CE3350 GEOTECHNICAL ENGINEERING

K. Rajagopal

Professor [email protected]

Ext # 4263

Page 2: CE3350 - Introduction 1

Construction of Sikkim airport

Page 3: CE3350 - Introduction 1

Construction of airport at Gangtok, Sikkim by Ms/ Maccaferri India

Page 4: CE3350 - Introduction 1

Construction of 33 m high embankment at Shillong bypass Road

Page 5: CE3350 - Introduction 1

Uttarakhand disaster – land slip/land slide

Page 6: CE3350 - Introduction 1

Uttarakhand disaster - 2013

Page 7: CE3350 - Introduction 1

Uttarakhand – land slide

Page 8: CE3350 - Introduction 1

Typical land slide – failure of road communication

Page 9: CE3350 - Introduction 1

Is it nature’s wrath? or inappropriate management?? could it have been prevented ??

Page 10: CE3350 - Introduction 1

Big Temple – Thanjavur > 1000 years old

Page 11: CE3350 - Introduction 1

Big Temple – Thanjavur > 1000 years old

Page 12: CE3350 - Introduction 1

Ajanta Caves

Page 13: CE3350 - Introduction 1

Ajanta Caves

Page 14: CE3350 - Introduction 1

Ajanta Caves

Page 15: CE3350 - Introduction 1

Machu Pichu, Peru

Page 16: CE3350 - Introduction 1

Series of terraces to reach to the top Terraces served to stabilise the hill slopes, space for agriculture, townships, obstruct the enemy

Page 17: CE3350 - Introduction 1

Apartment building in Kakinada – suddenly sunk into the ground

Page 18: CE3350 - Introduction 1

Taj Mahal, Agra – one of the most visited places in the World

Page 19: CE3350 - Introduction 1

Taj Mahal, sitting strong on the banks of river Yamuna in spite of severe erosion and earthquakes. Inclination of minarets has not changed since its construction in the year 1600’s

Page 20: CE3350 - Introduction 1

Brigade Holiday Inn, OMR, Chennai

Page 21: CE3350 - Introduction 1

SDS-11th dec-11 + SDC 1st jan-12

G.

UB

LB

Part-i Part-ii Part-iii Part-iv

0 1

1 3 24 30 31 14/15 7

5th step 4th step 3rdstep 2nd step

2

1

S

M.

3

BOH

BOH

Meeting Room

GYM, Health Center Lounge All day Dining

Business Center Foyer

1

3

5

8

4

T

7

6

9

9 12

8

14

11

10

13

T 24 30 14/15

7

5

8

4

7

6

9

BRIGADE HOLIDAY Inn – CHENNAI

Guest Room Level-1

Guest Room Level-3

Guest Room Level-2

Guest Room Level-4

Guest Room Level-6

5 4

7 3

31

S

3 6 2

Guest Room Level-5

Swimming pool

1st.step

Ramp

Page 22: CE3350 - Introduction 1

View of excavated surface on day of site visit (29th October 2011)

Page 23: CE3350 - Introduction 1

Close-up view of excavation – notice the secant piles on left side – on right side hollow steel pipes and 13m long soil nails driven to stabilize excavation

Page 24: CE3350 - Introduction 1

Sand bags dumped to prevent flow of soil from ground on right side excavation

Page 25: CE3350 - Introduction 1

Support of deep excavation using pre-stressed grouted anchors at Perambur Chennai

Page 26: CE3350 - Introduction 1

Ghat road at Kanakadurga Temple, Vijayawada

Objectives • Widen approach road • Create parking space at

the top of the hill

Page 27: CE3350 - Introduction 1

View of 2-tier Wall from Krishna River

Page 28: CE3350 - Introduction 1

Excavation for the 4-tier wall

Page 29: CE3350 - Introduction 1

ALIGNMENT OF TIER 1 FOR 4 TIER WALL

Page 30: CE3350 - Introduction 1

Top view of the completed 4-tier wall -

Page 31: CE3350 - Introduction 1

Additional Parking space gained at the top of the hill

Page 32: CE3350 - Introduction 1

Kansai International Airport

World’s first airport fully constructed on an artificial island away from land

Page 33: CE3350 - Introduction 1

•Air port is three miles (5 km) off the coast of Japan in Osaka bay

•Area of artificial island 1,275 acres (approximately 5.1x106 sq. m.) almost double the size of IITM campus

•Depth of water is 60 feet (20 meters)

Page 34: CE3350 - Introduction 1

•Seven years of construction time

•9.2 billon dollar budget (1 billion = 1,000 million)

•World’s largest man-made island and the longest building and bridge of its kind in the most massive public works project of the 20th century.

Page 35: CE3350 - Introduction 1

Cross-sectional view of sea wall

Overall view of the sea wall

Page 36: CE3350 - Introduction 1

CONSTRUCTION PROCESS Three main stages of the island construction Remediation (strengthening) of the seabed, Placement of a seawall, Fill to construct the island

While the fill is placed, airport buildings started coming up.

Page 37: CE3350 - Introduction 1
Page 38: CE3350 - Introduction 1

Barge bringing soil all the way from China !!!

Page 39: CE3350 - Introduction 1

Pre-consolidation Methods

Sand drains Pre-fabricated vertical drains Vacuum assisted pre-consolidation

Page 40: CE3350 - Introduction 1

Sand Drains

surcharge fill

sand columns

Page 41: CE3350 - Introduction 1

HPCL Visakhapatnam – failure of road embankment

Page 42: CE3350 - Introduction 1
Page 43: CE3350 - Introduction 1
Page 44: CE3350 - Introduction 1

Mangalore Refineries and Petroleum Limited Complex

Page 45: CE3350 - Introduction 1

Factory buildings on top of the slope

Page 46: CE3350 - Introduction 1

Entire height of slope stabilised using soil nails

Page 47: CE3350 - Introduction 1

Construction of an approach road to an RoB

Page 48: CE3350 - Introduction 1

Zerosite containment landfill pond at Hindustan Zinc, Vizag

Page 49: CE3350 - Introduction 1

Completed Pond in Service

Page 50: CE3350 - Introduction 1
Page 51: CE3350 - Introduction 1

Failure of a road embankment due to deep seated rotation

Page 52: CE3350 - Introduction 1

Bandra Worli Sea Link, Mumbai

What are the problems to be overcome?

Page 53: CE3350 - Introduction 1

Close-up view of the railway track

Page 54: CE3350 - Introduction 1

Cross-section of an embankment with a view of the soil

Page 55: CE3350 - Introduction 1

A view of the railway embankment from the ground level

Page 56: CE3350 - Introduction 1

First sign of distress – notice the tilting of the mile post

Page 57: CE3350 - Introduction 1

Tunnel below a railway track ???? – formed during rainy season

Page 58: CE3350 - Introduction 1