyk dCtk eqedhu 162 39.17 ck-lks-
105 fcyk dCtk xSj eqedhu jkLrk 163 4.17 xS-eq-jkLrk
106 lkyejke oYn pkankjke es?koky 164 31.01 ck-lks-
107 vejk oYn tkuw es?koky 671/165 34.10 ck-lks-
108 uhECk oYn tk# es?koky 672/165 40.00 ck-lks-
136 | P a g e
109 fpUnw iq=h d`ik es?koky 673/166 50.00 ck-lks-
110 ohjpUn oYn [kkuw] [kkdw oYn vklw es?koky 674/166 26.08 ck-lks-
112 fcyk dCtk eqedhu 676/167 46.12 ck-lks-
113 gdhe oYn nhuw eqlyeku 785/167 5.00 ck-lks-
114 ,syh;kl eksgenvyh fi- osjlky] gdhe ekj[k 'ksj[kku fi- nhuw] vklh;r iq- nhuw ] dslj ifRu fnuw
eqlyeku 677/167 25.15 ck-lks-
115 ojtwnsoh ifRu o[krkjke es?koky 678/168 43.04 ck-lks-
116 o[krk oYn pkdj es?koky 679/168 50.00 ck-lks-
117 fcyk dCtk eqedhu 680/169 49.14 ck-lks-
118 fcyk dCtk eqedhu 681/169 2.00 ck-lks-
119 lendoaj ifRu xaxkflag] Hkwikyflag] oYn eugjflag jktiqr 683/170 67.00 ck-lks-
120 gM+oUrflag oYn l#ifalg othj 685/171 9.09 ck-lks-
121 xaxkflag] gsefalg] ekrk xsjckbZ jktiqr 686/171 47.16 ck-lks-
122 fcyk dCtk xSj eqedhu dqvka 172 0.11 xSj eqefdu dqvka
123 xSj eqedhu vkSju 687/173 9.14 xSj eqefdu vkSju
124 xSj eqedhu vkcknh 688/173 8.00 xSj eqefdu vkcknh
125 xSj eqedhu vkcknh 174 28.13 xSj eqefdu vkcknh
137 | P a g e
126 xSj eqedhu jkLrk 175 2.03 xS-eq-jkLrk
127 xSj eqedhu dqvka 176 0.14 xSj eqefdu dqvka
128 xSj eqedhu dqvka 177 0.14 xSj eqefdu dqvka
129 xSj eqedhu xkSpj 689/178 10.03 xSj- eqefdu xkSpj
130 jk-m-izk- fo|ky; 690/178 5.00 xSj eqefdu eSnku
131 cljg loj 691/178 7.10 xSj eqefdu
132 fcyk dCtk xSj eqedhu vkcknh 179 73.18 xSj eqefdu vkcknh
133 vkjc] usgky firk gsek Hkhy 692/180 10.03 ck-lks-
134 fcyk dCtk eqedhu 693/180 1.09 xSj eqefdu
135 gktjh ifRu prqjke] euth iq=h prwes?koky 181 12.09 ck-lks-
136 xhrknsoh ifRu prjkjke es?koky 786/181 12.09 ck-lks-
137 fcyk dCtk xSj eqedhu vkcknh 694/182 15.00 xSj eqefdu vkcknh
138 xhrknsoh tksts prjkjke es?koky 695/182 45.03 ck-lks-
139 fcyk dCtk xSj eqedhu vkcknh 183 22.14 xSj eqefdu vkcknh
140 fcyk dCtk xSj eqedhu dqvka 184 0.13 xSj eqefdu dqvka
141 xSj eqedhu vkSju 185 35.13 xSj eqefdu vkSju
143 xSj eqedhu jkLrk 187 2.12 xS-eq-jkLrk
138 | P a g e
144 xSj eqedhu vkcknh 701/188 11.00 xSj eqefdu vkcknh
145 xSj eqedhu vkcknh 702/188 6.00 xSj eqefdu vkcknh
146 xSj eqedhu vkcknh 703/188 3.00 xSj eqefdu vkcknh
147 xSj eqedhu vkcknh 704/188 4.00 xSj eqefdu vkcknh
148 xSj eqedhu xkSpj 696/188 904.19 xSj eqefdu vkSju
149 xSj eqedhu Ldwy 705/188 3.00 xSj eqefdu Ldwy
150 xSj eqedhu ukMh 424/188 3.05 xSj eqefdu ukMh
151 'kkgtk oYn Hkkstk ] eksgyh csok yk[kk ]dLrwjk] izHkw fi- yk[kkHkhy 706/189 25.00 ck-lks-
152 eaxykjke] 'kkUrk ] tlksnk ]/kuh fi- ekath] lks<h ifRu ekth 707/189 35.14 ck-lks-
153 xSj eqedhu vkcknh 190 6.06 xSj eqefdu vkcnh
154 xSj eqedhu jkLrk 192 6.12 xS-eq-jkLrk
155 xSj eqedhu xkSpj 198 25.02 xSj eqefdu xkSpj
156 xSj eqedhu jkLrk 199 10.14 xS-eq-jkLrk
157 xSj eqedhu xkSpj 200 17.09 xSj eqefdu xkSpj
158 uch;k] veksy[k firk tyky ] Qwyk csok tykyes?koky 746/211 24.01 ck-lks-
159 ekalhxk oYn oyh es?koky 747/211 25.00 ck-lks-
160 tkyw ckadk fi- galk es?koky 748/211 25.00 ck-lks-
139 | P a g e
161 merh csok ljnkjk es?koky 749/212 38.16 ck-lks-
162 ,stuk tksts y{e.k es?koky 750/212 15.00 ck-lks-
163 ckgnjk iq= ?kew] ,stuk ] Hkkaxk]fi- ?kew] ucw ifRu ?kwes?koky 751/212 25.00 ck-lks-
164 xaxk ifRu gksFkh es?koky 752/212 24.00 ck-lks-
165 bUnzk ifRu eBkjjke es?koky 760/212 1.00 ck-lks-
166 fcyk dCtk xSj eqedhu dfczLrku 213 2.04 xSj eqefdu dfczLrku
167 euw oYn ohatk es?koky 753/214 30.13 ck-lks-
168 Hkyw oYn lsjk es?koky 754/214 30.12 ck-lks-
169 ewjknk ekrk jgheka eqlyeku 237 5.18 ck-lks-
170 oyh ] jktkjke] eaxykjke] psykjke] fi-[ksek ] jxw ifRu [ksek] veksy[k oYn eywdk] dpjk oYn egslk] [kkrw csok egslk] tkyw ] ckadk fi- galk
es?koky 238 10.14 ck-lks-
171 fcyk dCtk eqedhu 239 1.15 ck-lks-
172 'kadjyky n;kjkenkl vksloky 240 15.13 ck-lks-
173 /kuckbZ csok pSuflag jktiqr 241 48.04 ck-lks-
174 yw.kkjke oYn prwjke es?koky 552/84 8.11 ck-lks-
175 lduk oYn jkek es?koky 554/84 50.00 ck-lks-
176 Mkek oYn enk es?koky 555/84 50.00 ck-lks-
140 | P a g e
177 lkyw ] dkew fi- fonk es?koky 556/84 50.00 ck-lks-
178 nspUn ] gjukFk ] yknwjke fi- [kkdw es?koky 191 27.04 ck-lks-
179 egknku oYn jklkjke es?koky 193 13.14 ck-lks-
180 lqjrku] jenku] th;.k fi- bLekbZy] ftek ] tkne] eken] xaxk ] bLekbZy fi- Qru eqjhnh ifRu Qru
eqlyeku 194 83.03 ck-lks-
181 lyke oYn jkoy eqlyeku 708/195 24.04 ck-lks-
182 tkuw oYn vlkQ eqlyeku 709/195 48.09 ck-lks-
183 vykuk oYn tkuw eqlyeku 710/195 48.09 ck-lks-
184 tkus[kku oYn vljQ[kku eqlyeku 711/195 24.05 ck-lks-
185 isekjke] uoykjke] pwrjkjke] lrkjke] Mkywjke] fi- flejFkkjke tkV 712/196 31.11 ck-lks-
186 lyke oYn jkoy eqlyeku 713/196 35.11 ck-lks-
187 eBkj oYn jkoy eqlyeku 714/196 35.11 ck-lks-
188 gqlSu oYn vkgen] cph ifRu vkgen eqlyeku 715/196 35.11 ck-lks-
189 tks/kkjke oYn lejFkjke] 1@2 fgLlk isekjke] uoykjke] pwrjkjke] lrjke] Mkywjke ] fi- lhejFkkjke 1@2 fgLlk
tkV 716/196 75.00 ck-lks-
190 f'kok ] psuk ] bUnzk] veksy[k ]xw.kslk fi- pkUnk ] feBka ifRu pkankes?koky 717/196 43.00 ck-lks-
192 vkjc ] usgky fi- gklka Hkhy 719/197 20.00 ck-lks-
193 dLrwjk ] izHkw fi- yk[kk ] esgyh ifRu yk[kkHkhy 720/197 25.00 ck-lks-
141 | P a g e
194 erw oYn tsBk Hkhy 721/197 75.00 ck-lks-
195 gMewkujke oYn ohjkjke 1@2 fgLlk f[ko.khnsoh ifRu ujsaUnz 1@2 fgLlkfo'uksbZ 722/197 73.05 ck-lks-
196 gjukFk] usek] gehjk] ghjk fi- lhU/kyHkhy 723/197 40.00 ck-lks-
197 ft;.k oYn etuk ] Jo.k ] ljoh fi- xwekuk ] eywdksa csok xwekukes?koky 724/197 50.00 ck-lks-
198 fcyk dCtk eqedhu 725/201 11.00 ck-lks-
199 fcyk dCtk eqedhu 726/201 40.00 ck-lks-
200 dpjk oYn egslk es?koky 727/201 53.03 ck-lks-
201 iuw oYn jk;ey es?koky 728/201 40.00 ck-lks-
202 eaxy oYn jk;ey es?koky 729/201 40.00 ck-lks-
203 gsnj oYn ohatk es?koky 730/202 27.03 ck-lks-
204 fcyk dCtk leiZ.k Hkwfe 761/202 0.08 ck-lks-
205 ewchu oYn jkoy eqlyeku 731/202 28.16 ck-lks-
206 tkehu oYn jkoy eqlyeku 732/202 28.16 ck-lks-
207 ykaxk oYn jk.kk Hkhy 733/202 30.00 ck-lks-
208 fcyk dCtk eqedhu 734/203 15.04 ck-lks-
209 xksj/ku ] HkkjFkk ] fi- lrk Hkhy 735/203 57.00 ck-lks-
142 | P a g e
210 Hksjk oYn esgjk] y{eh csok esgjk] the;r csok jkoy] e?kk oYn jkly Fkkuk oYn izsgykn] lwjk oYn psuk pka?ku oYn lkgehj ] oyh;k oYn Hkksek] xw.kslk ] #?kk fi- ckadk
Hkhy 204 88.19 ck-lks-
211 tok oYn lksuk ] veksy[k ] d`".k fi- lkth;k] pkUnh oYn lkth;k xksj/ku oYn vejk
Hkhy 205 113.06 ck-lks-
212 eksVk meuk csok ljnkjk] euHkk ]csok ] etuk] ccko] veksy[k fi- tyky ] Qwyk csok tyky
es?koky 736/206 45.01 ck-lks-
213 euHkh ifRu etuk es?koky 737/206 40.00 ck-lks-
214 fcyk dCtk eqedhu 738/207 50.00 ck-lks-
215 feJhjke ] gsekjke] dLrwjkjke] fi- jk.kk lqFkkj 739/207 75.00 ck-lks-
216 tokjk oYn Hkaojk othj 740/207 50.00 ck-lks-
217 lkdj oYn iuw es?koky 741/207 50.00 ck-lks-
218 n;kjke oYn vkjc es?koky 742/207 50.00 ck-lks-
219 ksEHkwjke ] jk?kkjke] rstkjke fi- chatkjke es?koky 743/207 17.13 ck-lks-
220 fcyk dCtk xSj eqedhu jkLrk 208 10.02 xS-eq-jkLrk
221 yk[kk oYn Hkkstk Hkhy 209 21.09 ck-lks-
222 fcyk dCtk eqedhu 744/210 6.09 xSj eqefdu
223 Hkaojk oYn lpw es?koky 745/210 40.00 ck-lks-
224 rekphjke oYn Hkaojkjke es?koky 40.00 ck-lks-
143 | P a g e
feBs dk ryk dz-l- [kkrsnkj dk uke; e; firk ifr dk uke [kljk uEcj jdck fo-fo-
1 gSnj oYn tyky dkSe eqlyeku 348/110 12.05
2 [kaxkj [kkuw jenku lckst dkSe eqlyeku 350/11 11.04
3 ih-Mcyw;Mh lM+d 415/153 1.06
4
xzke iapk;r ehBs dk ryk 549/182 , 439/182 ,
437/182, 413/153
8 0.10
49.04 144.04
5 xzke iapk;r ehBs dk ryk 373/121 2.11
6 ikxfM;k rFkk jkLrs 381/124 0.14
7 xzke iapk;r ehBs dk ryk 392/131 6.15
8 ehjeksgen ] ,sfy;kl ] ljhQ jkenhu firk eksgor dkSe eqlyeku 459/199 17
9 jenku cwjku firk lykenhu ckgknwj dpjk firk bZ'kkd ljknhu oYn nhuk eqjknh csok nhuk dkSwe eqlyeku 480/214 23.17
10
jenku ] fglke ] lyhe [kehlk firk vehj ekjh;r csok dkSe eqlyeku 479/214,
483/214, 486/215
13.10 1.19
16.16
11 vksleku lwekj ethn firk ewchu ljnkj[kku vjckc eksgen firk y[kk gdk doyk gkle dkSe eqlyeku 200 96.08
12 lwp ] yrhQ firk vkne dkSe eqlyeku 492/216 29.06
13 otknhu oYn ldwj dkSSe eqlyeku 493/216 29.07
14 lyknhu oYn ldwj dkSe eqlyeku 213 40.04
15 nkcwn ] gdhe ] vn#i firk gqlSu dkSe eqlyeku 502/224 73.04
144 | P a g e
16 ewlk oYn vehu ] [kkuw ] ehj[kku ] vehj eqckjd firk vjckc eq- y[keksa csok vjckc 'kssj[kk oYn rkgj ] eukbZ oYn eksgen dkSe eqlyeku 505/224 84.14
17 nslyk] nyw tslk ] Hkwjk firk /kks/kk ldhuk ifRu /kks/k dkSe Hkhy 510/230 16.08
18 jlwy oYn vkjc ] /kkbZ csok lk;j dkSe eqlyeku 516/231 23
19 fcyk dCtk eqedhu Hkwfe 551/516 0.15
20 ewlk oYn xQwj dkSe es?koky 519/232 9.08
21 pkanh csok okyk dkSe es?koky 526/233 14.16
22 ewlk oYn vehu ] [kkuw ] ehj[kku ] vehj eqckjd firk vjckc eq- y[keksa csok vjckc dkSe eqlyeku
218 98
23
lyker csok dcwy vrkbZ gksFkh firk gste ekrw @ gste jkth csok gste ] Hkh[kk lqtkuk firk QStw oyks csok Qstw 6@23 uwjk eksfge lkgehj fugky firk tke ] vehur csok tke ] bZ'kkd eksgen lek fi- jk.kk 12@23 dkSe eqlyeku lk-nsg-
426/221 153.07
24 veuk oYn lhdk dkSe Hkhy lk- nsg 539/223 25
25 eksgen oYn jk.kk dkSe eqlyeku 498/223 20.07
26 bZ'kkd oYn jk.kk dkSe eqlyeku 500/223 15.01
27 jlwy oYn vkjc ] /kkbZ csok lk;j dkSe eqlyeku lk- nsg 501/223 26
28 tsey oYn feljh dkSe es?koky 499/223 25
29 vehu oYn ethn dkSe eqlyeku 435/181 11
30 vken ] eken firk 'ksj[kku ] [kh;k ifRu 'ksj[kku ] yrhQksa ifRu feJh dkSe eqlyeku 434/181 26.15
31 jk-xk-ikB- fteMkÅ ukMh chbZbZvks iapk;r lfefr pkSgVu 436/181 3
32 lwpw oYn nhuk dkSe eqlyeku 463/201
464/201 20 20
33 ewjhn] iwuk ] vkye] lk;h fi- lAaQy dkSe eqlyeku 462/201 39.09
34 ekspkj oYn iuk dkSe es?koky 478/212 25.12
145 | P a g e
35 lkscnkj iq= gehj /kuh ifRu gehj dkSe eqlyeku lk-nsg 477/212 26
36 'ksj[kku ] vyh[kku ehj[kku firk vej jlhnksa csok vej dkSe eqlyeku 495/217 36.18
37 bLekbZy guhQ] gkrk] jlwyk] gste ] blk firk eksgen jghe ifRu eksgen ewghc oYn bZeke dkSe eqlyeku lk-nsg 494/217 36.18
38
bZnjh'k ] v/kjhe tqek firk bLekbZy ewlk jghe lyhe ] jgerwyk okpw firk lkdj 2@3 ] vken ] eken firk 'ksj[kk [kh;ka ifRu 'ksj[kk yrhQksa csok feJh ] they Hkk[kj firk eksgen 4@3 dkSe eqlyeku
179 66.08
39 gchcwyk ] feBk[kka] tqlc gS;kr] vk/kw] lk;j ] bd# firk eksgen ewq- ulhck csok eksgen getk oYn gdhe vkpkj glu firk gkehUn 4@2 they ehjk nkslk firk cwjku [k.Mh iq=h fu;ekr dkSe eqlyeku
202 67.09
40 ehagy iq= lQh dkSe eqlyeku lk-nsg- 545/210 34.1
41 [kehlk iq= lQh dkSe eqlyeku lk- nsg- 546/210 82.1
42
[kh;ka oYn ] lwwjk mesnk dkuk firk xtk izsek Mkejk ljnkjk firk cpw the;r ifRu cpw eth;k uck firk Hkksek [kaxk d`".k QksVk firk fijkxk vklh;r csok fijkxk lq[kk oYn tsey oYn feljh dkSeq eqlyeku
203 82.06
43 gSe oYn pSuk dkSe es?koky 465/204 17.07
44 #ik oYn Hkksek es?koky 466/204 29.06
45 #ik] ghjk firk Hkksek @ dkuk vkEck] 'kdwj firk 'ksjk lkth cSck 'ksjk eksVk oyk nsjk dkSe es?koky lk-nsg 475/209 55.18
46 Hkhekjke dkywjke firk lkjax dkSe es?koky ewklk oYn vehu dkSe eqlyeku 219 27.01
47 Hkhekjke ifRu lkjaxjke Hkhek ] dkyw] fdjrk twwxrk /kuk uUnk gdk izHkw firk lkjax dkS es?koky lk-nsg
220 42.15
48 uwjk ] gdhe ] v/kjhe gkehn firk vehj Jherh lQwjka ifRu vehj ] vdxj beke bLeky ] lpw fi- tke dkSe eqlyeku 222 10.05
146 | P a g e
49 /kuk oklw y[kk firk Vhdeka Nxuh ifRu Vhdek dkSe es?koky lk- nsg- 469/205 20.1
50 vthe ] dyk ] guhQ firk jk.kk dkSe eqlyeku 468/205 20.1
51 fcyk dCtk 471/206 20.16
52 eksenjlwy ] vyh ] vdcj firk 'ksj[kku ] oyh 'ksj[kku iq= rkgj [kku dkSe eqlyeku 472/206 9
53 fenkn oYn ewck dkSe eqlyeku 470/206 11.17
54 ekyk oYn Hkwjk dkSe es?koky lk- nsg 542/207 41.05
55 lq[kk ohjpaun firk dpjk es?koky 541/207
540/207 1
41.05
56 uxj oYn ulhj dkSe eqlyeku 473/208 49.09
57 'kohpj oYn ewck uxj ewghac ukFkk firk ulhj Qkrek csok ulhj dkSe eqlyeku 474/208 71.15
58
gSnj ] erkjk fi- tyky vehu ] lyk th;.k firk ewchu tkeksa csok ewchu @ eksgen glu oYn ek#Q ] glhur ifRu ek#Q ewlk oYn vkye ] vther ifRu vkye lksukjke ] [kaxkjjke xsukjke firk iukjke dkSe es?koky ewghac oYn bZeke 'ksj[kku ] vyh[kku ] ehj[kku firk vej jlhnksa csok vej@ vyh oYn xWQqj @ twehy ] ehjk nkslk firk cwqjku [k.Mh eq=h fu;ker tksts jghe @ dkse eqlyeku lk-nsg-
417/154 49.03
59 ckgknwj[kku] tkehu[kku ] [keh'kk[kku ] bczkge [kka fir vkpkj dkSe eqlyeku 155 16
60
otknhu ] ljknhu egsUnzk ] nyw firk ldwj dcwy ] ewckjd ] flnhd firk uwjk ] feBka csok uwjk [kaxkj oY gksFkh [ksjeksgen ] 'ks# djhe vyh[kku ] 'ksj[kku firk fcyky lykenhu oYn vyQ glu oYn /kkss/kk @ glu oYn lyk @ dkSe eqlyeku lk-nsg-
158 55
61 djhe ] ok;n ] vCnwy firk cpy dkSe eqlyeku 420/156 9.18
62 bZ'kk ] eywd ] gdhe firk vkpkjj ] eqlk jks'ku ethn firk vCnwyk @ dkSe eqlyeku 421/156 9.18
63 bZ'kk ] eywd ] gdhe firk vkpkjj ] eqlk jks'ku ethn firk vCnwyk @ dkSe eqlyeku 157 62.19
64 ixMfM;k rFkk jkLrs 159 19.17
65 glu oYn /ksk/kk @ glu ork lyk @ {ks= dqlykeu lk-nsg 161 26.14
147 | P a g e
66 lokbZ ] utke firk v/kjhe ] bZnjh'k ]vthe ] lekyh tqek firk gSnj dkSe lk-nsg 160 28.16
67 otknhu] ljknhu] egsUnzk ] nyw firk ldwj dcwy] ewckjd ] fLknhd firk uwjk feBk csok uwjk fpuslj dejnhu ftek firk [kaxkj vejh ifRu [kaxkj dke eqlyeku 162 35.06
68 [ksjeksgen ] bZeke fi- vkne ] th;Unh ifRu vkne vejnhu oYn tkne ] ywdeku mQZ deky oYn 'ksjk ] vbZc[kka ] rS;c[kk ] utjvyh fi- mesnyh tkeksa csok mEesnvyh dkSe eqlyeku lk-nsg
163 17.14
69 /kkbZ @ 'kkgsj eqlyeku 422/164 13.04
70 egsUnzk ] ljhQ ] ogh;k fi- vksleku eqlyeku 424/164 20
71 pus'kj ] egsUnz fe;y fi- mLeku dkSe eqlyeku 423/164 30
72 vysnkn] uwjk jenku fi- vkc vdyk csok vkjc dkSe eqlyeku 180 19.11
73 vehu oYn ethn dkSe eqlyeku 435/181 11
74 xwyke ] lqekj fi- bZ'kk ] ds'kj ifRu bZ'kk ] tqEek[ka oYn okyw tqlc oYn ckxk ] vykcpk;k oYn ykyk ] lksuh csok ykyk dkSe eqlyeku 165 29.13
75 ofy;ka ifRu bckghe ewghc oYn bZeke @ gSnj ] erkjk fi- tyky vehy ] lyk ] th;.k fi- ewchu ] tkeh cSok ewchu dkSe eqlyeku 166 18.14
76 daHkhj ] 'ksj[kku jghe firk vthe #ik ifRu vehu ] lyke tkdc fi- vehj vkyk ljknhu fi- lkscnkj gok ifRu 'ksj[kku ewjknak ifRu dEHkhj vn#i uckc vjckc fi- ehjk dkSe eqlyeku
425/167 14.1
77 iM+r 426/167 2.01
78 nkslw oYn ulhj @ they erq fi- [keh'kk 3@12 tqek lqekj lkgehj fo- vdcj the;r csok vuoj Hkkjk oUYn eksjhUn vkgen QksVk 'ksjk xka/kh fi- okyw Fkkoh ifRu dkyw 3@18 dkSe eqlyeku
168 27.11
79 ehjeksgen ] ,sfy;kl ] ljhQ jkenhu firk eksgor dkSe eqlyeku 169 55.15
80 bZ'kk ] eywd ] gdhe firk vkpkj] ]lwjkc ewlk jks'ku ethn fi- vCnwyk 170 61.12
148 | P a g e
81 ethn] rkyc y[kehj fi- l[kh tkek csok l[kh ohMk lkdj fi- vkjc twek leUn vken [keh'kk fi- ogknk the;r ifRu okgnk ] vkye oYn iwatk djhe oYn vCnwyk dkSe eqlyeku
171 62.1
82 fotk oYn flyk dkSe eqlyeku 172 63.19
83 /kwjk oYn lrkj dkSe eqlyeku 427/163 9.15
84 e[k.kh i- tqlc dkSe eqlyeku 429/173 9
85 jgeku ] jghe fi- nhuk 4@3 thBky ifRu eykj eksgen jlwy] vyh] vdcj firk 'ksj[kku uk-ck- dh oyh 'ksj[kku oYn rkteksgEen 4@3 dlSe eqlyeku 428/173 56.03
86 they] ehjk ] nkslk fi- cqjku ] [k.Mh iq=h fu;ker dkSe eqlyeku 174 24.19
87 feljh[ka ] fglek[ka ] deeky[kka] fgUnky[kka ] vCnwy[ka fi- ,fy;kl lkyh cSok ,fy;kl dkSSe eqlyeku
175 66.11
88 gkde oYn [kaxkj [kkuw jenku fi- lckst esken oYn nh;k bZ'kkd gkde uwjk olk;k uckc fi- oyh dkSe eqlyeku 176 154
89
tke ] ehjglu eksgenyh firk lrkj ] bZukr oYn vehu eykj] egsUnzk fi- vksleku gS;kr oYn ehjglu g;kr cgknwj gehj fi- fglke ]bZckbZ ifRu fglke gklh ifRu fugkj nhuk oYn gk#u ewghc jghe eykj ljhQ fpus'kj egsUnzk cqjhgk fi- vksleku dkSe eqlyeku
430/177 93
90 ewghac oYn vksleku dkSe eqlyeku 431/177 31
91 Qty oYn feUnk uktk oYn 46 eeq- lqjrh cok ekgnku vyh[kku gtwusr eksgenjghe ldhur fi- egknbku jdck 27 oh?kk 17 foLok jlwy oYn vkjc eq- /kkkbZ cok lk;j 10-08 dkSe eqlyeku lk-nsg
433/178 38.05
92 ihjk oYn Qwyk dkSe es?koky 432/178 17.09
149 | P a g e
bczs dk ryk dz-l- [kkrsnkj dk uke; e; firk ifr dk uke tkfr
[kljk uEcj jdck fo-fo-
1 vpykjke] inekjke fi- Hkh;kaejke ] ik#nsoh csok Hkh;kajke gjyh] v.kNh] xsjksa iq=h;ka Hkh;kjke ] iwjkjke oYn oxrkjke dkSe tkV 664/510 70
2 vuwnsoh tksts ckxflag dkSe jktiwr fuoklh bczs dk ryk 791/603 31.02
3 vUnjk @ exk dkSe Hkhy 743/572 , 15.06
4 veukjke @ Qwykjke es?k fuoklh feBs dk ryk 588 11.05
769/584 54.1
771/584 , 8.15
773/583, 4.12
781/592 6.05
5 veuk @ exuk dkSe HkkaHkh fuoklh bczs dk ryk 803/605 50
6 vejkjke] /khjkjke ] usuwjke fi- xkSdykjke dkSe tkV 687/521 48
7 vejkjke ]/khjkjke, usuwjke fi- xksdykjke ] tsBh ckbZ i- xkSdykjke dkWe tkV 665/5100 70
8 eQrdaoj @ txrflag dkSe jktiqr fuoklh pkSgVu 741/571 50.06
9 vyh @ ukcw dkSe eqlyeku fuoklh cwB jkBkSM+ku 499 21.74
800/605 15.12
801/605 13.1
795/604 1.18
10 enu daoj ifRu ineflag dkSe jktiqr fuoklh ckcM+h dyk 852/605 35
11 nfj;k doaj ifRu nyirflag dkSe jktiqr fuoklh ckcM+h dyk 853/605 35
12 nsoh daoj ifRu egkflg dkSe iqjksfgr 854/605 36
150 | P a g e
13 vkbZNku @ iqj[kk dkSe lqFkkj 525 38
14 vkEck @ fgjk dkSe es?koky fuoklh ckcM+h dyk 620/483 50
15 vkukjke @ exukjke dkSe es?koky fuoklh bczs dk ryk 728/557 32
16 bZukr] ewlk ] lyke fi- vehu ] gqjeh ifEu vehu] jenku iq= jgeku dlawck csok jgeku dkSe eqlyeku fuoklh feBs dk ryk 548 61.1
17 bUnzflag @ mn;flag jktiqr fuoklh ckcM+h dyk 671/575 37.14
18 bUnzk @ n;kjke ] vfe;ka ifRu n;kjke ek.kdk ] eaxyk fi- ujlhaxk dkSe es?koky 596 96.04
19 bLekbZy ] bZ'kkd fi- clUn dkSe eqlyeku fuoklh feBs dk ryk719/549 40.00
720/549 40.00
20 bUnzflag @ jk.kflag dkSe jktiqr 485, 683/484
32.15 35.00
21 mrek] dktk ] lkaxk fi- /kk#] izHkw] iiw fi- gjx.k ] lksgnjh ifRu gjx.k izsek oYn nsok Jo.k @ ekyk mQZ eaxyk ?kew ekaxw fi gj[kk dkSe es?koky 552 24.00
560 27.05
22 mrek iq= /kk# dkSe es?koky fuoklh bczs dk ryk 759/580 65
23 exkajke] eksVkjke] dkywjke] jrukjke fi- ehjxksa@mnkjke tkfr tkV 514 34.16
24 dcwy ] yrhQ] gchc ] rS;c ] v;wc fi- g;kr dkSe eqlyeku fuoklh dksujk 606 12.1
25 dek oYn eksVk dkSe Hkhy fu- bczs dk ryk 707/542 28.06
26 djheka ifRu b'kjkjke dkSe Hkhy 530 43
27 dyk] /kks/kk] lkabZnkn fi- tyky ] dek oYn eksVk dkSe Hkhy 708/542 1
28 dyk oYn tyky dkSe Hkhy 703/542 28.06
29 dktk @ /kk# dkSe es?koky fuoklh bczs dk ryk 713/543 60
30 dlmw @ flagjk dkSe eqlyeku fuoklh dksujk 806/605 49.12
151 | P a g e
31 fdjrk @ tkek dkSe othj 660/509 35
32 d`".kjke @xwykjke es?koky 788/601 44.17
33 xxku @ lqxkyk dkSe es?koky 481 42.06
615/483 30.00
34 xw.kslnku @ ohtjktnku pkj.k 757/578 30
35 xweukjke] ewykjke fi- nsjkt] Hkxkjke] lhykjke] xksj/kujke fi- glakjke dkSe es?koky 721/551 22.1
36 xksik @ nwxkZ dkSe es?koky 524 36.07
37 xksj/ku @ dpjk dkSe es?koky fuoklh bczs dk ryk 563 595
71.02 74.06
38 xkj/ku @ Hkwikth dkSe iqjksfgr 577
753/579 779/592
6.10 44.00 25.00
39 xksjh @ Vkck dkSe es?koky fuoklh pkSgVUk 799/605 50
40 ?kew] Hkxw fi- gj[kk ] jk.kh ifRu gj[kk es?koky 766/581 70
41 prjk ] tqEek fi- galk dkSe es?koky fuoklh bczs dk ryk 725/553 60.13
42 prjkjke iq= Hkkjey jke dkSe es?koky fuoklh bczs dk ryk 730/548 42
43 pkxwnsoh ifRu txwjke dkSe es?koky fuoklh bczs dk ryk 851/580 12.00
760/580 38.00
44 pkUnk @ ikapk Hkhy fuoklh bczs dk ryk 758/580 15.05
45 pwuflag @ #iflag dkSe iqjksfgr fuoklh bczs dk ryk 568 26.13
45/75 14.02
152 | P a g e
736/567 27.06
46 pwuflag @ #iflag ] gqdeflag iksdjflag fi- #iflag dkSe iqjksfgr fuoklh bczs dk ryk 685/500 696/527 699/527
25.00 53.02 25.00
47 psukjke] tksjkjke] nslykjke] psrujke fi- lrkjke] vfe;ka ifRu lrkjke dkSe es?koky fuoklh bczs dk ryk 530 58
48 Nqxflag] r[krflag fi- chtjktflag mn; doaj @ chtjktflg dkSe jktiqr 667/510 60
49 Nrjflag@ lejFkflag dkSe jktiqr fuoklh pkSgVu 602 27.04
50 txh;k ] eh#] vjckc fi- dkNck dkSe eqlyeku fuoklh bczs dk ryk 652/505 78.02
51 teky] eh#] vjckc fi- dkNck dkSe eqlyeku fuoklh bczs dk ryk 607 608
24.04
52 tkek @ eywdk ] ccjh @ eywdk dkSe es?koky fuoklh bczs dk ryk 793/603 50
53 tkek efLtn feBs dk ryk 641/496 30.14
54 tkyeflg iq= pwukjke dkS tkV fuoklh ckcM+h dyk 631/489 28.07
55 xksek ] fryksdk fi- tsBkjke ] xaxk csok tsBkjkd ¼'ksjkjke½ dkSe tkV fuoklh pkSgVu 504 27.02
56 Vhdek @ txeky dkSe tkV 625/486 65
57 Vhdek @ Hkkjey fuoklh bczs dk ryk 628/488 632/489
32.00 40.00
58 Vhdek ] xksj[kk fi- eywdk fl.kxkjh @ eywdk ] yhyk @ fo'kuk rkjk ] oYn ekuk erh@ ekuk dkSe es?koky 545 144.1
59 rxflag] xsejflag] lqtkuflag] egs'kflag ] bUnzflag #iflag fi- gseth] gkaleoj i- gseth ] izsedaoj i- jkgkflag jktiqr 512 44.11
60 rusjktflag @ jk.kflag jktiqr fuoklh ckcM+h dyk 645/501 827.08
61 rksxkjke] Hksjkjke fi- Hkxukje] usuw ifRu Hkxokuk ] prjk ] pwukjke ] bUnk fi- e?kk dkSe tkV
523 47
153 | P a g e
62 tksxkjke] Hksjkjke fi- Hkxukjke usuw ifRu Hkxokuk] prjk] pwukjke bUnz fi- e?kk dkSe tkV 495 59
63 Fkkuk] xksik] jklk fi- nwxkZ dkSe es?koky fuoklh bczs dk ryk 491 184.08
64 n;kjke @ /kkjk dkSe es?koky fuoklh ckcM+h dyk 618/483 75
65 rksxkjke ] Hksjkjke fi- Hkxukjke usuw @ Hkxukjke dkSe tkV fuoklh bczs dk ryk 636/492 66
66 nfj;k @ flagjk dkSe eqlyeku fuoklh dksujk 805/605 42.08
67 nkuk oYn n;kjke pkxykjke ] /kukjke fi- t;eyjke] guhQka ifRu t;eykjke dkSe es?koky
537 95.14
68 nspUnjke oYn tykyjke dkSe es?koky 612/482 40
69 /kkiw ifRu tyky] y[kw oYn cpw] xksj/ku ek#] exw xsejk fi- gksrk dkSe Hkhy fuoklh bczs dk ryk
528 186.12
70 /kkiw @ lejFkflag dkSe jktiqjksfgr fuoklh bczs dk ryk 816/605 30
71 /ks/kk oYn tyky Hkhy fuoklh bczs dk ryk 705/542 28.06
72 uork] lhrk fi- fd'kuk ] xojh i- fd'kuk ckcM+h dyk 622/484 40
73 uxk oYn yk/kk dkSe tkV fuoklh ckcM+h dyk 487 624/484
20.72 2302
74 uUnjke ] iwuekjke] ewdukjke ] isekjke fi- fpekjke] yk[kkjke] uUnjke] iwuekjke] ewdukjke] isekjke fi- fpekjke dkSe tkV 694/527 40
75 ukj.kk @ bZ'kjk dkSe es?koky 613/482 75
76 ukj.kk] Hkhekjke fi- rqyNkk dkSe lqFkkj fuoklh bczs dk ryk 659/508 57.07
77 ukj.kk] Hkhekjke fi- rqyNk ] vkbZnku] phek] 'ksjk Hkaojk fi- iqjFkk eksgu@[khek jkdw i-[kh;ka dkSe lqFkkj fuoklh bczs dk ryk 506 17.07
78 uktkjke] mesnkjke ] Jo.kjke fi- ls[kkjke] djekbZ ifRu ls[kkjke dkSe es?koky 731/559 60.13
79 iatw @ Hkk# dkSe es?koky 714/546 46.07
80 iatw fi- Hkk#] ikapk ] yhyk] ujlk] gqdek fi- dyk ] cpw ckcw fi- cq<k ] /kkbZ i- cq<k dkSe es?koky
716/546 0.1
154 | P a g e
81 iBkbZ] ?kew] gkFkh ] nfj;k fi- chatk] /kh;ka ifRu chatk dkSe es?koky 755/579 56
82 iuk] dsljk fi- ,jk ewykjke Hkwjkjke] nkukjke fi- foj/kkjke] pkxwnsoh ifRu foj/kkjke dkSe lqFkkj
840/506 17.07
83 ikapk] yhyk] ujlk] gqdek fi- dyk] cpww] ckcw fi- cww<k /kkbZ i- cq<k dkSe es?koky fuoklh bczs dk ryk 715/546 101.19
84 ikapk @ dyk es?koky 808/605 50.1
85 ikapk ] yhyk fujek mQZ ujlk gqdeka fi- dyk cpw ckcw fi- c<k dkSe es?koky fuoklh bczs dk ryk 809/605 32
86 iwuk @ ikrk dkSe Hkhy fuoklh ckcM+h dyk 786/680 44.09
87 i`Fohjktflag] nwjtuflag fi- nhiflag dkSe jktiwr fuoklh bczs dk ryk 686/521 34.18
88 izrkiflag fi- egknkuflag] Hkh[kflag fi- egnkuflag dkSe jktiqr fuoklh bczs dk ryk 597 116.02
89 izHkw ] iiw fi- gjx.k ] lksnjh i- gjx.k dkSe es?koku 556 738/569 710/569
14.10 22.16 6.08
90 cpw ] ckcwfi- cq<k ] /kkbZ i- cq<k dkSe es?koky 807/605 50
91 cLrhnku ] cahtjktnku ] xw.kslnku fi- chtjktnku dkSe pkj.k647/502 85.15
649/502 9.05
92 pUnuiwjh] v'kksdiqjh ] dSyk'kiwjh] jkeiwjh fi- ckzxiwjh usuw ifRu ckxiwjh dkSe Lokeh fuoklh ckcM+h dyk 513 28.03
93 ckxflag] xsejflag] pUnuflag] nhiflag ] lkaxflag] chtjktflag fi- }kjdflag ] vUrjk ifRu }kjkdkflag] fdluksa iq=h }kjdkflag 782/592 13.05
94 ckcwyky fi- izkxpUn dkSe jktiwr fuoklh ckcM+h dyk 669/511 70
95 nfj;k doaj ifRu nyirflg dkSe jko.kk jktiwr 855/509 15
155 | P a g e
96 rstw doaj ifRu fdjrflg dkSe jko.kk jktiwr fuoklh ckcM+h dyk 642/509 10.03
97 ckcwflag] 'kSrkuflg fi- ekuflag] larks"k daoj ekuflag dkSe jko.kk jktiwr ] thokjke@ vkbZNkujke lqFkkj fuoklh ckc+M+h dyk 668/511 42
98 Hkejkjke fi- jrukjke dkSe es?koky fuoklh bczs dk ryk 764/581 50
99 Hkaojk fi- gatk dkSe Hkhy fuoklh ckcM+h dyk 531 53.1
100 Hkyk oYn xksj/ku ] xojh ifRu xksj/ku #[kh iq=h rkey ] mdjM+k egspk Hkkxh i- egspk [khek @ pks[kk ]jruh @ pks[kk lqjxu fi- [kkuw es?k- 540 96.1
101 Hkyw @ g# dkSe es?koky fuoklh bczs dk ryk 754/579 74
102 HkkjFkjke ] dwEHkkjke] jk.kkjke] [kkdwjke fi- vkbZnku dkSe es?koky 726/553 60.13
103 HkkjFkkjke] jk.kkjke] fi- vkbnku dwEHkk fi- jkm dkSe es?koky 541 80.06
104 Hkkjeyjke fi- izkxkjke dkSe es?koky 573 783/592
34.08 39.12
105 Hkh;kajke] ukj.kkjke] txwjke] nsnjke fi- fpukjke ] iiwjke fxj/kkjhjke] ?ke.Mkjke fi-ewykjke jekansoh I ewykjke
748/574 749/574
21.18 21.13
106 Hkh[kflag iq= egknkuflag dkSe jktiwr fuoklh bczs dk ryk 797/6055 32
107 Hkhekjke firk rqyNkjke dkSe tkV 666/570 50
108 e?kth iq= vpyflag jktiqr fuoklh ckcM+h dyk 702/542 39.04
109 tsBkjke] vkdsyjke] mesnkje fi- euthjke gqtwnsoh ifRu euthjke gehjk iuw nhuw fi-ohjek Hkhy 544 51.04
110 egs'kk ] /kuk] mesnk fi- cakdk ] jruh ui- ckadk dkSe tkV fuoklh bczs dk ryk 576 22.07
642/500 27.08
644/500 14.15
672/515 37.13
156 | P a g e
111 ekuk fi- lqjrk ] ywEHkk] xweuk fi- dkuk] Hkkoh i- dkuk ] jkuhnsoh ifRu yw.kkjke dkSe es?koky fu- bczs dk ryk 562 78.1
112 ekuk firk lqjrk dkSe es?koky fuoklh bczzs dk ryk 750/578 30.1
113 cpw ] prjk] Qrw ?kew Hkkxw fi- ek# ] rqylh ifRu ek# dkSe es?k- 536 93.1
114 ekalhxk ifRu clUn dkSe Hkhy fuoklh ckcM+h dyk 684/520 43.1
115 ehBw fi- jk.kk dkSe es?koky fuoklh bczs dk ryk 747/572 544
46.16 1.00
116 ehj[kk] dq'kyk fi-- fjgey iBkbZ ?kew ] gkDkh nfj;k fi- chatk ] /kh;ka csok chtk 533 14
733 71.15
117 ehj[kk] dq'kuk fi- fjM+ey dkSe es?koky fuoklh bczs dk ryk 785/592 50
118 esoh @ ykaxk dkSe es?koky fuoklh bczs dk ryk 712/543 64.08
119 eslk @ cakdk dkSe tkV fuklh bczs dk ryk 497 6.05
498 11.10
120 esgkjke] lqjrkjke fi- exkjke iwjksa ifRu exkjke dkSe tkV fuoklh ckcM+hdyk okykjke ] Hkkstkjke fi- fyNek.kkjke fu- bczs dk ryk 674/516 29.05
677/517 35
121 esgkjke ] lqjrkjke fi- exkjke iwjksa ifRu exkjke dkSe tkV fuoklh bczs dk ryk 678/517 72
122 eksgen firk ehj.k] xwykc] lyhe ] 'ksj[kku ] guhQ fi- rkj dkSe eqlyeku 717/549 203.06
123 jruk fi- izgykn nkek [kkdw] iwuk firk nsok dkSe es?koky fuoklh bczs dk ryk 763/581 35
124 jruk firk izgykn ] nkek ] [kkdw iwuk fi- nsok dkSe es?koky fuoklh bczs dk ryk 561 50.16
125 jrukjke firk ckykjke dkSe tkV fuoklh bczs dk ryk 682/579 12.02
157 | P a g e
126 fugky] vkgen] vynkn] dkle] gkle] lkyseksgEen fi- jenku daojh ifRu jenku dkSe eqlyeku fuoklh ckcM+h dyk 621/483 35
127 jes'k firk xweyk [ksrw ifRu xweuk dkSe lqFkkj fuoklh ckcM+h dyk 841/490 39.04
128 jk.kk firk vkbZnku dkSe es?koky fuoklh bczs dk ryk 804/605 32.19
129 jk/kk ifRu #iflag dkSe iqjksfgr fuoklh bczs dk ryk 697/527 25
130 fjM+eyflg firk [kkuflag dkSe iqjksfgr fuoklh fcLlw dyk 811/609 83.06
131 #iksansoh ifRu dkaHkkjke dkSe es?koky 727/997 31.17
132 js[kk ] vklw] prjk fi- Vhdek dkSe tkV651/503 681/518
8.12 31.00
133 js[kknsoh ifRu dkuthjke dkSe Hkhy fuoklh ckcM+h dyk 742/572 34.06
134 yk[kkjke uUnyky iwuekjke ] ewdukjke ] isekjke fi- fpekjke dkSe tkV fuoklhh fclkj.kh;k gky bczs dk ryk
692/526 693/526
40.00 45.00
135 ykNh ifRu Vhdekjke dkSe tkiV fuoklh bczs dk ryk 650/503 80
136 ykykjke ] jkewjke] [kekjke] vtZujke fi- veksy[kjke dcMh csok veksyh[k vkEck ghjk vejkjke jrukjke dkSe es?k fuoklh bczs dk ryk 535 61.08
137 yhyk @ dyk dkSe es?koky fuoklh bczs dk ryk 802/605 50
138 ujlkjke] xksj/kujke fuEck ] ghjk fi- bZ'kjk] [ksrw ifRu xweuk ] jes'k lwFkkj fuoklh bczs dk ryk
635/490 2.07
139 yw.kkjke firk Hkkjeyjke ] psru oYn gjukFk ] 'kkUrhnsoh ifRu yw.kkjke534 13.13
564 48.13
140 ysgjksansohg ifRu nhiflag dkSe iwjksghr fuoklh bczs dk ryk 817/805 24
141 okyuk firk fyNe.kk dkSe tkV fuoklh ckcMh dyk gkygh bczs dk ryk 675/516 75
142 foj/kkjke ] pkEikjke 'kadjyky firk lw[kkjke es?koky fuoklh bczs dk ryk 756/579 36
158 | P a g e
143 foj/kkjke ] pkEikjke ] 'kadjyky dsokgjpUn firk #xk fljnkjk jktw iqj[kk dkuth firk Qwlk nsm ifRu Qwlk feBw firk jk.kk ] tkek firk eywdk ccjh ifRu eywdk ] vejk ] exuk dkSe es?koky fuoklh bczs dk ryk
598 39.05
599 13.08
144 foj/kkjke ] pkxkjke ] 'kdjyky firk lq[kkjke dsok ] gjpn firk #xk fljnkjk jktw ] exk iwj[kk dkuth firk Qwlk nsm ifRu Qwlk dkSe es?koky fuoklh bczs dk ryk 550 122.1
145 chatk firk iwjk es?koky fuoklh bcsz dk ryk 671/482 50
146 ohjekjke firk iskykjke dkSe tkV fuoklh bczs dk ryk 683/519 40
147 'kkUrh tksts yw.kkjke es?koky fuoklh bczs dk ryk700/529 27.04
729/558 90.16
148 ohjeflag firk xksj/kuflag iwjksfgr 585 1.00
777/591 0.02
149 'ksjk firk iwj[kk dkSe lqFkkj fuoklh ckcMh dyk656/508 28.05
658/508 23.16
150 ksjk ] foyky firk lkdj dkSe es?koky Hkkjey firk Izkkxkjke es?koky 770/584 22.1
151 lrkjke firk esgkjke dkSe es?koky 539 64.04
152 ljnkjk firk [kaxkj dkSe eqlyeku 619/483 25
153 lkdsnkn oYn tyky Hkhy 706542 28.06
154 lkdj @ gjukFkjke es?koky 640/496 30.13
155 lkdj izsek, jk.kk firk gjukFk fu;ker ifRu gjukFk dkSe es?koky fuoklh ckcM+h dyk 627/488 629/488
53.11 11.18
156 lq[kjke ] dLrwjpan ] jruyky t;jkenkl firk gsejkt dkSe egs'kojh fuoklh ckcM+h 670/511 40.02
159 | P a g e
dyk
157 lqtkuflag firk gseflag jktiwr fuoklh ckcM+h dyk 661/509 20.01
158 lwjk] iwuek ] jk.kk firk dkNck dkSe es?koky507 30.12
654/554 35.12
159 lqtkuflag @ bZ'kjflag jktks nsoh ifRu bZ'kjkflag iwjksfgr 494 36.10
438/493 27.08
160 gjpan firk #?kk ] dkSe es?koky fuoklh bczs dk ryk 722/557 22.1
161 gjnkl] nkuk firk [kwek vpyk ] lwtk nwxkZ firk ehjk ek/kk glukFk firk esm] ukj.kk MsMk firk ykaxk es?koky 724/553 10.08
732/559 50.05
162 gjhjke firk vkbZNkujke lqFkkj 695/527 38.1
163 glu ] vkpkj firk gkehn dkSe eqlyeku fuoklh bczs dk ryk 547 77.12
164 gklw @ ek/kk dkSe es?koky 616/483 50
165 ghjk @ bZ'kjk dkSe lwFkkj 633/490 39.04
166 vkbZNkuflalg firk tsrekyflag jktiwr fuoklh ckcMh dyk 689/522 33
167 deydaoj ifRu enuflag jkiwr fuoklh ckcM+h dk 825/522 14
168 dyk @ tyky ] ccw ifRu dLrwjflag dkSe iwjksfgr fuoklh bczs dk ryk 709/542 7
169 dLrwjflag @ gehjflag ccwifRu dyflag dkSe iwjksfgr fuoklh bczs dk ryk 847/598 5
170 dsadw ifRu veuk dkSe es?koky 834/581 2.02
171 [ksrflag @ nhiflag dkSe iwjksfgr fuoklh bczs dk ryk 820/522 11.022
172 xw.kslk oYn dyk vUnjh ifRu xw.kslk dkSe Hkhy fuoklh bczs dk ryk 831/542 17.05
173 ?kewjke ] chtkjke dkSe es?koky fuoklh bczs dk ryk 819/592 9
160 | P a g e
174 rxkjke firk veukjke dkSe es?koky fuoklh ehBs dk ryk 850/581 15
175 nfj;k iq= flgajk dkSe ewlykeku fuoklh dksujk 812/609 42.03
176 nspUn oYn euth dkSe es?koky fuoklh l#is dk ryk 835/581 25
177 /kks/kk @ tyky dkSe Hkhy fuoklh bczs dk ryk 711/542 7
178 ujflag @ tokgjflg feJkk ifRu ujflag dkSe iwjksfgr fuoklh bczs dk ryk 843/589 20
179 ukjk;.k flag firk Hksjflag dkSe jktiwr fuoklh ckcM+h dyk 827/522 5.08
180 iBkbZjke firk ohatkjke ioZrh iBkbZjke dkSe es?koky uoklh bczs dk ryk 820/592 8.02
181 i`Fohflag oYn ukFkwflag eksgudoaj ifRu i`Fohflag dkSe jktiwr uoklh bczs dk ryk 826/522 4.16
182 lskgnjh ifRu gjx.k dkSe es?koky uoklh bczs dk ryk 832/542 12.05
183 ckcwflag firk xksj/kuflag dkSe iwjksfgr uoklh bczs dk ryk 843/589 12.08
184 Hks#flag @ ukFkwflag dkSe jktiwr fuoklh ckcM+h dyk 690/522 19
185 ekuk oYn exuk gktjh ifRu ekuk dkSe es?koky fuoklh ckcM+h dyk 833/483 15
186 eksgu @ okyk dkSe es?koky fuoklh ehBs dk ryk 465/581 6.00
814/581 2.02
187 fodzeflag firk vkbZnkuflaga enudoaj ifRu fodzeflag jktiwr fuoklh ckcM+h dyk 830/522 14
188 laeUrdaoj ifRu ohjflag dkSe iwjkssfgr fuoklh bczs dk ryk 844/589 12.08
189 ljnjkjke oYn ijlkjke ,yeksa ifRu ljnkjkjke dkSe es?koky fuoklh bczs dk ryk 614/483 12.16
190 lokbZ oYn Hkkjey <syh ifRu lokbZ dkSe es?koky fuoklh bczs dk ryk 823/482 3.15
191 lokbZflag oYn xksj/kuflag lEirdoaj ifRu lokbZflag dkSe iwjksfgr fuoklh bczs dk ryk 845/589 12.08
192 lkabZnkn fir tyky dkSe Hkhy fuoklh bczs dk ryk 710/542 7
193 lwUnjifRu eQk dkSe jko.kk jktiwr fuoklh ckcM+h dyk 822/522 25
194 gkde @ 'ksjk ] lhrk ifRu gkde dkSe es?koky fuoklh bczs dk ryk821/592 15.00
822/592 5.00
161 | P a g e
195 gkFkhjke oYn ohata fe;.k ifRu gkFkhjke dkSe es?koky fuoklh bczs dk ryk 818/282 8.02
196 gsek oYn Hkkstk Hkwjh ifRu gsek dkSe tkV fuoklh bczs dk ryk 824/516 2.1
197 xSj ewefdu vkcknh 794/604 783/592
1.18 2.00
198 xSj eqedhu Ldwy jk-xk-ik- ckcM+h efUnjxSj eqedhu Ldwy HkMk Msj xSj eqedhy Ldwy jkmizkfo --------
679/513 735/565 775/509
3.00 3.00 3.00
199 xSj eqedhu /kksjk HkkM
762/581 774/589 848/589 849/589
5.16 11.12 10.00 10.00
200 xSj eqedhu dfczLrku xSj eqedhu dfczLrku
531 366
4.14 2.00
201 Mwwaxjkjke firk feJhjke dkSe es?koky 583 856/584
9.00 27.00
202 dcwnsoh ifRu vejkjke jkdwnsoh ifRu ckcwyky dkSe es?koky fuoklh bczs dk ryk 857/588 858/587
20.00 16.00
203 fcyk dCtk eqedhu jktLFkku ljdkj 768/582 16.18
204 fcyk dCtk eqedhu jktLFkku ljdkj 784/592 12.18
205 fcyk dCtk eqedhu jktLFkku ljdkj 810/609 0.01
206 fcyk dCtk eqedhu jktLFkku ljdkj 570 0.09
207 fcyk dCtk eqedhu jktLFkku ljdkj 590 0.04
208 fcyk dCtk eqedhu jktLFkku ljdkj 610/482 3.07
209 fcyk dCtk eqedhu jktLFkku ljdkj 655/508 0.05
210 fcyk dCtk eqedhu jktLFkku ljdkj 663/510 6.08
162 | P a g e
211 fcyk dCtk eqedhu jktLFkku ljdkj 673/516 7.17
212 fcyk dCtk eqedhu jktLFkku ljdkj 576/517 0.02
213 fcyk dCtk eqedhu jktLFkku ljdkj 680/518 0.04
214 fcyk dCtk eqedhu jktLFkku ljdkj 688/522 20.08
215 fcyk dCtk eqedhu jktLFkku ljdkj 691/526 9.12
216 fcyk dCtk eqedhu jktLFkku ljdkj 704/542 24.1
217 fcyk dCtk eqedhu jktLFkku ljdkj 752/579 1.16
218 fcyk dCtk eqedhu jktLFkku ljdkj 757/580 0.07
219 fcyk dCtk eqedhu jktLFkku ljdkj 761/581 7.18
220 fcyk dCtk eqedhu jktLFkku ljdkj 767/582 22.13
221 fcyk dCtk eqedhu jktLFkku ljdkj 778/592 0.06
222 fcyk dCtk eqedhu jktLFkku ljdkj 796/605 3.05
223 fcyk dCtk eqedhu jktLFkku ljdkj 637/492 2
224 fcyk dCtk eqedhu jktLFkku ljdkj 639/493 0.1
225 fcyk dCtk eqedhu jktLFkku ljdkj 698/527 3
226 fcyk dCtk eqedhu jktLFkku ljdkj 734/565 1
227 fcyk dCtk eqedhu jktLFkku ljdkj 737/567 2.05
228 fcyk dCtk eqedhu jktLFkku ljdkj 790/601 1
229 fcyk dCtk eqedhu jktLFkku ljdkj 813/609 0.1
230 fcyk dCtk eqedhu jktLFkku ljdkj 814/536 0.08
231 fcyk dCtk eqedhu jktLFkku ljdkj 815/537 0.08
232 fcyk dCtk eqedhu jktLFkku ljdkj 836/605 0.08
233 fcyk dCtk eqedhu jktLFkku ljdkj 837/592 0.08
163 | P a g e
234 fcyk dCtk eqedhu jktLFkku ljdkj 838/538 0.08
235 fcyk dCtk eqedhu jktLFkku ljdkj 839/497 0.08
236 bczkghe @ lqekj 776/591 0.02
237 Hkhek fi- bUnzkjke 586 15.07
238 Hkh[kh @ 'ksjkjke 848/592 9
239 jkew @ #[kck dkSe es?koky fuoklh bczs dk ryk 592 5
240 P.W.D. dh lM+ds 555 13.06
241 P.W.D. dh lM+ds 626486 3.14
242 P.W.D. dh lM+ds 630/488 4.11
243 P.W.D. dh lM+ds 634/490 4.11
244 P.W.D. dh lM+ds 634/500 6.05
245 P.W.D. dh lM+ds 646/501 0.16
246 P.W.D. dh lM+ds 648/502 11.1
247 P.W.D. dh lM+ds 653/505 6.08
248 P.W.D. dh lM+ds 657/508 4.19
249 P.W.D. dh lM+ds 701/529 0.02
250 P.W.D. dh lM+ds 739/569 6.06
251 P.W.D. dh lM+ds 742/571 0.18
252 P.W.D. dh lM+ds 745/572 10.01
253 P.W.D. dh lM+ds 772/587 3.18
254 P.W.D. dh lM+ds 780/592 19.16
255 P.W.D. dh lM+ds 787/600 0.05
256 P.W.D. dh lM+ds 789/601 2.13
164 | P a g e
257 P.W.D. dh lM+ds 792/603 3.12
258 P.W.D. dh lM+ds 798/605 19.15
259 e?kflag ] ek/kqflag fi- vpyflag jktiqr fuoklh ckcM+h dyk 617/483 35
260 ykHkwjke fi- mrekjke dkSe es?koky fuoklh bczs dk ryk 554 18
165 | P a g e
CHAPTER –VIII Enclosures
166 | P a g e
167 | P a g e
168 | P a g e
169 | P a g e
170 | P a g e
171 | P a g e
172 | P a g e
173 | P a g e
174 | P a g e
175 | P a g e
176 | P a g e
177 | P a g e
178 | P a g e
179 | P a g e
180 | P a g e
181 | P a g e
182 | P a g e
183 | P a g e
184 | P a g e
185 | P a g e
186 | P a g e
187 | P a g e
188 | P a g e
189 | P a g e
190 | P a g e
191 | P a g e
192 | P a g e
193 | P a g e
194 | P a g e
Action plan for IWMP MIS website Format ‐1
Physical Target (Watershed Works) Name of Project : Barmer(IWMP)‐54 Block: Chohtan Distt.: Barmer
Name of Head Name of Activity Name of Subactivity Total Target (Quantity)
Unit (ha/nos/Rmt/Cubic
meter)
Financial yearwise Physical Target
2012‐13 2013‐14 2014‐15 2015‐16 2016‐17 1.Watershed
Development Works 1.1 Land Development
(Productive use) 1.1.1 Afforestation (on wasteland) ha
1.1.2 Afforestation (on total land including wasteland)
ha
1.1.3 Horticulture(on wasteland) ha
1.1.4 Horticulture(on total land including wasteland)
ha
1.1.5 Agriculture (on wasteland) ha
1.1.6 Agriculture(on total land including wasteland)
ha 1.1.7 Pasture (on wasteland) 25 ha 0 10 11 4 0
1.1.8 Pasture(on total land including wasteland)
25 ha 0 10 11 4 0 1.1.9 Others (on wasteland) ha
1.1.10 Others (on total land including wasteland)
5714 ha 0 300 4200 1214 0
1.2 Soil & Moisture
Conservation 1.2.1 Staggered trenching ha
1.2.2 Countour Bunding ha 1.2.3 Graded Bunding ha 1.2.4 Bench Terracing ha 1.2.5 Others ha
195 | P a g e
1.3 Vegetative and
Engineering Structure 1.3.1 Earthen Checks 13075 Cubic meter 0 0 9992 3083 0
1.3.2 Brushwood Checks Rmt
1.3.3 Gully plugs Cubic meter
1.3.4 Loose bolder Cubic meter
1.3.5 Gabion structure Cubic meter 1.3.6 Others nos
1.4 Water Harvesting
Structure (New created) 1.4.1 Farm ponds 8 nos 0 0 0 8 0
1.4.2 Check dams nos 1.4.3 Nallah Bunds nos 1.4.4 Percolation tanks nos
1.4.5 Ground Water recharge structure
nos 1.4.6 Others 203 nos 0 38 118 47 0
1.5 Water Harvesting
Structure (Renovated) 1.5.1 Farm ponds nos
1.5.2 Check dams nos 1.5.3 Nallah Bunds nos 1.5.4 Percolation tanks nos
1.5.5 Ground Water recharge structure
nos 1.5.6 Others 5 nos 0 1 2 2 0
1.6 Water Harvesting
Structure ( Storage capacity of New structures)
1.6.1 Farm ponds 16000 Cubic meter
1.6.2 Check dams Cubic meter
1.6.3 Nallah Bunds Cubic meter
1.6.4 Percolation tanks Cubic meter
1.6.5 Ground Water recharge structure
Cubic meter
196 | P a g e
1.6.6 Others 10150 Cubic meter 0 1900 5900 2350 0
1.7 Water Harvesting
Structure ( Storage capacity of Renovated structures)
1.7.1 Farm ponds Cubic meter
1.7.2 Check dams Cubic meter
1.7.3 Nallah Bunds Cubic meter
1.7.4 Percolation tanks Cubic meter
1.7.5 Ground Water recharge structure
Cubic meter
1.7.6 Others 100000 Cubic meter 0 20000 40000 40000 0 2.EPA 2.1 No. of EPA activities 2 nos 2 0 0 0 0
2.2 No. of water
extracting unit created 16 nos 16 0 0 0 0
3.Institution & Capacity Building
3.1 SHG Formation (Newly created)
3.1.1 No. of SHG 196 nos 196 0 0 0 0
3.1.2 Total No. of SHGs members 1176 nos 1176 0 0 0 0 3.2.1 No. of SHG assisted 196 nos 0 45 75 76 0
3.2.2 Total No. of SHGs members 1176 nos 0 270 450 456 0 3.3 UG Formation 3.3.1 No. of UG 16 nos 16 0 0 0 0
3.3.2 Total No. of members of UGs
1559 nos 1559 0 0 0 0
3.4 Formation of
Federation 3.4.1 No. of Federation 12 nos 12 0 0 0 0
3.4.2 Total No. of members of Federation
1176 nos 1176 0 0 0 0 3.5 Capacity building 3.5.1 No. of Training nos 3.5.2 No. of Persons trained nos 4.Livelihood activities for
the asset-less persons 4.1 No. of activities 15 nos 0 3 3 9
4.2 No. of Beneficiaries 1206 nos 0 277 463 466 5.Production system
µ-enterprises 5.1 Sericulture 5.1.1 No. of activities nos
197 | P a g e
5.1.2 No. of Beneficiaries nos 5.2 Beekeeping 5.2.1 No. of activities nos 5.2.2 No. of Beneficiaries nos 5.3 Poultry 5.3.1 No. of activities nos 5.3.2 No. of Beneficiaries nos 5.4 Fisheries 5.4.1 No. of activities nos 5.4.2 No. of Beneficiaries nos 5.5 Bio-fuel Plantation 5.5.1 Area Covered ha 5.5.2 No. of Beneficiaries nos 5.6 Others 5.6.1 No. of activities 9 nos 1 3 3 3 0 5.6.2 No. of Beneficiaries 1803 nos 450 331 660 812 0
198 | P a g e
Financial Target (Watershed works) Format ‐2 Name of Project : Barmer(IWMP)‐54 Block: Chohtan Distt.: Barmer
Name of Head Name of Activity Name of Subactivity
Total Target
Amount (Rs. In lakh)
Financial year 2012‐13 2013‐14 2014‐15 2015‐16 2016‐17 1.Watershed
Development Works 1.1 Land Development
(Productive use) 1.1.1 Afforestation
1.1.2 Horticulture 1.1.3 Agriculture 11.43 0.00 O.6 8.40 2.43 0.00 1.1.4 Pasture 25.54 0.00 13.50 5.61 6.43 0.00 1.1.5 Others
1.2 Soil & Moisture
Conservation 1.2.1 Staggered
trenching
1.2.2 Countour
Bunding
1.2.3 Graded Bunding
1.2.4 Bench
Terracing
1.2.5 Others
1.3 Vegetative and
Engineering Structure 1.3.1 Earthen Checks 15.01 0.00 0.00 11.47 3.54 0.00
1.3.2 Brushwood
Checks
1.3.3 Gully plugs 1.3.4 Loose bolder
1.3.5 Gabion
structure
1.3.6 Others
1.4 Water Harvesting
Structure (New Created) 1.4.1 Farm ponds 16
0.00 0.00 0.00 16.00 0.00 1.4.2 Check dams 1.4.3 Nallah Bunds
1.4.4 Percolation
tanks
199 | P a g e
1.4.5 Ground Water
recharge structure
1.4.6 Others 297 0.00 52.50 172.50 72.00 0.00
1.5 Water Harvesting
Structure (Renovated) 1.5.1 Farm ponds
1.5.2 Check dams 1.5.3 Nallah Bunds
1.5.4 Percolation
tanks
1.5.5 Ground Water
recharge structure
1.5.6 Others 100 0.00 20.00 40.00 40.00 0.00
2.Administrative Cost 2.1 Salary 2.2 Others 25.713 5.14 5.14 5.14 5.14 5.14
3.Monitoring 3.1 Monitoring of
Projects
4.Entry Point Activity 4.1 Plan for EPA 34.284 34.28 0.00 0.00 0.00 0.00 5.Institution &
Capacity Building 5.1 SHG Formation
5.2 UG Formation
5.3 Formation of
Federation
5.4 Capacity building 5.5 Others 6.DPR 6.1 Preparation Of DPR 7.Livelihood activities
for the asset-less persons 7.1 Plan for Livelihood
activities 77.14
0.00 13.00 27.39 36.75 0.00 8.Production system
& micro-enterprises 8.1 Sericulture
8.2 Beekeeping 8.3 Poultry 8.4 Fisheries 8.5 Bio-fuel Plantation 8.6 Others 85.71 4.29 18.59 41.20 21.64 0.00
200 | P a g e
BARMER (IWMP)‐54 Format‐
3 FINANCIAL PIA
To be entered at PIA Level Financial Target Projectwise
No. Head
Amount (Rs. in Lakh)
Financial year
2012‐13 2013‐14 2014‐15 2015‐16 2016‐17
1 Administrative 11.9994 11.9994 11.9994 11.9994 11.9994
2 Capacity building 10.94927 8.9999 7.82122 1.56439 1.56439
3 Monitoring 1.0284 1.0284 1.0284 1.0284 1.0284
4 Preparation Of DPR 3.428 5.143 0 0 0
5 EPA 0 0 0 0 0
6 Any Other
201 | P a g e
BARMER (IWMP)‐54 Format‐4 FINANCIAL WCDC
To be entered at WCDC Level Financial Target Projectwise
No. Head Amount (Rs. in Lakh)
Financial year
2012‐13 2013‐14 2014‐15 2015‐16 2016‐17
1 Administrative
2 Capacity building 3.89974 3.34282 2.78564 0.557180.5571
8
3 Monitoring 0.3428 0.3428 0.3428 0.3428 0.3428
4 Preparation Of
DPR
5 Any Other
202 | P a g e
Format‐5 Capacity building plan (PIA level) Name of Project : Barmer(IWMP)‐54 Block: Chohtan District : Barmer
No. Head Financial year
2012‐13 2013‐14 2014‐15 2015‐16 2016‐17
1 No of trainings planned 54 45 39 8 8
2 No of persons to be
trained 2700 2250 1950 400 400
Format‐6 Capacity building plan (WCDC) Projectwise
No. Head Financial year
2012‐13 2013‐14 2014‐15 2015‐16 2016‐17
1 No of trainings
planned 20 17 14 3 3
2 No of persons to be
trained 1000 850 700 150 150
203 | P a g e