Central MeetBike More sustainable transport in Central European cities through improved integrated...
-
Upload
hollie-shields -
Category
Documents
-
view
218 -
download
2
Transcript of Central MeetBike More sustainable transport in Central European cities through improved integrated...
Central MeetBike More sustainable transport in Central European cities through improved integrated bicycle promotion and
international networking
Jaroslav Martinek
2
Content
1.Key facts
2.Objectives of the project
3.Structure of the project
4.Selected activities
5.Possible cooperation between bicy and CMB
3
• Central MeetBike is implemented through the Central Europe
Programme and co-financed by the ERDF
• Duration of the project: 3 years (03/2011-02/2014)
• Information available online: www.centralmeetbike.eu
1. Key facts
4
1. Key facts
Dresden
Lead Partner (CDV)
Czech Coordinator (CDV)
Slovak Coordinator (VUD)
Polish Coordinator (PSWE)
German Coordinator (TUD)
Pardubice Uherské Hradiště Žilina Prešov Gdansk Tczew Leipzig
• Project partner: 12 partner from 4 countries
• 1 research institution and 2 cities per country
5
2. Objectives of the project
-objectives
-objectives
CE-objectives:
• Promotion of the cooperation and
improvement of the competitiveness of the
Central European regions and cities
• International exchange of experience in the
field of integrated promotion of bicycle
transportation
CMB-objectives:
• Increase of bicycle share for short distances
• Improvement of conditions for cyclists
• Provision of information and education of
decision makers on the field of integrated
bicycle promotion
6
3. Structure of the project
7
3. Structure of the project
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
8
3. Structure of the project
• Bicycle policy audit (BYPAD)
• Household survey
• Analysis of deficiencies and lack
of knowledge by national experts
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
9
3. Structure of the project
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
e.g.
• Recommendations for developing
strategy documents
• Activities of knowledge transfer
• Investments in infrastructure
10
3. Structure of the project
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
e.g.
• National and local cycling plans
(strategies)
11
3. Structure of the project
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation• BYPAD in every partner city
12
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Household surveys
Objective: statistical data about the
current mobility behaviour
13
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Analysis of deficiencies and lack
of knowledge by national experts
4 main findings:
•Low level of strategic thinking of
bicycle promotion
•Low awareness for the potentials of
cycling amongst decision makers
•Hardly existing bicycle
infrastructure
•Some cities have already achieved
success (Gdansk, Pardubice,
Uherské Hradiště)
14
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Working Group
•Discussion of measures that are
going to be implemented by partners
during the project (campaigns,
bicycle parking, low cist measures
etc.)
•Exchange of experiences
15
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Recommendations for strategy
documents
•Recommendations for establishing
strategy documents on local and
national level
•Based on the analysis of deficiencies
and lack of knowledge by the national
experts
•Recommendations form the basis for
national and local strategy documents
of partners
16
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Seminars for teaching integrated
bicycle promotion
•Objectives: transfer of knowledge
on integrated bicycle promotion
•Target groups: decision makers,
urban planners
•Cooperation with the German
Institute of Urban Affairs (Difu)
17
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Central MeetBike fact sheets
•Objective: information on selected
topics regarding bicycle promotion
18
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Field trips in Germany
•Objectives: increase of awareness,
real life experience of bicycle
infrastructure
•Target groups: decision makers,
politicians, media
19
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Dissemination of project content
•Website: www.centralmeetbike.eu
•Leaflets
•Newsletters
•Posters
•Cooperation with other projects
20
4. Selected activities
1. Problem Analysis
2. Development of measures
3. Implementation of measures
4. Ex-Post evaluation
Campaigns
•Pardubice: Bike to work (Do Práce
Na Kole)
•Gdansk: Bike Friday
•Leipzig and Dresden: StadtRadeln