Introduction to CCBA (Forestry Projects)
ByN. Mohan Reddy
![Page 2: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/2.jpg)
CCBA Standards
Community
Climate Biodiversity
CCBA projects
![Page 3: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/3.jpg)
CCBA PARTNERS
• BP
• SC Johnson
• GFA Terra
• Intel
• Conservation International
• Hamburg Institute of International Economics
• The Nature Conservancy
• Pelangi
![Page 4: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/4.jpg)
CCBA Mission & Target
Mission
Develop and promote standards to identify land-based projects with clear triple benefits
Target
All land use activities done in discreet projects - focus on carbon market
![Page 5: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/5.jpg)
Identification of project and development of project concept note
Development of Project Design DocumentProject Description
Select baseline approach and assess additionalitySet baseline emission level and crediting period
Calculate net emission reductionsDevelop a monitoring plan
Assess environmental impactsInvite local stakeholders for comments
Project developer
Project developer
Includes:
Project developer
Operational Entity
Verification and certification
Issuance of CCBA s to project developers
CDM Executive Board
CCBA Project Cycle
Project developer
CCBA
3 rd Party Verification
Submission of validation reports and Project Design Document
Operational EntityValidation/Registration of Project
Submission of the PDD and host country approval to validat0r
Project developer
Make PDD publicly available for 22 days
Operational Entity
)
CCBA approval
3 rd Party Verification
![Page 6: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/6.jpg)
Project Template
![Page 7: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/7.jpg)
CCBA Standards
Minimum requirements
1) Integrated baseline
2) Integrated project scenario
3) Worksheets for each major project activity
4) Basic legal and human rights issues addressed
To be CCBA certified, project must 1) meet minimum requirements & 2) score sufficient points in each of the three components.
![Page 8: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/8.jpg)
CCBA Standards
ClimateClimate
Thresholds & Scores• baselines,
• leakage
• additionality
• monitoring
![Page 9: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/9.jpg)
CCBA Standards
CommunityCommunity
Thresholds & Scores• participation
• net benefits
• capacity
![Page 10: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/10.jpg)
CCBA Standards
Biodiversity
Biodiversity
Thresholds & Scores• project location
• ecological design
• water
![Page 11: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/11.jpg)
Standards Format
Community
Climate Biodiversity
Minimum requirements
![Page 12: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/12.jpg)
Projects From India
IFFDC Wasteland Forestation Project
– Location Uttar Pradesh, Madhya Pradesh, Rajasthan, India
– Webhosting Stage from May 13 through June 3, 2009
– Consultant IFFDC
– Expected CERs -5000 PA
![Page 13: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/13.jpg)
Projects From India
Reforestation of degraded land
– Location Chhattisgarh– Validation – Consultant EVI– Expected CERs -
![Page 14: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/14.jpg)
Projects From India
• Bagepalli CDM Reforestation Programme
– Location Karnataka– Validation – Consultant TÜV SÜD – Expected CERs -
![Page 15: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/15.jpg)
Observations• Many Projects from USA, New Zealand and
Australia got gold standards, fetches premium prices
• All Indian AR CDM projects moving towards CCBA Standards
• Consultants In CCBA Business– IFFDC
– EVI
![Page 16: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/16.jpg)
Future Scenarios
• Quality AR projects can fetch premium price
• Projects will be limited to bio diverse rich patches
• Projects on plantation might not be possible
• Orissa forest has many bio diversity rich projects
• Taking up these projects initially, can help in
taking up REDD projects
![Page 17: CCBA](https://reader035.fdocuments.us/reader035/viewer/2022062319/5585b442d8b42af75f8b46b5/html5/thumbnails/17.jpg)
Thank You