CE/C/I-JP Dy. CE/C/III-JPnwr.indianrailways.gov.in/uploads/files/1386066114327-Cons nov 13.… ·...
Transcript of CE/C/I-JP Dy. CE/C/III-JPnwr.indianrailways.gov.in/uploads/files/1386066114327-Cons nov 13.… ·...
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1
CE/C/I-JP Dy. CE/C/III-JP
1
AF/B
KI/
GC/J
P/4
R
Construction strengthening and rebuilding minor bridges between Nadbai- Bharatpur
Open tender
Two bid system
29.0
4.9
9 15 07 08 Yes
CPM/JP/KTT/CA/16 dated 15.02.2000
M/s Jugendra Singh & Co., Etah.
2.98 crore 04.01.2000 01.06.01 31/3/04 Work completed, Final bill under preparation with Sh. J.K.Jain SSE/C/W/Sirohi.
2
AF/B
KI/
GC/
JP/6
8
Laying and linking BG track between BTE- AH section
Open tender
24..
04.0
4
One bid system
27.0
9.0
4
5 1 4 Yes NWR/S&C/CA/51 dated 04.01.05
M/s RSV Construction Hyderabad
1.83 crore 01.03.05 5.11.04 31.5.05 Work completed. Final bill / Final variation under Technically check Since 19.5.2012.
3
AF/B
KI/
GC/J
P
/69
Laying and linking BG track between BTE-AH section
Open tender
24.0
4.0
4
One bid system
27.9
.2004
5 1 4 Yes NWR/S&C/CA/49 dated24.12.04
M/s Engipress Rail Link, Gwalior
1.58 crore 25.02.05 28.10.04 30.11.05 Final bill awaited from XEN/C/AWR & (Sh. S.K. Mittal)..
4
AF/B
KI/
GC/3
6
Welding of rail joints bet. BKI- KL section
Open tender
-
One packet system
09.0
6.0
3
3 1 2 Yes, Dy. CE(C)JP/CA/77 dated 07.10.03
M/s India Thermit Corp Ltd., Kanpur
1.02 Crore
08/3/04 12/10/03 30/06/04 Final bill technically checked, Final variation /Final bill under process for finance vetting.
5
NW
R-J
P/R
E
yard
/11
Const./Exten of station building at RE yard
Open tender
8.0
8.2
008
One packet system
29.0
8.2
008
01 - 01 Yes Dy CE/C-JP/CA/221 dt. 17.02.09
M/s New Everest Stone Curshing Co. Gurgaon
4.88 Crore 14/6/09 26/10/08 31/08/11 Work completed. Final bill is under process for payment.
6
HIS
-
RE/D
oubling/2
Const/ Extension of FOB&PF shelter shed bet. RE-HIS.
Open tender
24.0
7.2
008
One packet system
25.0
8.2
008
03 - 01 Yes Dy CE/C-JP/CA/224 dt. 19.03.09
M/S Sanjeev Brothers, Jaipur.
4.16 Lakhs
22/4/09 22/02/09 31/12/11 Work is in progress,
7
HSI-
RE/D
oubling/1
Construction of Major Bridge minor bridge R/wall earth work station building ballast supply , track linking etc.
Open tender
2
1
&
22.0
7.2
008
One packet system
23.0
4.2
008
05 - 01 Yes NWR/S&C/CA/101 dated 23.10.08-
M/s ARSS- Triveni(JV) Bhubaneshwar
50.81 Crore
24/2/10 03/11/08 31/10/12 Work is in progress. Further extension of DOC is awaited from agency.
8
AW
R-
HSI/
Doubling/6
Construction station building Misc. structure ballast supply track linking etc.
Open tender
21.0
2.2
008
One packet system
23.0
4.2
008
06 - 01 Yes NWR/S&C/CA/102 dated 23.10.08
M/s ARSS Infra structure project Ltd. Bhubaneshwar (Orissa)
21.24 Crore
02/07/09 27/10/08 31/05/12 Work is in progress. Further extension of DOC is awaited from agency.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2
9
NW
R/S
&C/R
OB
/111/9
Const of ROB at LC No.111-C.
Open tender
02.1
0.2
008
One packet system
0
5.1
1.2
008
03 - 01 Yes Dy.CE(C)/ JP/CA/230 dated 13.10.10
M/S Bharat Spun Pipe & Const.Co. JP
6.52 Cr. 04/05/10 25/08/09 31.3.13 Work completed.
10
WR/S
&C/T
/13 Construction of 72
units Type-II, 108 units Type- III, 36 units Type-IV
in Multistoried Towers & HEALTH Unit, shopping complex
Open tender
-
One bid system
15/0
4/2
009
04 04 0 Yes CE/S&C/CA/27 dtd. 8.9..2009
M/s Balaji Builders & Developers (JV) Jaipur
28.88 Crore
14.1.11 16.7.09 30.1.13 Final variation is under process for Administrative Approval in HQ..
11
NW
R/S
&C/T
/30 Const. of Type-IV &
V MS Qtrs in railway officer colony Jagatpura Jaipur.
Open tender
One packet system
- Yes NWR/S&C/CA/117 dtd. 13.7.2012
M/S MBL Infrastructure
27.25 Crore
7.11.13
26.7.2013 Work in progress
12
NW
R/S
&C/T
/1/R
O
B-5
3
Construction of ROB- 53-B on Biwani- Rohtak line.
Open tender
One packet system
- Yes Dy CE/C/IIII/JP/CA/242 dt. 11.9.2013
M/s Shree Goutam Construction Co. Ltrd.
4.75 Crore
14.5.14
28.5.13
Work in progress
13
NW
R/S
&C/T
/1/R
R
I Buildin
g.
Construction of RRI building at satroad & Bhiwani sattion yard.
Open tender
One packet system
-
Yes
Dy CE/C/IIII/JP/CA/241 dt. 13.8.2013
M/s Shree Shayam Engg.
1.93 Crore
17.5.14
1.6.13 Work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3
DY. CE/C/II-JP
1 JP-DO/ Doubling/8
Construction of FOB bet. DO-JP section
Open tender
- Single Packet System
29.11.06 2 M/s. Sanjeev Brothers Jaipur
1 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. Sanjeev Brothers Jaipur
130.02 15.4.08 14.2.07 15/04/08 Extended upto 15/10/2010
Clearance required from Vig.
2 DO-JP-FL/ Doubling/16
Welding of 52Kg. /60Kg. Rails
Open tender
- Single Packet System
31/07/07 1 M/s. ITC, Kanpur.
0 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. ITC, Kanpur. 341.22 18/02/09 20/06/09 18/02/09 Extended upto 30/04/2011
Physically completed.
3 T. No. DO-JP/ Doubling/23
Dismantling of existing BG track, laying & linking in Zone-III BAI (Excl.) to KWP (incl.) stn in DO-JP section
Open tender
- Single Packet System
19/12/08 3 M/s. P. C. Sharma, Noida
2 YES Dy.CE(C)-II/JP/CA/32 dt. 29/05/09
M/s. P. C. Sharma, Noida
187.06 9/9/2009 1/4/2009 9/9/2009 Extended upto 31/01/11
Final bill under process with SE/C/PW/JP
4 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/1 RR
Construction of minor bridges, wing/return walls , earthwork in formation ,construction including addition and altertation of station buildings, passanger platforms & shelters.FOB etc between Jaipur (incl) & Ringus (incl) stations of Jaipur -Ringus Section
Open tender
_ Single Packet System
18/01/11 Giriraj Civil Developers Pvt Ltrd. BorivaliBombay
YES NWR/S&C/CA/110 Dated 16/08/2011
Giriraj Civil Developers Pvt Ltrd. BorivaliBombay
2141 10/8/2012 07/04/2011 _ contract terminated final measurment in techinical check
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4
5 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/5 RR
Construction of Minor Bridges , Wing /Return walls.E/work in formation construction including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR
Open tender
_ Single Packet System
16/09/11 Modi Construction(JV) Jaipur
YES NWR/S&C/CA/116 Dated 27/03/2012
Modi Construction(JV) Jaipur
1724 26/04/2013
02.01.2012 Extended upto 31/10/13
Final bill under process with SE/C/W/JP
6 NWR/S&C/JP-SIKR -LHU
&SIKR-CUR/GC/T/ 01(geotech)
Staking out alignment , conducting geotechnical
investigation design of the sun/super structure of minor & major bridges , prepration of GAD got minor &Major bridges etc
Open tender
_ Single Packet System
20.12.11 M/S Surbhi Enterprises Jagatpura Jaipur.
YES NWR/S&C/CA/118 Dated 25/07/12
M/S Surbhi Enterprises Jagatpura Jaipur.
946 Lakhs 01.09.2012 1/8/2012 Extended upto 31/12/13
work in progress
7 TENDER NO. NWR/S&C/JP- SIKR/GC/T-3
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications
between Ringus Km. 189.00 to SIKAR Km 238.70 on Ringus - SIKAR section in connection with Jaipur-Ringus-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open tender
22.1.12 Single Packet System
24.2.12 7 M/s Rajsthan Mining Engineers Jaipur
NO M/s Rajsthan Mining Engineers Jaipur
4.66 crors 22.4.13 15/04/2012 6/4/2013 Workshort closed final bill passed
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
5
8 NWR/S&C/ROB/Design-Drg/T/1
Carrying out Geotechnical investigation and consultancy work for Road Over/Under Bridge (ROB/RUB) for Railway span including detail design (foundation, sub structure and super structure), preparation of GAD and working drawing as desired in scope of work of 3 ROBs on LC No.C-149 (at Phulera in Ringus – Phulera section), LC No.323/A (Jodhpur- Samdari- Barmer section), LC No.61-A (at Rewari in Rewari – Alwar section) and 2 RUBs on LC No.232 & 234 (in Jaipur – Phulera section).
Open tender
Single Packet System
17.02.12 6 C.S. Engineers & consulants Delhi 12
no NWR/S&C/CA/127 Dated 25/06/2013
19.30 lacs 25/09/12 extended up to 30/12/13
Work in proggress
9 NWR/S&C/JP/RUB-82&83/T-1]:
Construction of Road Under Bridge including providing road approaches, covering shed, retaing wall, pedestrian path way, height gauge, drainage arrangement, sump etc complete in lieu of level crossing No.- 82 & 83 in Jaipur - Sawai Madhopur Railway section.
Open tender
double Packet System
20/12/12 V.K.Sood Engineers& Contractor Panchkula
YES NWR/S&C/CA/127 Dated 25/06/13
V.K.Sood Engineers& Contractor Panchkula
15.36 Crores
10/4/2014 22/04/2013 Work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6
10 Tender No. NWR/S&C/RPC/ROB-149 C/T-01
Construction of 2 lane Road over bridge (3span) with RCC deck slab on composite &PSC girder super structure including pile foundation & RCC sub structure & related allied works, in lieu of Level crossing No.C-149 at Km 212/0 - 1 near Phulera in Rewari - Ringus - Phulera (RPC) section.
Open tender
Single Packet System
27/02/13 M/s Biharilal Meghani New Delhi
YES M/s Biharilal Meghani New Delhi
6.50 crores 29/04/2014 16/05/2013 Work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
7
Dy. CE/C/GC-JP
1 DY.CE /C/GC/ NWR/ 2011/T-3
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications
Open t
ender 16.3.11 Single
Packet system
21.4.11 08 01
M/s
CH
EVRO
N M
INERALS
Ashok K
um
ar
Bansal &
Associa
tes,
New
Delh
i
Not
aw
ard
ed t
o L
1
03 /NWR/Dy. CE/C-GC/JP /2011-12/JP-SIKR-CUR & SIKR-LHU dt. 23.09.2011.
M/s. Jai Mata Construction Co. House No. 14169, Stree No. 8A, Ganesh Nagar, Bhatinda
41354240.0
0
15.08.12 Ext. 31.8.13
17.08.2011 26.08.13
2 DY.CE /C/ GC/ NWR/ 2011/T-14
Construction of New Major Bridge of span 12 X 6.10 m (Km. 319/6-7) and strengthening of Bridge no. 165 (3x6.10 M at Km. 268/5-6) and PSC Slabs as super-structure including earth work in approaches and other ancillary works in Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu Gauge conversion Project.
Open t
ender 16.12.11 Single
Packet system
25.01.12 06 - - Yes 11/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 04.07.12
M/s Surabhi Maheshwar rao, C-58, Road No. 1, Film Nagar,Jublee Hills, Hyderabad
2,7
6,4
7,1
51.4
7
15.08.12 Ext. 31.10.13
30.3.2012.
3 DY.CE /C/ GC/ NWR/ 2011/T-18
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-II (Km. 267.50 to Km. 314.00) including Dundlod Mukundgarh, Nua & Jhunjhunu yards in connection with JP-SIKR-LHU & Sikar - Churu Gauge conversion project
Open t
ender 16.12.11 Single
Packet system
20.01.12 02 - - YES 16/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 27.09.12
M/s Bharwal Lal Bijarnia, Villgae- Raipur, Post- Prewari, Distt. Nagour.
5,1
1,1
6,6
65.7
7 06.03.13
Ext. 30.10.13
20.7.2012
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
8
4 DY.CE /C/ GC/ NWR/ 2011/T-19
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-III (Km. 314.00 to Km. 360.70) including Ratan Shahar, Chirawa, Surajgarh & Loharu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.
Open t
ender 16.12.11 Single
Packet system
18.01.12 05 - - YES 13/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 03.08.12.
M/s Laxyo Energy Pvt. Ltd., 113, Bakhatgarh Tower, 10/A, New Plasia, Indore (MP)
4,7
3,9
4,3
38.3
7
06.03.13 Ext 31.3.14
20.7.2012
5 DY.CE /C/ GC/ NWR/ 2011/T-17
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-I (Km. 237.50 to Km. 267.50) including Sikar & Nawalgarh yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.
Open t
ender 16.12.11 Single
Packet system
23.01.12 04 03 M/s Bhika
ram Dev
rath, VPO-
Dhiarla,
Distt.
Churu.
M/s Goel
Brothers
Rail Infra
PVT. Ltd.,
Bareilly.
Shri Nahar
Const. Co.,
Jodhpur.
L-4 12/NWR/Dy. CE/ C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 03.08.12
M/s Shupal Kumawat, Rly. Contractor, Village & Post.- Badhal, Distt.- Jaipur.
3,3
0,9
6,6
19.9
7
04.04.13 31.12.13
06.9.2012
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
9
6 Dy.CE/C/GC/2012/T-23
Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations including loading, unloading and and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open t
ender 05.03.12 Single
Packet system
09.04.12 04 - - Yes 14/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 16.08.12
M/s Hanuman Construction Company, Bhootra Niwas, new market Nokha.
5,3
6,4
8,9
55.9
3
19.06.13 Ext. 31.7.13
15.7.2012
31.7
.13
Work under closer.
7 Dy.CE/C/GC/2011/T-12R
Supplying and stacking 65mm gauge stone ballast machine
crushed (hard stone) conforming to RDSO specifications between 59.901 (L. C. 51) to Km. 90.46 (Churu Station) on Sikar – Churu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open t
ender 04.4.12 Single
Packet system
07.5.12 05 - - yes 17/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR &
SIKR-LHU dt. 03.10.12
M/s Kamakhaya Trading Co. House No. 32, Patel Nagar, Bhiwani.
31910760.0
0
23.01.13 Ext. 30.3.13
09.08.2012
Work
clo
se
d o
n 2
1.3
.13
Fin
al b
ill d
elay
fo
r w
ant
of
‘No
Du
e C
erti
fica
te
of
Min
ing
dep
t. f
rom
co
ntr
acto
r.
8 Dy.CE/C/GC/2012/T-26
Residual work of construction including addition and alteration of station buildings, Staff quarters, passenger platforms, platform surfacing, and all other ancillary works between Jhunjhunu (excl.)-Loharu (incl.) stations of Sikar-
Open t
ender 12.6.12 Single
Packet system
16.7.12 02 - - yes 18/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 22.11.12
M/s RSB Project Limited, RSB Plaza, SCO,30,31, Sector -16 Faridabad (Haryana)
78396906.6
4 10.3.13
Ext. 31.01.14
18.09.12
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
10
Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project
9 Dy.CE/C/GC/2012/T-9
Residual work of construction including addition and alteration of station buildings, Staff quarters, passenger platforms, platform surfacing, and all other ancillary works between Sikar(Incl.)-Jhunjhunu (incl.) stations of Sikar-
Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project
Open t
ender 14.6.12 Single
Packet system
17.7.12 01 - yes NWR /S&C/CA/119 dtd.20.11.12
M/s RSB Project Limited, RSB Plaza, SCO,,30.31, Sector -16 Faridabad (Haryana)
121313546.2
7
20.3.13 Ext. 31.3.14
25.09.12
10 Dy.CE/C/GC/2012/T-28
Residual earth work in bank, Cutting and lead bank utilising cut spoils for widening/construction of BG formation including side drains, trolley refuses, cess wall etc. and other ancillary works between Sikar(Incl.)-Loharu (Incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project.
Open t
ender 11.7.12 Single
Packet system
14.08.12 02 - - yes 19/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 21.12.12
M/s Bharwal Lal Bijarnia, Jaulsa Kua Road, Near Tagore B. Ed. College, Tegore Nagar, Kuchaman City, Distt. Nagour.
11921930.3
6 03.01.13
Ext. 30.9.13 21.09.2012
11 Dy.CE/C/GC/2012/T-29
Residual work for construction of minor bridges including dismantling of existing bridges, construction of return/wing walls, launching of already casted & transported RCC box and other ancillary works between Sikar(Incl.)-Loharu (Incl.) and
Open t
ender 11.7.12 Single
Packet system
14.8.12 01 - - yes 21/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 19.01.13
M/s Surabhi Maheshwar rao, C-58, Road No. 1, Film Nagar,Jublee Hills, Hyderabad 3
0179405.0
6 26.02.13
Ext. 31.08.13 03.10.12
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11
Sikar(Incl.)-Churu (Incl.) stations of Sikar- Loharu & Sikar – Churu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project.
12 Dy.CE/C/GC/2012/T-27
Providing in situ Glued joints of G-3 ( L) type as per RDSO drawings for 60 kg & 52 kg rails with all fittings etc. complete in Jaipur - Sikar -Loharu & Sikar - Churu section in connection with Jaipur - Sikar - Loharu & Sikar - Churu
Open t
ender 06.07.12 Single
Packet system
07.08.12 03 - - yes 22/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 22.02.13
M/s Creative Engineers, F-189, Road NO. 5, I. P. Industrial Area, Kota.
14121970.5
6 19.04.15 20.12.12
13 Dy. CE /C/ GC/ NWR / 2012/T-33
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Jhunjhunu station on Sikar - Loharu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open t
ender 09.11.12 Single
Packet system
14.12.12 05 - - yes 24/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 08.03.13
M/s Shree Shyam Engineering Company, Punia Colony, Churu
1,0
1,3
4,6
21.0
0 15.5.13 23.1.2013
15
.5.1
3
Fin
al b
ill d
elay
fo
r w
ant
of
‘No
Du
e
Cer
tifi
cate
of
Min
ing
dep
t. f
rom
con
trac
tor.
14 Dy. CE /C/ GC/NWR/ 2012/T-31
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Nawalgarh station on Sikar - Loharu section in connection with Jaipur- Sikar-Loharu and Sikar-Churu Gauge Conversion project
Open t
ender 09.11.12 Single
Packet system
11.12.12 05 - - Yes 23/NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 08.03.13
M/s Devendra Singh Contractor, 7, pratap nagar, Saket Colony, Rajgarh Raod, Hissar
21305400.0
0 28.7.13 03.02.2013
30
.6.1
3
Fin
al b
ill d
elay
fo
r w
ant
of
‘No
Du
e
Cer
tifi
cate
of
Min
ing
dep
t. f
rom
con
trac
tor.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
12
15 Dy. CE /C/ GC/NWR/ 2012/T-32
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Surajgarh station on Sikar - Loharu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open t
ender 09.11.12 Single
Packet system
12.12.12 03 - - Yes 24-A/ NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 08.03.13
M/s Hanuman Const. Co. Bhutra Niwas,New Market Nokha Distt
1,0
9,7
9,6
70.0
0.0
0 21.6.13 20.02.2013
12
.6.1
3
Fin
al b
ill d
elay
fo
r w
ant
of
‘No
Du
e
Cer
tifi
cate
of
Min
ing
dep
t. f
rom
con
trac
tor.
16 Dy. CE /C/ GC/NWR/ 2012/T-24R-1
Construction including Fabrication of FOBs and platform shelters in SIKAR-LOHARU section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project.
Open t
ender 10.12.12 Single
Packet system
11.01.13 06 - - Yes 28/ NWR/Dy. CE/C-GC/JP /2012-13/JP-SIKR-CUR & SIKR-LHU dt. 27.07.13
M/s Rishab Construction (Pvt.) Ltd. 53-54, Shopping Centre, Janata Colony, Jaipur
6,9
5,
21,8
26.1
7 07.10.13
Ext.31.12.13 05.04.13
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
13
CE/C/II-JP
Dy. CE/C/I-UDZ
1 T.NO.UDZ-
HMT/MB/
T/1
Construction of
Major bridges from
DNRP-HMT in
connection with
UDZ-HMT section
GC Project .
Open 19.11.10 Single 21.12.10 2 Yes NWR/S&C/
CA/111 dtd.
9.9.11
M/S Om Prakash
Goyal & Co.,
Neemach
1568
29.11.12
31.12.13
10.08.11 Work in
Progress
2 T.NO.UD
Z-
HMT/GC
/MB/T-2
Const., minor
bridges &
earthwork from
Km. 160/0 to
187/0 in
connection with
UDZ-HMT Section
GC Project
Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/
CA/109 dtd.
16.8.11
M/s Braham Prakash
ModiRavi Constn.Co.
(JV) , Jaipur
1212.6
21.09.12
27.6.13
31.03.14
30.04.11
Work in Pr
ogress
3 T.NO.UD
Z-
HMT/GC
/EW/T/3
Construction of
Minor bridges &
earthwork from
Km. 270/0 to
320/0 in
connection with
UDZ-HMT section
GC Project.
Open 08.12.10 Single 20.01.11 5 Yes NWR/S&C/
CA/112 dtd.
21.10.11
Amit-Mass (JV) ,
Alkapuri, VADODARA
1665.1
20.01.13 03.08.11 Contract
terminated
on
07.11.2012
4 T.NO.UD
Z-
HMT/GC
/EW/T/4
Construction of
Minor bridges &
earthwork form
Km. 207/0 to
250/0 in
connection with
UDZ-HMT section
GC Project .
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s Rahee-Triveni
(J/V), Kolkatta
3045.2
07.02.13
30.11.13
23.08.11 Work in
Progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
14
5 UDZ-
HMT/GC
/BLDG/T-
6-R
Provision of office
& residential
accommodation at
UDZ in connection
with UDZ-HMT
section GC Project
Open 29.6.12 Single 3.8.12 01 01 0 Yes Dyce/UDZ/C
A/15 dtd.
23.11.2012
M/S Aakrati Builders
& Associates
J.K.House, 121, ,
Fatehpura, Udaipur
199.54 09.05.13
05.09.13
28-02-14
18.9.12
Work in
Progress
6 T.NO.UDZ-
HMT/GC/
EW/T/11
Construction of
Minor bridges &
earthwork from
Km.187/0 to 207 in
connection with
UDZ-HMT section
GC Project
Open 17.07.12 Single 23.8.12 03 - - Yes NWR/S&C/
CA/1223
dtd.
23.01.2013
M/S M.G.
Contractors, Pvt.,
Ltd., Panchkula
1919.40 6.02.14 27.11.12 Work in
Progress
7 T.NO.UDZ-
HMT/GC/
EW/T/12
Construction of
Minor bridges &
earthwork from
Km. 250/0 to
270/0 in
connection with
UDZ-HMT section
GC Project
Open 17.07.12 Single 23.8.12 03 - - Yes NWR/S&C/
CA/ 123 dtd.
13.02.1013
M/S Ravi Infrabuild
Projects Pvt, Ltd.,
sector-11, Udaipur
3517.86 17.01.14 03.11.12 Work in
Progress
8 Tender
No. UDZ-
HMT/LHS/
T-14
Construction of
Limited Height
Sub-way in lieu of
Level crossings
(63Nos) in
Udaipur-
Himmatnagar
section
Open 27.10.12 Two bid
system
5.12.12 05 04 01 Yes NWR/S&C/
CA/ 126 dtd.
19.06.2013
M/S M.G.
Contractors, Pvt.,
Ltd., Panchkula
5652.54 30.04.15 In progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
15
DY. CE/C/DNRP
DY.CE/C/BNSW
- NIL -
1 Dy.CE/C
/UDZ/D
NRP-
RTM/FL
S/2011/
T/1
Carrying out final
location of survey
& ….other
preliminary
activities in
connection with
new BG line
between DNRP-
RTM via
Banswara
Open 1/6/11 &
30/6/11
(NIT & First
corrig.)
Single 1/7/11 10 Dy.CE/C/
UDZ/DNR
P-RTM
/FLS/201
1/T/1
M/s
S.M.Consultants,
Bhubneswar
4.99 Cr 12/11/12 28/11/11 14/11/12
30/08/13
Extended
doc.
Work in
progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
16
CE/C/III-JP
DY. CE/C/I-Aii
1 Aii/
Const/ Loco/
Mod/T/1
Const. &
fabrication of various sheds with or without tracks for EOT cranes of different capacity
and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds,
BG/MG tracks in c/with Modernisation of Loco Workshop at Ajmer.
Open 25.08.09 Single 28-10-09 08 Nos. M/s Era
Infra Engg. Ltd. Noida.
- No,
Tender awarded to 2nd lowest tenderer, after
Tech. evaluation of L-1.
NWR/S&C
/ CA/31 Dt. 17-06-10
M/s Bharat Span-
GPT (JV) 43 Industrial Area, Jhotwara, Jaipur
3829.48
Lakhs
22/04/201
206/11/201230/06/2013 & 31/12/2013
27-03-10 - Work is in
progress.
2 Aii/ Const/ C&W/ Mod.
/T/3/R1
Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity
and construction of offices, Toilets including laying
of BG tracks and dismantling of existing structures/sheds,
BG/MG tracks in c/with Modernisation of C&W Workshop at Ajmer.
Open 14.06.10 Single 7/7/2010 - - - Yes Under execution
M/s Prem Fabricators 301 Meera Manon Arcude, Near Krupa Petrol Pump, Parimal Garden, Ellis Bridge,
Ahmedabad.
1524.97 Lakhs
05/12/2012 & 31/12/2013
9/5/2011 - Work is in progress.
3 AII/BNGM-RAS/ NL/T/2
Construction of major bridge including earth work on the approaches
between BNGM (Excl.)-RAS
(incl.) section in c/with BNGM-RAS New B.G. Rail Line Project.
Open 03.11.10 Single 10.12.10 07 Nos. - - Yes Under execution
M/s SB-SHC-MCDPL (JV) C-10, Vaishali Nagar, Jaipur.
Rs. 1592.08 Lakhs
18/07/201231/12/2012 & 31/08/2013
23.07.2011 - Work is in progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
17
4 AII/BNGM-RAS/ NL/T/ 3(R)
Earthwork in bank/cutting and construction of minor bridges between Km.
0.00 to 10.50
Open 12.07.11 Single 03.08.11 07 Nos. - - Yes Under execution
M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar
Rs. 1060.43 Lakhs
30/10/2012, 31/03/2013, 31/07/201
3 & 31/10/201
3
10.11.2011 - Work is in progress.
5 AII/BNG
M-RAS/ NL/T/4
Earthwork in
bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS
( Km. 10.50 to 20.50) section in c/with
Bangurgram-RAS new BG Rail Link Project.
Open 16.12.10 Single 24.01.11 10 Nos. - - Yes Under
execution
M/s Jai Mata Di
Energy System (JV) VPO-Narodara, Tehsil - Laxmangarh Sikar (Raj.)
Rs.
1103.49 Lakhs
16/06/201
2, 31/12/2012, 31/05/2013 & 30/09/2013
29.06.2011 - Work is in
progress.
6 AII/BNGM-RAS/ NL/T/5
Earthwork in bank/cutting and construction of minor bridges including ancillary works
beween Bangurgram-RAS ( Km. 20.50 to 28.50) section in c/with Bangurgram-RAS
new BG Rail Link
Project.
Open 16.12.10 Single 24.01.11 08 Nos. - - Yes Under execution
M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar
Rs. 825.62 Lacs
16/06/2012, 31/12/2012, 30/06/2013 &
31/10/2013
04.07.2011 - Work is in progress.
7 AII/BNGM-RAS/ NL/T/8
Supplying and Stacking machine crushed stone track
Ballast in stacks as per Railways’ specifications between Km. 0.00 to 28.50 [Bangurgram to Ras] in
connection with
Bangurgram - Ras new rail line project.
Open 19.08.11 Single 27.09.11 4 Nos. - - Yes Under execution
M/s Rajesh Kumar Gupta, 54, Nehru Nagar, Kush Marg, Alwar(Raj.)
Rs. 406.50 Lacs
25/12/2012, 31/03/2013,
30/06/2013 & 30/09/2013
08.02.2012 - Work is in progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
18
8 AII/ BNGM-
RAS/NL/T/12
Construction of Road under Bridges & Road Over Bridges including earth
work & Road work on the
approaches & miscellaneous works in connection with Bangurgram-Ras New BG line project
Open 13.08.12 Single 21.09.12 6 Nos. - - Yes Under execution
M/s. Varaha Infra Ltd., Umesh Smriti, 6- Jalam Vilas Sceheme, Paota, B-Road,
Jodhpur (Raj.)
335944842.4
5
21/10/2013
23/11/2012 - Work is in progress.
9 AII/ BNGM-
RAS/NL/T/11 R2
Laying and linking of Broad gauge main line, loop lines including points
and crossings in
yards, spreading of ballast, tamping of track, transportation of P-way materials, construction of
station building & platform and other ancillary works between Bangurgram and Ras stations in connection with
Bangurgram-Ras
New Broad Gauge Line Project.
Open 05.10.12 Single 09.11.12 1 Nos. - - Yes Under execution
M/s. Bhanwar Lal Bijarnia, Village-Rajpura, Tehsil-Nawa, District-Nagaur (Raj.)
66749882.0
9
14/09/2013
- - Work to be commenced.
10 AII/
Const./DFCCIL/T/1-R
Construction of
staff Quarters including electric work, Under Ground Water Tank, Road work, Boundary Wall etc.
between Madar-Guriya Section in connection with
shifting of utilities for DFCCIL.
Open 11.10.12 Single 19.11.12 2 Nos. - - Yes Under
execution
M/s. RSB project
Limited, RSB Plaza, SCO 30-31, sector-16, Faridabad-121002
248670141.3
6
17/08/201
4
- - Work under
progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19
Dy. CE/C/II-Ajmer
1
T.No.AII/KVJ-
KRJD/I/ BG
Doubling/T/3
Earthwork in bank/cutting for formation between Keshavganj (incl.) – Swarupganj (Excl.) section in connection with Keshavganj– Swarupganj Patch Doubling Project.
Open
24
.09
.10
Single
01
.11
.10
14
No
s.
Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6 Jalam Vilas Scheme, Poata B. Road, Jodhpur
NIL Yes
NW
R/S
&C
/CA
/32
Dt. 2
1.0
7.1
1
M/S Varaha Infra Ltd., Umesh Smriti-6
Jalam Vilas Scheme, Poata B. Road,
Jodhpur `89
6.9
0 L
acs.
17.11.2011, 31.03.2012, 30.06.2012,30.11.2012, 31.12.2012,31.03.2013
& 30.05.2013
01
.02
.11
- Work Completed.
2
T.No.AII/KVJ-
KRJD/I/ BGD/ T/2R
Construction/Extension of Major/minor bridges including earthwork on the approaches between Keshavganj (incl.) – Swarupganj (Excl.) section with Railway’s design & drawing and construction of ORH at Abu Road in connection with Keshavganj-Swarupganj Patch Doubling Project.
Open
04
.02
.11
Single
03
.03
.11
04
No
s.
Ist Lowest M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17, Vijaya Building, Barakhamba Road, Connaught Place, New Delhi.
NIL Yes
NW
R/S
&C
/CA
/33
Dt. 3
0.0
8.1
1
M/s Tantia-YSCC-IV BPL (JV), 1304, 13th
Floor, 17, Vijaya Building, Barakhamba
Road, Connaught Place, New Delhi. `1
095
.38 L
acs.
20.02.2012, 30.06.2012,30.11.2012, 31.01.2013
& 28/02/2013
--
28.02.2013 Work Completed
3
T.No.AII/KVJ-
KRJD/I /BG
Doubling/T/6
Supplying and stacking 50mm machine crushed stone track ballast confirming to Railway specifications in stacks on cess along the track and in yards at various stations between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project
Open
04
.04
.20
11
Single
10
.05
.11
05
No
s.
Ist Lowest M/s Bhaniyana Construction, 28, Kanishka Resort,By Pass Road, PAL,Distt. Jodhpur(Raj.)
NIL Yes
Dy.C
E(C
)AII/K
VJ-S
RP
J/B
GD
/CA
/69 D
td. 1
6.1
1.2
01
1
Ist Lowest M/s Bhaniyana
Construction, 28, Kanishka Resort,By
Pass Road, PAL,Distt. Jodhpur(Raj.) `3
71
.12
Lac
s.
17.05.2012, 17.11.2012,31.03.2013,30.04.2013 & 15.06.13
--
- Work Completed
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
20
4
T.No.AII/KVJ-
KRJD/I/ BG
Doubling/T/8-R
Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project.
Open
27
.07
.11
Single
02
.09
.11
6 N
os.
Ist Lowest M/s Laxyo Energy Pvt. Ltd., 46/1, TIT Road, Ratlam (M.P.)
NIL Yes
Dy.C
E(C
)AII/K
VJ-S
RP
J/B
GD
/CA
/71 D
td. 0
5.1
2.2
01
1
Ist Lowest M/s Laxyo Energy Pvt. Ltd., 46/1,
TIT Road, Ratlam (M.P.)
`37
1.1
2 L
acs.
14.04.2012, 30.09.2012, 30.04.2013
& 31/10/2013
--
- Work under progress
5
T.No.AII/KVJ-
KRJD/I/ BG
Doubling/T/14-R
Addition, alteration and construction of S&T structures, Pass. Platform, Platform Shelters, station Building, staff Quarters, water Huts, toilets, Hand Pumps, FOBs, Level Crossing works, Km Post, Gradient Posts & Hectometer Posts etc. between Keshavganj – Swarupganj (both incl.) section and Officer Rest House at Aburoad Station in connection with Keshavganj– Swarupganj BG Patch Doubling Project.
Open
30
.07
.12
Single
03
.09
.12
02
No
s.
Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6 Jalam Vilas Scheme, Poata B. Road, Jodhpur
NIL Yes
NW
R/S
&C
/CA
/47
date
d 2
4/1
2/2
012
M/S Varaha Infra Ltd., Umesh Smriti-6
Jalam Vilas Scheme, Poata B. Road,
Jodhpur `89
8.8
6 L
acs.
14.06.2013 &
30.09.2013
23
.10
.20
12
- Work under progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
21
6 T.No.AII/
Const/ LHS/T/1
Construction of Limited Height Subway in lieu of existing LC No. 101 (Km 548/5-6), LC No. 102 (Km 550/7-8), LC No. 107 (Km 562/6-7), LC No. 109 (Km 568/9-10), LC No. 110 (Km 571/2-3) & LC No. 111 (Km 572/5-6) between stations Keshavganj-Swarupganj of Marwar-PalanPur Section in connection with elimination of level crossing gates.
Open
08
.08
.12
Single
19
.09
.12
2 N
os.
2nd Lowest M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).
NIL No
NW
R/S
&C
/CA
/50
date
d 2
1.0
2.2
013
M/s. Ravi Infrabuild Projects Pvt. Ltd.
Office 95, Hiran Magri Sector-11, Udaipur-
313002 (Raj.).
`11
22
.63 L
acs.
11.05.2013 &
10.12.2013
19
.12
.20
12
- Work under progress
7 T.No.AII/
Const./ LHS/T/2
Construction of Limited Height Subway in lieu of existing LC No. 58, 60, 61, 62, 64, 65, 66, 67, 68, 69, 71, 72 & 73(13 Nos) between stations Marwar to Rani of Marwar-Palanpur Section in connection with elimination of level crossing gates.
Open
21
.02
.20
13
Single
28
.03
.20
13
01
No
s.
1st Lowest M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).
NIL No -
M/s. Ravi Infrabuild Projects Pvt. Ltd.
Office 95, Hiran Magri Sector-11, Udaipur-
313002 (Raj.).
`17
90
497
92
.55
07.04.2014 - - Work yet to be
commenced
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
22
8
T.No.AII/GRI-
MJ/BGD/T/1
Earthwork in embankment for cutting & filling, Blanketing for bank, Addition, alteration and construction of S&T structures, Pass. Platform, Platform Shelters, station Building, staff Quarters, water Huts, toilets, Hand Pumps, FOBs, TMC Rest house etc. between Guriya–Marwar Jn. stations (both excl.) and Officer Rest House at Mawar Jn. Station in connection with Guriya-Marwar Jn. BG Patch Doubling Project.
Open 3
0.0
8.1
2
Single
16
.10
.12
07
No
s.
1st Lowest M/s. Braham Prakash Modi, 74 Sudarshanpura, Industrial Area, Baisgodam, Jaipur-06
NIL No
NW
R/S
&C
/CA
/51
date
d 1
4/0
3/2
013
M/s. Braham Prakash Modi, 74
Sudarshanpura, Industrial Area,
Baisgodam, Jaipur-06
`35
41
.71 L
acs.
09.03.2014
31
.12
.20
12
- Work under progress
9
T.No.. AII/GRI-
MJ/BGD/T/2
Construction of Important/Major Bridges including earthwork, blanketing on the approaches between stations Guriya to Marwar Junction with Railway’s/Contractor’s design & drawing in connection with Guriya-Marwar Junction BG Patch Doubling Project.
Open
21
.01
.20
13
Single
26
.02
.20
13
06
No
s.
1st Lowest M/s.PNC Infratech Ltd.-Jain Construction Company (JV) 761/30, Aklank House, Near Mal Godown, Tikam Ganj, Ajmer
NIL No -
M/s. PNC Infratech Ltd.-Jain Construction
Company (JV) 761/30, Aklank
House, Near Mal Godown, Tikam Ganj,
Ajmer `32
40
432
84
.89
28.01.2015 - - Work yet to be
commenced
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
23
10 T.No.AII/
Const./ FLS/T/1
Marking out of center line, taking levels including all details, Carrying out Geotech investigation, designing of foundation and sub – structures / super structure of Minor / Major bridges/LHS, preparation of land plans & proposal, Preparation of L-section & yard plans etc. & submitting detailed working drawings in connection with Bangurgram to Guriya & Marwar to Rani Doubling projects and Various shifting of utility works of DFCCIL & LHS works between Kishangarh & Palanpur stations.
Open
17
.09
.20
12
Single
09
.11
.20
12
03
No
s.
2nd Lowest M/s. S. M. Consultants, Plot No.-130, S.M. Tower, Mancheswar Industrial Estate, Rasulgarh, Bhubneshwar (Odisha)
M/s. BPC India,
Nataraj Bhawan,
P.O.Khamarchandi, P.S.
Haripal, Dist.-
Hooghly, West
Bengal
No -
M/s. S. M. Consultants, Plot No.-
130, S.M. Tower, Mancheswar
Industrial Estate, Rasulgarh,
Bhubneshwar (Odisha)
`18
33
829
3.9
7
06/07/2013 &
30/11/2013 - - Work under progress
11 T.No.AII/
Const/ FBW/T/1
Flash butt Welding of 60/52 Kg. New/SH,(72/90 UTS ) Rail joints by using mobile flash butt welding plant in connection with various sanctioned works of Ajmer unit of construction organization.
Open
11
.10
.20
12
Single
19
.11
.20
12
01
No
.
1st Lowest M/s. The India Thermit Corpn. Ltd., 84/22, Fazal Ganj, Kanpur-208012.
NIL No -
M/s. The India Thermit Corpn. Ltd., 84/22, Fazal Ganj,
Kanpur-208012
`69
90
480
0.0
0
18.03.2015 - - Work not yet cmmenced.
12
T.No.AII/Const./
DFCCIL/T/8
Construction of staff Quarters including electric work, Under Ground Water Tank, Road work, Boundary Wall etc. between Chandawal (incl.) – Nana (incl.) Section in connection with shifting of utilities for DFCCIL.
Open
11
.01
.20
13
Single
19
.02
.20
13
& 2
2/0
4/2
01
3
01
No
.
1st Lowest M/s. RSB project Limited, RSB Plaza, SCO 30-31, sector-16, Faridabad-121002
NIL No -
M/s. RSB project Limited, RSB Plaza, SCO 30-31, sector-
16, Faridabad-121002
`29
47
352
33
.22
19.11.2014 - - Work under progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
24
13
T.No.AII/Const.
/DFCCIL/T/9
Construction of staff Quarters including electric work, Under Ground Water Tank, Road work, Boundary Wall etc. between Nana (excl.) – Palanpur (excl.) Section in connection with shifting of utilities for DFCCIL.
Open
11
.01
.20
13
Single
19
.02
.20
13
& 2
2/0
4/2
01
3
01
No
.
1st Lowest M/s. RSB project Limited, RSB Plaza, SCO 30-31, sector-16, Faridabad-121002
NIL No -
M/s. RSB project Limited, RSB Plaza, SCO 30-31, sector-
16, Faridabad-121002
`18
71
122
04
.24
19.08.2014 - - Work under progress
14
T.No.AII/Const.
/DFCCIL/ T/7
Shifting of different utilities in connection with infringements in the DFCCIL alignment, by dismantling of service buildings, Over Head/ Underground water Tanks, diesel Shed, Cycle stand etc. & reconstruction of the same utilities, construction of Road, boundary wall, drains, septic tanks, pathways & extension of FOB's etc as per requirement on shifted locations between Madar-Palanpur stations.
Open
10
.01
.20
13
Single 1
9.0
2.2
013
& 2
1/0
5/2
01
3
01
No
.
1st Lowest M/s. RSB project Limited, RSB Plaza, SCO 30-31, sector-16, Faridabad-121002
NIL No -
M/s. RSB project Limited, RSB Plaza, SCO 30-31, sector-
16, Faridabad-121002
`30
77
083
56
.73
28/112014 - - Work under progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
25
Dy. CE/C/Jodhpur
1. JU/Const-
6/10-11 Const of ROB at L.C.
No. C-325 at (BME)
Open
tender
15.10.2010 Single 16.09.10 06 M/S Rachana
const. comp.
N/A L-1 Dy CE/C
/JU/34/2011-12
dt. 21.10.11
M/S Rachana const.
comp.
380.99 07.11.11
31.07.12
30.11.12
28.02.13
30.04.13
28.06.11 Work
completed on
30.4.13
After negotiation
Final variation is
under sanction
2. JUConst-/
09.R/2010-
11
MKN-BIDD E/Work in
cutting & filling
Const.of ROB instead
of LC etc.
Open
temder
21.02.11 Single 07.06.11 01 M/s Bhanwar Lal
Briainiya Vill.
Rajpura Distt.
NGO
- L-1 Dy.CE/C/
JU/37/ 2011-12
dtd. 23.01.12
M/s Bhanwar Lal
Briainiya
335.54 29.09.12
31.01.13
30.04.13
31.07.13
31.12.13
10.10.11 Work in
progress
-
3. TNo JU/
Const./T-
01/ 12-13
(ROB)
Accepted
on
10.09.12
Const. of ROB at LC
No. C-323-A (at
Barmer),
Open 05.07.12 Single 07.08.12 02 Parul
Construction
Co.,
Mehsana
M/s Vishnu
Prakash R
Pungalia,
Jodhpur.
L-1 Dy.CE/C/
JU/04/2012-13,
dtd. 08.01.13
Parul Construction Co.,
Mehsana
329.43 09.07.13
15.09.13
31.10.13
25.10.12 Work in
progress
4. T.No. JU/
CONST/
15/2011-
12
Accepted
on–
17.09.12
Work of remodeling of
JU yard including all
work related to P. way,
AT welding
Open 25.03.12 Single 26.04.12 04 Sh.Girdhari Ram
S/o Sh. Sajjan
Ram,
JODHPUR
M/s P.C.
Sharma, Noida
(U.P.)
L-1 Dy.CE/C/
JU/03/2012-13,
dtd. 13.12.12
Sh.Girdhari Ram S/o Sh.
Sajjan Ram,
JODHPUR
132.02 16.06.13
31.10.13
11.11.12 Work in
progress
5. T.No. JU/
Const/T-
02/ 2012-
13 (JU
Yard)
Accepted
on–
16.10.12
Work of remodeling of
JU yard incl all work
related to Civil works
Open 19.07.12 Single 22.08.12 03 M/s Kalu Ram
Contractor,
Jodhpur.
M/s Prathem
Builders,
Jodhpur Kera
Ram S/o Pusha
Ram, Jodhpur.
L-1 Dy.CE/C/
JU/05/2012-13,
dtd. 08.01.13
M/s Kalu Ram
Contractor, E-15, Shastri
Nagar, JU.
414.97 15.08.13
15.12.13
07.12.12 Work in
progress
6. T.No.JU/C
ONST./T-
07/2012-
13
(D.Shed)
- Residual work of
extension of Bay No.4
inside Diesel Shed
BGKT
Open
tender
30.10.2012 Single 30.11.12 05 M/s Jai Mata
De Energy
System,
VP. Narodara
(Laxman
garh), Sikar
(Raj)
- L-1 Dy.CE/C/
JU/09/2012-13/
D.Shed, dtd.
30.03.13
M/s Jai Mata De Energy
System,
VP. Narodara (Laxman
garh), Sikar (Raj)
166.97 10.05.13
31.08.13
30.11.13
30.01.13 Work in
progress
7. T.No.JU/
Const./T-
04/2012-
13/GAD
Carrying out
Geotechnical
investigation for ROB
on LC No.21 & LC
No.61
Open
tender
10.10.12 Single 08.11.12 04 M/s C.S.
Engineers &
Consultants,
Shakarpur,
DELHI – 110 092
1. M/s Strength
Engineering
Services Pvt.
Ltd., Jaipur
2.M/s
ARKITECHN
L-2 Dy.CE/C/
JU/...../2013-14,
dtd. ...............
M/s C.S. Engineers &
Consultants, Shakarpur,
DELHI – 110 092
18.87 28.04.13
30.11.13
07.02.13 Work in
progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
26
O Consultants
(India) Pvt.
Ltd., ,
Bhubaneswar
8. T.No.JU/C
ONST./T-
08 /2012-
13/GAD-
Preparation of GAD
and Soil Testing for
RUBs in various
sections of Jodhpur
division
Open
tender
07.12.12 Single 10.01.13 03 M/s Theme
Engineering
Services Pvt.
Ltd., B-24,
Jaipur
1. M/s
M.K. Soil
Testing
Laboratory,
Ahmedabad
2. M/s
Engineer's
Associates,
Ratanada,
Jodhpur
L-1 Dy.CE/C/
JU/10/2013-
14/GAD, dtd.
19.10.13.
M/s Theme
Engineering Services
Pvt. Ltd., Jaipur
20.19 06.07.13
30.11.13
15.04.13 Work in
progress
9. JU/Const./
T-15/2013-
14/ GAD
Staking out alignment,
detail Engg.
Construction survey in
c/w new line between
Thaiyat Hamira - Sanu
(58.50 Kms.)
Open
tender
19.04.13 Single Tender 2305.13 03 Nos. M/s Spage
Consultancy, Jodhpur.
1. M/s Metro
Survey Services
& Construction,
Jodhpur
2. M/s Theme
Engineering
Services Pvt.
Ltd., B-24,
Gokul Vatika,
Jawahar Circle,
Jaipur
L-3 NWR/S&C/CA/5
9, dated
18.11.2013
M/s Spage
Consultancy, Jodhpur. 90.68 05.03.14 10.09.13 Work in
progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
27
CE/C/IV-JP
Dy. CE/C/BKN
1 Const/B
KN/18/2009-10/RE-HSR/Std-II dated 18.02.2010
Const. of Station
biliding and other service buildimnngs etc. between Rewari ( excluiding ) to Hansi in c/with RE-HSR Std-II panel interlocking.
Open
tender
18.02.10 single 26.03.10 05 nos Tender
awarded to evaluated L1 tenderer.
Tender
awarded to evaluated L1 tenderer, hence further offer not discussed.
102-
NWR/Dy CE/C-II/BKN Dt 19.10.2010
M/S V.K.Const. Co.
2-D-37, Jawahar Nagar Sri Ganganagar
Rs 416.38
lakhs
15.05.11 15.06.10 15.03.13 Final variation in
process.
2 Const/ BKN/02(R)/ SDRA/ 2010-11
Dated 05.06.10
Construction of station building , passenger platforms, staff quarters , duty
huts for L-Xing, earthwork in embankment etc. in connection with Provision of B class station at Sudhrana .
Open tender
11.06.10 Single 14.07.10 09 nos Tender awarded to evaluated L1 tenderer.
Tender awarded to evaluated L1 tenderer, hence
further offer not discussed.
103/NWR/Dy CE/C-II/BKN Dt 13.12.2010
M/S Jitender Singh , VPO- Kakoda Distt Jhunjhnu
RS 366.52 lakhs
18.10.11 01.11.10 30.09.12 Pre stressing and launching of PSC slabs of Br. No. 11 is balance. Finishing work of 2
qtrs is in progress.
3 Const/BKN/04/2011-12/BKN-SDLP-RTGH-SRDR
Supplying and stacking 55000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
14.09.11 single 14.10.11 08 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
172-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S Jai Mata Const.Co. H.No.14169 Street no.8A Ganesh Nagar Bhatinda( Pb)
Rs 305.25 lakhs
25.05.12 10.01.12 31.12.13 47140 cum supplied.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
28
4 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR
Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
17.09.311 single 17.10.11 2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
173-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat
Rs 534.82 lakhs
01.06.12 05.01.12 31.03.14 Work is in progress.
5 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers
from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar
Open tender
20.01.12 single 22.02.12 2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
178-NWR/Dy CE/C-I/BKN Dt 18.08.2012
M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003
Rs 531.61 lakhs
25.12.12 24.05.12 31.12.13 Work is in progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
29
Gauge conversion project
6 Const/BKN/03/2010-11
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-03 ( Km.81.00 to 115.00 including Sri Karanpur & Keasri Singhpur station yard) on Suratgarh –Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project
Open tender
08.08.10 single 08.09.10 03 Nos. Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1 .
9-NWR/Dy CE/C-III/BKN Dt 09.03.2011.
M/S Bhanwar Lal Bijarnia Village-Rajpura Post-Parewadi Tehsil-Nawa Distt: Nagaur (Raj)
Rs 178.57lakhs
31.05.11 15.12.10 30.06.12 Final variation in process.
7 Const/BKN/12/2010-11/SGN
R-HMH-SURP
Construction, Strengthening/extension of existing Minor bridges and
placement of PSC slabs with RCC ballast retainers of span upto 6.10m including earthwork in approaches of bridges and other ancillary works in Diplana (excluding) to Suratpura (including) section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
09.10.10 single 10.11.10 04 nos Tender awarded to evaluated L-1 .
02 Nos (i) M/S Vikas Const. Co. Bhagina
Road Near Water Works Pilani (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh
132-NWR/Dy CE/C-II/BKN dt
07.03.12
M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar
Rs 165.50 lakhs
23.02.12 05.10.11 28.08.13 Final variation in process.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
30
8 Const/BKN/10/2010-11/SGNR-HMH-SURP
Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall etc, including supply of cement between Diplana (excluding) to Suratpura (including) to section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
09.10.10 single 10.11.10 06 nos Tender awarded to evaluated L-1 .
03 Nos (i) M/S Rajender Singh Contractor, 817, Sector-15A, Hisar (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh (iii) M/S Devender Singh Naveen (JV),7 Pratap Nagar , Saket Colony Rajgarh Road Hisar.
122-NWR/Dy CE/C-II/BKN dt 26.11.2011.
The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani
Rs 510.15 lakhs
23.03.12 26.07.11 30.06.13 Final bill under technical check.
9 Const/BKN/ 13/2010-11
Supply of 52 kg /90 UTS SKV welding portions to the Railways for welding of rail joints from km 20.500 to 138.00 between Sarupsar (including) to Sri Ganganagar (including) in connection with Sarupsar to Sri Ganganagar Gauge conversion project.
Open tender
20.01.10 single 29.01.12 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Agmt No17/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 28.02.2012
M/S India Thermit Corporation Ltd. 84/22, Fazal Ganj, Kanpur
Rs181.73 lakhs
29.01.12 28.08.11 31.08.13 Work in progress
10 Const/BKN/03/2011-12/SURP-HMH-SGNR Dt. 19.05.2011
Construction / modification of station building & structures i.e. S&T buildings, platforms, PF shelters , duty bunk and other ancillary works between Tehsil Bhadra ( excluding) to Sidhmukh (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project
Open tender
26.05.11 single 29.06.11 03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
126-NWR/Dy CE/C-II/BKN dated 11.01.12
M/S Agarwal Const Co. Dudhwa Khara , Churu
Rs 418.60 lakhs
10.10.12 11.11.11 15.09.13 Final bill is under technical check.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
31
11 Const/BKN/02/SURP-HMH-SGNR/11-12
Construction / modification of station building & structures i.e. S&T buildings, platforms, duty bunk and other ancillary works between Sidhmukh ( excluding) to Suratpura Jn. (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project
Open tender
26.05.11 single 29.06.11 05 nos Tender awarded to evaluated L-1 .
(i) M/S Ridhi Sidhi Construction Co. Sujangarh Road , Nokha , Bikaner ( Raj) (ii) M/S Sangam Construction Company C/O Nasar Latif S/O Abdul Khan Moh. Nardiyan Ward No.17, Rajgarh , Sadulpur ( Churu)
129-NWR/Dy CE/C-II/BKN Dt 02.02.12.
M/S Pyare Lal Dhaka Const. Co. Churu)
Rs 315.48 lakhs
04.11.12 23.11.11 15.09.13 Final bill is under technical check.
12 Const/BKN/09(R)/2011-12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.
Construction and modification of station buildings, platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in
connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
20.01.12 single 28.03.12 04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
177-NWR/Dy CE/C-II/BKN Dt 07.08.12.
M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)
Rs 647.31 lakhs
03.03.13 06.07.12 31.12.13 Work is in progress
13 Const/BKN/32(R)/2011-12/SURP-HMH-SGNR Dated 29.05.2012
Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 132.00 to 175.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open tender
01.06.12 single 09.07.12 2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
01-NWR/Dy CE/C/BKN/SURP-HMH Dt 12.09.2012
M/S Jai Mata Const. Co, 14169, Street no.8-A, Ganesh Nagar , Bathinda
Rs 726.00 lakhs
03.04.13 05.08.12 15.11.13 Work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
32
14 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012
Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project
Open tender
26.05.12 single 27.06.12 05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
20/NWR/Dy CE/C/BKN/2012-13/SRPR-SGNR Dated 19.10.2012
M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur
Rs137.94 lakhs
28.12.12 07.09.12 25.10.13 Work is in progress
15 Const/BKN/05/2012-13/SRPR-SGNR
Dismantling & reconstruction of parcel office, extension of waiting hall, construction of platform shelters, improvement of platform surfacing of Island platform and other ancillary works at Sri Gangsanagar in connection with Sarupsar -
Sriganganagar Gauge Conversion Project.
Open tender
08.08.12 single 08.08.12 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
21-NWR/Dy CE/C/BKN/SRPR-SGNR Dt 06.12.12
M/S V.K.Const Co, 2-D-37,Jawaharnagar Sri Ganganagar
Rs131.75 lakhs
06.05.13 26.10.12 31.12.13 Work is in progress
16 Const/BKN/33 (R)/2011-12/SURP-HMH-SGNR Dated 09.07.12
Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Paharsar halt, Hansiawas Halt, Anupshahar & any other suitable location between Km. 132.00 to 175.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open tender
09.07.12 single 13.08.12 04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
02-NWR/Dy CE/C/BKN/2012-13/SURP-HMH-SGNR Dt 20.11.2012
Devender Singh Contractor, 7 Pratap Nagar, Saket Colony, Rajgarh Road, Hisar
Rs 620.10 lakhs
11.06.13 17.10.12 11.06.13 Work completed.Final variation sanctioned. Final bill is to be passed after submission of Mining NOC by the conttractor.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
33
17 Const/BKN/01 (R)/2011-12/SURP-HMH-SGNR Dated 26.07.12
Supplying and stacking 41600 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Sidhmukh, Narwasi & Gogameri depots on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open tender
26.07.12 single 30.08.12 07 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
03-NWR/Dy CE/C/BKN/2012-13/SURP-HMH-SGNR Dt 11.12.2012
M/S R.K.Infrastructure , Near Sangam Chouraha, Sardarshahar Road, Ratangarh Distt Churu
Rs 399.36 lakhs
11.06.13 15.11.12 10.07.13 Work completed.Final variation is under preparation.
18 Const/HMH/09/2012-13/SURP-HMH-SGNR Dated 16.07.12
Construction/modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Diplana (excluding) to Tehsil Bhadra (including) section in connection with
Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
16.07.12 single 22.08.12 05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
NWR/S&C/CA/48 dated 22.01.2013
M/S Ramesh Kumar Bansal, 182, Vinoba Basti, Near Dhan Mandi Gate, Sri Ganganagar ( Raj)
Rs 1051.42 lakhs
03.08.13 27.10.12 15.11.13 Work is in progress. Contractor has applied for further DOC upto 14.05.2014, which is in process.
19 Const/BKN/03/2012-13/SRPR-SGNR
Dismantling & Construction of BG Washing line coach care complex,BG goods platform with approach road, electrical sub-station building,building extension of high level passenger platform, water hydrants on washable apron,drainage pipe line and other ancillary works at Sri Gangsanagar station yard in connection with Sarupsar -Sriganganagar Gauge Conversion Project.
Open tender
27.06.12 single 06.08.12 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
NWR/S&C/CA/45 dated 07.12.12.
M/S Pragati Construction Consultants, 28/12, East Punjabi Bagh, Main Ring Road, New Delhi -110026.
Rs 1009.05 lakhs
02.07.13 26.10.12 31.12.13 Work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
34
20 Const/BKN/04/2012-13/SRPR-SGNR
Construction of BG Sick line shed , Dismantling of MG sheds & MG goods PF at Sri Ganganagar, Foot Over bridge at Sri Ganganagar & Suratgarh station, and other ancillary works at Sriganganagr station yard in connection with Sarupsar-Sriganganagar Gauge Conversion Project
Open tender
27.06.12 single 06.08.12 01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
NWR/S&C/CA/44 dated 07.12.12.
M/S Pragati Construction Consultants, 28/12, East Punjabi Bagh, Main Ring Road, New Delhi -110026.
Rs 1266.63 lakhs
02.07.13 26.10.12 31.12.13 Work is in progress
21 Const/BKN/01/2012-13/SURP-DPLN-HMH-SGNR dated 08.08.12
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines, including points and crossings in yards, spreading of ballast tamping of track, transportation of P.Way materials and other ancillary
works in Zone-3 (Ch.88000 to 132000 including Gogameri, Tehsil Bhadra & Anupsahar station yard) on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
11.08.12 single 14.09.12 2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
06/NWR/Dy CE/C/BKN/2012-13/SURP-DPLN dated 20.02.2013
M/S Laxyo Energy Pvt. Ltd 46/1 TIT Road Ratlam (MP)
553.10 lakhs 08.11.13 15.12.12 08.11.13 Work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
35
22 Const/BKN/02/2012-13/SURP-DPLN-HMH-SGNR dated 08.08.12
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines, including points and crossings in yards, spreading of ballast tamping of track, transportation of P.Way materials and other ancillary works in Zone-4 (Ch.132000 to 175000 including Sidhmukh, Narwasi, Suratpura & Sadulpur By-pass station yard) on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
11.08.12 single 14.09.12 2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
05/NWR/Dy CE/C/BKN/2012-13/SURP-DPLN dated 08.02.2013
M/S Bhairav Construction Co, Sukh sagar , Arya Samaj Road, Gulab Bari < Kota ( Raj)
521.79 lakhs 08.11.13 17.11.12 08.11.13 Work is in progress
23 Const/BKN/04(R)/2012-13/SRPR-SGNR dt. 07.12.2012
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, Addition and alteration to station yards, insertion of fan shaped turnouts, shifting of existing turnouts, leading of P.way material and other miscellaneous works in Suratgarh Yard on Suratgarh -Sriganganagar section in connection with Sarupsar -Sriganganagar Gauge conversion project
Open tender
10.12.12 single 11.01.13 2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
22-NWR/Dy CE/C/BKN/SRPR-SGNR Dt15.05.13
M/S P.C. Sharma, A-87, Sector-49, Noida, Gautam Budh Nagar,UP
294.64 25.11.13 Work is in progress
25.11.13 Work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
36
24 Const/BKN/02 R/2012-13/RE-HSR STD III dated 03.01.2013
Dismantling of existing BG track, laying and linking of Broad Gauge main line, loop lines, including points and crossings in yards, spreading of ballast, tamping of track, addition and alteration to station yards, insertion of fan shaped turn outs, shifting of existing turn outs, leading of p.way material and other miscellaneous works at Manheru, Bawani Khera, Jitakheri & Hansi yards in connection with Standard –II R Interlocking works of Rewari – Hisar section
Open tender
06.01.13 single 08.02.13 2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
07/NWR/Dy CE/C/BKN/2012-13/SURP-DPLN dated 07.05.2013
M/S Ganpati Const Co. H.No. 430-B/1, Shanti Nagar, Bathinda -151001
231.13 11.11.13 15.03.13 31.03.14 Work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
37
DY. CE/C/HMH
Details of contracts concluded AS ON 02.12.2013 1 Const/
BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt. 04.10.10
Rebuilding, Construction, Strengthening/ extension of existing Minor bridges and upto 6.10m including earthwork in in Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
09.10.10 One packet system
10.11.10 4 1 3 Yes, L-1
Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt: - 05.02.11
M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar
425.56 04.02.12 24.11.11 04.02.12 31.12.13
Work is in progress.
2 Const/ BKN/ 22/2010-11 Dated 04.12.10
Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 44.00 to 88.00 on
Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project
Open Tender
11.12.10 One packet system
12.01.11 6 1 5 Yes, L-1
Const/ BKN/ 22/2010-11 Dated 07.05.11
M/s Jai Mata Const. Co. H.No. 14169 Street No. 8A, Bathinda
686.25 07.05.11 25.07.11 07.05.12 30.04.13
Work has been completed & final bill under process
3 Const/BKN/16/ 2010-11/ SGNR-HMH-SURP dt. 02.12.10
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, PF shelters / FOB, duty bunk and other ancillary works between Sri Ganganagar (excluding) to Sadul Sahar (including) section c/w SURP-HMH-SGNR GC project.
Open Tender
01.01.11 One packet system
12.01.11 6 1 5 Yes, L-1
Const/ BKN/16/ 2010-11/SGNR-HMH-SURP 07.05.11
M/s Surender Kumar Bansal, 59 P Block, Shri Ganga Nagar
547 17.05.12 27.05.11 30.9.12230.4.13
Final bill Passed
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
38
4 Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 19.02.11
Construction/Rebuilding of substructure of Bridge No. 40 (1 x 45.70 m Open Web Girder) at km 141.515 on Gang Canal, Bridge No. 2-A (2 x 61.0 m Open Web Girder) at km 2.347 on Ghaggar River, Bridge No. 14-B (2 x 61.0 m Open Web Girder) at km 18.345 on Ghaggar River and Bridge No. 21-A (1 x 76.20 m Open Web Girder) at km 28.638 on Indira Gandhi Main Canal including other ancillary works in c/w SURP-HMH-SGNR GC project.
Open Tender
24.02.11 One packet system
30.03.11 5 1 4 Yes, L-1
Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 15.07.11
M/s Jaimatadi Energy System, JV, VPO Narodara, Teh. Laxmangarh, Dist. Sikar
13.34 Cr. 14.07.12 01.02.12 14.7.13 31.10.13
Work is in progress.
5 Const/ BKN/ 16/2011-12/ SURP-HMH-SGNR Dated–16.08.2011
Construction of Foot Over Bridge and Platform Shelter at Hanumangarh Junction, Hanumangarh Town, Ellenabad and Nohar station in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.””
Open Tender
28.08.11 One packet system
28.09..11 2 1 1 Yes, L-1
Const/BKN/16/2011-12/SURP-HMH-SGNR Dated: - 16.12.2011
M/s Sajneev Brothers, C-10, Vaishali Nagar, Jaipur
302.87 Lakh 15.12.12 20.03.12 15.12.12 31.12.13
work is in progress
6 Const/BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 10.10.2011
Supplying and stacking 40000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Banwali, Fateh Singhwala, Budh Singhwala & between Km.201.00 to 202.00 Depot on Sri Ganganagar–Diplana section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.
Open Tender
14.10.11 One packet system
18.11.11 4 1 3 Yes, L-1
Const/ BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 14.12.2011
M/s Jai Mata Const. Co., House No. 14169, Street No. 8A, Ganesh Nagar, Bathinda
439.70 LAKH 13.06.12 17.12.11 31.07.1215.4.13
Work has been completed & final bill under process
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
39
7 Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 05.12.2011
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in section & at LC’s of Zone-1 (Ch. 138.000 to 204.130) on Sri Ganganagar-Hanumangarh section c/w SURP-HMH-SGNR GC project.
Open Tender
10.12.11 One packet system
11.01.12 3 1 2 Yes, L-1
Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 22.01.12
M/s RAVI INFRABUILD PROJECTS PVT. LTD., 95, Hiran Magri Sector-11, Udaipur
904.54 21.01.13 01.02.12 21.01.1331.10.13
Work is in progress
8 Const/HMH/20(R-2)/ SURP-HMH-SGNR/2010-11 Dated 22.12.2011
Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km.171.00 to 204.130 (including Hanumangarh)
Open Tender
25.12.11 One packet system
25.01.12 5 1 4 Yes, L-1
Const/HMH/20(R-2)/SURP-HMH-SGNR/2010-11 Dated 24.02.12
M/s Sura Const. Co., Sector-13, 1323/1133, Hisar.
687.05 23.10.12 25.02.12 23.10.1215.02.13
Work complited final bill under process.
9 Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12
Supplying and stacking 90000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications in various Depots i.e. near Hanumangarh Junction, Talwara Jhil, Ellenabad, Nohar, Diplana & any other location on Hanumangarh-Diplana section
Open Tender
13.01.12 One packet system
13.03.12 5 1 4 Yes, L-1
Const/HMH/25/SURP-HMH-SGNR/2011-12 Dated–09.05.12
(Sh. Devender Singh, 7, Pratap Nagar,Saket Colony, Rajgarh Road, Hisar).
874.71 08.05.13 01.06.12 08.05.13 Work complited final bill under process.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
40
10 Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,
Transportation, Assembling, Erection, Cambering, Riveting (with contractor’s rivets) painting and launching (as per contractor’s approved scheme) of open web through steel girders on Bridge No. 2-A (2 x 61.00m) at km. 2.347 on Ghaggar River, Bridge No. 14-B (2 x61.00m) at km. 18.345 on Ghaggar River and Bridge No. 21-A (1x 76.20m) at Km. 28.638 on Indira Gandhi Main Canal (Girder components will be supplied by Railway) with supplying & fixing of bearings and supplying, fabricating & fixing of galvanized steel channel sleepers along with matching fittings at site, on newly constructed top of pier/abutment to perfect level & alignment and other ancillary works in c/with SURP-HMH-SGNR GC project. (M/s Kiran Infra Engineers Ltd, Jaipur.
Open Tender
13.01.12 One packet system
30.7.12 4 1 3 Yes, L-1
Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,
M/S Kiran Infra engg.Lted B-141 Road no 9D VKI area JP
495.56 16.9.13 01.10.12 16.9.13 16.03.14
work is in progress
11 Const/HMH/05/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
Construction / modification of station buildings & structures i.e. RRI Building, officers / sub ordinate rest house, S&T buildings, Platforms, duty bunk and other ancillary works between Hanumangarh Jn (including) to Hanumangarh Town (including) section
Open Tender
11.07.12 One packet system
13.08.12 2 1 1 Yes, L-1
Const/HMH/05/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
M/S. V.K. Construction Co, 2-D-37, Jawahar Nagar, Sri Ganganagar
828.64 03.8.13 20.10.12 03.8.13 15.12.13
work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
41
12 Const/HMH/06/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Hanumangarh Town (excluding) to Talwara Jhil (including) section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.
Open Tender
11.07.12 One packet system
13.08.12 4 1 3 Yes, L-1
Const/HMH/06/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
M/S. V.K. Construction Co, 2-D-37, Jawahar Nagar, Sri Ganganagar
691.32 23.07.13 20.11.12 23.07.1331.1.14
work is in progress
13 Const/HMH/7/ 12-13/SURP-
HMH-SGNR Dated 09.7.2012,
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms,
duty bunk and other ancillary works between Talwara Jhil (excluding) to Khinaniyan (including) section in connection
Open Tender
11.7.12 One packet system
13.8.12 4 1 3 Yes, L-1
Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–
07.01.12
M/S P.S.Infra Build Pvt.Lited 15 jaat Dharmshala G.T.Road Fatehabad
779.3 12.7.13 4.11.12 12.7.13 28.02.13
work is in progress
14 Const/HMH8/ 12-13/SURP-HMH-SGNR Dated 09.7.2012,
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Khinaniyan (excluding) to Diplana (including) section in connection
Open Tender
11.7.12 One packet system
13.8.12 4 1 3 Yes, L-1
Tender No. Const/HMH/08/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
M/S Shree Shyam Engineering Co.29 Poonia Colony Churu(Raj)
779.3 12.7.13 29.10.12 12.7.13 31.12.13
work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
42
15 Const/HMH9/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-1 (Ch. 0.000 to 44.000 including Hanumangarh, Hanumangarh town, Sherekan, Talwara Jhil & Ellenabad station yard)
Open Tender
10.8.12 One packet system
14.9.12 2 1 1 Yes, L-1
Const/HMH/09/SURP-HMH-SGNR/2012-13 Dated – 05.08.2012
M/S Bhanwar Lal Bijarnia, village- Rajpura, Tehsil nawa. Distt.Nagaur (Raj)
709.89 30.10.13 22.11.12 30.10.1331.03.14
work is in progress
16 Const/HMH10/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials
and other ancillary works in Zone-2 (Ch. 44.000 to 88.000 including Khinaniyan, Nohar & Diplana station yard)
Open Tender
10.8.12 One packet system
14.9.12 2 1 1 Yes, L-1
Const/HMH10/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,
M/S. P.C.Sharma A-87-sector 49 NOIDA Distt. Gautum Budh Nagar
444.35 21.10.13 23.10.12 21.10.13 31.03.14
work is in progress
17 Const/HMH11/ 12-13/SURP-HMH-SGNR Dated 26.9.2012,
Construction of Road under Bridges in lieu of existing Level crossing No. 122 (km 140/5-6), 135 (km 152/4-5), 142 (km 160/11-12), 169 (km 193/2-3) and 178 ( km.201 / 12-13 ) on Sriganganagar - Hanumangarh section in connection with elimination of level crossing gates.
Open Tender
29.9.12 One packet system
30.10.12 6 1 5 Yes, L-1
Const/HMH11/ 12-13/SURP-HMH-SGNR Dated 26.9.2012,
M/S Gawar const. ltd. S.F-1, JMD Galleria. Sector 48. Sohna road. Gurgaon
688.4 6.4.13 17.11.12 06.04.13 15.11.13
work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
43
18 Const/HMH13/ 12-13/SURP-HMH-SGNR Dated 22.10.2012,
Construction of Road under Bridges in lieu of existing Level crossing No.33 at km. 47.420, 38 at km. 55.032, 40 at km. 67.620, 48 at km. 75.564, 53-1 at km.93.197, 56 at km. 99.028, 74 at km. 132.745 & 81 at km. 143. 380 on Hanumangarh-Sadulpur section in connection with elimination of level crossing gates.
Open Tender
25.10.12 One packet system
27.11.12 1 1 1 Yes, L-1
Const/HMH13/ 12-13/SURP-HMH-SGNR Dated 22.10.2012,
M/S Hari Singh & Co.,H.No.101, Model Town, Narwana, Distt- Jind 09416464971.
852.45 10.11.13 27.01.13 10.11.13 work is in progress
19 Const/HMH1213/12(R)/SURP-HMH-SGNR Dated 07.12.
12,
Transportation of BG PSC sleepers from various sleepers factories or any other places or yards including loading, unloading and stacking / spreading at site from KM 0.000 to 88.000 and Transportation of Rails from various places in North
Western Railway
Open Tender
11.01.13 One packet system
11.01.13 7 1 6 Yes, L-1
Const/HMH1213/12(R)/SURP-HMH-
SGNR Dated 07.12.12,
M/S Karanni const New lane BKN
243.9 4.8.13 20.3.13 04.08.13 03.03.14
Work is in Progress
20 Const/HMH/4
/ SURP-HMH-SGNR/
2013-14
dated 04.07.
13
Supplying and stacking 33000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming
to RDSO specifications in the section of Hanumangarh-Diplana in connection with Suratpura- Hanumangarh-SriGanganagar Gauge Conversion Project
Open Tender
9.7.13 One packet system
12.8.13 3 1 2 Yes, L-1
Const/HMH/4/ SURP-
HMH-SGNR/2013-
14 dated 04.07.13
M/s Sura const.Co., Sector no 13 H.No.1133/1323, Hissar
308.98 26.3.14 10.10.13 26.3.14 Work is in Progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
44
21 Const/HMH/02 (R) SURP-HMH-SGNR/2012-
13 dated
–19.11.2012
Flash Butt Welding of 52 Kg / 60 Kg rails at site / depot using Mobile Flash Butt Welding Plant between Sri Ganganagar station (including)- Hanumangarh Junction-Suratpura station (including) in connection Suratpura -Hanumangarh- Sri Ganganagar gauge conversion project
Open Tender
23.11.12 One packet system
26.12.12 2 1 1 Yes, L-1
Const/HMH/02 (R) SURP-HMH-SGNR/2012-13 dated –19.11.2012
M/s Speed Crafts Limited, Layak Bhawan Boring Canal Road Patna-800001
577.81 01.10.14 2.4.13 01.10.14 Work is in Progress
22 Const/HMH/02/SURP-HMH-SGNR/2013-14 dated 04.07.2013
Construction of Road under Bridges in lieu of 07 Nos. of Level Crossing Gates on Hanumangarh - Suratpura section in connection with elimination of level crossing gates
Open Tender
09.07.13 One packet system
12.08.13 2 1 1 Yes, L-1
Const/HMH/02/SURP-HMH-SGNR/2013-14 dated 04.07.2013
M/s Mohla Const. Co., 476,Sector 15-A Hisar
730.558 25.09.14 - 25.09.14 Work awared on 26.11.13
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
45
CE/C/HQ-JP
Dy. CE/C/DO
1
DO
/GG
C/N
L/8
-
Construction of minor bridges from Chainage 00.00 to
30000 Between Dausa and Lalsot in connection with DO-GGC new BG Line
Open t
ender
Single Packet system
07/1
2/2
005
Yes NWR/S&C/CA/78 dated
27.06.06
M/s Jain construction
Co.(JV) Ajmer
6.33 crore 20/05/07 Further
extension
granted upto
31/12/2007
04/04/06 Contract terminated
.
Final variation and risk & cost statement has
been process for approval .
2
DO
/GG
C/N
L/9
Construction of BG
formation from
Chainage 1150 to 15000 between Dausa Kala-Shekhpura in connection with
DO-GGC new BG line project.
Open t
ender
Single
Packet
system
04/0
1/2
006
Yes NWR/S&C
/CA/81dat
ed 06.09..06
M/s Kewai
Construction (JV)
Jodhpur
6.45 crore 26/09/07
Further
extension granted up
to 30/11/201
1
12/07/06 - contract
terminate on
24/11/12. Final measurements
have been recorded but not
signed by
contractor
3
DO
/GG
C/N
L/1
0
Construction of BG formation from Chainage 15000 to
28000 between Dausa and Lalsot in connection with
DO-GGC new BG line project.
Open t
ender
Single Packet system
16/0
1/2
006
Yes NWR/S&C/CA/79 dated
30.06.06
M/s Parma Ram Bhakar Jodhpur.
6.39 crore 17/07/07 extended
upto
30/11/2011
11/05/06 - Contract terminate on
24/11/12. Final
measurements have been
recorded but not
signed by contractor
4
DO
/GG
C/N
L/1
4
Construction of Major Bridges with 1200mm dia cast in situ board piles & PSC girder superstructure of
18.30 M between DO-GGC in c/with DO –GGC NLBG Project
Open t
ender
03/1
0/2
007
Single Packet system
14/1
1/2
007
Yes NWR/S&C/CA/94 dated
18/02/2008
M/s Atlanta-ARSS
(JV) Bhubaneshwar
(Orissa).
41.63 crore
16/09/09 Extended
upto 31/10/201
2
20/02/08 - work completed. Final bill under
process.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
46
5
DO
/GG
C/N
L/1
5
Construction of Minor Bridges from chainage 30000.00 to 38500.00 & Construction of BG
Formation from
chainage 28000.00 to 38500.00 between Dausa and Lalsot in connection with DO-GGC New BG line Project
Open t
ender
03/1
0/2
007
Single Packet system
14/1
1/2
007
3 Yes Dy. CE/C/I/JP/CA/16 dated
29/02/20
08
M/s. ARSS Infrastructure
Projects Limited, Bhubaneshwar
(Orissa).
5.31Crores 09/06/09 Extended
upto 31/08/201
1
24/01/08 - Work completed. Final bill under
process.
6
DO
/GG
C/N
L/1
8
Construction of Broad Gauge Formation & Minor Bridges from
Chainage 41000.00 to
45000.00 between Dausa and Lalsot in connection with Dausa- Gangapur City New Broad
Gauge line project.
Open t
ender
Single packet system
14/1
1/2
007
Yes NWR/S&C/CA/97 dated
03/03/20
08
M/s Atlanta-ARSS (JV) Bhubneshwar
(Orissa)
17.95 Crore
30/07/09 extended
upto 30/06/201
3
14/03/0/8 - Work in progress
7
DO
/GG
C/N
L/2
1
Construction of BG formation and Minor Bridge from chanaige 45000 to
60000 bet. Lalsot and Gangapur City in connection with
DO-GGC New B G line Project
Open t
ender
24/0
9/2
007
Single Packet system
02/1
1/2
007
3 Yes NWR/S&C/CA/95 dated
18/02/20
08
M/s. ARSS Infrastructure
Projects Limited, Bhubaneshwar
8.41 Crores
20/03/09 Extended
upto 31/08/201
3. Further extension
under
process
15/03/08 - Work in progress
8
DO
/GG
C/N
L/2
2
Construction of BG formation and Minor Bridge from chanaige 60000to 75000 bet. Lalsot and Gangapur City in connection with
DO-GGC New B G line Project
Open t
ender
24/0
9/2
007
Single Packet system
02/1
1/2
007
3 Yes Dy. CE/C/I/JP/CA/17 dated
29/02/2008
M/s. ARSS Infrastructure
Projects Limited, Bhubaneshwar
6.71 Crores
10/03/09 Extended
upto 30/06/201
4
10/03/08 - work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
47
9
DO
/GG
C/N
L/2
3
Construction of BG formation and Minor Bridge from chanaige 75000 to 90000 bet. Lalsot
and Gangapur City
in connection with DO-GGC New B G line Project
Open t
ender
24/0
9/2
007
Single Packet system
02/1
1/2
007
3 Yes NWR/S&C/CA/96 dated
18/02/2008
M/s. ARSS Infrastructure
Projects Limited, Bhubaneshwar
8.56 Crores
20/03/09 Extended
upto 31/03/201
4
15/03/08 -
work in progress.
10
DO
/GG
C/N
L/8
(R&
C)
Construction of Minor Bridges from
Chainage 00.00 to 30000.00 between Dausa and Lalsot in connection with Dausa Gangapur city new Broad
gauge line project.
Open t
ender
17/0
1/2
008
Single packet
system
20/0
2/2
008
1 Yes Dy. CE/C//DO
/CA/20 Dated23/06/2008
M/s Kewai Construction Co.
(J/V), Jodhpur
5.98 Crore 01/01/09 Extended
upto 31/08/201
2
28/08/08 - Work has been terminate on
12/07/12. Final bill under process
11
JP/C
/W/4
8RR/R
OB
Dausa
Construction of Road Over Bridge across the Railway track in Dausa
Yard at Level Crossing No. 181-B at Km. 179/10-11 on Jaipur Bandikui section.
Open t
ender
16/1
2/2
007
Single packet system
18/0
1/2
008
1 - Yes NWR/S&C/CA/94 dated
18/02/20
08.
M/s Bharat Spun Pipe &
Construction Co., Jaipur
3.82 Crore 15/07/09 Extended
upto 15/11/201
2
25/04/2009-
- Final variation has been process for approval of
HQ on
07/09/2013
12
DO
/GG
C/N
L/2
9
Construction of platforms, earthwork in platform in
connection with Dausa-
Gangapurcity new BG line project.
Open t
ender
27/0
1/2
009
Single packet system
02/0
3/2
009
9 - - Yes Dy.CE/C/DO/CA/
35 dated:
15 /10/2009
M/s Bharat- Kamal (J/V),
Jaipur
5.47 crore 04/08/10 Extended
upto 31/12/13
07/08/2009
- work in progress.
13
DO
/GG
C/N
L/3
6
Construction of broad gauge formation & muior
bridges from Chainage 90000 to 92700 between Lalsot and Gangapurcity new Broad gauge line
project.
Open t
ender
22/1
1/2
009
Single packet system
28/1
2/2
009
2 - - yes Dy. CE/C/DO/
CA/43
dated 07/04/20
10
M/s Mohan Singh Jat, Gangapurcity
1.50 crore 05/12/2010 Extended
upto
6/12/11.
07/04/2010
- Work held up. Contractor has filed suit in the
court. 7 days notice has been
issued under clause 62 of GCC
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
48
14
DO
/GG
C/N
L/3
1
Construction of ROBs across Railway track at chainage 37034,83925 &
37925 and
drainage over pass at chainage 36960 & 37520 between salempura to Udaikalan station inconnection with Dausa-
Gangapurcity new BG line project
Open t
ender
Single packet system
16/0
2/2
010
11 - - Yes NWR/S&C/CA/105 dated
22/11/2010
M/s Shree Ram Kripa
Construction Jaipur
13.44 Crore
29/02/2012.
Extended up to
31/03/201
4
- - Work in progress
15
DO
/GG
C/N
L/3
2
Construction of 150unit type II, 7 units type-III staff
quarters & IOW office and other
ancillary works the water supply, sewerage, drinakge, roads, parking, sanitary
and provision of electrical// communication conduits & metal boxes for NWR residential colony at various stations
between Dausa- Gangapurcity new
BG line project.
Open t
ender
Single packet system
05/0
7/2
01
02 - - Yes NWR/S&C/CA/107 dated
28/03/2011
M/s L.N. Agrawal-MCD Pvt. Ltd., (J/V) Jaipur
15.65 Crore
31/03/2012.
Extended
upto 31/12/13.
- - Work in progress.
16
DO
/GG
C/N
L/3
0
Construction of single line 13
standard straight alignment tunnel in soil and rock including cut and cover portion between chainage 38/720 to 40/840
including side drain and other approaches of tunnel between
Didwana- Lalsot Railway station in connection with
Dausa-Gangapurcity new BG line project.
Open t
ender
Single packet
system
27/0
7/2
009
12 - - Yes NWR/S&C/CA/106
dated 29/12/10
M/s Valecha-Transtonelstroey
(J/V) Mumbai
53.02 Crore
27/09/2012.
Extended upto
30/09/2014.
- - Work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
49
17
DO
/GG
C/N
L/2
6
DO/GGC/NL/26- Supplying and stacking 50mm gauge machine crushed stone
track ballast in
stacks as per Railway’s specification between Km. 1.00 to 41.00 (Dausa-Lalsot) section in connection with
Dausa- Gangapurcity new BG line project.
Open t
ender
Single packet system
07/0
1/2
011
6 Yes Dy.CE/C/DO/CA/54
dated 22/07/11
M/s R.K. Infra (J/V), Jaipur
7.74 Crore 05/04/2012
Extended upto
31/12/13
Work in progress
18
DO
/GG
C/N
L/2
8
Construction of Broad gauge
formation in cutting,
construction of rail side drain, catch water drain & slope protection work from
chainage 36000 to 38500 between Dausa and Lalsot in connection with Dausa- Gangapurcity new BG line project
Open t
ender
15/0
3/2
011
Single packet
system
21/0
4/2
011
3 - - Yes Dy.CE/C/
DO/CA/57 dated
30/11/2011
M/s Jagdish Prasad Agrawal,
Alwar
6.03 Crore 26/04/12 Extended
upto 30/12/201
3
17/10/11 work held up 7 days notice
issued.
19
DO
/GG
C/N
L/4
0
Laying and linking of BG track and
transportation of P.Way material, PSC sleepers etc
between Dausa- Deedwana section in connection with Dausa- Gangapurcity new BG line project.
Open t
ender
28/0
3/2
011
Single packet
system
18/0
5/2
011
6 - - Yes Dy.CE/C/DO/CA/56
dated 18/10/11
M/s Goel Brothers Rail Infra Pvt.
Ltd., Bareilly.
5.66 Crore 01/08/2012.
Extended upto
31/03/201
4
13/09/11 Work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
50
20
DO
/GG
C/N
L/4
3
Construction of duty bunk miscellaneous structures and road work etc.
between Dausa
Gangapurcity section in connection with Dausa Gangapurcity new BG line project.
Open Tender
21/0
5/2
011
Single packet system
27/0
6/2
011
4 - - Yes - M/s Bharat –Kamal (J/V),
Udaipur
5.31 Crore 18/10/12 - - Contract proposed to be
closed vide letter dated
19/03/2012
21
DO
/GG
C/N
L/3
9RR
Construction of station buildings, signaling structures and miscellaneous structures etc. at
various stations between Dausa
(excl.) to Gangapurcity (excl.) in connection with Dausa
Gangapurcity new BG line project.
Open T
ender
28/0
6/2
011
Single packet system
05/0
8/2
011
3 - - Yes NWR/S&C/CA/115 dated
21/03/2012
M/s Bharat-Kamal (J/V), Udaipur
8.25 Crore 28/02/13. Extended
upto 31/03/201
4.
- - work in progress
22
DO
/GG
C/N
L/9
(R&
C)
Construction of Broad Gauge Formation from chainage 1150.00
to 15000.00 between Dausa Kala and
Shekhpura Villages in connection with
Dausa-Gangapur City New Broad Gauge line Project(Risk & Cost tender).
Open t
ender
25/1
1/2
011
Single packet system
28/1
2/2
011
7 - - Yes Dy.CE/C/DO/CA/58
dated 21/02/20
112
M/s Jai Salasar Balaji
Construction Co. (J/V) Jaipur
4.60 04/05/12 Extended
upto 04/09/201
2
21/01/12 - Work terminate on 09/07/12.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2013
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
51
For CAO/C/JP
23
DO
/GG
C/N
L/1
0 (
R&
C)
Construction of Broad Gauge Formation from chainage 15000.00 to
28000.00 between
Dausa and Lalsot in connection with Dausa-Gangapur City New Broad Gauge line Project(Risk & Cost tender).
Open t
ender
25/1
1/2
011
Single packet system
28/1
2/2
011
7 - - Yes Dy.CE/C/DO/CA/59
dated 21/02/20
112
M/s Jai Salasar Balaji
Construction Co. (J/V) Jaipur
2.95 04/05/12 Extended
upto 04/09/201
2
21/01/12 - work terminated on 09/07/12
24
DO
/GG
C/N
L/
44RR
Welding of rail joints through flash butt process between Dausa-
Gangapurcity section O
pen t
ender
07/0
6/2
012 single
packet system
12/0
7/2
012 1 - - yes Dy.CE/C/
DO/CA/71 dated
19/07/20
13
M/s The India Thermit
Corporation Ltd., Kanpur
4.66 crore 18/02/2014
- Agreement has been executed.
25
DO
/GG
C/N
L/9
(R&
C)R
Construction of broad gauge formation from chainage 1150 to 15000 in connection with
Dausa Gangapurcity new line project (Risk & Cost tender).
Open t
ender
Single packet system
11/0
1/2
013
2
- - Yes Dy.CE/C/DO/CA/67
dated 16/04/13
M/s Meenesh Contractor &
Developers Pvt. Ltd., Jaipur
5.47 Crore 05/07/2013.
Extended upto
31/10/2013 Further
extension under
process
08/04/2013
- work in progress
26
DO
/GG
C/N
L/1
0(R
&C)
R
Construction of broad gauge
formation from
chainage 15000 to 28000 in connection with Dausa Gangapurcity new
line project(Risk & cost tender).
Open t
ender
Single packet
system
11/0
1/2
013
2
- - Yes Dy.CE/C/DO/CA/68
dated
16/04/13
M/s MCD Pvt. Ltd., & Aastha
Construction
Co.(JV), Jaipur
3.30 Crore 05/07/13 Extended
upto
31/10/2013. Further extension
under process
08/04/2013