1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, Berlin

Transcript of CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future...

Page 1: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

1

CDM und JI

Current status and future strategies

Franzjosef Schafhausen

Federal Ministry for the Environment, Nature

Conservation and Nuclear Safety, Berlin

Page 2: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

2

Targets and International Data

on Greenhouse Gas Emissions

Page 3: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

3

Kyoto Targets

plus 10%Iceland

plus 8 %Australia

plus 1%Norway

plus/minus 0 %New Zealand

minus 5 %Croatia

minus 6 %Japan, Canada, Poland, Hungaria

minus 7 %USA

minus 8 %Belgium, Bulgaria, Denmark, Germany, Estonia,

European Union, Finland, France, Greece, Ireland, Italy,

Latvia, Lithuania, Liechtenstein, Luxembourg, Monaco,

Netherlands, Austria, Portugal, Romania, Sweden,

Switzerland, Slovakia, Slovenia, Spain, Czech Republic,

United Kingdom

ZielVertragspartei (Annex I Staat)

Page 4: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

4

CO2 – Trends 1990 - 2004

+ 4,5 %+ 25 %World

+ 1,6 %- 36 %CIT

+ 15 %+ 95 %China

+ 9%+ 75 %Non Annex I

+ 0,7 %+ 4,5 %EU15

+ 1,3 %+ 16 %OECD

Changes 2003 - 2004Changes 1990 - 2004Country groups /

Countries

Page 5: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

5

EU bubbleEU Member State „burden sharing“ target

Luxembourg - 28 %

Danmark - 21 %

Germany - 21 %

Austria - 13 %

UK - 12,5

Belgium - 7,5 %

Italy - 6,5 %

Netherlands - 6 %

Finland +/- 0 %

France +/- 0 %

Sweden + 4 %

Ireland + 13 %

Spain + 15 %

Greece + 25 %

Portugal + 27 %

EU - 8 %

Page 6: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

6

Great Number of EU Member States are „short“ !

- 6,9- 292,33.918,2- 84.210,44.261,4total

+ 1,7+ 11,4668,9- 12,5 %657,6764,5United

Kingdom

- 25,2- 111,4330,2+ 15 %441,6287,2Spain

+ 9,4+ 6,575,4+ 4 %69,072,5Sweden

- 9,0- 7,576,4+ 27 %83,960,1Portugal

- 27,0- 25,468,7- 13 %94,179,0Austria

- 8,9- 19,6200,2- 6 %219,8213,0Netherlands

- 35,4- 5,09,2- 28 %14,212,7Luxembourg

- 16,8- 97,9486,0- 6,5 %583,9519,8Italy

- 10,2- 7,162,8+ 13 %69,955,6Ireland

- 0,3- 0,5136,0+ 25 %136,5108,8Greece

+ 1,4+ 8,1570,8+/- 0 %562,8570,8France

+ 1,9+ 1,471,2+/- 0 %69,871,2Finland

- 2,2- 21,6972,0- 21 %993,61230,3Germany

- 14,4- 9,254,5- 21 %63,769,0Denmark

- 9,5- 14,3135,9- 7,5 %150,2146,9Belgium

Zielab-

weichung

in %

Zielab-

weichung in

Mio. t

Zielgröße

2008 - 2012

„burden

sharing“

THG-

Emissionen

2005

THG-

Emissionen

Basisjahr

EU-

Mitgliedstaat

Page 7: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

7

Accession Countries „long“

- 2,3- 113,94.841,94968,05.261,0Total EU - 25

+ 23,9+ 178,4923,7757,7999,6Total

Accession

Countries

----9,06,0Cyprus

+ 35,5+ 30,1114,9- 6,084,8122,3Hungaria

+ 21,9+ 32,5180,6- 8,0148,1196,3Czech

Republic

- 7,2- 1,418,6- 8,020,120,2Slovenia

+ 28,7+ 15,167,5- 8,052,473,4Slovakia

+ 11,7+ 45,2432,2- 6,0387,0459,8Poland

----3,22,2Malta

+ 124,8+ 26,046,9- 8,020,850,9Lithuania

+ 119,9+ 13,023,8- 8,010,825,9Latvia

+ 84,7+ 18,039,2- 8,021,242,6Estonia

Zielab-

weichung

in %

Zielab-

weichung in

Mio. t

Zielgröße

2008 - 2012

Kyoto ZielTHG-

Emissionen

2005

THG-

Emissionen

Basisjahr

EU-

Mitgliedstaat

Page 8: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

8

The revised German NAP II

(Cabinet decision on 18. April 2007)

Page 9: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

9

EU ETS „cap“ (Status 18. April 2007)

– The German Case

Emissionsbudget 2008-2012

alle Treibhausgase: 973,7 Mio. t CO2 Äq.

AufteilungCO2 _ Nicht CO2

Nicht-CO2: 127 Mio. t CO2 Äq.

CO2: 846,7 Mio. t

Energie und Industrie: 499 Mio. t

AufteilungEnergie + Industrie

(Cap)

Nicht-EH46 Mio. t

Emissionshandel453,1 Mio. t (Cap)

Page 10: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

10

The CDM-market

Page 11: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

1111

CDM works

Registered projects: 638

Expected CERs: 870,000,000

Requested Registration: 78

Project pipeline: > 1600

Expected CERs: > 1,900,000,000

Issued CERs: 44,750,944

Requested CERs: 52,717,946

Status: 27.04.2007

Page 12: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

1212

Page 13: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

13

Page 14: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

14

Status of JI/CDM in Germany(Status: 26.3.07)

Page 15: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

15

Page 16: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

16

Project Categories

Page 17: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

17

Host Countries

Page 18: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

18

Host Countries continued

Page 19: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

19

The German CDM-Initiative

‚CDM – Initative‘ means: CDM and JI

Fields of Activities:

1. National Framework

2. Bilateral Co-operation/ Memoranda ofUnderstanding

3. Projectportfolio

4. Tools

5. Lessons learned

6. Recent/Current Activities

Page 20: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

20

National Framework I

Use of CERs and ERUs in the ETS:

20% of the EU ETS cap = 90 Mio. Certificates p.a. = 450 Mio.Certificates in 2008/12

Assuming a reduction of 50.000 t CO2eq/a this would correspond to1800 projects

The constitution of the Emissons Trading Authority (DeutscheEmissionshandelsstelle) has been successfully performed:

• CDM-projects are usually handled within 3-4 weeks time

• High workload with JI projects in Germany

Page 21: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

21

AA BMWiBMVEL BMZ

Other ministries

IMA CO2-Reduktion / AK VII

Foreign affairs Agriculture Economy Development

Interministerial Working Group

BMUResponsibility for

climate change

UBA

DEHStDepartement

within UBA Environm

ent

Agency

reporting

steering

advice &

guidelines

National Framework/Administration

DNA

BMVBS

Page 22: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

2222

National Framework/Legal Basis ProMechG = Projekt-Mechanismen-Gesetz

1. Regulations for CDM and JI transform the internationalStandards (COP/MOP and EU-Linking Directive)

2. Independent Certifiers guarantee for credibility of projects

3. Check by DEHSt : completeness, consistency andplausibility

4. Projects in Germany: Additionality/ THG Inventory

Page 23: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

23

Competent authority (German DFP/DNA)=

German Emissions Trading Authority (DEHSt)

within the Federal Environment Agency (UBA)

based on the Rules of ProMechG:

• approval of JI and CDM project activities

• authorization of private entities

• registration of national projects

• checking verification reports

• performing CDM/JI Database, website and otherinformation tools

National Framework/Competences

Page 24: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

24

National Framework/Federal Ministry

for Environment

• Further development of JI/CDM

• Negotiations on the International and EuropeanLevel

• Memoranda of Understanding

• Chair of AK VII „JI und CDM“ of theInterministerial Workinggroup „CO2-Reduction“(IMA „CO2-Reduktion“)

• JIKO

• Alternate Member of JISC

Page 25: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

25

CDM/JI-Agreements/MoU

Existing Agreements:

BASREC

• Egypt

• Peru

• Mexico

• Tunesia

Negotiations near conclusion:

– Israel, India, Costa Rica

Ongoing negotiations:

– Azerbaijan, Brasil, Bulgaria, Chile, China, Malaysia,Poland, Romania, Russia, South Africa, Thailand, CzechRepublic, Ukraina

Page 26: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

26

Financial Contributions to Funds

KfW Carbon Fund - established as PPP

• Initial contribution (4 Mio EUR)

• first tranche: overall capital brought in at 80 Mio EUR

BASREC Fund - (Baltic Sea Regional Energy Cooperation)multilateral Fund

• Initial contribution (5 Mio EUR)

• Partners: Poland, Estonia, Lativa, Lithuania and Russia

• No plans to use CERs/ERUs for meeting emission reductiontarget ( -21%)/Priority given to domestic action

Page 27: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

27

Projectportfolios

• Enhancing co-operation with selected host countries

• Visibility of Germany as CDM/JI-Investing Country

• Networking and institutional contacts

• Systematic Co-operation with political Decision Makers and

Service Providers in the Host Country

• Mobilisation of German Actors in Host Countries

• Developing strategies to open the market for projects which

are ready for implementation

• Precondition for being included in the portfolio: ready for

implementation

Page 28: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

28

Examples of project portfolios• Projectportfolios for Russia, Romania and

Ukraina (developed by „dena“ as contractor)

• Activities just started in China, Russia und LatinAmerica

• Further planning for Israel, Egypt und Tunesia

Russia:

• Agreement on Co-operation: BMU/MEDT

• 12.12.2006 JI-Workshop in Moscow

• Presentation of German projects in Russia

• Presentation of JI-Manual for russian companies

• March 2007: German- Russian Economy Meeting

Page 29: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

29

Examples of ProjectportfoliosChina:

• 06./07.12.06 Projectmatching-Workshop in Beijing

• over 60 suggestions for projects in China had beensubmitted and being checked by german and chineseexperts (DEG, KCC)

• German actors in Beijing involved (AHK, GTZ)

• SEPA involved

• Besides Projectmatching, Working groups to:(N2O abatement, Sludge treatment and Energy efficiency),

• Project – starting point to long-term co-operating strategy

• Meeting for Evaluation with german companies in January2007

• Round Table in Beijing in April 2007 with chineseinstitutions lead by AHK, discussion on further focus(Energy efficiency and bioenergy)

Page 30: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

30

Examples of Projectportfolios

Latin America: Development of a webbased CDM-Platform

direct target:

primarily use as tool for communication to foster cross-

national networking, information

Embedding of prominent actors in host countries, close co-

operation with DNA and political decision makers,

mobilisation of german actors on-site, networking with

actors in Germany

target on project level:

support for project development, enhancing of communication

structure in the host countries, if possible: bilateral project-

portfolios

Page 31: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

31

Tools of the CDM-Initiative

• Pre-Check (update being prepared)

• manual (update being prepared)

• CDM/JI-Brochure (new edition just released)

• CDM/JI-data base (being installed at DEHSt, accessvia internet)

• JIKO-Info

• New web portal just activated this week: www.jiko-bmu.de

• Web based CDM-platform for Latin America(being developed)

Page 32: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

32

Lessons learned/Amendment

ProMechGProMechG

• procedures for JI in Germany have to be improved

• adjusting ProMechG to international and europeandecisions

• CDM/JI- experience of DEHSt: checking of plausibility isproving of value, procedures are being accelerated

• no need for further ordinances

Ordinance for fees

• fees are being prohibitiv

Amendment of ProMechG (Parliament (DeutscherBundestag“)/ 1st reading in May):

• ProMechG is being adjusted to JI second track

• lower fees (20-600 ) – Administrative costs in futurefinanced by Reserve in National Allocation Plan for thesecond period (2008 – 2012)

Page 33: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

3333

Recent activities of BMU

• German-Russian Economy Meeting/JI

TerraTec in Leipzig/ in March 2007

Contractor: dena

• JI- Biomass – Workshop with Russia, Ukraina,

Romania, Bulgaria and Poland

TerraTec in Leipzig (March 2007)

Contractor: GfA Envest

Page 34: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

3434

Current Activities

Start-up Workshop with Tunesia in March 2007

Opening Minister Sigmar Gabriel

Focus:+ Solar Thermal (cooling,Power plant)

+ Landfill

+Financing

Follow-up-Activities mid 2007

Page 35: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

3535

Current Activities BMU

China:

• Strategic Round table in March 2007

• Follow-up to Projectmatching –WorkshopDecember 2006

• Options to participate

• Strategic Dialogue on minister‘s level/ endof year

Page 36: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

3636

Further activities in preparation

1. Egypt: Workshop/Projectportfolio(possibly in june 2007)

2. Israel: Workshop on CDM and inventories

3. Ukraina: further development of theprojectportfolio, firstly further contacts on thepolitical level, open for further german projectideas

4. CTI-projectmatching in October 2007 / focus onFSE countries, Eastern Europe

Page 37: CDM und JI Current status and future strategies€¦ · 1 CDM und JI Current status and future strategies Franzjosef Schafhausen Federal Ministry for the Environment, Nature Conservation

3737

Thank you for your attention!

Franzjosef SchafhausenDeputy Director-General “Environment and Energy”

Federal Ministry for the Environment, NatureConservation and Nuclear Safety

Tel.: +49 30 28550 3660

Fax: +49 30 28550 10 2349

[email protected]