Centralized Voice Logging System for LC Gate Communication
2
description
Centralized Voice Logging System for LC Gate Communication - PowerPoint PPT Presentation
Transcript of Centralized Voice Logging System for LC Gate Communication
SOUTH CENTRAL RAILWAY
Divisional Railway Office Guntakal
“Centralized Voice Logging System for LC Gate Communication”
Inaugurated byShri. T.P. Singh
DRM/GTLOn
10.06.2013In the presence of
Shri. P.V.V. Satya Narayana ADRM/GTL
Shri G. Pavan kumarSr.DSTE/GTL
Shri D. Subrahamanyam Shri K.V.V. Satya Narayana Sr DEN Co-ord /GTL Sr.DFM/GTL
एलसी� गे�ट सीचा�र के� लिलएके� द्री�के� त आवा�ज ल�गिंगे�गे लिसीस्टम
मडल र�लवा� के�र्या��लर्यागे�तकेल
Centralized Voice Logging System for LC Gate Communication
DIVISIONAL RAILWAY OFFICEGUNTAKAL