![Page 1: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1.jpg)
S.NO. Description Unit Qty. Rates Amount
1 Earth work in excavation by mechanical means
(Hydraulic Excavator )/ manual means in foundation
trenches or drains (not exceeding 1.5 m in width or 10
sqm on plan) including dressing of sides and ramming
of bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil
as directed, for all leads and lifts.
1.1 All kinds of soil. Cum 10.00
2 Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, for all leads and lifts.
Cum 8.00
3 Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering - All work upto plinth level :
3.1 1:5:10 (1 cement : 5 coarse sand :10 graded stone
aggregate 40 mm nominal size) Cum 3.00
4 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size) Cum 3.00
5 Random rubble masonry with hard stone in foundation
and plinth including levelling up with cement concrete
1:6:12 (1 cement : 6 coarse sand : 12 graded stone
aggregate 20mm nominal size) upto plinth level with :
5.1 Cement mortar 1:6 (1 cement : 6 coarse sand). Cum 5.00
6 Providing and laying in position specified grade of
reinforced cement concrete excluding the cost of
centering, shuttering, finishing and reinforcement - All
work up to plinth level
6.1 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone
aggregate 20 mm nominal size) Cum 4.00
MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR
ESTATE SECTION
Name of Work: Covering of Stage at Central Lawn in MNIT.
G Schedule
Part I Civil Work
Page 1
![Page 2: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/2.jpg)
S.NO. Description Unit Qty. Rates Amount
7 Reinforced cement concrete work in walls (any
thickness), including attached pilasters, buttresses,
plinth and string courses, fillets, columns, pillars,
piers, abutments, posts and struts, beams, suspended
floors, roofs having slope up to 15° landings,
balconies, shelves, chajjas, lintels, bands, plain
window sills, staircases and spiral stair cases etc. up to
floor five level, excluding cost of centering, shuttering,
finishing and reinforcement :
7.1 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone
aggregate 20 mm nominal size) Cum 2.00
8 Centering and shuttering including strutting, propping
etc. and removal of form for : Foundations, footings,
bases of columns, etc. for mass concrete.
8.1 Foundations, footings, bases of columns, etc. for mass
concrete. Sqm 5.00
9 Lintels, beams, plinth beams, girders, bressumers and
cantilevers. Sqm 10.00
10 Columns, Pillars, Piers, Abutments, Posts and Struts.
Sqm 3.00
11 Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete up to plinth level.
11.1 Thermo-Mechanically Treated bars. Kg 1000.00
12 Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete above plinth level.
12.1 Thermo-Mechanically Treated bars. Kg 600.00
13 Brick work with common burnt clay F.P.S. (non
modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level in
all shapes and sizes in :
13.1 Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 3.00
Page 2
![Page 3: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/3.jpg)
S.NO. Description Unit Qty. Rates Amount
14 Half brick masonry with common burnt clay F.P.S.
(non modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level.
14.1 Cement mortar 1:4 (1 cement :4 coarse sand) Sqm 20.00
15 12 mm cement plaster of mix :
15.1 1:6 (1 cement: 6 fine sand) Sqm 10.00
16 15 mm cement plaster on the rough side of single or
half brick wall of mix :
16.1 1:6 (1 cement: 6 fine sand) Sqm 12.00
17 6 mm cement plaster of mix :
17.1 1:3 (1 cement: 3 fine sand) Sqm 15.00
18 Finishing walls with Acrylic Smooth exterior paint of
required shade :
18.1 New work (Two or more coat applied @ 1.67 ltr/10
sqm over and including priming coat of exterior primer
applied @ 2.20 kg/10 sqm). Sqm 100.00
19 Painting with synthetic enamel paint of approved
brand and manufacture of required colour to give an
even shade:
19.1 Two or more coats on new work over an under coat of
suitable shade with ordinary paint of approved brand
and manufacture. Sqm 250.00
20 Kota stone slab flooring over 20 mm (average) thick
base laid over and jointed with grey cement slurry
mixed with pigment to match the shade of the slab
including rubbing and polishing complete with base of
cement mortar 1 : 4 (1 cement : 4 coarse sand) :
20.1 25 mm thick. Sqm 150.00
21 Kota stone slabs 20 mm thick in risers of steps,
skirting, dado and pillars laid on 12 mm (average)
thick cement mortar 1:3 (1 cement 3coarse sand) and
jointed with grey cement slurry mixed with pigment to
match the shade of the slabs, including rubbing and
polishing complete. Sqm 15.00
Page 3
![Page 4: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/4.jpg)
S.NO. Description Unit Qty. Rates Amount
22 Steel work in built up tubular ( round, square or
rectangular hollow tubes etc.) trusses etc., including
cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer,
including welding and bolted with special shaped
washers etc. complete.
22.1 Hot finished welded type tubes Kg 5200.00
23 Supply & Installation of Multi cell/tight cell
Polycarbonate Panel System of minimum thickness
8mm of approved colour and shade confirming to
specifications mentioned below:
Panel Width shall not be less than 600 mm to ensure
best performance for wind uplift, vibration, oil canning
and visual appearance. The panels shall be uniform in
colour with an integral Tight-Cell core. Panels shall be
manufactured with Vertical Standing Seam at both
sides of the panel. Snap-on connector to interlock the
panels shall have a grip-lock locking mechanism to
ensure maximum uplift capability. End-
cap/Aluminium U Profile (mill finish) shall be
provided for end closure. Panels shall be co-extruded
UV protected. The polycarbonate panels shall be bent
to required profile (circular,linear,curvilinear) and
fixed in position, to the structural steel framework,
using self-driving self-tapping screws, Aluminium or
other profiles, accessories etc.
Sqm 160.00
TOTAL of Part I Civil Work
1
Wiring of light point/ fan point/ exhaust fan point/ call
bell point with 1.5 sq. mm nominal size FR PVC
insulated unsheathed flexible copper conductor 1.1 kV
grade and 1.5 sq. mm nominal size FR PVC insulated
unsheathed flexible copper earth conductor 1.1 kV
grade (IS:694) of approved make in surface / recessed
ISI marked MMS ( IS:9537 P - III ) PVC
conduit & it's accessories, round tiles,18 SWG M.S.
box with earth terminal, 6 A switch, 3.0 mm thick ISI
marked phenolic laminated sheet, zinc plated / brass
screws, cup washers, making connections, testing etc.
as required.
1.1Long point (up to 10 mtr..) P.
point40.0
Part II Electrical Work
Page 4
![Page 5: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/5.jpg)
S.NO. Description Unit Qty. Rates Amount
2
S&F following sizes (dia.) of ISI marked medium duty
PVC conduit along with accessories in surface /
recessed using saddles, clamps, fastener as required
including cutting the wall, covering conduit and
making good the same as required.
2.120 mm R.
mtr.150.0
2.225 mm R.
mtr.150.0
3
Supplying and drawing FR PVC insulated &
unsheathed flexible copper conductor ISI marked
(IS:694) of 1.1 kV grade and approved make in
existing surface or recessed conduit/casing capping
including making connections etc. as required. (BSR
Group-1)
3.1 1 x 1.5 sq.mm Mtr. 300.00
3.2 1 x 2.5 sq.mm Mtr. 540.00
3.3 1 x 4.0 sq.mm Mtr. 540.00
3.4 1 x 6.0 sq.mm Mtr. 450.00
3.5 1 x 10.0 sq.mm Mtr. 450.00
4
P&F Recessed/ Surface mounting heavy duty
horizontal type sheet steel Distribution board
phophatised/ powder painted complete with suitable
rating insulated copper bus bar, shorting link , neutral
link, earth link and din bar,masking sheet, conforming
to IS13032 & IS8623 including making internal DB
terminations with copper lugs , testing etc. as required.
Double door (Three phase)
6 Way Each 3.0
5
P&F 240/415 V AC MCB with positive isolation of
breaking capacity not less than 10 KA (B/ C/ D
tripping characteristic) ISI marked IS 8828(1996)]/
conforming to IEC 60898 in existing board/sheets
including making connections, testing etc. as required.
Single pole MCB
6 A to 32 A rating Each 48.0
Triple pole MCB
40 A/ 63 A rating Each 10.0
4.1
5.1
5.2
Page 5
![Page 6: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/6.jpg)
S.NO. Description Unit Qty. Rates Amount
6
P&F 240/415 V isolator conforming to IS:13947-III/
IEC 60947-3 on existing board / sheet including
making connections, testing etc. as required.
Four pole Isolator
100 A rating Each 4.0
7
P&F metal clad industrial plug top & socket unit with
pin and sleeve type contact on porcelain/ bakelite base
in sheet steel enclosure (without MCB) including
making connections, testing etc.as required
Single / Double Pole (Three pin)
20 A Each 24.0
Three / Four pole (Five pin)
30A-32A Each 4.0
7.3 63 A Each 1.0
8
P & F 18 SWG Sheet steel boxes duly finished with
two coats of red oxide and with earthing terminal of
following sizes (nominal size) on surface or in
recessed as required.
8.1 175mm x 100mm x 60mm Each 20.0
9
P & F surface/recessed type 10 mm thick Teak wood
board duly antitermite treated, varnished and fixed by
using gutties/ PVC fasteners of following size as
required.
9.1 250 mm x 100 mm Each 20.0
9.2 100 mm x 175 mm Each 20.0
10
P & F ISI marked (IS :3854) 16 amp. flush type switch
including cutting hole in tile and making connection
testing etc. as required.
Each 40.0
11
P & F 3/6 pin 16 amp flush type socket including
cutting hole in tile and making connection testing etc.
as required.
Each 40.0
12
P & F ISI marked 6 amp bakelite batten/angle holder
including making connection testing etc. as required. Each 40.0
13
P & F paper phenolic resin bonded laminates
confirming to IS : 2036 - 1995 for boxes/ frames
including making holes for switches etc, with brass
screws, washers/ zinc plated nut and bolts as required.
13.1 3.0 mm thick Sq.m 5.0
6.1
7.1
7.2
Page 6
![Page 7: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/7.jpg)
S.NO. Description Unit Qty. Rates Amount
14
P/Laying P.V.C. / XLPE insulated & P.V.C. sheathed
cable of 1.1 KV grade with aluminium conductor of
IS:1554 P-I / IS :7098 P - I of Group 1 of approved
make in ground as per IS:1255 including excavation
of 30cmx75cm size trench, 25 cm thick under layer of
sand,IInd class bricks covering, refilling
earth,compaction of earth, making necessary
connection, testing etc. as required of size.
16.0 Sq.mm
4 core Mtr. 60.0
25.0 Sq.mm
4 core Mtr. 30.0
15
P & F IP -65 protected integral flood light luminaire
suitable for HPSV/ Metal halide lamp comprising of
powder coated die cast aluminium housing,
electrochemically brightened and anodized stippled
aluminium reflector, covered with suitably gasketed
heat resistant and toughened glass, porcelain holder,
integral control gear box having copper ballast,
capacitor, electronic ignitor prewired with pvc
insulated copper conductor up to terminal block
including making connection testing etc. as required.
(with out lamp)
15.1 1 X 400 Watt Each 10
16
P & F Normal / High Output High pressure sodium
vapour/ Metal halide / Halogen lamp as required.
Metal halide lamp single ended tubular
400 Watt Each 10
Total of Part II Rs.
Total of Part I & Part II
Signature of the Contractor with Seal and Address
16.1
Executive Engineer
14.1
14.2
Page 7
![Page 8: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/8.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 8
![Page 9: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/9.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 9
![Page 10: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/10.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 10
![Page 11: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/11.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 11
![Page 12: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/12.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 12
![Page 13: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/13.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 13
![Page 14: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/14.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 14
![Page 15: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/15.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 15
![Page 16: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/16.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 16
![Page 17: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/17.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 17
![Page 18: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/18.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 18
![Page 19: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/19.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 19
![Page 20: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/20.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 20
![Page 21: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/21.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 21
![Page 22: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/22.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 22
![Page 23: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/23.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 23
![Page 24: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/24.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 24
![Page 25: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/25.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 25
![Page 26: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/26.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 26
![Page 27: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/27.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 27
![Page 28: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/28.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 28
![Page 29: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/29.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 29
![Page 30: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/30.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 30
![Page 31: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/31.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 31
![Page 32: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/32.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 32
![Page 33: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/33.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 33
![Page 34: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/34.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 34
![Page 35: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/35.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 35
![Page 36: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/36.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 36
![Page 37: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/37.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 37
![Page 38: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/38.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 38
![Page 39: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/39.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 39
![Page 40: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/40.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 40
![Page 41: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/41.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 41
![Page 42: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/42.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 42
![Page 43: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/43.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 43
![Page 44: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/44.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 44
![Page 45: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/45.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 45
![Page 46: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/46.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 46
![Page 47: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/47.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 47
![Page 48: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/48.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 48
![Page 49: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/49.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 49
![Page 50: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/50.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 50
![Page 51: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/51.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 51
![Page 52: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/52.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 52
![Page 53: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/53.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 53
![Page 54: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/54.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 54
![Page 55: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/55.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 55
![Page 56: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/56.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 56
![Page 57: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/57.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 57
![Page 58: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/58.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 58
![Page 59: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/59.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 59
![Page 60: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/60.jpg)
S.NO. Description Unit Qty. Rates Amount
Page 60
![Page 61: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/61.jpg)
Page 61
![Page 62: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/62.jpg)
Page 62
![Page 63: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/63.jpg)
Page 63
![Page 64: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/64.jpg)
Page 64
![Page 65: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/65.jpg)
Page 65
![Page 66: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/66.jpg)
Page 66
![Page 67: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/67.jpg)
Page 67
![Page 68: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/68.jpg)
Page 68
![Page 69: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/69.jpg)
Page 69
![Page 70: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/70.jpg)
Page 70
![Page 71: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/71.jpg)
Page 71
![Page 72: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/72.jpg)
Page 72
![Page 73: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/73.jpg)
Page 73
![Page 74: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/74.jpg)
Page 74
![Page 75: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/75.jpg)
Page 75
![Page 76: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/76.jpg)
Page 76
![Page 77: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/77.jpg)
Page 77
![Page 78: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/78.jpg)
Page 78
![Page 79: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/79.jpg)
Page 79
![Page 80: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/80.jpg)
Page 80
![Page 81: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/81.jpg)
Page 81
![Page 82: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/82.jpg)
Page 82
![Page 83: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/83.jpg)
Page 83
![Page 84: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/84.jpg)
Page 84
![Page 85: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/85.jpg)
Page 85
![Page 86: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/86.jpg)
Page 86
![Page 87: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/87.jpg)
Page 87
![Page 88: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/88.jpg)
Page 88
![Page 89: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/89.jpg)
Page 89
![Page 90: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/90.jpg)
Page 90
![Page 91: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/91.jpg)
Page 91
![Page 92: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/92.jpg)
Page 92
![Page 93: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/93.jpg)
Page 93
![Page 94: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/94.jpg)
Page 94
![Page 95: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/95.jpg)
Page 95
![Page 96: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/96.jpg)
Page 96
![Page 97: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/97.jpg)
Page 97
![Page 98: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/98.jpg)
Page 98
![Page 99: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/99.jpg)
Page 99
![Page 100: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/100.jpg)
Page 100
![Page 101: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/101.jpg)
Page 101
![Page 102: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/102.jpg)
Page 102
![Page 103: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/103.jpg)
Page 103
![Page 104: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/104.jpg)
Page 104
![Page 105: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/105.jpg)
Page 105
![Page 106: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/106.jpg)
Page 106
![Page 107: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/107.jpg)
Page 107
![Page 108: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/108.jpg)
Page 108
![Page 109: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/109.jpg)
Page 109
![Page 110: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/110.jpg)
Page 110
![Page 111: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/111.jpg)
Page 111
![Page 112: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/112.jpg)
Page 112
![Page 113: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/113.jpg)
Page 113
![Page 114: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/114.jpg)
Page 114
![Page 115: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/115.jpg)
Page 115
![Page 116: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/116.jpg)
Page 116
![Page 117: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/117.jpg)
Page 117
![Page 118: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/118.jpg)
Page 118
![Page 119: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/119.jpg)
Page 119
![Page 120: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/120.jpg)
Page 120
![Page 121: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/121.jpg)
Page 121
![Page 122: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/122.jpg)
Page 122
![Page 123: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/123.jpg)
Page 123
![Page 124: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/124.jpg)
Page 124
![Page 125: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/125.jpg)
Page 125
![Page 126: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/126.jpg)
Page 126
![Page 127: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/127.jpg)
Page 127
![Page 128: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/128.jpg)
Page 128
![Page 129: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/129.jpg)
Page 129
![Page 130: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/130.jpg)
Page 130
![Page 131: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/131.jpg)
Page 131
![Page 132: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/132.jpg)
Page 132
![Page 133: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/133.jpg)
Page 133
![Page 134: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/134.jpg)
Page 134
![Page 135: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/135.jpg)
Page 135
![Page 136: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/136.jpg)
Page 136
![Page 137: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/137.jpg)
Page 137
![Page 138: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/138.jpg)
Page 138
![Page 139: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/139.jpg)
Page 139
![Page 140: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/140.jpg)
Page 140
![Page 141: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/141.jpg)
Page 141
![Page 142: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/142.jpg)
Page 142
![Page 143: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/143.jpg)
Page 143
![Page 144: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/144.jpg)
Page 144
![Page 145: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/145.jpg)
Page 145
![Page 146: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/146.jpg)
Page 146
![Page 147: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/147.jpg)
Page 147
![Page 148: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/148.jpg)
Page 148
![Page 149: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/149.jpg)
Page 149
![Page 150: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/150.jpg)
Page 150
![Page 151: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/151.jpg)
Page 151
![Page 152: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/152.jpg)
Page 152
![Page 153: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/153.jpg)
Page 153
![Page 154: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/154.jpg)
Page 154
![Page 155: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/155.jpg)
Page 155
![Page 156: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/156.jpg)
Page 156
![Page 157: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/157.jpg)
Page 157
![Page 158: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/158.jpg)
Page 158
![Page 159: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/159.jpg)
Page 159
![Page 160: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/160.jpg)
Page 160
![Page 161: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/161.jpg)
Page 161
![Page 162: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/162.jpg)
Page 162
![Page 163: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/163.jpg)
Page 163
![Page 164: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/164.jpg)
Page 164
![Page 165: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/165.jpg)
Page 165
![Page 166: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/166.jpg)
Page 166
![Page 167: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/167.jpg)
Page 167
![Page 168: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/168.jpg)
Page 168
![Page 169: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/169.jpg)
Page 169
![Page 170: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/170.jpg)
Page 170
![Page 171: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/171.jpg)
Page 171
![Page 172: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/172.jpg)
Page 172
![Page 173: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/173.jpg)
Page 173
![Page 174: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/174.jpg)
Page 174
![Page 175: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/175.jpg)
Page 175
![Page 176: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/176.jpg)
Page 176
![Page 177: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/177.jpg)
Page 177
![Page 178: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/178.jpg)
Page 178
![Page 179: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/179.jpg)
Page 179
![Page 180: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/180.jpg)
Page 180
![Page 181: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/181.jpg)
Page 181
![Page 182: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/182.jpg)
Page 182
![Page 183: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/183.jpg)
Page 183
![Page 184: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/184.jpg)
Page 184
![Page 185: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/185.jpg)
Page 185
![Page 186: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/186.jpg)
Page 186
![Page 187: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/187.jpg)
Page 187
![Page 188: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/188.jpg)
Page 188
![Page 189: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/189.jpg)
Page 189
![Page 190: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/190.jpg)
Page 190
![Page 191: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/191.jpg)
Page 191
![Page 192: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/192.jpg)
Page 192
![Page 193: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/193.jpg)
Page 193
![Page 194: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/194.jpg)
Page 194
![Page 195: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/195.jpg)
Page 195
![Page 196: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/196.jpg)
Page 196
![Page 197: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/197.jpg)
Page 197
![Page 198: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/198.jpg)
Page 198
![Page 199: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/199.jpg)
Page 199
![Page 200: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/200.jpg)
Page 200
![Page 201: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/201.jpg)
Page 201
![Page 202: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/202.jpg)
Page 202
![Page 203: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/203.jpg)
Page 203
![Page 204: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/204.jpg)
Page 204
![Page 205: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/205.jpg)
Page 205
![Page 206: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/206.jpg)
Page 206
![Page 207: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/207.jpg)
Page 207
![Page 208: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/208.jpg)
Page 208
![Page 209: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/209.jpg)
Page 209
![Page 210: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/210.jpg)
Page 210
![Page 211: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/211.jpg)
Page 211
![Page 212: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/212.jpg)
Page 212
![Page 213: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/213.jpg)
Page 213
![Page 214: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/214.jpg)
Page 214
![Page 215: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/215.jpg)
Page 215
![Page 216: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/216.jpg)
Page 216
![Page 217: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/217.jpg)
Page 217
![Page 218: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/218.jpg)
Page 218
![Page 219: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/219.jpg)
Page 219
![Page 220: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/220.jpg)
Page 220
![Page 221: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/221.jpg)
Page 221
![Page 222: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/222.jpg)
Page 222
![Page 223: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/223.jpg)
Page 223
![Page 224: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/224.jpg)
Page 224
![Page 225: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/225.jpg)
Page 225
![Page 226: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/226.jpg)
Page 226
![Page 227: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/227.jpg)
Page 227
![Page 228: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/228.jpg)
Page 228
![Page 229: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/229.jpg)
Page 229
![Page 230: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/230.jpg)
Page 230
![Page 231: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/231.jpg)
Page 231
![Page 232: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/232.jpg)
Page 232
![Page 233: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/233.jpg)
Page 233
![Page 234: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/234.jpg)
Page 234
![Page 235: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/235.jpg)
Page 235
![Page 236: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/236.jpg)
Page 236
![Page 237: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/237.jpg)
Page 237
![Page 238: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/238.jpg)
Page 238
![Page 239: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/239.jpg)
Page 239
![Page 240: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/240.jpg)
Page 240
![Page 241: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/241.jpg)
Page 241
![Page 242: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/242.jpg)
Page 242
![Page 243: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/243.jpg)
Page 243
![Page 244: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/244.jpg)
Page 244
![Page 245: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/245.jpg)
Page 245
![Page 246: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/246.jpg)
Page 246
![Page 247: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/247.jpg)
Page 247
![Page 248: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/248.jpg)
Page 248
![Page 249: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/249.jpg)
Page 249
![Page 250: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/250.jpg)
Page 250
![Page 251: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/251.jpg)
Page 251
![Page 252: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/252.jpg)
Page 252
![Page 253: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/253.jpg)
Page 253
![Page 254: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/254.jpg)
Page 254
![Page 255: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/255.jpg)
Page 255
![Page 256: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/256.jpg)
Page 256
![Page 257: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/257.jpg)
Page 257
![Page 258: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/258.jpg)
Page 258
![Page 259: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/259.jpg)
Page 259
![Page 260: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/260.jpg)
Page 260
![Page 261: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/261.jpg)
Page 261
![Page 262: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/262.jpg)
Page 262
![Page 263: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/263.jpg)
Page 263
![Page 264: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/264.jpg)
Page 264
![Page 265: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/265.jpg)
Page 265
![Page 266: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/266.jpg)
Page 266
![Page 267: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/267.jpg)
Page 267
![Page 268: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/268.jpg)
Page 268
![Page 269: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/269.jpg)
Page 269
![Page 270: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/270.jpg)
Page 270
![Page 271: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/271.jpg)
Page 271
![Page 272: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/272.jpg)
Page 272
![Page 273: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/273.jpg)
Page 273
![Page 274: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/274.jpg)
Page 274
![Page 275: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/275.jpg)
Page 275
![Page 276: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/276.jpg)
Page 276
![Page 277: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/277.jpg)
Page 277
![Page 278: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/278.jpg)
Page 278
![Page 279: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/279.jpg)
Page 279
![Page 280: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/280.jpg)
Page 280
![Page 281: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/281.jpg)
Page 281
![Page 282: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/282.jpg)
Page 282
![Page 283: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/283.jpg)
Page 283
![Page 284: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/284.jpg)
Page 284
![Page 285: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/285.jpg)
Page 285
![Page 286: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/286.jpg)
Page 286
![Page 287: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/287.jpg)
Page 287
![Page 288: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/288.jpg)
Page 288
![Page 289: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/289.jpg)
Page 289
![Page 290: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/290.jpg)
Page 290
![Page 291: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/291.jpg)
Page 291
![Page 292: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/292.jpg)
Page 292
![Page 293: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/293.jpg)
Page 293
![Page 294: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/294.jpg)
Page 294
![Page 295: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/295.jpg)
Page 295
![Page 296: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/296.jpg)
Page 296
![Page 297: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/297.jpg)
Page 297
![Page 298: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/298.jpg)
Page 298
![Page 299: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/299.jpg)
Page 299
![Page 300: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/300.jpg)
Page 300
![Page 301: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/301.jpg)
Page 301
![Page 302: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/302.jpg)
Page 302
![Page 303: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/303.jpg)
Page 303
![Page 304: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/304.jpg)
Page 304
![Page 305: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/305.jpg)
Page 305
![Page 306: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/306.jpg)
Page 306
![Page 307: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/307.jpg)
Page 307
![Page 308: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/308.jpg)
Page 308
![Page 309: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/309.jpg)
Page 309
![Page 310: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/310.jpg)
Page 310
![Page 311: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/311.jpg)
Page 311
![Page 312: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/312.jpg)
Page 312
![Page 313: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/313.jpg)
Page 313
![Page 314: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/314.jpg)
Page 314
![Page 315: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/315.jpg)
Page 315
![Page 316: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/316.jpg)
Page 316
![Page 317: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/317.jpg)
Page 317
![Page 318: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/318.jpg)
Page 318
![Page 319: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/319.jpg)
Page 319
![Page 320: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/320.jpg)
Page 320
![Page 321: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/321.jpg)
Page 321
![Page 322: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/322.jpg)
Page 322
![Page 323: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/323.jpg)
Page 323
![Page 324: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/324.jpg)
Page 324
![Page 325: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/325.jpg)
Page 325
![Page 326: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/326.jpg)
Page 326
![Page 327: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/327.jpg)
Page 327
![Page 328: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/328.jpg)
Page 328
![Page 329: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/329.jpg)
Page 329
![Page 330: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/330.jpg)
Page 330
![Page 331: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/331.jpg)
Page 331
![Page 332: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/332.jpg)
Page 332
![Page 333: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/333.jpg)
Page 333
![Page 334: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/334.jpg)
Page 334
![Page 335: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/335.jpg)
Page 335
![Page 336: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/336.jpg)
Page 336
![Page 337: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/337.jpg)
Page 337
![Page 338: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/338.jpg)
Page 338
![Page 339: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/339.jpg)
Page 339
![Page 340: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/340.jpg)
Page 340
![Page 341: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/341.jpg)
Page 341
![Page 342: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/342.jpg)
Page 342
![Page 343: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/343.jpg)
Page 343
![Page 344: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/344.jpg)
Page 344
![Page 345: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/345.jpg)
Page 345
![Page 346: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/346.jpg)
Page 346
![Page 347: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/347.jpg)
Page 347
![Page 348: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/348.jpg)
Page 348
![Page 349: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/349.jpg)
Page 349
![Page 350: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/350.jpg)
Page 350
![Page 351: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/351.jpg)
Page 351
![Page 352: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/352.jpg)
Page 352
![Page 353: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/353.jpg)
Page 353
![Page 354: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/354.jpg)
Page 354
![Page 355: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/355.jpg)
Page 355
![Page 356: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/356.jpg)
Page 356
![Page 357: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/357.jpg)
Page 357
![Page 358: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/358.jpg)
Page 358
![Page 359: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/359.jpg)
Page 359
![Page 360: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/360.jpg)
Page 360
![Page 361: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/361.jpg)
Page 361
![Page 362: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/362.jpg)
Page 362
![Page 363: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/363.jpg)
Page 363
![Page 364: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/364.jpg)
Page 364
![Page 365: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/365.jpg)
Page 365
![Page 366: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/366.jpg)
Page 366
![Page 367: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/367.jpg)
Page 367
![Page 368: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/368.jpg)
Page 368
![Page 369: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/369.jpg)
Page 369
![Page 370: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/370.jpg)
Page 370
![Page 371: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/371.jpg)
Page 371
![Page 372: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/372.jpg)
Page 372
![Page 373: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/373.jpg)
Page 373
![Page 374: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/374.jpg)
Page 374
![Page 375: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/375.jpg)
Page 375
![Page 376: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/376.jpg)
Page 376
![Page 377: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/377.jpg)
Page 377
![Page 378: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/378.jpg)
Page 378
![Page 379: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/379.jpg)
Page 379
![Page 380: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/380.jpg)
Page 380
![Page 381: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/381.jpg)
Page 381
![Page 382: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/382.jpg)
Page 382
![Page 383: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/383.jpg)
Page 383
![Page 384: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/384.jpg)
Page 384
![Page 385: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/385.jpg)
Page 385
![Page 386: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/386.jpg)
Page 386
![Page 387: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/387.jpg)
Page 387
![Page 388: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/388.jpg)
Page 388
![Page 389: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/389.jpg)
Page 389
![Page 390: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/390.jpg)
Page 390
![Page 391: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/391.jpg)
Page 391
![Page 392: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/392.jpg)
Page 392
![Page 393: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/393.jpg)
Page 393
![Page 394: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/394.jpg)
Page 394
![Page 395: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/395.jpg)
Page 395
![Page 396: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/396.jpg)
Page 396
![Page 397: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/397.jpg)
Page 397
![Page 398: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/398.jpg)
Page 398
![Page 399: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/399.jpg)
Page 399
![Page 400: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/400.jpg)
Page 400
![Page 401: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/401.jpg)
Page 401
![Page 402: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/402.jpg)
Page 402
![Page 403: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/403.jpg)
Page 403
![Page 404: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/404.jpg)
Page 404
![Page 405: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/405.jpg)
Page 405
![Page 406: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/406.jpg)
Page 406
![Page 407: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/407.jpg)
Page 407
![Page 408: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/408.jpg)
Page 408
![Page 409: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/409.jpg)
Page 409
![Page 410: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/410.jpg)
Page 410
![Page 411: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/411.jpg)
Page 411
![Page 412: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/412.jpg)
Page 412
![Page 413: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/413.jpg)
Page 413
![Page 414: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/414.jpg)
Page 414
![Page 415: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/415.jpg)
Page 415
![Page 416: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/416.jpg)
Page 416
![Page 417: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/417.jpg)
Page 417
![Page 418: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/418.jpg)
Page 418
![Page 419: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/419.jpg)
Page 419
![Page 420: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/420.jpg)
Page 420
![Page 421: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/421.jpg)
Page 421
![Page 422: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/422.jpg)
Page 422
![Page 423: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/423.jpg)
Page 423
![Page 424: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/424.jpg)
Page 424
![Page 425: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/425.jpg)
Page 425
![Page 426: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/426.jpg)
Page 426
![Page 427: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/427.jpg)
Page 427
![Page 428: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/428.jpg)
Page 428
![Page 429: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/429.jpg)
Page 429
![Page 430: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/430.jpg)
Page 430
![Page 431: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/431.jpg)
Page 431
![Page 432: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/432.jpg)
Page 432
![Page 433: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/433.jpg)
Page 433
![Page 434: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/434.jpg)
Page 434
![Page 435: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/435.jpg)
Page 435
![Page 436: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/436.jpg)
Page 436
![Page 437: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/437.jpg)
Page 437
![Page 438: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/438.jpg)
Page 438
![Page 439: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/439.jpg)
Page 439
![Page 440: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/440.jpg)
Page 440
![Page 441: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/441.jpg)
Page 441
![Page 442: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/442.jpg)
Page 442
![Page 443: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/443.jpg)
Page 443
![Page 444: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/444.jpg)
Page 444
![Page 445: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/445.jpg)
Page 445
![Page 446: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/446.jpg)
Page 446
![Page 447: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/447.jpg)
Page 447
![Page 448: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/448.jpg)
Page 448
![Page 449: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/449.jpg)
Page 449
![Page 450: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/450.jpg)
Page 450
![Page 451: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/451.jpg)
Page 451
![Page 452: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/452.jpg)
Page 452
![Page 453: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/453.jpg)
Page 453
![Page 454: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/454.jpg)
Page 454
![Page 455: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/455.jpg)
Page 455
![Page 456: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/456.jpg)
Page 456
![Page 457: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/457.jpg)
Page 457
![Page 458: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/458.jpg)
Page 458
![Page 459: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/459.jpg)
Page 459
![Page 460: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/460.jpg)
Page 460
![Page 461: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/461.jpg)
Page 461
![Page 462: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/462.jpg)
Page 462
![Page 463: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/463.jpg)
Page 463
![Page 464: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/464.jpg)
Page 464
![Page 465: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/465.jpg)
Page 465
![Page 466: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/466.jpg)
Page 466
![Page 467: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/467.jpg)
Page 467
![Page 468: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/468.jpg)
Page 468
![Page 469: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/469.jpg)
Page 469
![Page 470: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/470.jpg)
Page 470
![Page 471: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/471.jpg)
Page 471
![Page 472: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/472.jpg)
Page 472
![Page 473: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/473.jpg)
Page 473
![Page 474: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/474.jpg)
Page 474
![Page 475: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/475.jpg)
Page 475
![Page 476: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/476.jpg)
Page 476
![Page 477: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/477.jpg)
Page 477
![Page 478: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/478.jpg)
Page 478
![Page 479: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/479.jpg)
Page 479
![Page 480: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/480.jpg)
Page 480
![Page 481: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/481.jpg)
Page 481
![Page 482: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/482.jpg)
Page 482
![Page 483: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/483.jpg)
Page 483
![Page 484: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/484.jpg)
Page 484
![Page 485: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/485.jpg)
Page 485
![Page 486: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/486.jpg)
Page 486
![Page 487: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/487.jpg)
Page 487
![Page 488: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/488.jpg)
Page 488
![Page 489: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/489.jpg)
Page 489
![Page 490: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/490.jpg)
Page 490
![Page 491: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/491.jpg)
Page 491
![Page 492: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/492.jpg)
Page 492
![Page 493: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/493.jpg)
Page 493
![Page 494: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/494.jpg)
Page 494
![Page 495: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/495.jpg)
Page 495
![Page 496: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/496.jpg)
Page 496
![Page 497: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/497.jpg)
Page 497
![Page 498: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/498.jpg)
Page 498
![Page 499: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/499.jpg)
Page 499
![Page 500: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/500.jpg)
Page 500
![Page 501: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/501.jpg)
Page 501
![Page 502: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/502.jpg)
Page 502
![Page 503: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/503.jpg)
Page 503
![Page 504: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/504.jpg)
Page 504
![Page 505: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/505.jpg)
Page 505
![Page 506: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/506.jpg)
Page 506
![Page 507: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/507.jpg)
Page 507
![Page 508: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/508.jpg)
Page 508
![Page 509: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/509.jpg)
Page 509
![Page 510: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/510.jpg)
Page 510
![Page 511: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/511.jpg)
Page 511
![Page 512: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/512.jpg)
Page 512
![Page 513: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/513.jpg)
Page 513
![Page 514: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/514.jpg)
Page 514
![Page 515: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/515.jpg)
Page 515
![Page 516: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/516.jpg)
Page 516
![Page 517: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/517.jpg)
Page 517
![Page 518: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/518.jpg)
Page 518
![Page 519: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/519.jpg)
Page 519
![Page 520: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/520.jpg)
Page 520
![Page 521: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/521.jpg)
Page 521
![Page 522: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/522.jpg)
Page 522
![Page 523: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/523.jpg)
Page 523
![Page 524: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/524.jpg)
Page 524
![Page 525: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/525.jpg)
Page 525
![Page 526: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/526.jpg)
Page 526
![Page 527: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/527.jpg)
Page 527
![Page 528: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/528.jpg)
Page 528
![Page 529: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/529.jpg)
Page 529
![Page 530: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/530.jpg)
Page 530
![Page 531: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/531.jpg)
Page 531
![Page 532: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/532.jpg)
Page 532
![Page 533: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/533.jpg)
Page 533
![Page 534: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/534.jpg)
Page 534
![Page 535: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/535.jpg)
Page 535
![Page 536: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/536.jpg)
Page 536
![Page 537: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/537.jpg)
Page 537
![Page 538: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/538.jpg)
Page 538
![Page 539: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/539.jpg)
Page 539
![Page 540: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/540.jpg)
Page 540
![Page 541: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/541.jpg)
Page 541
![Page 542: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/542.jpg)
Page 542
![Page 543: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/543.jpg)
Page 543
![Page 544: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/544.jpg)
Page 544
![Page 545: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/545.jpg)
Page 545
![Page 546: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/546.jpg)
Page 546
![Page 547: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/547.jpg)
Page 547
![Page 548: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/548.jpg)
Page 548
![Page 549: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/549.jpg)
Page 549
![Page 550: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/550.jpg)
Page 550
![Page 551: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/551.jpg)
Page 551
![Page 552: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/552.jpg)
Page 552
![Page 553: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/553.jpg)
Page 553
![Page 554: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/554.jpg)
Page 554
![Page 555: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/555.jpg)
Page 555
![Page 556: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/556.jpg)
Page 556
![Page 557: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/557.jpg)
Page 557
![Page 558: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/558.jpg)
Page 558
![Page 559: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/559.jpg)
Page 559
![Page 560: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/560.jpg)
Page 560
![Page 561: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/561.jpg)
Page 561
![Page 562: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/562.jpg)
Page 562
![Page 563: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/563.jpg)
Page 563
![Page 564: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/564.jpg)
Page 564
![Page 565: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/565.jpg)
Page 565
![Page 566: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/566.jpg)
Page 566
![Page 567: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/567.jpg)
Page 567
![Page 568: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/568.jpg)
Page 568
![Page 569: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/569.jpg)
Page 569
![Page 570: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/570.jpg)
Page 570
![Page 571: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/571.jpg)
Page 571
![Page 572: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/572.jpg)
Page 572
![Page 573: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/573.jpg)
Page 573
![Page 574: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/574.jpg)
Page 574
![Page 575: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/575.jpg)
Page 575
![Page 576: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/576.jpg)
Page 576
![Page 577: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/577.jpg)
Page 577
![Page 578: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/578.jpg)
Page 578
![Page 579: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/579.jpg)
Page 579
![Page 580: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/580.jpg)
Page 580
![Page 581: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/581.jpg)
Page 581
![Page 582: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/582.jpg)
Page 582
![Page 583: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/583.jpg)
Page 583
![Page 584: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/584.jpg)
Page 584
![Page 585: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/585.jpg)
Page 585
![Page 586: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/586.jpg)
Page 586
![Page 587: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/587.jpg)
Page 587
![Page 588: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/588.jpg)
Page 588
![Page 589: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/589.jpg)
Page 589
![Page 590: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/590.jpg)
Page 590
![Page 591: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/591.jpg)
Page 591
![Page 592: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/592.jpg)
Page 592
![Page 593: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/593.jpg)
Page 593
![Page 594: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/594.jpg)
Page 594
![Page 595: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/595.jpg)
Page 595
![Page 596: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/596.jpg)
Page 596
![Page 597: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/597.jpg)
Page 597
![Page 598: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/598.jpg)
Page 598
![Page 599: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/599.jpg)
Page 599
![Page 600: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/600.jpg)
Page 600
![Page 601: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/601.jpg)
Page 601
![Page 602: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/602.jpg)
Page 602
![Page 603: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/603.jpg)
Page 603
![Page 604: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/604.jpg)
Page 604
![Page 605: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/605.jpg)
Page 605
![Page 606: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/606.jpg)
Page 606
![Page 607: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/607.jpg)
Page 607
![Page 608: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/608.jpg)
Page 608
![Page 609: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/609.jpg)
Page 609
![Page 610: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/610.jpg)
Page 610
![Page 611: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/611.jpg)
Page 611
![Page 612: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/612.jpg)
Page 612
![Page 613: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/613.jpg)
Page 613
![Page 614: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/614.jpg)
Page 614
![Page 615: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/615.jpg)
Page 615
![Page 616: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/616.jpg)
Page 616
![Page 617: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/617.jpg)
Page 617
![Page 618: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/618.jpg)
Page 618
![Page 619: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/619.jpg)
Page 619
![Page 620: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/620.jpg)
Page 620
![Page 621: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/621.jpg)
Page 621
![Page 622: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/622.jpg)
Page 622
![Page 623: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/623.jpg)
Page 623
![Page 624: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/624.jpg)
Page 624
![Page 625: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/625.jpg)
Page 625
![Page 626: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/626.jpg)
Page 626
![Page 627: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/627.jpg)
Page 627
![Page 628: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/628.jpg)
Page 628
![Page 629: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/629.jpg)
Page 629
![Page 630: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/630.jpg)
Page 630
![Page 631: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/631.jpg)
Page 631
![Page 632: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/632.jpg)
Page 632
![Page 633: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/633.jpg)
Page 633
![Page 634: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/634.jpg)
Page 634
![Page 635: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/635.jpg)
Page 635
![Page 636: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/636.jpg)
Page 636
![Page 637: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/637.jpg)
Page 637
![Page 638: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/638.jpg)
Page 638
![Page 639: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/639.jpg)
Page 639
![Page 640: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/640.jpg)
Page 640
![Page 641: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/641.jpg)
Page 641
![Page 642: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/642.jpg)
Page 642
![Page 643: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/643.jpg)
Page 643
![Page 644: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/644.jpg)
Page 644
![Page 645: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/645.jpg)
Page 645
![Page 646: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/646.jpg)
Page 646
![Page 647: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/647.jpg)
Page 647
![Page 648: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/648.jpg)
Page 648
![Page 649: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/649.jpg)
Page 649
![Page 650: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/650.jpg)
Page 650
![Page 651: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/651.jpg)
Page 651
![Page 652: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/652.jpg)
Page 652
![Page 653: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/653.jpg)
Page 653
![Page 654: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/654.jpg)
Page 654
![Page 655: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/655.jpg)
Page 655
![Page 656: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/656.jpg)
Page 656
![Page 657: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/657.jpg)
Page 657
![Page 658: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/658.jpg)
Page 658
![Page 659: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/659.jpg)
Page 659
![Page 660: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/660.jpg)
Page 660
![Page 661: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/661.jpg)
Page 661
![Page 662: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/662.jpg)
Page 662
![Page 663: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/663.jpg)
Page 663
![Page 664: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/664.jpg)
Page 664
![Page 665: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/665.jpg)
Page 665
![Page 666: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/666.jpg)
Page 666
![Page 667: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/667.jpg)
Page 667
![Page 668: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/668.jpg)
Page 668
![Page 669: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/669.jpg)
Page 669
![Page 670: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/670.jpg)
Page 670
![Page 671: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/671.jpg)
Page 671
![Page 672: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/672.jpg)
Page 672
![Page 673: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/673.jpg)
Page 673
![Page 674: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/674.jpg)
Page 674
![Page 675: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/675.jpg)
Page 675
![Page 676: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/676.jpg)
Page 676
![Page 677: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/677.jpg)
Page 677
![Page 678: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/678.jpg)
Page 678
![Page 679: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/679.jpg)
Page 679
![Page 680: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/680.jpg)
Page 680
![Page 681: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/681.jpg)
Page 681
![Page 682: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/682.jpg)
Page 682
![Page 683: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/683.jpg)
Page 683
![Page 684: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/684.jpg)
Page 684
![Page 685: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/685.jpg)
Page 685
![Page 686: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/686.jpg)
Page 686
![Page 687: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/687.jpg)
Page 687
![Page 688: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/688.jpg)
Page 688
![Page 689: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/689.jpg)
Page 689
![Page 690: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/690.jpg)
Page 690
![Page 691: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/691.jpg)
Page 691
![Page 692: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/692.jpg)
Page 692
![Page 693: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/693.jpg)
Page 693
![Page 694: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/694.jpg)
Page 694
![Page 695: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/695.jpg)
Page 695
![Page 696: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/696.jpg)
Page 696
![Page 697: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/697.jpg)
Page 697
![Page 698: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/698.jpg)
Page 698
![Page 699: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/699.jpg)
Page 699
![Page 700: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/700.jpg)
Page 700
![Page 701: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/701.jpg)
Page 701
![Page 702: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/702.jpg)
Page 702
![Page 703: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/703.jpg)
Page 703
![Page 704: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/704.jpg)
Page 704
![Page 705: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/705.jpg)
Page 705
![Page 706: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/706.jpg)
Page 706
![Page 707: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/707.jpg)
Page 707
![Page 708: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/708.jpg)
Page 708
![Page 709: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/709.jpg)
Page 709
![Page 710: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/710.jpg)
Page 710
![Page 711: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/711.jpg)
Page 711
![Page 712: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/712.jpg)
Page 712
![Page 713: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/713.jpg)
Page 713
![Page 714: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/714.jpg)
Page 714
![Page 715: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/715.jpg)
Page 715
![Page 716: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/716.jpg)
Page 716
![Page 717: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/717.jpg)
Page 717
![Page 718: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/718.jpg)
Page 718
![Page 719: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/719.jpg)
Page 719
![Page 720: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/720.jpg)
Page 720
![Page 721: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/721.jpg)
Page 721
![Page 722: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/722.jpg)
Page 722
![Page 723: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/723.jpg)
Page 723
![Page 724: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/724.jpg)
Page 724
![Page 725: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/725.jpg)
Page 725
![Page 726: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/726.jpg)
Page 726
![Page 727: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/727.jpg)
Page 727
![Page 728: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/728.jpg)
Page 728
![Page 729: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/729.jpg)
Page 729
![Page 730: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/730.jpg)
Page 730
![Page 731: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/731.jpg)
Page 731
![Page 732: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/732.jpg)
Page 732
![Page 733: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/733.jpg)
Page 733
![Page 734: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/734.jpg)
Page 734
![Page 735: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/735.jpg)
Page 735
![Page 736: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/736.jpg)
Page 736
![Page 737: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/737.jpg)
Page 737
![Page 738: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/738.jpg)
Page 738
![Page 739: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/739.jpg)
Page 739
![Page 740: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/740.jpg)
Page 740
![Page 741: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/741.jpg)
Page 741
![Page 742: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/742.jpg)
Page 742
![Page 743: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/743.jpg)
Page 743
![Page 744: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/744.jpg)
Page 744
![Page 745: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/745.jpg)
Page 745
![Page 746: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/746.jpg)
Page 746
![Page 747: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/747.jpg)
Page 747
![Page 748: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/748.jpg)
Page 748
![Page 749: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/749.jpg)
Page 749
![Page 750: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/750.jpg)
Page 750
![Page 751: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/751.jpg)
Page 751
![Page 752: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/752.jpg)
Page 752
![Page 753: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/753.jpg)
Page 753
![Page 754: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/754.jpg)
Page 754
![Page 755: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/755.jpg)
Page 755
![Page 756: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/756.jpg)
Page 756
![Page 757: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/757.jpg)
Page 757
![Page 758: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/758.jpg)
Page 758
![Page 759: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/759.jpg)
Page 759
![Page 760: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/760.jpg)
Page 760
![Page 761: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/761.jpg)
Page 761
![Page 762: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/762.jpg)
Page 762
![Page 763: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/763.jpg)
Page 763
![Page 764: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/764.jpg)
Page 764
![Page 765: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/765.jpg)
Page 765
![Page 766: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/766.jpg)
Page 766
![Page 767: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/767.jpg)
Page 767
![Page 768: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/768.jpg)
Page 768
![Page 769: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/769.jpg)
Page 769
![Page 770: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/770.jpg)
Page 770
![Page 771: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/771.jpg)
Page 771
![Page 772: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/772.jpg)
Page 772
![Page 773: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/773.jpg)
Page 773
![Page 774: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/774.jpg)
Page 774
![Page 775: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/775.jpg)
Page 775
![Page 776: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/776.jpg)
Page 776
![Page 777: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/777.jpg)
Page 777
![Page 778: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/778.jpg)
Page 778
![Page 779: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/779.jpg)
Page 779
![Page 780: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/780.jpg)
Page 780
![Page 781: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/781.jpg)
Page 781
![Page 782: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/782.jpg)
Page 782
![Page 783: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/783.jpg)
Page 783
![Page 784: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/784.jpg)
Page 784
![Page 785: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/785.jpg)
Page 785
![Page 786: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/786.jpg)
Page 786
![Page 787: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/787.jpg)
Page 787
![Page 788: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/788.jpg)
Page 788
![Page 789: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/789.jpg)
Page 789
![Page 790: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/790.jpg)
Page 790
![Page 791: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/791.jpg)
Page 791
![Page 792: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/792.jpg)
Page 792
![Page 793: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/793.jpg)
Page 793
![Page 794: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/794.jpg)
Page 794
![Page 795: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/795.jpg)
Page 795
![Page 796: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/796.jpg)
Page 796
![Page 797: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/797.jpg)
Page 797
![Page 798: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/798.jpg)
Page 798
![Page 799: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/799.jpg)
Page 799
![Page 800: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/800.jpg)
Page 800
![Page 801: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/801.jpg)
Page 801
![Page 802: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/802.jpg)
Page 802
![Page 803: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/803.jpg)
Page 803
![Page 804: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/804.jpg)
Page 804
![Page 805: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/805.jpg)
Page 805
![Page 806: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/806.jpg)
Page 806
![Page 807: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/807.jpg)
Page 807
![Page 808: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/808.jpg)
Page 808
![Page 809: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/809.jpg)
Page 809
![Page 810: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/810.jpg)
Page 810
![Page 811: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/811.jpg)
Page 811
![Page 812: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/812.jpg)
Page 812
![Page 813: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/813.jpg)
Page 813
![Page 814: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/814.jpg)
Page 814
![Page 815: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/815.jpg)
Page 815
![Page 816: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/816.jpg)
Page 816
![Page 817: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/817.jpg)
Page 817
![Page 818: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/818.jpg)
Page 818
![Page 819: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/819.jpg)
Page 819
![Page 820: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/820.jpg)
Page 820
![Page 821: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/821.jpg)
Page 821
![Page 822: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/822.jpg)
Page 822
![Page 823: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/823.jpg)
Page 823
![Page 824: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/824.jpg)
Page 824
![Page 825: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/825.jpg)
Page 825
![Page 826: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/826.jpg)
Page 826
![Page 827: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/827.jpg)
Page 827
![Page 828: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/828.jpg)
Page 828
![Page 829: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/829.jpg)
Page 829
![Page 830: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/830.jpg)
Page 830
![Page 831: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/831.jpg)
Page 831
![Page 832: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/832.jpg)
Page 832
![Page 833: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/833.jpg)
Page 833
![Page 834: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/834.jpg)
Page 834
![Page 835: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/835.jpg)
Page 835
![Page 836: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/836.jpg)
Page 836
![Page 837: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/837.jpg)
Page 837
![Page 838: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/838.jpg)
Page 838
![Page 839: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/839.jpg)
Page 839
![Page 840: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/840.jpg)
Page 840
![Page 841: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/841.jpg)
Page 841
![Page 842: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/842.jpg)
Page 842
![Page 843: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/843.jpg)
Page 843
![Page 844: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/844.jpg)
Page 844
![Page 845: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/845.jpg)
Page 845
![Page 846: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/846.jpg)
Page 846
![Page 847: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/847.jpg)
Page 847
![Page 848: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/848.jpg)
Page 848
![Page 849: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/849.jpg)
Page 849
![Page 850: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/850.jpg)
Page 850
![Page 851: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/851.jpg)
Page 851
![Page 852: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/852.jpg)
Page 852
![Page 853: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/853.jpg)
Page 853
![Page 854: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/854.jpg)
Page 854
![Page 855: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/855.jpg)
Page 855
![Page 856: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/856.jpg)
Page 856
![Page 857: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/857.jpg)
Page 857
![Page 858: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/858.jpg)
Page 858
![Page 859: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/859.jpg)
Page 859
![Page 860: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/860.jpg)
Page 860
![Page 861: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/861.jpg)
Page 861
![Page 862: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/862.jpg)
Page 862
![Page 863: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/863.jpg)
Page 863
![Page 864: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/864.jpg)
Page 864
![Page 865: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/865.jpg)
Page 865
![Page 866: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/866.jpg)
Page 866
![Page 867: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/867.jpg)
Page 867
![Page 868: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/868.jpg)
Page 868
![Page 869: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/869.jpg)
Page 869
![Page 870: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/870.jpg)
Page 870
![Page 871: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/871.jpg)
Page 871
![Page 872: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/872.jpg)
Page 872
![Page 873: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/873.jpg)
Page 873
![Page 874: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/874.jpg)
Page 874
![Page 875: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/875.jpg)
Page 875
![Page 876: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/876.jpg)
Page 876
![Page 877: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/877.jpg)
Page 877
![Page 878: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/878.jpg)
Page 878
![Page 879: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/879.jpg)
Page 879
![Page 880: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/880.jpg)
Page 880
![Page 881: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/881.jpg)
Page 881
![Page 882: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/882.jpg)
Page 882
![Page 883: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/883.jpg)
Page 883
![Page 884: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/884.jpg)
Page 884
![Page 885: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/885.jpg)
Page 885
![Page 886: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/886.jpg)
Page 886
![Page 887: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/887.jpg)
Page 887
![Page 888: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/888.jpg)
Page 888
![Page 889: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/889.jpg)
Page 889
![Page 890: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/890.jpg)
Page 890
![Page 891: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/891.jpg)
Page 891
![Page 892: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/892.jpg)
Page 892
![Page 893: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/893.jpg)
Page 893
![Page 894: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/894.jpg)
Page 894
![Page 895: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/895.jpg)
Page 895
![Page 896: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/896.jpg)
Page 896
![Page 897: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/897.jpg)
Page 897
![Page 898: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/898.jpg)
Page 898
![Page 899: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/899.jpg)
Page 899
![Page 900: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/900.jpg)
Page 900
![Page 901: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/901.jpg)
Page 901
![Page 902: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/902.jpg)
Page 902
![Page 903: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/903.jpg)
Page 903
![Page 904: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/904.jpg)
Page 904
![Page 905: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/905.jpg)
Page 905
![Page 906: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/906.jpg)
Page 906
![Page 907: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/907.jpg)
Page 907
![Page 908: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/908.jpg)
Page 908
![Page 909: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/909.jpg)
Page 909
![Page 910: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/910.jpg)
Page 910
![Page 911: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/911.jpg)
Page 911
![Page 912: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/912.jpg)
Page 912
![Page 913: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/913.jpg)
Page 913
![Page 914: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/914.jpg)
Page 914
![Page 915: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/915.jpg)
Page 915
![Page 916: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/916.jpg)
Page 916
![Page 917: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/917.jpg)
Page 917
![Page 918: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/918.jpg)
Page 918
![Page 919: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/919.jpg)
Page 919
![Page 920: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/920.jpg)
Page 920
![Page 921: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/921.jpg)
Page 921
![Page 922: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/922.jpg)
Page 922
![Page 923: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/923.jpg)
Page 923
![Page 924: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/924.jpg)
Page 924
![Page 925: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/925.jpg)
Page 925
![Page 926: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/926.jpg)
Page 926
![Page 927: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/927.jpg)
Page 927
![Page 928: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/928.jpg)
Page 928
![Page 929: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/929.jpg)
Page 929
![Page 930: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/930.jpg)
Page 930
![Page 931: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/931.jpg)
Page 931
![Page 932: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/932.jpg)
Page 932
![Page 933: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/933.jpg)
Page 933
![Page 934: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/934.jpg)
Page 934
![Page 935: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/935.jpg)
Page 935
![Page 936: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/936.jpg)
Page 936
![Page 937: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/937.jpg)
Page 937
![Page 938: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/938.jpg)
Page 938
![Page 939: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/939.jpg)
Page 939
![Page 940: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/940.jpg)
Page 940
![Page 941: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/941.jpg)
Page 941
![Page 942: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/942.jpg)
Page 942
![Page 943: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/943.jpg)
Page 943
![Page 944: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/944.jpg)
Page 944
![Page 945: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/945.jpg)
Page 945
![Page 946: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/946.jpg)
Page 946
![Page 947: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/947.jpg)
Page 947
![Page 948: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/948.jpg)
Page 948
![Page 949: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/949.jpg)
Page 949
![Page 950: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/950.jpg)
Page 950
![Page 951: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/951.jpg)
Page 951
![Page 952: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/952.jpg)
Page 952
![Page 953: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/953.jpg)
Page 953
![Page 954: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/954.jpg)
Page 954
![Page 955: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/955.jpg)
Page 955
![Page 956: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/956.jpg)
Page 956
![Page 957: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/957.jpg)
Page 957
![Page 958: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/958.jpg)
Page 958
![Page 959: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/959.jpg)
Page 959
![Page 960: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/960.jpg)
Page 960
![Page 961: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/961.jpg)
Page 961
![Page 962: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/962.jpg)
Page 962
![Page 963: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/963.jpg)
Page 963
![Page 964: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/964.jpg)
Page 964
![Page 965: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/965.jpg)
Page 965
![Page 966: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/966.jpg)
Page 966
![Page 967: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/967.jpg)
Page 967
![Page 968: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/968.jpg)
Page 968
![Page 969: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/969.jpg)
Page 969
![Page 970: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/970.jpg)
Page 970
![Page 971: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/971.jpg)
Page 971
![Page 972: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/972.jpg)
Page 972
![Page 973: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/973.jpg)
Page 973
![Page 974: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/974.jpg)
Page 974
![Page 975: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/975.jpg)
Page 975
![Page 976: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/976.jpg)
Page 976
![Page 977: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/977.jpg)
Page 977
![Page 978: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/978.jpg)
Page 978
![Page 979: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/979.jpg)
Page 979
![Page 980: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/980.jpg)
Page 980
![Page 981: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/981.jpg)
Page 981
![Page 982: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/982.jpg)
Page 982
![Page 983: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/983.jpg)
Page 983
![Page 984: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/984.jpg)
Page 984
![Page 985: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/985.jpg)
Page 985
![Page 986: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/986.jpg)
Page 986
![Page 987: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/987.jpg)
Page 987
![Page 988: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/988.jpg)
Page 988
![Page 989: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/989.jpg)
Page 989
![Page 990: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/990.jpg)
Page 990
![Page 991: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/991.jpg)
Page 991
![Page 992: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/992.jpg)
Page 992
![Page 993: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/993.jpg)
Page 993
![Page 994: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/994.jpg)
Page 994
![Page 995: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/995.jpg)
Page 995
![Page 996: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/996.jpg)
Page 996
![Page 997: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/997.jpg)
Page 997
![Page 998: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/998.jpg)
Page 998
![Page 999: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/999.jpg)
Page 999
![Page 1000: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1000.jpg)
Page 1000
![Page 1001: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1001.jpg)
Page 1001
![Page 1002: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1002.jpg)
Page 1002
![Page 1003: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1003.jpg)
Page 1003
![Page 1004: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1004.jpg)
Page 1004
![Page 1005: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1005.jpg)
Page 1005
![Page 1006: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1006.jpg)
Page 1006
![Page 1007: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1007.jpg)
Page 1007
![Page 1008: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1008.jpg)
Page 1008
![Page 1009: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1009.jpg)
Page 1009
![Page 1010: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1010.jpg)
Page 1010
![Page 1011: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1011.jpg)
Page 1011
![Page 1012: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1012.jpg)
Page 1012
![Page 1013: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1013.jpg)
Page 1013
![Page 1014: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1014.jpg)
Page 1014
![Page 1015: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1015.jpg)
Page 1015
![Page 1016: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1016.jpg)
Page 1016
![Page 1017: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1017.jpg)
Page 1017
![Page 1018: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1018.jpg)
Page 1018
![Page 1019: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1019.jpg)
Page 1019
![Page 1020: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1020.jpg)
Page 1020
![Page 1021: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1021.jpg)
Page 1021
![Page 1022: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1022.jpg)
Page 1022
![Page 1023: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1023.jpg)
Page 1023
![Page 1024: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1024.jpg)
Page 1024
![Page 1025: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1025.jpg)
Page 1025
![Page 1026: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1026.jpg)
Page 1026
![Page 1027: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1027.jpg)
Page 1027
![Page 1028: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1028.jpg)
Page 1028
![Page 1029: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1029.jpg)
Page 1029
![Page 1030: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1030.jpg)
Page 1030
![Page 1031: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1031.jpg)
Page 1031
![Page 1032: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1032.jpg)
Page 1032
![Page 1033: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1033.jpg)
Page 1033
![Page 1034: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1034.jpg)
Page 1034
![Page 1035: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1035.jpg)
Page 1035
![Page 1036: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1036.jpg)
Page 1036
![Page 1037: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1037.jpg)
Page 1037
![Page 1038: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1038.jpg)
Page 1038
![Page 1039: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1039.jpg)
Page 1039
![Page 1040: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1040.jpg)
Page 1040
![Page 1041: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1041.jpg)
Page 1041
![Page 1042: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1042.jpg)
Page 1042
![Page 1043: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1043.jpg)
Page 1043
![Page 1044: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1044.jpg)
Page 1044
![Page 1045: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1045.jpg)
Page 1045
![Page 1046: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1046.jpg)
Page 1046
![Page 1047: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1047.jpg)
Page 1047
![Page 1048: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1048.jpg)
Page 1048
![Page 1049: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1049.jpg)
Page 1049
![Page 1050: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1050.jpg)
Page 1050
![Page 1051: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1051.jpg)
Page 1051
![Page 1052: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1052.jpg)
Page 1052
![Page 1053: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1053.jpg)
Page 1053
![Page 1054: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1054.jpg)
Page 1054
![Page 1055: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1055.jpg)
Page 1055
![Page 1056: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1056.jpg)
Page 1056
![Page 1057: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1057.jpg)
Page 1057
![Page 1058: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1058.jpg)
Page 1058
![Page 1059: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1059.jpg)
Page 1059
![Page 1060: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1060.jpg)
Page 1060
![Page 1061: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1061.jpg)
Page 1061
![Page 1062: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1062.jpg)
Page 1062
![Page 1063: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1063.jpg)
Page 1063
![Page 1064: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1064.jpg)
Page 1064
![Page 1065: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1065.jpg)
Page 1065
![Page 1066: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1066.jpg)
Page 1066
![Page 1067: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1067.jpg)
Page 1067
![Page 1068: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1068.jpg)
Page 1068
![Page 1069: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1069.jpg)
Page 1069
![Page 1070: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1070.jpg)
Page 1070
![Page 1071: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1071.jpg)
Page 1071
![Page 1072: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1072.jpg)
Page 1072
![Page 1073: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1073.jpg)
Page 1073
![Page 1074: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1074.jpg)
Page 1074
![Page 1075: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1075.jpg)
Page 1075
![Page 1076: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1076.jpg)
Page 1076
![Page 1077: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1077.jpg)
Page 1077
![Page 1078: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1078.jpg)
Page 1078
![Page 1079: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1079.jpg)
Page 1079
![Page 1080: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1080.jpg)
Page 1080
![Page 1081: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1081.jpg)
Page 1081
![Page 1082: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1082.jpg)
Page 1082
![Page 1083: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1083.jpg)
Page 1083
![Page 1084: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1084.jpg)
Page 1084
![Page 1085: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1085.jpg)
Page 1085
![Page 1086: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1086.jpg)
Page 1086
![Page 1087: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1087.jpg)
Page 1087
![Page 1088: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1088.jpg)
Page 1088
![Page 1089: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1089.jpg)
Page 1089
![Page 1090: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1090.jpg)
Page 1090
![Page 1091: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1091.jpg)
Page 1091
![Page 1092: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1092.jpg)
Page 1092
![Page 1093: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1093.jpg)
Page 1093
![Page 1094: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1094.jpg)
Page 1094
![Page 1095: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1095.jpg)
Page 1095
![Page 1096: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1096.jpg)
Page 1096
![Page 1097: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1097.jpg)
Page 1097
![Page 1098: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1098.jpg)
Page 1098
![Page 1099: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1099.jpg)
Page 1099
![Page 1100: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1100.jpg)
Page 1100
![Page 1101: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1101.jpg)
Page 1101
![Page 1102: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1102.jpg)
Page 1102
![Page 1103: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1103.jpg)
Page 1103
![Page 1104: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1104.jpg)
Page 1104
![Page 1105: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1105.jpg)
Page 1105
![Page 1106: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1106.jpg)
Page 1106
![Page 1107: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1107.jpg)
Page 1107
![Page 1108: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1108.jpg)
Page 1108
![Page 1109: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1109.jpg)
Page 1109
![Page 1110: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1110.jpg)
Page 1110
![Page 1111: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1111.jpg)
Page 1111
![Page 1112: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1112.jpg)
Page 1112
![Page 1113: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1113.jpg)
Page 1113
![Page 1114: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1114.jpg)
Page 1114
![Page 1115: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1115.jpg)
Page 1115
![Page 1116: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1116.jpg)
Page 1116
![Page 1117: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1117.jpg)
Page 1117
![Page 1118: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1118.jpg)
Page 1118
![Page 1119: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1119.jpg)
Page 1119
![Page 1120: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1120.jpg)
Page 1120
![Page 1121: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1121.jpg)
Page 1121
![Page 1122: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1122.jpg)
Page 1122
![Page 1123: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1123.jpg)
Page 1123
![Page 1124: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1124.jpg)
Page 1124
![Page 1125: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1125.jpg)
Page 1125
![Page 1126: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1126.jpg)
Page 1126
![Page 1127: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1127.jpg)
Page 1127
![Page 1128: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1128.jpg)
Page 1128
![Page 1129: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1129.jpg)
Page 1129
![Page 1130: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1130.jpg)
Page 1130
![Page 1131: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1131.jpg)
Page 1131
![Page 1132: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1132.jpg)
Page 1132
![Page 1133: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1133.jpg)
Page 1133
![Page 1134: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1134.jpg)
Page 1134
![Page 1135: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1135.jpg)
Page 1135
![Page 1136: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1136.jpg)
Page 1136
![Page 1137: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1137.jpg)
Page 1137
![Page 1138: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1138.jpg)
Page 1138
![Page 1139: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1139.jpg)
Page 1139
![Page 1140: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1140.jpg)
Page 1140
![Page 1141: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1141.jpg)
Page 1141
![Page 1142: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1142.jpg)
Page 1142
![Page 1143: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1143.jpg)
Page 1143
![Page 1144: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1144.jpg)
Page 1144
![Page 1145: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1145.jpg)
Page 1145
![Page 1146: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1146.jpg)
Page 1146
![Page 1147: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1147.jpg)
Page 1147
![Page 1148: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1148.jpg)
Page 1148
![Page 1149: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1149.jpg)
Page 1149
![Page 1150: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1150.jpg)
Page 1150
![Page 1151: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1151.jpg)
Page 1151
![Page 1152: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1152.jpg)
Page 1152
![Page 1153: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1153.jpg)
Page 1153
![Page 1154: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1154.jpg)
Page 1154
![Page 1155: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1155.jpg)
Page 1155
![Page 1156: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1156.jpg)
Page 1156
![Page 1157: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1157.jpg)
Page 1157
![Page 1158: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1158.jpg)
Page 1158
![Page 1159: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1159.jpg)
Page 1159
![Page 1160: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1160.jpg)
Page 1160
![Page 1161: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1161.jpg)
Page 1161
![Page 1162: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1162.jpg)
Page 1162
![Page 1163: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1163.jpg)
Page 1163
![Page 1164: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1164.jpg)
Page 1164
![Page 1165: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1165.jpg)
Page 1165
![Page 1166: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1166.jpg)
Page 1166
![Page 1167: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1167.jpg)
Page 1167
![Page 1168: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1168.jpg)
Page 1168
![Page 1169: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1169.jpg)
Page 1169
![Page 1170: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1170.jpg)
Page 1170
![Page 1171: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1171.jpg)
Page 1171
![Page 1172: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1172.jpg)
Page 1172
![Page 1173: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1173.jpg)
Page 1173
![Page 1174: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1174.jpg)
Page 1174
![Page 1175: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1175.jpg)
Page 1175
![Page 1176: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1176.jpg)
Page 1176
![Page 1177: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1177.jpg)
Page 1177
![Page 1178: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1178.jpg)
Page 1178
![Page 1179: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1179.jpg)
Page 1179
![Page 1180: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1180.jpg)
Page 1180
![Page 1181: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1181.jpg)
Page 1181
![Page 1182: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1182.jpg)
Page 1182
![Page 1183: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1183.jpg)
Page 1183
![Page 1184: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1184.jpg)
Page 1184
![Page 1185: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1185.jpg)
Page 1185
![Page 1186: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1186.jpg)
Page 1186
![Page 1187: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1187.jpg)
Page 1187
![Page 1188: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1188.jpg)
Page 1188
![Page 1189: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1189.jpg)
Page 1189
![Page 1190: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1190.jpg)
Page 1190
![Page 1191: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1191.jpg)
Page 1191
![Page 1192: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1192.jpg)
Page 1192
![Page 1193: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1193.jpg)
Page 1193
![Page 1194: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1194.jpg)
Page 1194
![Page 1195: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1195.jpg)
Page 1195
![Page 1196: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1196.jpg)
Page 1196
![Page 1197: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1197.jpg)
Page 1197
![Page 1198: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1198.jpg)
Page 1198
![Page 1199: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1199.jpg)
Page 1199
![Page 1200: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1200.jpg)
Page 1200
![Page 1201: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1201.jpg)
Page 1201
![Page 1202: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1202.jpg)
Page 1202
![Page 1203: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1203.jpg)
Page 1203
![Page 1204: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1204.jpg)
Page 1204
![Page 1205: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1205.jpg)
Page 1205
![Page 1206: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1206.jpg)
Page 1206
![Page 1207: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1207.jpg)
Page 1207
![Page 1208: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1208.jpg)
Page 1208
![Page 1209: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1209.jpg)
Page 1209
![Page 1210: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1210.jpg)
Page 1210
![Page 1211: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1211.jpg)
Page 1211
![Page 1212: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1212.jpg)
Page 1212
![Page 1213: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1213.jpg)
Page 1213
![Page 1214: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1214.jpg)
Page 1214
![Page 1215: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1215.jpg)
Page 1215
![Page 1216: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1216.jpg)
Page 1216
![Page 1217: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1217.jpg)
Page 1217
![Page 1218: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1218.jpg)
Page 1218
![Page 1219: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1219.jpg)
Page 1219
![Page 1220: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1220.jpg)
Page 1220
![Page 1221: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1221.jpg)
Page 1221
![Page 1222: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1222.jpg)
Page 1222
![Page 1223: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1223.jpg)
Page 1223
![Page 1224: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1224.jpg)
Page 1224
![Page 1225: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1225.jpg)
Page 1225
![Page 1226: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1226.jpg)
Page 1226
![Page 1227: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1227.jpg)
Page 1227
![Page 1228: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1228.jpg)
Page 1228
![Page 1229: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1229.jpg)
Page 1229
![Page 1230: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1230.jpg)
Page 1230
![Page 1231: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1231.jpg)
Page 1231
![Page 1232: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1232.jpg)
Page 1232
![Page 1233: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1233.jpg)
Page 1233
![Page 1234: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1234.jpg)
Page 1234
![Page 1235: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1235.jpg)
Page 1235
![Page 1236: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1236.jpg)
Page 1236
![Page 1237: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1237.jpg)
Page 1237
![Page 1238: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1238.jpg)
Page 1238
![Page 1239: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1239.jpg)
Page 1239
![Page 1240: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1240.jpg)
Page 1240
![Page 1241: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1241.jpg)
Page 1241
![Page 1242: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1242.jpg)
Page 1242
![Page 1243: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1243.jpg)
Page 1243
![Page 1244: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1244.jpg)
Page 1244
![Page 1245: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1245.jpg)
Page 1245
![Page 1246: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1246.jpg)
Page 1246
![Page 1247: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1247.jpg)
Page 1247
![Page 1248: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1248.jpg)
Page 1248
![Page 1249: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1249.jpg)
Page 1249
![Page 1250: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1250.jpg)
Page 1250
![Page 1251: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1251.jpg)
Page 1251
![Page 1252: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1252.jpg)
Page 1252
![Page 1253: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1253.jpg)
Page 1253
![Page 1254: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1254.jpg)
Page 1254
![Page 1255: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1255.jpg)
Page 1255
![Page 1256: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1256.jpg)
Page 1256
![Page 1257: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1257.jpg)
Page 1257
![Page 1258: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1258.jpg)
Page 1258
![Page 1259: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1259.jpg)
Page 1259
![Page 1260: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1260.jpg)
Page 1260
![Page 1261: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1261.jpg)
Page 1261
![Page 1262: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1262.jpg)
Page 1262
![Page 1263: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1263.jpg)
Page 1263
![Page 1264: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1264.jpg)
Page 1264
![Page 1265: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1265.jpg)
Page 1265
![Page 1266: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1266.jpg)
Page 1266
![Page 1267: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1267.jpg)
Page 1267
![Page 1268: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1268.jpg)
Page 1268
![Page 1269: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1269.jpg)
Page 1269
![Page 1270: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1270.jpg)
Page 1270
![Page 1271: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1271.jpg)
Page 1271
![Page 1272: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1272.jpg)
Page 1272
![Page 1273: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1273.jpg)
Page 1273
![Page 1274: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1274.jpg)
Page 1274
![Page 1275: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1275.jpg)
Page 1275
![Page 1276: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1276.jpg)
Page 1276
![Page 1277: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1277.jpg)
Page 1277
![Page 1278: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1278.jpg)
Page 1278
![Page 1279: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1279.jpg)
Page 1279
![Page 1280: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1280.jpg)
Page 1280
![Page 1281: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1281.jpg)
Page 1281
![Page 1282: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1282.jpg)
Page 1282
![Page 1283: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1283.jpg)
Page 1283
![Page 1284: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1284.jpg)
Page 1284
![Page 1285: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1285.jpg)
Page 1285
![Page 1286: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1286.jpg)
Page 1286
![Page 1287: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1287.jpg)
Page 1287
![Page 1288: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1288.jpg)
Page 1288
![Page 1289: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1289.jpg)
Page 1289
![Page 1290: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1290.jpg)
Page 1290
![Page 1291: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1291.jpg)
Page 1291
![Page 1292: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1292.jpg)
Page 1292
![Page 1293: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1293.jpg)
Page 1293
![Page 1294: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1294.jpg)
Page 1294
![Page 1295: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1295.jpg)
Page 1295
![Page 1296: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1296.jpg)
Page 1296
![Page 1297: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1297.jpg)
Page 1297
![Page 1298: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1298.jpg)
Page 1298
![Page 1299: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1299.jpg)
Page 1299
![Page 1300: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1300.jpg)
Page 1300
![Page 1301: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1301.jpg)
Page 1301
![Page 1302: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1302.jpg)
Page 1302
![Page 1303: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1303.jpg)
Page 1303
![Page 1304: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1304.jpg)
Page 1304
![Page 1305: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1305.jpg)
Page 1305
![Page 1306: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1306.jpg)
Page 1306
![Page 1307: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1307.jpg)
Page 1307
![Page 1308: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1308.jpg)
Page 1308
![Page 1309: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1309.jpg)
Page 1309
![Page 1310: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1310.jpg)
Page 1310
![Page 1311: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1311.jpg)
Page 1311
![Page 1312: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1312.jpg)
Page 1312
![Page 1313: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1313.jpg)
Page 1313
![Page 1314: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1314.jpg)
Page 1314
![Page 1315: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1315.jpg)
Page 1315
![Page 1316: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1316.jpg)
Page 1316
![Page 1317: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1317.jpg)
Page 1317
![Page 1318: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1318.jpg)
Page 1318
![Page 1319: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1319.jpg)
Page 1319
![Page 1320: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1320.jpg)
Page 1320
![Page 1321: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1321.jpg)
Page 1321
![Page 1322: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1322.jpg)
Page 1322
![Page 1323: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1323.jpg)
Page 1323
![Page 1324: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1324.jpg)
Page 1324
![Page 1325: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1325.jpg)
Page 1325
![Page 1326: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1326.jpg)
Page 1326
![Page 1327: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1327.jpg)
Page 1327
![Page 1328: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1328.jpg)
Page 1328
![Page 1329: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1329.jpg)
Page 1329
![Page 1330: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1330.jpg)
Page 1330
![Page 1331: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1331.jpg)
Page 1331
![Page 1332: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1332.jpg)
Page 1332
![Page 1333: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1333.jpg)
Page 1333
![Page 1334: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1334.jpg)
Page 1334
![Page 1335: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1335.jpg)
Page 1335
![Page 1336: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1336.jpg)
Page 1336
![Page 1337: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1337.jpg)
Page 1337
![Page 1338: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1338.jpg)
Page 1338
![Page 1339: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1339.jpg)
Page 1339
![Page 1340: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1340.jpg)
Page 1340
![Page 1341: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1341.jpg)
Page 1341
![Page 1342: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1342.jpg)
Page 1342
![Page 1343: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1343.jpg)
Page 1343
![Page 1344: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1344.jpg)
Page 1344
![Page 1345: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1345.jpg)
Page 1345
![Page 1346: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1346.jpg)
Page 1346
![Page 1347: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1347.jpg)
Page 1347
![Page 1348: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1348.jpg)
Page 1348
![Page 1349: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1349.jpg)
Page 1349
![Page 1350: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1350.jpg)
Page 1350
![Page 1351: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1351.jpg)
Page 1351
![Page 1352: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1352.jpg)
Page 1352
![Page 1353: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1353.jpg)
Page 1353
![Page 1354: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1354.jpg)
Page 1354
![Page 1355: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1355.jpg)
Page 1355
![Page 1356: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1356.jpg)
Page 1356
![Page 1357: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1357.jpg)
Page 1357
![Page 1358: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1358.jpg)
Page 1358
![Page 1359: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1359.jpg)
Page 1359
![Page 1360: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1360.jpg)
Page 1360
![Page 1361: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1361.jpg)
Page 1361
![Page 1362: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1362.jpg)
Page 1362
![Page 1363: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1363.jpg)
Page 1363
![Page 1364: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1364.jpg)
Page 1364
![Page 1365: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1365.jpg)
Page 1365
![Page 1366: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1366.jpg)
Page 1366
![Page 1367: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1367.jpg)
Page 1367
![Page 1368: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1368.jpg)
Page 1368
![Page 1369: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1369.jpg)
Page 1369
![Page 1370: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1370.jpg)
Page 1370
![Page 1371: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1371.jpg)
Page 1371
![Page 1372: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1372.jpg)
Page 1372
![Page 1373: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1373.jpg)
Page 1373
![Page 1374: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1374.jpg)
Page 1374
![Page 1375: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1375.jpg)
Page 1375
![Page 1376: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1376.jpg)
Page 1376
![Page 1377: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1377.jpg)
Page 1377
![Page 1378: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1378.jpg)
Page 1378
![Page 1379: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1379.jpg)
Page 1379
![Page 1380: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1380.jpg)
Page 1380
![Page 1381: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1381.jpg)
Page 1381
![Page 1382: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1382.jpg)
Page 1382
![Page 1383: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1383.jpg)
Page 1383
![Page 1384: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1384.jpg)
Page 1384
![Page 1385: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1385.jpg)
Page 1385
![Page 1386: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1386.jpg)
Page 1386
![Page 1387: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1387.jpg)
Page 1387
![Page 1388: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1388.jpg)
Page 1388
![Page 1389: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1389.jpg)
Page 1389
![Page 1390: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1390.jpg)
Page 1390
![Page 1391: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1391.jpg)
Page 1391
![Page 1392: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1392.jpg)
Page 1392
![Page 1393: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1393.jpg)
Page 1393
![Page 1394: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1394.jpg)
Page 1394
![Page 1395: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1395.jpg)
Page 1395
![Page 1396: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1396.jpg)
Page 1396
![Page 1397: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1397.jpg)
Page 1397
![Page 1398: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1398.jpg)
Page 1398
![Page 1399: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1399.jpg)
Page 1399
![Page 1400: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1400.jpg)
Page 1400
![Page 1401: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1401.jpg)
Page 1401
![Page 1402: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1402.jpg)
Page 1402
![Page 1403: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1403.jpg)
Page 1403
![Page 1404: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1404.jpg)
Page 1404
![Page 1405: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1405.jpg)
Page 1405
![Page 1406: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1406.jpg)
Page 1406
![Page 1407: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1407.jpg)
Page 1407
![Page 1408: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1408.jpg)
Page 1408
![Page 1409: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1409.jpg)
Page 1409
![Page 1410: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1410.jpg)
Page 1410
![Page 1411: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1411.jpg)
Page 1411
![Page 1412: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1412.jpg)
Page 1412
![Page 1413: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1413.jpg)
Page 1413
![Page 1414: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1414.jpg)
Page 1414
![Page 1415: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1415.jpg)
Page 1415
![Page 1416: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1416.jpg)
Page 1416
![Page 1417: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1417.jpg)
Page 1417
![Page 1418: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1418.jpg)
Page 1418
![Page 1419: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1419.jpg)
Page 1419
![Page 1420: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1420.jpg)
Page 1420
![Page 1421: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1421.jpg)
Page 1421
![Page 1422: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1422.jpg)
Page 1422
![Page 1423: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1423.jpg)
Page 1423
![Page 1424: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1424.jpg)
Page 1424
![Page 1425: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1425.jpg)
Page 1425
![Page 1426: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1426.jpg)
Page 1426
![Page 1427: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1427.jpg)
Page 1427
![Page 1428: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1428.jpg)
Page 1428
![Page 1429: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1429.jpg)
Page 1429
![Page 1430: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1430.jpg)
Page 1430
![Page 1431: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1431.jpg)
Page 1431
![Page 1432: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1432.jpg)
Page 1432
![Page 1433: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1433.jpg)
Page 1433
![Page 1434: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1434.jpg)
Page 1434
![Page 1435: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1435.jpg)
Page 1435
![Page 1436: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1436.jpg)
Page 1436
![Page 1437: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1437.jpg)
Page 1437
![Page 1438: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1438.jpg)
Page 1438
![Page 1439: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1439.jpg)
Page 1439
![Page 1440: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1440.jpg)
Page 1440
![Page 1441: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1441.jpg)
Page 1441
![Page 1442: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1442.jpg)
Page 1442
![Page 1443: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1443.jpg)
Page 1443
![Page 1444: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1444.jpg)
Page 1444
![Page 1445: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1445.jpg)
Page 1445
![Page 1446: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1446.jpg)
Page 1446
![Page 1447: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1447.jpg)
Page 1447
![Page 1448: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1448.jpg)
Page 1448
![Page 1449: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1449.jpg)
Page 1449
![Page 1450: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1450.jpg)
Page 1450
![Page 1451: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1451.jpg)
Page 1451
![Page 1452: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1452.jpg)
Page 1452
![Page 1453: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1453.jpg)
Page 1453
![Page 1454: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1454.jpg)
Page 1454
![Page 1455: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1455.jpg)
Page 1455
![Page 1456: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1456.jpg)
Page 1456
![Page 1457: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1457.jpg)
Page 1457
![Page 1458: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1458.jpg)
Page 1458
![Page 1459: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1459.jpg)
Page 1459
![Page 1460: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1460.jpg)
Page 1460
![Page 1461: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1461.jpg)
Page 1461
![Page 1462: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1462.jpg)
Page 1462
![Page 1463: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1463.jpg)
Page 1463
![Page 1464: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1464.jpg)
Page 1464
![Page 1465: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1465.jpg)
Page 1465
![Page 1466: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1466.jpg)
Page 1466
![Page 1467: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1467.jpg)
Page 1467
![Page 1468: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1468.jpg)
Page 1468
![Page 1469: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1469.jpg)
Page 1469
![Page 1470: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1470.jpg)
Page 1470
![Page 1471: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1471.jpg)
Page 1471
![Page 1472: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1472.jpg)
Page 1472
![Page 1473: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1473.jpg)
Page 1473
![Page 1474: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1474.jpg)
Page 1474
![Page 1475: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1475.jpg)
Page 1475
![Page 1476: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1476.jpg)
Page 1476
![Page 1477: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1477.jpg)
Page 1477
![Page 1478: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1478.jpg)
Page 1478
![Page 1479: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1479.jpg)
Page 1479
![Page 1480: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1480.jpg)
Page 1480
![Page 1481: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1481.jpg)
Page 1481
![Page 1482: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1482.jpg)
Page 1482
![Page 1483: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1483.jpg)
Page 1483
![Page 1484: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1484.jpg)
Page 1484
![Page 1485: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1485.jpg)
Page 1485
![Page 1486: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1486.jpg)
Page 1486
![Page 1487: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1487.jpg)
Page 1487
![Page 1488: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1488.jpg)
Page 1488
![Page 1489: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1489.jpg)
Page 1489
![Page 1490: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1490.jpg)
Page 1490
![Page 1491: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1491.jpg)
Page 1491
![Page 1492: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1492.jpg)
Page 1492
![Page 1493: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1493.jpg)
Page 1493
![Page 1494: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1494.jpg)
Page 1494
![Page 1495: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1495.jpg)
Page 1495
![Page 1496: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1496.jpg)
Page 1496
![Page 1497: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1497.jpg)
Page 1497
![Page 1498: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1498.jpg)
Page 1498
![Page 1499: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1499.jpg)
Page 1499
![Page 1500: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1500.jpg)
Page 1500
![Page 1501: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1501.jpg)
Page 1501
![Page 1502: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1502.jpg)
Page 1502
![Page 1503: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1503.jpg)
Page 1503
![Page 1504: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1504.jpg)
Page 1504
![Page 1505: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1505.jpg)
Page 1505
![Page 1506: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1506.jpg)
Page 1506
![Page 1507: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1507.jpg)
Page 1507
![Page 1508: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1508.jpg)
Page 1508
![Page 1509: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1509.jpg)
Page 1509
![Page 1510: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1510.jpg)
Page 1510
![Page 1511: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1511.jpg)
Page 1511
![Page 1512: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1512.jpg)
Page 1512
![Page 1513: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1513.jpg)
Page 1513
![Page 1514: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1514.jpg)
Page 1514
![Page 1515: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1515.jpg)
Page 1515
![Page 1516: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1516.jpg)
Page 1516
![Page 1517: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1517.jpg)
Page 1517
![Page 1518: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1518.jpg)
Page 1518
![Page 1519: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1519.jpg)
Page 1519
![Page 1520: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1520.jpg)
Page 1520
![Page 1521: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1521.jpg)
Page 1521
![Page 1522: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1522.jpg)
Page 1522
![Page 1523: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1523.jpg)
Page 1523
![Page 1524: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1524.jpg)
Page 1524
![Page 1525: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1525.jpg)
Page 1525
![Page 1526: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1526.jpg)
Page 1526
![Page 1527: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1527.jpg)
Page 1527
![Page 1528: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1528.jpg)
Page 1528
![Page 1529: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1529.jpg)
Page 1529
![Page 1530: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1530.jpg)
Page 1530
![Page 1531: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1531.jpg)
Page 1531
![Page 1532: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1532.jpg)
Page 1532
![Page 1533: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1533.jpg)
Page 1533
![Page 1534: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1534.jpg)
Page 1534
![Page 1535: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1535.jpg)
Page 1535
![Page 1536: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1536.jpg)
Page 1536
![Page 1537: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1537.jpg)
Page 1537
![Page 1538: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1538.jpg)
Page 1538
![Page 1539: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1539.jpg)
Page 1539
![Page 1540: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1540.jpg)
Page 1540
![Page 1541: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1541.jpg)
Page 1541
![Page 1542: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1542.jpg)
Page 1542
![Page 1543: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1543.jpg)
Page 1543
![Page 1544: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1544.jpg)
Page 1544
![Page 1545: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1545.jpg)
Page 1545
![Page 1546: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1546.jpg)
Page 1546
![Page 1547: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1547.jpg)
Page 1547
![Page 1548: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1548.jpg)
Page 1548
![Page 1549: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1549.jpg)
Page 1549
![Page 1550: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1550.jpg)
Page 1550
![Page 1551: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1551.jpg)
Page 1551
![Page 1552: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1552.jpg)
Page 1552
![Page 1553: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1553.jpg)
Page 1553
![Page 1554: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1554.jpg)
Page 1554
![Page 1555: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1555.jpg)
Page 1555
![Page 1556: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1556.jpg)
Page 1556
![Page 1557: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1557.jpg)
Page 1557
![Page 1558: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1558.jpg)
Page 1558
![Page 1559: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1559.jpg)
Page 1559
![Page 1560: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded](https://reader035.fdocuments.us/reader035/viewer/2022071003/5fc074b1edb9de03752f2367/html5/thumbnails/1560.jpg)
Page 1560