CEF – Readiness Study
description
Transcript of CEF – Readiness Study
Background of CEF
› President: José Manuel Durão Barroso › 19 Oct 2011: Press Conference, Brussels
› Kostas Glinos: Head of Unit DG-CNECT › 26 Oct 2011: Presentation at TERENA GA
› Links› www.terena.org/tf-msp/documents/ecpublic/
› Proposal to be part of Horizon 2020› Running period: 2014 - 2020
The Connecting Europe Facility (CEF)
› Transport 31.7 billion Euros
(inc. cohesion fund 10 billion)
› Energy 9.1 billion Euros
› Key Digital Infrastructure
9.2 billion Euros
› TOTAL: 50 billion Euros
Key Digital Service Infrastructures
› Total Investment in key DSI ~ 9 billion
› Broadband 7 billion› encourage local companies to improve connectivity for
European citizens: 30 Mbps minimum at least 50% at 100 Mbps
› Backbone for Public Administration 2 billion
Why DSI?
› Global Economic Crisis› Public Admin costs need to be reduced› Duplication of Infrastructure – Expensive› US Unified Community Anchor Network (UCAN)
HEALTH
CULTURE
SOCIAL
The NREN / GÉANT model
Three Possible Scenarios
EC DG-CNECT (INFSO)Tender invitation 4 Jul 2012 - SMART 2012/0048
Study of the readiness of Member States for a common pan-European network infrastructure for public services (max €500k)
›Coverage› High speed and connectivity between public institutions of the EU in
areas such as public administration, culture, education and health.
›Core service platform› Infrastructure based existing Internet backbone and where necessary
new networks will be deployed.
›Generic services› Authorisation, authentication, inter-domain security and bandwidth on
demand, federation of services, mobility management, quality control and performance control, integration of national infrastructures.
Readiness Study Objectives
› Establish a Knowledge Base
› Analysis of Current Situation
› Outreach and Dissemination
› Scenarios and Recommendations
R&E Networking Community
› Agreement:› TERENA General Assembly› NREN PC› European NREN CEOs› TERENA and DANTE Management
› TERENA and DANTE collaborate› TERENA point of contact with study
› The Community would NOT submit proposal:› We wanted to ensure influence› Lack of expertise across all sectors› We could be excluded if unsuccessful› Positioned ourselves as a primary
STAKEHOLDER to be consulted
Status 31 January 2013
› TERENA contacted 14 consultancies with proposal to collaborate as primary STAKEHOLDER
› EC received 5 proposals
› EC Contract awarded December 2012
Capgemini Nederland, representing a consortium of Capgemini and Deloitte Belgium
Project Inception Meeting: 22 January 2013
Timeline 2013
Jan Inception Meeting
Now Email discussion list <[email protected]>
? Community Workshop?
June CEF BoF at TNC 2013 Maastricht (Monday)
June Presentation by partners to TERENA GA?
July Interim Study Report
Sept Project Conference2 days, hosted by EC
Dec Final Study Report presented to EC
Community Engagement
› Documentation› TF-MSP Document Store:› www.terena.org/tf-msp/documents/ecpublic
› Open email distribution list› [email protected]
› Self subscribe at:› www.terena.org/mailinglists.php
› Let’s engage
Email: [email protected]