213
First Prize
Zonal Railways
CENTRAL RAILWAY, CST MUMBAI
Mumbai (Maharashtra)
Unit Profile
First Train not only in India but in Asia started in Central Railway from Boribunder
(CSTM) to Thane over a distance of 30 km on 16th April 1853. The first Electric
Train also started in Central Railway from VT (CSTM) to Kurla via Harbar line on 3rd
Feb, 1925. Central Railway consists of 5 Divisions i.e. Bhusawal, Nagpur, Mumbai,
Pune & Sholapur with route kms. 3905.47 kms, [BG (1.767 m) – 3606.86 kms, NG
(0.762 m) – 278.32 kms & NG (0.610 m) – 20.29 kms] and total TKM 5336.57 kms.
Out of this 1858.543 kms (RKM) is Electrified (25 KV AC – 1763.20 kms and 1500 V
DC – 95.386 kms.). Central Railway covers 3 states i.e. Maharashtra, Karnataka and
Madhya Pradesh.
The Zonal Headquarters of Central Railway is at Mumbai. It is headed by General
Manager who is assisted by additional General Manager and Principal Head of
Departments of Finance, Engineering, Mechanical, Electrical, Signal &
Telecommunications, Transport, Commercial, Stores, Medical & Railway Protection
Force.
C.Rly. serves the entire state of Maharashtra, part of Karnataka and Madhya
Pradesh. The economical capital of India, i.e. Mumbai Nava Seva Port Trust is
served by C.Rly.
The Sub-urban section of C.Rly. in Mumbai extends from CSTM, the city’s business
and residential centre, to Kasara in North-East, Karjat/Khopoli in South-East and
Panvel in New Mumbai and also in Pune division, Pune to Lonavla.
There is present holding of 569 Electric locomotives, 245 Diesel locomotives, 282
EMU rakes in terms of 9 cars, Electric Multiple Units (846 motor coaches and 1692
trailer coaches) on Central Railway.
Energy Consumption
Reduction in Specific Energy Consumption (SEC) Electric Traction
Entity 2012-13 2013-14
Unit consumption (Lakhs kWh/year) 19153 18895
Money value (Rs. Lakhs/year) 136970 143289
GTKM for Goods (in thousand) 94454337 94542572
GTKM for Passenger ( in thousand) 37924138 39843713
SEC of Goods (kWh/1000 GTKM) 5.85 5.61
SEC for Passenger (kWh/1000 GTKM) 18.81 18.71
214
Reduction in SEC (Diesel Traction)
Entity 2012-13 2013-14
Unit consumption (Lakhs kWh/year) 231285 242002
Money value (Rs. Lakhs/year) 114988 161781
GTKM for Goods (in thousands) 16687400 20564337
GTKM for Passenger ( in thousands) 18016279 19234270
SEC of Goods (kWh/1000 GTKM) 2.43 2.39
SEC for Passenger (kWh/1000 GTKM)
4.05 3.99
Reduction in SEC (Non-Traction)
2012-13 2013-14
Unit consumption (Lakhs kWh/year) 1345 1324
Money value (Rs. Lakhs/year) 11109 11068
SEC (kWh/kW) 757.71 731.89
5.85
5.61
5.45
5.50
5.55
5.60
5.65
5.70
5.75
5.80
5.85
5.90
2012-13 2013-14
SE
C(K
WH
/1000 G
TK
M)
YEAR
Specific Energy Consumption for Goods
Goods
19153
18895
18750
18800
18850
18900
18950
19000
19050
19100
19150
19200
2012-13 2013-14YEAR
Energy Consumption (Electric Traction)in Lakh Units
215
Savings in Energy Bills
Entity 2012-13 2013-14
(i) Annual Electric energy savings achieved (Lakh kWh/ Year)
(a) Current year GTKM for passenger x [(SEC of previous year - SEC of current year in kWh/ 1000 GTKM) x 1000]
18.96 39.84
(b) Current year GTKM for Goods x [(SEC of previous year - SEC of current year in kWh/ 1000 GTKM) x 1000]
151.13 226.90
(c) Total annual electric energy saving (lakhs kWh/ year) [6 (i)(a) + 6 (i)(b)] / 105
170.09 266.75
(ii) Diesel saving achieved (Kilo Liters/ Year)
(a) Current year GTKM for passenger x [(SFC of previous year - SFC of current year in Liters / 1000 GTKM) x 1000]
1261 1154
(b) Current year GTKM for Goods x [(SFC of previous year - SFC of current year in Liters / 1000 GTKM) x 1000]
2002 823
(c) Total annual HSD saving (Kilo Liters / year) [6 (ii)(a) + 6 (ii)(b)] / 103
3263 1977
(iii) % saving 2012 – 13 & 2013 – 14 for Electric Traction
(a) For Passenger [(savings in current year/ electricity consumption of previous year)] x 100
0.28 0.59
(b) For Goods [(savings in current year/ electricity consumption of previous year)] x 100
2.82 4.23
(iv) % saving 2012 – 13 & 2013 – 14 for Diesel
(a) For Passenger [(savings in current year/ diesel consumption of previous year)] x 100
1.72 1.58
(b) For Goods [(savings in current year/ diesel consumption of previous year)] x 100
5.68 2.03
Policy and Action plans
Energy policy
Guidelines on energy conservation are being received from time to time from the
Railway Board. These are advised to the divisions and monitored. Energy
Conservation week is celebrated from 14th December to 21st December of every
year by conducting seminars, distributing booklets on energy conservation
measures.
Objectives:
216
• To have lowest specific energy consumption. • To maximize the use of renewable energy resources wherever feasible. • To identify the areas of excessive energy consumption and avoidable loss of
energy and to initiate measures to arrest the same.
Major Projects Implemented during the year 2013-14
(A) Traction power
The following major activities including energy conservation measures have been
implemented to reduce energy consumption and achieve economy in energy
expenditure during the year 2013-14.
a) Tariff containing measures
Energy tariff plays a vital role in economic and efficiency of traction system. Dual
purpose initiative has been taken to avail the incentive available on power factor as
well as reduction in demand and minimization of loss.
b) Demand side management to conserve energy
Central railway continuously monitors demand of the sub-stations with the demand
approaching/overshooting buzzers to alert the traction power controller to control
the maximum demand by way of extension of feed.
By effective energy management, the demand has been restricted to save demand
charges for Railway and thereby helping the supply authorities in managing the
system without extra burden of exceeding demand or losses.
Central Railway has issued instructions to switch off the standby transformers at the
traction sub-stations. This has resulted in minimization of losses. Central Railway
has provided capacitor bank in 17 traction sub-stations.
c) Provision of energy saving devices
Central Railway draws power from 25 kV AC traction sub-stations for traction.
Capacitor banks have been provided at 15 traction sub-stations. Since the
installation of capacitor banks, power factor has improved in the order of 0.90 to
0.99 resulting into handsome savings in restricting the power consumption. The
benefits achieved are as under:-
i) Saving in restricting the demand. ii) Saving on account of avoided losses due to improved power factor (kWh*(1-(pf1-
pf2)^2).
d) Improvement in operational efficiency by training the locomotive operation staff resulting in improvement in Specific Energy Consumption (SEC).
217
Central Railway has taken initiatives on energy efficiency in operation of electric
locomotives by –
i) Regular counselling of operation staff/drivers. ii) Provision of Coasting Boards. iii) Installation of Energy Meters on electric locomotives/EMU’s to monitor the
energy consumption. iv) Comparing the unit wise SECs and take corrective measures. V) Switching off of trailing locomotive when empty rake is hauled by MU. VI) Switching off of auxiliaries. VII) Panto lowering.
e) Introduction of 3-phase technology
Central Railway has adopted 3-phase technology resulting in reduction of about
10% to 13% energy consumption due to regeneration on AC and DC EMUs &
locomotives.
f) As per guidelines of Railway Board, Central Railway has proposed procurement of Cheaper Power through Bi-Lateral Mechanism in Maharashtra through GUVNL by open access.
g) Conversion from 1500 V DC to 25 kV AC traction
The section, Igatpuri-Kalyan, Lonavala-Kalyan, Kalyan-Thane has been converted
from age old 1500 V DC to 25 kV AC traction to improve operational efficiency and
energy savings. Work in Thane to Mumbai CST section has also been completed and
will be energised on 25 kV AC shortly. Work on harbour line is also in progress.
(B) Non-Traction (General Services)
• 04 Nos. Integrated Renewable Energy based emergency backup power
system (Solar panel– 1 kW & Wind mill 5.1 kW has been installed at
Umbermali (near Kasara), Thansit, Matheran and Asangaon stations of BB
Division.
• 10 kWp Solar panel (Grid connected) has been provided at Parcel building
Mumbai CST of BB division.
• 2224 nos. of energy efficient T-5 tube lights of 28 W have been provided at
stations and service buildings in place of 40 W tube lights.
• 1481 Nos. of CFLs has been provided in place of incandescent lamps.
• 551 nos. of old 90 W ceiling fans replaced with energy efficient 60 W ceiling
fans.
• 7 nos. Timer switches provided on high mast towers for yard lighting in the
year 2013-14.
• 36 nos. energy efficient pump sets have been provided.
• At 26 stations, LED station name boards have been provided.
• 569 Nos. three star and above graded equipments have been procured.
• 401 Nos. of staff quarters have been rewired with copper wiring.
• 55 Nos. solar panels have been provided at stations for emergency standby
power supply.
• 1441 Nos. electronic regulator have been provided in place of resistance type.
218
• 1978 conventional ballast have been replaced by electronic ballast. • 02 Nos. solar based water heaters have been provided.
Significant amount of electrical energy is being saved by adopting the following
measures:
• Auto switching on/off 70% platform lights at stations.
• Energy consumption target is fixed for the Zonal Railway by the Railway
Board and onwards target is fixed for divisions & workshops.
Major works planned for future
A. Electric Traction
Conversion of 1500 V DC traction to 25 kV AC traction in Mumbai suburban section
of Harbour & Tran harbour line viz. CSTM-Panvel and Thane- Vashi.
B. General Services
Energy audit of major administrative offices at HQ and Divisional level, major
stations, diesel & electric loco sheds, all workshops, major pumping installations,
Divisional Hospitals.
• Replacement of the existing T-12 / T-5 FT lights with T-5 tube lights and use
of only T-5 FT lights in future in all new constructions.
• Replacement of electric water heaters with solar water heaters and use of
only solar water heaters in future at new installations.
• Provision of solar panels at balance LC gates as standby.
• Electrification of way side stations using solar panels.
• Provision of solar panel at way-side stations, having frequent power failure
from power utilities as a standby arrangement, including other major stations
and S&T installations.
• Replacement of domestic electrical fittings namely ceiling fans, fan regulators,
switches and ELCBs with energy efficient fittings.
• Replacement of Refrigerators, deep-fridges, water coolers including master
water coolers and other electrical appliances etc. with BEE certified star rated
appliances etc.
• Replacement of the existing water pumps of older version with energy
efficient pumps.
• Provision of solar panels at Railway colonies for street lighting of Railway
colonies.
• Use of LED lights extensively by replacing the conventional light in as many
areas as possible including light of station façade at important stations.
• Provision of Energy Savers, Photo Sensing Devices, Auto timers etc for
controlling the operation of various electrical gadgets as per the need for
optimum utilization of energy.
• Provision of Shunt Capacitor Bank at distribution load points.
219
C. Loco Operation
• Optimum deployment of locos for specified trainload.
• Energy saved by shutting down of light Engines when idle for more than 15
minutes and engines for more than 45 minutes.
• By coasting and judicious use of breaking.
D. Diesel Traction
The following measures are required by Divisions to improve Energy
Conservation and saving in traction energy bills.
• Provision of Coasting Boards along the line and advising Drivers to follow the
coasting boards strictly when train is running on time.
• Minimising movement of Light engine.
• Lubrication of side faces of rails on curves.
• Avoidance of Signals being given on approach.
• Elimination of Goods train running with wagons in door open condition.
• Braking of the train in judicious manner for stopping at appropriate point.
Ensuring proper speed while negotiating temporary/permanent caution
orders.
• Effective controlling of speed at the gradient to arrest Wheel slipping
Correct usage of sanders.
• Vigil by Station staff on trains running with partial brake binding.
• Switching off locomotive in yards when detention is likely to be more than
30".
• Improvement in maintenance of diesel locos by arresting leakages in fuel oil
system and improved health of power pack.
• Counselling of loco Pilots by Loco Inspectors regarding idling of rear locos in
MU while empty load hauling and taking advantage of coasting, where ever
possible.
• Counselling for proper handing/ taking over of HSD oil balances between
Loco Pilots and Shunters.
• Use of dynamic brakes to control train smoothly.
• Ensurance of proper release of loads before departure.
220
Second Prize
Zonal Railways
SOUTH CENTRAL RAILWAY
Secunderabad (Telangana)
Unit Profile
South Central Railway (SCR) formed in October, 1966, is one of the largest Zonal
Railways on Indian Railways. It comprise of six divisions viz. Secunderabad,
Vijayawada, Guntakal, Guntur, Hyderabad and Nanded with route kilometers of
5743.481 on Broad Gauge and 175.930 on Metre Gauge & three workshops i.e.,
Carriage Repair Shop, Lallaguda, Tirupati and Wagon Workshop, Guntupalli. During
the year 2013-14, it carried a total of 386 million passengers and more than 107
million tons of freight, with gross originating earnings of 10616 Crores, registering
5.02% growth over previous year.
Overview of Infrastructure and other salient features of South Central Railway as on
31.03.2014
Sr. No Descriptions Nos.
1. No. of stations 742
2. No. of Divisions 6
3. No. of Carriage/Wagon Workshops 3
4. No. of Electrical Loco Sheds 3
5. No. of Diesel Loco Sheds 5
6. No. of Traction sub-stations 39
7. No. of sub-stations (Non-Traction) 210
8. No. of Electric Locomotives including 90 WAG9 and 40 WAP7) 530
9. No. of Diesel Locomotives 562
10. No. of MEMU Coaches 133
11. No. of EMU Coaches 96
Energy Consumption in Non-Traction
Due to adoption of various energy conservation measures the Non-Traction energy
consumption has reduced by 10.56% over last 4 years, in spite of an increase of
10.67% in connected load.
221
Specific Energy Consumption
Electrical Traction
Specific Energy Consumption in
kWh/1000 GTKM for Goods
Specific Energy Consumption in
kWh/1000 GTKM for Passengers
Electrical Non-Traction
145.86
138.65
139.59
141.73
134.47 145.31
130.36
148.05
130.45
153.44
125
135
145
155
Energy Consumption in MU Connected Load in MW
2009-10 2010-11 2011-12 2012-13 2013-14
4.71
4.66
3.67
3.85
0.0
2.0
4.0
6.0
2012-13 2013-14
RB Target Actual
18.69
18.66
18.0
18.5
19.0
2012-13 2013-14
1052
985
925
880
850
800
900
1000
1100
2009-10 2010-11 2011-12 2012-13 2013-14
Specific Energy Consumption in kWh/kW
222
Diesel Traction
Energy Conservation Measures implemented & Achievements
during 13-14
Traction (Electric)
•••• Extensive usage of regenerative braking for
trains working with three phase locos 9.38
million units saved amounting to 6.91 Crores.
•••• South Central Railway having 39 Traction
Sub-Stations consisting of 14 nos. of
12.5/13.5 MVA and 61 nos. of 20/21.6 MVA
transformers. Stand by transformers are
switched off resulting in saving of 41.83 Lakh
units i.e. approx. 3.09 Crores.
•••• During 2013-14 all the TSSs of SC Rly. are
maintained power factor above 0.97.
•••• Switching off yard lights to required minimum
level at traction sub stations.
•••• Yearly Calibration of Tri-vector meter jointly
by AP DISCOMs & Railways.
•••• To ensure sparkless current collection OLIVER ’G’ is regularly used for attending
spark location.
•••• Replacement of 10 kVA Auxiliary transformers with 5 kVA transformers at L.C.
Gates and IB locations to reduce iron losses.
Traction (Diesel)
Following conservation measures are adopted to monitor consumption of diesel for
traction purposes.
2.06
1.94
1.5
1.8
2.1
2012-13 2013-14
Specific Fuel Consumption in Liters/1000 GTKM for Goods
3.6
3.41
3.0
3.5
4.0
2012-13 2013-14
Specific Fuel Consumption in in Liters/1000 GTKM for Passengers
223
•••• Fuel consumption trials for different types of trains are conducted regularly to
monitor and to improve their performance. Appropriate action is initiated to
check the consumption of HSD Oil if any increase is noticed in trip ration and also
improve the Engine man ship of the crew. Various aspects like load, gradient,
imposed speed restrictions from time to time are taken into account while
assessing the trip ration.
•••• Loco Pilots and shunters are regularly counseled by the nominated Loco
Inspectors to account correct fuel balances while handing over and taking over of
locomotives in traffic yards and in diesel sheds.
•••• The Handling Loss at the time of decanting HSD oil from road tankers and at HSD
oil issuing points is fixed at 0.1%. South Central Railway has achieved an
average of 0.09% which is well within the target fixed and the net in saving is to
the tune of 263 kL per annum valued at 132.10 Lakhs.
Maintenance of Locomotives
•••• Specific Fuel Consumption (SFC), a parameter to determine the efficiency of the
engine in consumption of HSD oil, is calculated during heavy schedules and
corrected, if required.
•••• When the locomotives are idling in yard for more than 30 min, instructions are
issued to shut down the locomotives to avoid excess consumption of HSD oil.
•••• When trains are running in empty condition (empty wagons), the rear diesel
locomotive in Multiple Unit (MU) is shut down to avoid excess consumption.
Non-Traction
Use of non-conventional energy sources
SCR has been consistently following the policy of
use of non-conventional energy sources. Till
March, 2014 SCR has provided solar generating
plants at 93 stations (50.28 kWp), 8 service
buildings (106.74 kWp), 411 LC gates (80.12
kWp), 93 solar street lights (7.78 kWp), 6
Pumps (12.25 kWp), 193 solar water heaters
(157300 LPD) and 71 natural day light pipes.
Those provided during 2013-14 are
detailed below:
•••• Solar Thermal Water Heating System:
Provision of 27 Solar thermal water heating
systems of different capacities (12300 LPD) in
place of conventional water heaters resulting
to saving of 0.99 Lakh units amounting to
8.50 Lakhs.
•••• Solar Photovoltaic Modules at stations:
49 stations (19.01 kWp) & 4 pumps (7.16
kWp) have been provided with solar
224
photovoltaic modules of different capacities resulting to saving of 0.1 Lakh units
amounting to 0.8 Lakhs.
•••• Solar Photovoltaic Modules at level crossing gates: 68 level crossing gates
(15.726 kWp) have been provided with solar
photovoltaic modules of different capacities
resulting to saving of 0.08 Lakh units
amounting to 0.7 Lakhs.
•••• Solar Photovoltaic Modules at street
lighting/colony: 56 street lights (4.3 kWp)
at service buildings/colonies have been
provided with solar photovoltaic modules of
different capacities resulting to saving of 0.05
Lakh units amounting to 0.4 Lakhs.
•••• Solar Photovoltaic Modules at service buildings: 6 service buildings (67.4
kWp) have been provided with solar
photovoltaic modules of different capacities
resulting to saving of 0.35 Lakh units
amounting to 2.98 Lakhs.
•••• Natural Solar Light Pipe System: 7 natural
solar light pipes have been provided at service
buildings to conserving electrical energy
during day time resulting to saving of 0.03
Lakh units amounting to 0.24 Lakhs.
•••• Automation of Pumps: 24 pumps of various
capacities have been automated by GSM
based control, GPRS technology, float level
water control system and by providing timer
switches, saving valuable man power &
energy resulting to saving of 0.30 Lakh units
amounting to 2.57 Lakhs.
•••• Use of Energy Efficient pumps: 115 energy
efficient pumps in pLakhe of old/overaged
inefficient pumps have been provided at various water supply installations
resulting to saving of 1.60 Lakh units amounting to 13.79 Lakhs.
•••• Efficiency measurement of pumping installations: 71 pumping installations
have been measured efficiency of pumps resulting to saving of 1.41 Lakh units
amounting to 12.16 Lakhs.
•••• Copper wiring for quarters: 673 staff quarters have been done copper wiring
new/in pLakhe of aluminium wiring resulting to saving of 1.0 Lakh units
amounting to 8.62 Lakhs.
•••• Segregation of 70/30% Lighting circuits at platforms: 37 stations have
been segregated 70/30% lighting circuits on platforms resulting to saving of 0.24
Lakh units amounting to 2.06 Lakhs.
225
•••• Timers for 70/30% Platform Lighting & 2/3 Fan circuits: 172 timers for
70/30% Platform Lighting & 2/3 Fan circuits have been provided at Railway
stations. Due to this the 70% lights and fans at non-seated areas are switched
“OFF” at platforms automatically during non-train periods.
•••• Timers for water coolers: 534 timers have been provided for water coolers at
Railway stations and Service buildings to switch “OFF” the water coolers during off
peak period/night time to conserving precious energy resulting to saving of 0.94
Lakh units amounting to 8.09 Lakhs.
•••• Timers for Roll in/out examination lights & AC units: 111 timers have been
provided for Roll in/out examination lights & AC units to switch “OFF”
automatically to conserving precious energy resulting to saving of 0.31 Lakh units
amounting to 2.68 Lakhs.
•••• Timers for High mast/Yard/Street lighting/Colony: 89 timers have been
provided for High mast/Yard lighting/Street lighting/Colony to switch “OFF” lights
during off peak periods/day time resulting to saving of 0.99 Lakh units amounting
to 8.51 Lakhs.
•••• Occupancy Sensors: 172 occupancy sensors have been provided for lighting
control in officer’s chambers and VIP lounge etc. to conserving energy during non-
occupancy periods resulting to saving of 1.45 Lakh units amounting to 12.49
Lakhs.
•••• Automatic Power Factor Correction Panels: 9 Automatic power factor
correction panels in HT/LT sub-stations have been provided to maintaining power
factor above 0.99 resulting to saving of 0.97 Lakh units amounting to 8.38 Lakhs.
•••• VVVF drives for cranes and traversers: 2 VVVF drives have been provided for
cranes and traversers in workshop to reduce energy consumption and increase
the reliability resulting to saving of 0.30 Lakh units amounting to 2.56 Lakhs.
•••• Star Labeled Equipments: 4489 Nos. of 3 star rated and above labeled
electrical equipments have been provided such as AC plants, Geysers, Ceiling fans
etc. resulting to saving of 11.68 Lakh units amounting to 100.72 Lakhs.
•••• LED Lighting: 3381 Nos. of LED based lighting of different wattages have been
provided at stations and service buildings.
226
•••• One trilingual LED station name board has been
provided in place of glow sign boards resulting
to saving of 0.04 Lakh units amounting to 0.30
Lakhs.
•••• T5 lamps in place of T12 lamps: 7651 T5
fluorescent tube lights have been provided in
place of T12 FTL fittings at all major load
centers, Stations/Service buildings/street lights
etc. to reducing connected load & energy
resulting to saving of 3.61 Lakh units amounting
to 31.19 Lakhs.
•••• Electronic Ballast in place of conventional
ballast: 1433 Nos. of electronic Ballast in place
of conventional ballast in FTL & metal halide
circuits have been provided resulting to saving
of 0.67 Lakh units amounting to 5.75 Lakhs.
•••• Induction lamps: 136 Induction lamps of different wattages in place of higher
wattage fittings have been provided.
•••• CFL lamps: 1242 CFL lamps of different wattages in place of higher wattage
fittings have been provided resulting to saving of 0.51 Lakh units amounting to
4.40 Lakhs.
•••• Energy Savers: 34 energy savers have been provided for lighting, AC, Geyser
circuits etc. resulting to saving of 0.20 Lakh units amounting to 1.71 Lakhs.
•••• Electronic Fan Regulators: 6407 Electronic fan regulators have been provided
in place of conventional regulators resulting to saving of 0.84 Lakh units
amounting to 7.20 Lakhs.
•••• Electronic Energy Meters: 1047 Electronic kWh meters have been provided in
place of conventional meters.
•••• Energy Audit: Energy audit has been done departmentally at 31 locations
resulting to saving of 0.60 Lakh units amounting to 5.16 Lakhs.
Environment & Safety
•••• Procurement of fuel catalyst for control of emissions in diesel generator sets. The
generated power on the railway is only 0.94% of total consumption on Non-
traction. Presently, fuel emissions are controlled by regular cleaning of filters and
upkeep of DG sets.
•••• Ensuring all safety measures for power installations and counseled staff
periodically.
227
3046
27612711
2591
2200
2400
2600
2800
3000
3200
2010-11 2011-12 2012-13 2013-14
SEC (Kwh/Kw)
SEC (Kwh/Kw)
Certificate of Merit
Zonal Railways
EAST CENTRAL RAILWAY
Hajipur (Bihar)
Unit Profile
During the year 2013, the energy savings in East Central Railway has been
remarkable compared to 2012-13 in terms of less energy consumption, savings due
to various majors adopted and the trend is continuing further in 2014-15.
The ECR comprises of five divisions –Danapur, Dhanbad, Mughalsarai, Sonpur,
Samastipur and two workshops in Harnaut and Samastipur. The Railway covers
most of the areas of Bihar and Jharkhand. It is centrally located in Delhi- Howrah,
Delhi-Guwahati and Mumbai- Howrah routes.
Energy Consumption
Energy consumption of ECR in non-traction areas during 2012-13 & 2013-14 has
been 182.90 & 179.2 MUs respectively while in traction areas has been 1004.7 and
1018.9 respectively. The increase in energy consumption in traction side has
occurred due to electrification of Sonpur division (~400 RKm)
Although energy consumption has decreased by 3.7 million units (from 182.90 MU
to 179.20 in non-traction) during 2013-14 i.e. 1.70 % due to various majors
adopted, rebate in energy bills on account of improved power factor, reduction in
kVAh and timely payment was Rupees 2.95 crores.
Non Traction
ECR
2010-11
2011-12
2012-13
2013-14
% Increase/
Decrease w.r.t last year
Energy Consumption(MU)
181.35 177.30 182.3 179.20 (-)1.70%(saving)
SEC(kWh/kW) 3046 2761 2711 2591 (-)4.42%(saving)
228
Traction
ECR
2010-11
2011-12
2012-13
2013-14 % Increase/ Decrease
Energy Consumption(MU)
983.23 964.33 1004.7 1018.9 (+)1.41%
Specific Energy Consumption, SEC(Goods)
10.6 11.12 6.19 5.9 (-)4.68% improvement
SEC(Pass) 20.20 18.74 19.79 19.6 (-)1.00% improvement
Promotion of renewable sources of energy
East Central Railway has gone for extensive use of solar power energy at manned
level crossing gates, way side stations etc LED lamp is preferred with solar panel for
reasons that LEDs are available in lower power ratings. As a policy, ECR has also
plan to use roof of station building, service building etc for installation of solar panel
in a big way.
During the reporting period, 2 nos. 10.4 kWP solar power panels are provided one
each at GM building/HJP & DRM building / SEE feeding directly to power Mains
without storage facility. Also Rambhadrapur station is designated as green station
where 2220 Wp capacity solar plant is installed to cater the need of electrical energy
of that station.
01 no. 100 Kwp size solar panel is being installed at GM building in addition to
existing 2x10.4 Kwp plant.
In addition solar distilled water plant as a replacement of electrical distilled water
plant 4 nos. have also been planned at coaching depots, DHN, RNCC, DBG & GYA.
229
Energy Conservation Achievements
Major Projects Implemented during the year 2013-14
The following energy conservation measures are actively implemented:
Traction
1. East Central Railway has 22 commissioned Traction Sub-stations at 132 kV
level and 05 Feeding Posts at 25 kV level. There 10 nos. 21.6 MVA and 06 nos.
12.5/13.5 MVA standby transformers. These transformers are switched off to
save no load loss.
2. One Transformer of Rajabera traction sub-station was replaced from 12.45
MVA to 21.6 MVA.
3. According to present tariff order of BERC, minimum power factor to be
maintained is 0.90. During the year 2013-14 average power factor 0.95 was
maintained by E.C. Railway and rebate amounting Rs. 13.63 crore was
received through monthly traction energy bill.
Non -traction:
1. 10 nos. stations have been electrified through solar power system with LED
light for green station in DNR division.
2. Saving of Rs. 434.30 lakhs on account of 2.07% reduction in consumption of
electricity w.r.t. last year.
3. Saving of Rs. 359.04 lakhs due to reduction in HSD oil consumption of 53418
liters w.r.t. last year in non-traction has been achieved.
4. The work of Illumination of Reservation chart has been completed in 354 Nos.
of AC coaches & 607 nos. of SCN coaches.
5. Mobile/Laptop charging points has been completed in 427 AC coaches & 605
GSCN coaches (2 points) of ECR.
6. All under slung AC coaches has been converted from R12 refrigerant gas to
R134a gas.
7. Vacuum cleaners are employed for cleaning of electrical appliances of coaching
services and general services.
8. 65 Nos. LC gates have been electrified through Solar system in the current
year and total 501 nos. LC gates have been illuminated by Solar energy on
ECR.
9. 04 nos. Escalator, 02 each at Patna Jn & Dhanbad have been commissioned
during the current year for the convenience of Passenger.
10. 2072 Nos. of T5 28W TL fittings & 294 Nos. of 4x24W FTL Energy efficient
lamps fittings has been provided at stations for improvement of illumination
level and conservation of energy.
11. 02 Nos. station, 01 each at SPJ & SEE division have been illuminated with LED
lights through Solar panel.
12. 10 nos. station name board have been illuminated through LED light, 05 each
from SPJ & SEE division.
13. 03 nos. High Mast Tower (20 mtr.) has been provided during current year.
230
Energy Conservation Measures
1. An innovative scheme has been introduced for automatic switching ON & OFF with help of signalling system lighting at platforms (100% during train arrived and 30% during absence of train). Automatic switching has been provided at 04 stations during the current year and 48 nos. stations have been covered under the scheme on ECR.
2. 02 nos. 10.4 KWp capacity grid connected solar system has been provided at new GM bldg/HJP DRM’s office building SEE.
3. Rambhadrapur station of SPJ division has been made complete green station by providing LED lights at PF & street light through solar panel.
4. Automation of 19 Nos. of pump through level controller has been provided during current year.
5. 18983 nos. new electronic energy meters has been provided in the railway quarters.
6. 02 nos. LC gates of MGS division have been provided with stand alone wind plus solar photovoltaic hybrid power generating system.
7. 75 nos. LED have been provided in MGS division during the year.
8. 135 nos. signages have been provided at different places in SEE division.
9. All Incandescent lamps have been replaced by energy efficient light fittings. In that connection total 96,171 nos. CFL have been provided to residents of Railway quarters free of cost.
As this Railway has adopted energy conservation means on large scale, it will be in fitness of things to consider this Railway for BEE awards in Zonal Railway category for moral busting and further motivating all concerns in achieving even higher goals.
231
Certificate of Merit
Zonal Railways
WEST CENTRAL RAILWAY
Jabalpur (Madhya Pradesh)
Unit Profile
West Central Railway (WCR) with its headquarters at JABALPUR came in to
existence on 1st April, 2003. The territorial jurisdiction of West Central Railway
stretches from Khandwa (excluding) to Manikpur (excluding) on the Mumbai-Howrah
route via Itarsi- Jabalpur and from Mathura (excluding) to Nagda (excluding) on
Delhi-Mumbai route via Ratlam forming a part of one of the important diagonal and
side of golden quadrilateral of Indian Railways. Other than this GWALIOR-GUNA-
MAKSI, BINA-KATNI-SINGRAULI, KOTA-CHHITORGHAR AND SATNA-REWA sections
are also part of WCR.
It consists of three divisions by including Jabalpur & Bhopal divisions of the erstwhile
Central Railway and Kota division of Western Railway. Along with three divisions, all
activity centers in their jurisdiction i.e. two workshops, three Loco sheds, and
Training institutes have also been made integral parts of the new Zonal set up.
The railway moves varied mix of traffic like cement , power house coal, lime stone,
fertilizers, petroleum products, steel and food grains under public distribution
system, maintaining vital supply chain for the crucial industrial sector of the
country. This railway has a total of 2990 route kilometres, out of which 1601 route
Km is electrified.
232
2011-12 2012-13 2013-14
Electrified Route Km ( Total 2990 Route Km )
1291 1594 1601
Energy Consumption
Fuel (Electrical and Diesel) constitutes important component of WCR’s working
expenses. WCR pays around Rs 686.35 crores for electrical traction, Rs 886.27
crores for Diesel traction, Rs 55 crores for non traction electric purposes.
Consumption of electricity and Diesel for traction applications depend upon traffic
hauled. There has been significant increase in GTKM hauled during, 2011-12, 2012-
13 & 2013-14 w.r.t. previous year. Corresponding increase in electricity and diesel
consumption has been quite less resulting in decreased SEC/SFC as evident from
the figures tabulated below-
Specific Energy Consumption
TRACTION (Electric) 2012-13 2013-14
Unit Consumed (Lakhs kWh) 11936.8 11843.6
GTKM for Goods (in thousands) 74902622 79340726
GTKM for Passenger (in thousands) 29508830 29930522
SEC for Goods(kWh/1000 GTKM) 7.07 6.65
SEC for Passenger (kWh/1000 GTKM) 18.51 18.48
% SEC reduction during 2013-‘14 for (Passenger) w.r.t. preceding year.
0.489 -0.162
% SEC reduction during 2013-‘14 for (Goods) w.r.t. preceding year.
1.87 -5.94
TRACTION (Diesel)
Diesel Consumption in KL 155466 161866
SFC FOR Goods(Liters/1000 GTKM) 1.93 -1.9
% SFC reduction (Passenger) w.r.t. Preceding year 1.09 1.55
0
500
1000
1500
2000
2011-'12 2012-'13 2013-'14
Electrified Route Km
Electrified Route Km
233
% SFC reduction (Goods) w.r.t. Preceding year 2.03 -0.82
NON – TRACTION ELECTRIC
Electricity Consumed in Lakhs kWh 885.92 916.89
Connected Load in kW 92675 95188
SEC in kWh/kW 80 73.8
% SEC reduction w.r.t. preceding year. {(Current year SEC-previous year SEC)/ previous year SEC.}
0.03 -0.07
TRACTION (Electric) 2012-13 2013-14
SEC for Passenger (kWh/1000 GTKM) 18.51 18.48
TRACTION (Electric) 2012-13 2013-14
SEC for Goods(kWh/1000 GTKM) 7.07 6.65
1175
1180
1185
1190
1195
2012-13 2013-14
Energy Consumed (Traction) (in MU)
Energy Consumed
(Traction) (MU)
18.46
18.47
18.48
18.49
18.5
18.51
2012-13 2013-14
SEC for Passenger (kWh/1000 GTKM) (improvement)
SEC for Passenger
(kWh/1000 GTKM)
(improvement)
234
Traction (Diesel) 2012-13 2013-14
% SFC reduction (Goods) w.r.t. Preceding year (improvement)
2.03 0.82
NON – TRACTION ELECTRIC (Improvement)
2012-13 2013-14
SEC in kWh/kW (improvement) 80 73.8
6.4
6.6
6.8
7
7.2
2012-13 2013-14
SEC for Goods(kWh/1000 GTKM)
SEC for Goods(kWh/1000
GTKM)
0
0.5
1
1.5
2
2.5
1 2
% SFC reduction (Goods) w.r.t. Preceding year
(improvement)
% SFC reduction (Goods)
w.r.t. Preceding year
(improvement)
70
72
74
76
78
80
2012-13 2013-14
SEC in kWh/kW (improvement)
SEC in kWh/kW
(improvement)
235
Electrical Energy NON – TRACTION 2012-13 2013-14
% SEC reduction (improvement) w.r.t. preceding year.
0.03 0.07
Energy Conservation Measures
1) Utilization of Energy Efficient fittings: LED lights, CFLs, T-5 energy efficient
fittings with electronics ballast etc provided at major stations. T-5 energy
efficient fittings is made stock item and planned to provide T-5 fittings in future.
Bhopal Railway Station (Food Plaza) – Energy Efficient fittings (CFL)
2) Provision of Shunt capacitor banks: Shunt Capacitor Banks has been
provided at all traction substations for improvement of power factor.
0
0.02
0.04
0.06
0.08
2012-13 2013-14
% SEC reduction(improvement) w.r.t. preceding
year.
% SEC
reduction(improvement)
w.r.t. preceding year.
236
3) Use of regenerative breaking: Application of regenerative braking has been
implemented in state of the art 3 phase Electric Locomotives WAG9, WAP5 &
WAP7 in WCR territory. 141.07 Lakh kWh and 763.72 Lakh Rupees saved during
year 2013-14 by regenerative breaking in locos.
State of the art 3 phase Electric Loco WAG9
4) Coasting & lowering of Pantograph: Coasting board has been provided for
purpose of coasting of locomotive. Lowering of pantograph also implemented
when trains stop more than specified time. Drivers regularly counselled for
coasting & lowering of pantograph.
5) Provision of LED based station name board: 35 nos. LED based station
name board have been provided in WCR, this will decrease the power
consumption.
(2x25 kV AC Traction System)
237
6) Provision of timer in High Mast Tower lights: Timer switch have been
provided in 22 nos. of High Mast Tower lighting year 2013-14.
7) Prepaid metering system
Prepaid metering concept similar to mobile charging is introduced first time by
this Railway on Indian Railway. Existing energy metering system is replaced by
prepaid metering system for 58 Vendors at various Railway Stations to create
awareness about Energy usage.
238
8) Provision of T-5 Fitting: 6949 nos. of energy efficient T-5 fittings have been
provided against the replacement of FL fittings during the year during the year
2013-14.
9) JABALPUR Division: Provision of 2 nos. solar light pipe 530 mm dia have been
done in DRM’s office canteen for day lighting. It collects light from sun and
reflects to room .It mainly consists of three parts i.e. light collector, Reflector
pipe and light diffuser. The main features/ advantages of the system are
following.
•••• Zero maintenance
•••• Better natural light condition
•••• Pay back system cost in 2 to 3 years
•••• Works efficiently even in rainy season
•••• Zero UV radiation
•••• Long life (20 years)
The light energy produce by one light pipe is 4000 lux cover 500 sq feet area.
By provision of this 1100 kWh per annum will be saved. Thus saving of energy
by 2 light pipe = 2200 kWh per year. The saving in terms of money= 2200 x 7
= Rs 15400/- per year.
239
Certificate of Merit
Zonal Railways
NORTH CENTRAL RAILWAY
Subedarganj, Allahabad (Uttar Pradesh)
Unit Profile
North Central Railway created on 01.04.2003, have two heavy density over
saturated electrified sections i.e. Ghaziabad – Mughalsarai and Palwal – Agra – Bina.
Line capacity utilization on these sections is more than 100%. North Central Railway
runs more than 350 Mail/Express & Passenger Trains, 57 EMU-MEMU and more than
200 goods trains daily.
North Central Railways has three divisions viz Allahabad, Jhansi & Agra, two electric
loco-sheds-Jhansi & Kanpur holding 404 Locos, one Wagon Repair Workshop/Jhansi,
one Bogies Spring Workshop/Gwalior, one Diesel Loco Shed/Jhansi with over all
electrification of 54.7% of B.G. track and hauls 84.7% of its traffic on electric
traction. Total connected load (non-traction) of various utilities over NCR is 103136
kW and annual unit consumption is 144.41 MU.
There are total 39 Rly traction sub-stations and their total contractual demand is
385.5 MVA. Workshop/Jhansi is the only major load centre having connected load of
more than 5000 kW.
Overview of Infrastructure and other salient features
Route Kilometres 3151.00
Track Kilometres 5736.00
Electrified Route Kilometres 1633.93
Electrified Track Kilometres 4379.30
No. of Stations 374
No. of Divisions 03
No. of Carriage & wagon Repair
Workshops
01
No. of Electric Loco Sheds 02
No. of Diesel Loco Sheds 01
No. Traction Sub Stations 39
No. of Sub Stations(Non Traction) 148
No. of Tl Coaches 1019
No. of AC Coaches 152
No. of Staff Quarters 28054
No. of Electrified Quarters 26622
No. of Electric Locomotives 404
240
No. of Passenger Trains Run 370
No. of Goods trains Run 200
Total Earnings ( In Crore of `) 11406.27
Operating Ratio 64.3
Energy Consumption
16230.048
16857.5716739.59 16755.584
2010-11 2011-12 2012-13 2013-14
Energy Consumption in Lakh kWh (Electric
Traction)
91356
99388
107930104779.23
2010-11 2011-12 2012-13 2013-14
HSD Oil Consumption (in KL)
% Increase in 2013-14 Vs 2012-13 0.09
% Decrease in 2013-14 Vs 2012-13 2.91
241
107699125079.35
150818.87162413.01
2010-11 2011-12 2012-13 2013-14
Total Energy Cost in Lakh Rs
372.5 372.5
377.5
385.5
2010-11 2011-12 2012-13 2013-14
Contract Demand in MVA
6.00 5.99
4.85
3.57
2010-11 2011-12 2012-13 2013-14
SEC for Goods ( Elect. Traction)
18.97
18.72
18.60 18.6018.48
2009-10 2010-11 2011-12 2012-13 2013-14
SEC for Passenger ( Elect. Traction)
% Increase in 2013-14 Vs 2012-13= 2.1
% Reduction in 2013-14 Vs 2012-13= 26
% Reduction in 2013-14 Vs 2012-13= 0.64
242
139.71 139.712
137.65
143.574144.41
2009-10 2010-11 2011-12 2012-13 2013-14
Energy Consumption in MU (Non Traction)
9099693676
97908
103000 103136
2009-10 2010-11 2011-12 2012-13 2013-14
Connected Load in KW
1491.44
1405.911393.92 1400.19
2010-11 2011-12 2012-13 2013-14
SEC (Non Traction)
2 1.999
2.003
1.999
1.993
2009-10 2010-11 2011-12 2012-13 2013-14
SFC (Goods)
% Increase in 2013-14 Vs 2012-13= 0.58
% Increase in 2013-14 Vs 2012-13= 0.132
% Increase in 2013-14 Vs 2012-13= 0.44
% Reduction in 2013-14 Vs 2012-13= 0.300
243
Energy Conservation Methods Implementation & Its Achievements
1. Traction (Electric)
• Provision of energy efficient Static Converters in electric locos: Static converter is
an energy efficient solid state device as compared to conventional ARNO rotary
equipment which converts single phase to three phase balanced supply for
auxiliary motors in electric loco. Thus, besides conserving energy in this process,
the static converter also saves failure of 3 phase electric motors in electric locos
due to unbalance supply, hence a step towards resource & energy conservation.
These Static converters have been provided in place of ARNO converter in 20
Locos in 2012-13 & 29 Locos in 2013-14. Out of 400 locos 181 locos are equipped
till date with static converter in Electric Loco Shed Kanpur & Jhansi.
• Use of regenerative breaking: Application of regenerative braking has been
implemented in state of the art 3 phase Electric locomotives WAG9, WAP5 &
WAP7 in NCR territory. Total Rs 1970.37 Lakhs in 2012-13 & Rs 3791.34 in 2013-
14 have been saved on this account.
• Microprocessor based Energy Meters have been provided in all Electric
Locomotives of Electric Loco Shed Kanpur & Jhansi to monitor the energy
consumption. Specific energy consumption (SEC) of the locomotives are
calculated & compared with the benchmark values to take corrective measures.
• Capacitor Banks of 56300 kVAR have been provided over 39 Traction sub
stations.
• 50% Lights of all 39 Traction substations are kept OFF during night.
• Switching OFF standby transformer at all 39 Traction Substations.
• Keeping OHE voltage at appropriate level.
• Provision of coasting boards and power boards enroute for trains to regulate
power on falling and raising gradients.
• Incandescent Lamp in Locomotive Cabin have been replaced with LED Bulbs.
3.99
3.9993.993
3.976
3.963
2009-10 2010-11 2011-12 2012-13 2013-14
SFC(Passenger)
% Reduction in 2013-14 Vs 2012-13= 0.326
244
• Energy audit of Mathura Traction Sub Station & General Manager Office Building
has been done in the year 2007 & 2009. Recommendations have been
implemented. Proposal for Energy Audit at Rail Spring Karkhana, Sithouli &
Wagon Repair Workshop, Jhansi is under process.
2. Traction (Diesel)
• When the locomotives are idling in yard/shed for more than 30 minutes,
instructions are issued to shut down the locomotive to avoid excess consumption
of HSD oil.
• Provision of Micro Controlled Base Governor & Medha Excitation Propulsion
System in 92 Diesel Locomotives has been done.
Diesel Locomotive of Jhansi Diesel Shed fitted with Micro Controlled Base Governor & Medha Excitation Propulsion System.
• Special attention of locomotives during scheduled maintenance to arrest leakage
of fuel and lubricants from Pipe lines, Joints/Valves etc.
• During running of Goods trains in empty condition (empty wagons etc.), the rear
diesel locomotive in Multiple Unit (MU) is shut down to avoid excess consumption
of HSD oil.
• Loco pilots (Electric/Diesel) are trained and motivated to save energy/fuel. In this
regard, weak loco pilots are identified and educated/counselled. In case of need,
the loco pilots are also directed to simulator training to improve their energy
saving/driving skills.
245
3. Non Traction
• GPRS based Automation of pumps have been done in Jhansi division to save
energy, water and man power.
• Solar Street Lights have been provided at way-side stations & Workshop units of
NCR.
Solar water Heater of 2000 LPD provided at hostel of Workshop Jhansi & canteen
of RSK, Sithouli Gwalior.
• Provision of Automatic Power Factor Correction Panel of Cap. 1500 kVAr in
Carriage & wagon Repair Workshop Jhansi.
• Three thousand energy efficient T-5 fittings were provided in place of T-12 / T-8
fittings at stations and service buildings.
• One thousand eight CFLs are replaced with 100 watt incandescent lamps.
• Nine hundred ninety one 60 Watt ceiling fans have been provided in place of 90
watt ceiling fans.
• One thousand Electronic fan regulators have been provided in place of
conventional regulator.
• 6 Timers have been provided on high mast towers.
• Seven Automatic Power Factor Correction Panels of 250 kVAR have been provided
in HT and LT sub-stations.
• 2638 electronic kWh meters have been provided in place of conventional kWh
meters for residential quarters and vendors’ premises.
• Use of copper wiring in place of aluminium for 1796 quarters.
• Micro-controller based Automatic Platform Lighting Management System with
segregation of 70% / 30% circuits has been provided for Railway Platforms.
• It is mandatory to use 3 stars and above labeled electrical products and
equipments, which are energy efficient.
LED based station name board in place of neon sign board has been replaced at
stations during 2013-14.
• During Energy Conservation Week from 14th December to 21st December, a
special ringing tone “Save Electricity, Save Money” is rung on each railway phone
of NCR in place of conventional ringing tone for motivation of railway employees &
their families to save energy.