CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.
-
date post
20-Dec-2015 -
Category
Documents
-
view
225 -
download
0
Transcript of CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.
![Page 1: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/1.jpg)
CEM 510 Construction Planning and
Scheduling
Detailed Course OutlineDr Soliman Almohawis
![Page 2: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/2.jpg)
• Course Philosophy, Requirements, Syllabus
• Steps in Executing Projects
• Models used for Planning, Scheduling, and Control
• Bar Chart: Advantages and Disadvantages
• Networks
• CPM: Advantages and Disadvantages
• CPM-Based Project Management
• Homework Assignment 1
Topic 1: Introduction
Outline:
![Page 3: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/3.jpg)
• Planning Definition
• Activity Definition
• Types of Activities
o Production
o Procurement
o Management - related
Topic 2: Project Planning
Outline
![Page 4: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/4.jpg)
Outline Contd..• Breakdown of project into activities
i. Prerequisites
ii. Factors to consider
iii. Activities frequently omitted
iv. Degree of network details
• Homework Assignment # 2
![Page 5: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/5.jpg)
• Rules for Diagramming
Representation of activity.
Representation of relations.
i. Dependent vs. Independent
ii. Merge
iii. Burst
iv. Cross relation
Topic 3: Arrow Diagramming
Outline:
Dependency
Continuity
![Page 6: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/6.jpg)
Outline Contd.. Dummy activities
Numbering
Efficiency
• Procedures for drawing the network
Activity list
Dependency
Redundancy
Approaches
Homework Assignment 3
![Page 7: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/7.jpg)
• Rules for Diagramming
Representation of activity.
Representation of relations.
i. Dependent vs. Independent
ii. Merge
iii. Burst
iv. Cross relation
Topic 4: Precedence Diagramming
Outline:
Dependency
Continuity
![Page 8: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/8.jpg)
Outline Contd.. Dummy activities
Numbering
Efficiency
• Procedures for drawing the network
Activity list
Dependency
Redundancy
Sequence step no.
![Page 9: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/9.jpg)
Outline Contd..
• Example
• Homework Assignment # 4
![Page 10: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/10.jpg)
• Activity Consideration.
• Allowance for lost time.
• Normal Duration.
• Scheduling Computations (using activity time).
Forward Pass
Backward Pass
Critical Path
Floats
Topic 5: Time Computation – Arrow Network
Outline:
![Page 11: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/11.jpg)
Outline Contd..• Scheduling Computations (using event times)
Forward Pass
Backward Pass
Critical Path
Floats
• Examples.
• Homework Assignment #5.
![Page 12: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/12.jpg)
• General Approach.
i. Link Lag.
ii. Floats.
iii. Critical Activities.
• Methods
i. Computation on the Network.
ii. Computation on the Matrix.
Topic 6: Time Computation – Precedence Network
Outline:
![Page 13: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/13.jpg)
Outline Contd..• Examples.
• Homework Assignment # 6.
![Page 14: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/14.jpg)
• Users
• Tabular Method
• Graphical Methods
i. CPM Diagrams
ii. Bar Charts
iii. Time-scaled Diagrams
Topic 7: Forms of Schedule Communication
Outline:
• Examples
• Homework Assignment 7
![Page 15: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/15.jpg)
• Types of Cost
i. Direct
ii. Indirect
• Activity Time-Cost Relationship
i. Utility Data Curve
ii. Characteristics of Utility Curve
iii. Types of Utility Curve
Topic 8: Time-Cost Tradeoff: Simple Compression
Outline:
![Page 16: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/16.jpg)
Outline Contd..• Project Time-Cost Relationship
i. Project Compression – Procedures.ii. Project Compression – Example.
![Page 17: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/17.jpg)
Topic 9: Time-Cost Tradeoff: Complex compression and Decompression
Other Utility Data Curves Multi Stage Discrete
Complex Compression Procedures Example Homework Assignment 8
Decompression Procedures Examples
![Page 18: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/18.jpg)
• Scheduling considerations
Resource Considerations
- Unrestricted availability
- Restricted availability
Resource leveling
- Objective
- Criteria
- Worksheet method
- Example
Topic 10: Resource Implications on Schedule
Outline:
![Page 19: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/19.jpg)
Outline Contd..• Scheduling with Limited Resources
General Approach Time scaled method Example
• Homework Assignment 9
![Page 20: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/20.jpg)
• General Objective
• Specific Objectives
• Level of control
• Time (Progress) Control
Prerequisites
Monitoring
- Sources of information
- Overall Progress
- S Curve
Topic 11: Project Control
Outline:
![Page 21: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/21.jpg)
Outline Contd..- By activity- Examples
Updating- Updating Interval- General Procedure
• Financial Control Cost Liquidity Form
• Homework Assignment 10
![Page 22: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/22.jpg)
Topic 12: Program Evaluation & Review Technique (PERT)Outline: CPM vs PERT
Advantages of PERT
Statistics Review Central Tendency Dispersion Probability Distribution Function Central Limit Theorem
![Page 23: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/23.jpg)
Outline Cont:
PERT Assumptions Activity Assumption Network Assumptions
Example
Homework Assignment 11
![Page 24: CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.](https://reader036.fdocuments.us/reader036/viewer/2022081506/56649d435503460f94a1fb16/html5/thumbnails/24.jpg)
Topic 13: Complex NetworkOutline:
Precedence with Overlapping Relations Finish to Start with Lead Time Start to Start with Lead Time Finish to Finish with Lead Time Start to Finish with Lead Time
Compound Relationship Example, Homework Assignment 12