Phases of Software Project ManagementSoftware Project Planning
Project Content and deliverables
3rd LectureCEN 4021: Software Engineering II
AcknowledgementsAcknowledgements
Dr. Onyeka Ezenwoye
Dr. Peter Clarke
2
3rd LectureCEN 4021: Software Engineering II
AgendaAgenda
Overview of phases of Software Project Management (SPM)
Software Project Planning– Project Content and deliverables
3rd LectureCEN 4021: Software Engineering II
Phases of SPMPhases of SPM
The software project management activities include:– Project planning and scheduling– Project cost– Project monitoring and reviews– Personnel selection and evaluation– Report writing and presentations
3rd LectureCEN 4021: Software Engineering II
Phases of SPMPhases of SPM
The previous management activities are captured using the acronym POMA:– Planning– Organizing– Monitoring– Adjusting
3rd LectureCEN 4021: Software Engineering II
POMA POMA Management ProcessManagement Process
Planning Activities
Organizing Activities
Monitoring Activities
Adjustment Activities
3rd LectureCEN 4021: Software Engineering II
POMAPOMA
Models the software management cycle– Software processes model development cycle
Applies software engineering knowledge – For example
Requirements elicitationSoftware measurements
3rd LectureCEN 4021: Software Engineering II
POMAPOMA
Not necessarily sequential– Activities within each category may overlap– Categories may overlap– For example, original plans may be adjusted during monitoring
and adjustment activities.
3rd LectureCEN 4021: Software Engineering II
PlanningPlanning
Set of activities used to develop a plan of attack for the project:
Description of software product i.e., artifact contents and deliverables.
The Software product attributes. Project schedule. Resources needed to meet project schedule. Measurements used to gauge the status of the
project. Risk associated with project.
3rd LectureCEN 4021: Software Engineering II
PlanningPlanning
Points to note: Time consuming Important phase of SPM Often rushed Even with a well conceived plan changes are
often necessary. Experience is very helpful in developing a
project plan. especially knowledge of organization.
3rd LectureCEN 4021: Software Engineering II
OrganizingOrganizing
Seeks to construct a software development based on the project plan.
Activities include:
– Acquiring various skilled individuals needed for the project.
– Defining the a process and a set of methodologies for the project.
– Obtaining the tools to support the process and methodologies.
– Creating a set of well-defined metrics to track and gauge the project.
3rd LectureCEN 4021: Software Engineering II
OrganizingOrganizing
Issues of major concern: Personnel are properly equipped to perform their
designated task i.e., – equipping personnel include obtaining tools and preparing
facilities
– educating personnel in using tools, methodology, and metrics
Allocation of adequate financial funding. Team may include financial and personnel management. “People management” aspect of organizing is critically
important.– Morale affects productivity
3rd LectureCEN 4021: Software Engineering II
MonitoringMonitoring
Monitoring focuses on: Consistently and regularly collecting measurements. Analyzing the data. Representing and presenting the data for a defined set
of reports. Making projections and making recommendations based
on the analysis of the data. Involves people management.
3rd LectureCEN 4021: Software Engineering II
AdjustingAdjusting
Adjustments are often necessary due to:– Changing software requirements
– Discovery of an unfeasible design
– Lost of skilled team members
– Financial constraints
Adjustments may be made to:– Requirements
– Schedule
– Resources
– Project content
It is very important to do a thorough risk analysis during the planning stage of the project
3rd LectureCEN 4021: Software Engineering II
AgendaAgenda
Phases of Software Project Management (SPM)
Software Project Planning (POMA)– Project Content and deliverables
3rd LectureCEN 4021: Software Engineering II
Plan ContentPlan Content
Varies depending on the type of software project.
All project plans must address:– What is the nature of the s/w project and what
software artifacts are the desired deliverables?
– What is the overall schedule and the associated major project milestones?
– What are the required resources and their associated financial costs?
– What are the known risks and the areas that are still unknown?
3rd LectureCEN 4021: Software Engineering II
Comprehensive PlanComprehensive Plan
Problem and requirements– User problems needs and wishes
Product/Project Description– Complete scope of the project i.e., all project deliverables, and a
description of each deliverable.
Product/Project Attributes– Description of the various attributes of deliverables and non
deliverables as they pertain to the goals of the project e.g., quality. Identify metrics for the attributes.
Schedule– Sequence of tasks – Identification of milestones and deliverables
3rd LectureCEN 4021: Software Engineering II
Comprehensive PlanComprehensive Plan
Cost– Details in terms of some unit e.g., person-days, for
each deliverable– Includes expenditures – tools, travel, training,
communications Resources
– List of people needed and their skills– Complete set of tools– Special training – Software and hardware systems required
3rd LectureCEN 4021: Software Engineering II
Comprehensive PlanComprehensive Plan
Process and Methods– Description of the overall process and methods
Risks– List of potential problems– Assessed impact– Probability of occurrence– Plan to prevent risk from turning into a real problem
3rd LectureCEN 4021: Software Engineering II
Requirements Elicitation Requirements Elicitation
Before the project can be initiated, software engineers need to:
– identify the requirements of the project,
– interfaces to related systems or subsystems.
Gathering s/w requirements is one of the most difficult task of any s/w project.
The software project manager needs to provide an environment conducive to proper requirements gathering and analysis.
– Enough time and suitable skilled people
3rd LectureCEN 4021: Software Engineering II
Requirements ElicitationRequirements Elicitation
Points to note:
Requirements must be understood and agreed upon by all the stakeholders.
– Not just software engineers
Not understanding the s/w requirements of the project can be very costly.
– Improper testing, quality issues
– Customer requirements not met
– Missed schedules
Consult domain experts is necessary.
The requirements document is a contract!!
3rd LectureCEN 4021: Software Engineering II
Agreeing on and initiating
Reqs
Reqs Elicitation
Reqs Analysis and
Prototyping
Reqs Review
Reqs Specification
Agreeing and“Signing Off”
(as needed)
General requirements General requirements management activitiesmanagement activities
3rd LectureCEN 4021: Software Engineering II
Requirements AnalysisRequirements Analysis
Involves checking that the specification is correct, complete, consistent, unambiguous, and realistic.
Correct – accurately represents the client’s view of the system.
Complete – all possible scenarios are described including exceptional behavior.
Consistent – does not contradict itself. Unambiguous – exactly one system is defined.
3rd LectureCEN 4021: Software Engineering II
Requirements AnalysisRequirements Analysis
Software prototype - a s/w model created for the purpose of better understanding the requirements and the feasibility of the proposed solution.
Must have clearly specified schedules – To avoid repeated viewing and reviewing of prototypes
– Define clear entrance and exit criteria.
– Define scope of prototype activity.
– Must be agree upon by everyone.
3rd LectureCEN 4021: Software Engineering II
Types of Requirements Types of Requirements
Major types of requirements:– The project deliverables– The needs satisfied by the deliverables (project)
Project deliverables– Requirements document– Design document– Source code– Executable code– Test scenarios
3rd LectureCEN 4021: Software Engineering II
Types of Requirements Types of Requirements
Project deliverables– Test cases with test data
– User guide
– Product reference manual
– Test results and quality-related data
– Process specification
– Project plan
It is important to be informed of the practices of the organization.
3rd LectureCEN 4021: Software Engineering II
Types of Requirements Types of Requirements
Project needs and their characterization– This is the area where most s/w engineers, rather than the
software project manager, should focus there energy. – The following items should be identified:– The functionality of the s/w– The nonfunctional requirements of the s/w– The interfaces that the s/w needs to interact with its users
3rd LectureCEN 4021: Software Engineering II
Review and Approval of Review and Approval of Requirements Requirements
software project manager needs to ensure the first set of reqs (the deliverables) are clearly defined understood, prioritized, and agreed upon by the stakeholders.
All parties should formally “sign-off” on the deliverables. include a final review of the requirements specification
prior to sign-off.
3rd LectureCEN 4021: Software Engineering II
Prioritization of Prioritization of RequirementsRequirements
Project reqs are sometimes initiated by solution providers internally.
These requirements are the most difficult to evaluate. The requirements usually initiate during maintenance. It is a good idea to have a prioritization procedure for both
internal and external reqs. Inputs from the various reqs sources are constantly
coming in to the s/w organization and being captured, possibly by an automated tool.
3rd LectureCEN 4021: Software Engineering II
Development
Support
Customer
Consultant
ReqsRepository.
.
.
SoftwareProduct
ManagementBoard
List of Reqs input to the
Product Plan
RequirementsPrioritization
RequirementsSources
Requirements PrioritizationRequirements Prioritization
3rd LectureCEN 4021: Software Engineering II
Prioritization of Prioritization of Requirements Requirements
Resources must be set aside for the following activities:– Regular review of inputs– Analysis of the valid inputs– Prioritization of the inputs– Response to both the accepted ideas and rejected ones– Formulation of the accepted reqs subset into actual reqs for the
product plan.