CEM 515 CONSTRUCTION QUALITYASSURANCE BY ABIDEEN GANIYU OTHER GROUP 5 MEMBERS BANDAR AL-SHARF...
-
Upload
darleen-bridges -
Category
Documents
-
view
214 -
download
0
Transcript of CEM 515 CONSTRUCTION QUALITYASSURANCE BY ABIDEEN GANIYU OTHER GROUP 5 MEMBERS BANDAR AL-SHARF...
CEM 515 CONSTRUCTION QUALITYASSURANCE
BY
ABIDEEN GANIYU OTHER GROUP 5 MEMBERS
BANDAR AL-SHARFABDULLAH ABUZAID
FLOWCHART ASSIGNMENT• The process investigated is the thesis submission
stages for MSc students of KFUPM.
• After public defense, corrections, approval of thesis committee and department chairman.
• The subsequent stages are depicted in the flowchart in the next slide while a suggested improvement after a brainstorming session with my group members is shown in slide 4.
Student submit hardcopy of thesis for review at DGS office
Native speaker review
Student makes corrections
Errors found
Dean’s signature and stamp
Student makes pdf copies, put in CD copies and upload Thesis to KFUPM website
Student make photocopies
Student goes to Dammam for hardcover binding
Student submits bounded copies and CDs at DGS office
Student submit hardcopy of thesis for review at DGS office
Native speaker review
Student makes corrections
Errors found
Dean’s signature and stamp
Student submits bounded copies and CDs at DGS office
Student submits the signature page and soft copy to a new department where they will make pdf copies, put in CD copies and upload Thesis to
KFUPM website, make photocopies and make hardcover copies