CAVIAR flying debrief (2008) Reading 25 th November 2008
description
Transcript of CAVIAR flying debrief (2008) Reading 25 th November 2008
Page 1
TAFTS 2008NPL calibration and Summer flying
Paul Green, Ralph Beeby, Alan Last, Caroline Cox,John Harries, Juliet Pickering
Imperial College London
With many diagrams taken from Stu Newman’s report
CAVIAR flying debrief (2008)Reading 25th November 2008
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 2
Introduction
• Calibration at NPL• Summer 2008 Flight campaign• Closing remarks
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 3
The TAFTS Instrument
• dual-input Martin-Puplett (polarizing) FTS with two spectral bands
• measure both nadir and zenith (+net)• 4 liquid helium cooled detectors
– 80-300cm-1 (2 x Ge:Ga)– 300-700cm-1 (2 x Si:Sb)
• resolution: 0.12cm-1 (apodized)• single scan: 2 secs• 4 internal BB sources• employs Brault sampling scheme• all built in-house (J Murray + A Canas)• UKMO C-130, ARA Egrett, BAe-146
Radiometric calibration
• At NPL 30th June – 18th July 2008• First radiometric calibration with 2 external blackbody
sources. • Differential instrument, always measures the
difference between two views. • First calibration with target at -55C. (Best to date is
around -40C.) • New beamsplitter (Cardiff Uni) arrived early June.
One set of measurements with original BS, and one with the new one, for comparison.
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 4
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 5
NPL external calibration blackbody
• Purpose-built traceable temperature standard calibrated BB for use by both TAFTS and ARIES [UKMO 3-16μm FTS]
• Alcohol cooled• Temperature range
– -65 to +10C• Blackbody emissivity
– 0.996 0.002 (λ < 50 μm)– 0.994 0.005 (50 μm < λ
< 100 μm)– 0.990 +0.005 / -0.02 (100
μm < λ < 200 μm) Eric Usadi, NPL
Summer flying 2008
• Campaign dates: 13 Aug – 25 Sept 2008 (7 weeks)• 35 flight hours = (7x 5hr flights)• All we needed were perfect clear-sky over Camborne
in Cornwall…..
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 6
Flight campaign instrumentation
• Camborne based instrumentation– Radiosonde balloons (temperature, water vapour profile, wind)– GPS (water vapour)– Lidar backscatter (aerosol + cloud base)– Microwave retrieved water vapour and temperature (18/09/08 only)– Microtops sun photometer (aerosol optical thickness)– NPL 0.7-14μm sun-pointing FTS
• BAe-146 in-situ– Radiometers, TAFTS, ARIES, SWS– In-situ (temp, WV, wind, cloud, aerosol etc.)– Dropsondes– BBRs, surface temp, hemispherical radiance
• Model fields– MO Mesoscale model, MO and ECMWF NWP models
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 7
CAVIAR 2008 Flight schedule
Date Flight no. Meteorology Useful science
TAFTS performance
13/08/08 B394 N/A Test flight
19/08/08 B396 Persistent broken StCu, increasing late on
Yes Partial laser up to 1.5hrs
22/08/08 B397/398 Some broken StCu Yes No laser
11/09/08 B399 Too cloudy (Aborted) Good
18/09/08 B400 Excellent Yes Excellent
23/09/08 B404 Too cloudy (Aborted) Good
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 8
B396 15:00UTC B397 12:00UTC
SEVIRI images
B398 – Clear-skies?
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 9
B398 – 22/08/08 14:42UTC B398 – 22/08/08 16:27UTC
B400 synoptic chart
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 10
B400 – SEVIRI
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 11
SEVIRI image, 10:00UTC
B400 – flight track
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 12
B400 - Clouds?
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 13
B400 - Atmospheric profile data
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 14
Courtesy of R. Beeby
B400 - Preliminary data
• Entire flight dataset 3h20– 08:27:25Z – 11:46:53Z
• But concentrate on run 4• 34kft (southwards heading)• 10:25:53 -10:32:52: 7minutes • Sonde launches at:
– 10:26:04 #3– 10:28:01 #4
• Simulations: sonde #3 from 75mbar below aircraft melded with 11:00 Camborne sonde (Courtesy of R. Beeby)
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 15
Up- and downwelling radiance
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 16
Up- and downwelling radiance
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 17
B400 net radiance
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 18
B400 – other runs
Run # Altitude Time(UTC)
1 20kft 08:30
2 5.5kft 09:00
3 100ft 09:12
Balloon chase
4 34kft 10:30
5 29kft 10:45
6 14.5kft 11:10
7 5kft 11:28
8 100ft 11:40-11:45
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 19
Red dots – Camborne overpasses
CAVIAR flying debrief (2008)Reading 25th November 2008
Page 20
Closing remarks
• NPL calibration• Campaign in UK August/September 2008
– LW data fundamentally sound… SW still to access
• Future work:– Work on NPL calibration data to determine ε and ΔT of
blackbodies– New Cardiff-made BS analysis– Final data calibration – with uncertainties– Cross-calibration with ARIES– Determination of far-IR water vapour continuum coefficients