CATS Contract of Objectives presentation
-
Upload
bruce-ware-pmi-certified-pm-professional -
Category
Technology
-
view
169 -
download
0
description
Transcript of CATS Contract of Objectives presentation
Second CATS Workshop – Geneva – January 26th, 2010 Page: 1
CONTRACT-BASEDAIR TRANSPORTATION SYSTEM
(CATS)
Contract of Objectives Concept
Presented by Laurent GuichardEUROCONTROL
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 2Version: 1.0
Objectives of the Concept
Find a simple object to manage all the aspects of the ATM system
Specify how this object is operationalised to support ATM
• Organisational aspect
• Performance aspect
• Business aspect
• Legal aspect
• Planning phase
• Execution phase
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 3Version: 1.0
CATS concept: ATM through TW
Object : the Target Windows (TW)• A flight is composed of a set of Target Windows
• These TWs are :
• defined through the Airline trajectory, at transfers of responsibility area (spatial and temporal intervals: variable sizes)
• refined during the planning phase
• through a collaborative process (CDM)
• based on punctuality at destination
• best use of scarce resources
• integrate room of manoeuvre (disruption, uncertainty)
• fixed before departure (signature of the Contract of Objectives)-> (commitment / accountability)
• become Objectives for all the actors/operators
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 4Version: 1.0
CATS: TW Organisational aspect
Airport
On ground
Control Unit
Control Unit
Control Unit
Contract of Objectives / RBT
ApproachANSP1 ANSP2 AirportTWR TWR
On groundOn FlightTaxiing Taxiing
Off-BlockTime
LandingTakeoff Target Windows
In-BlockTime
Air side
main objective
Ground side
main objective
1 Flight
Executed RBT Authorized RBT
Negotiated/Contracted
TWs
Agreed RBT
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 5Version: 1.0
� Drafting process comprises three phases:• Phase 1: Airport resource management
4 Airports (departure and destination) and airlines4 Examining runway capacities, in order to bring the resources
into line with airline demand on the date when the requested flights are to be performed
• Phase 2: Resource management and anticipation of disruption
4 Airports, airlines and ANSPs (CDM process)4 Incorporation of known or probable medium-term disruptions
• Phase 3: Disruption management4 The TW incorporates the most recent data and any current
disruptive factors which will affect future traffic.4 The "Contract of Objectives " is issued shortly before off-block
time at the airport.4 the Target Windows become fixed.
CATS: TW lifecycle
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 6Version: 1.0
CATS: TW lifecycle
TWsAirlines/Airports
SWIMNETTW
negotiation
TWrefinement
CoOTW signed
LIFECYCLE OF TARGET
WINDOWS
(Refinement)
TWsAirlines/Airports
and ANSPs
RENEGOTIATE
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 7Version: 1.0
CATS concept: a global framework
CATS concept : Global framework through TW management
Business aspect
Actors’ business model Integration
Business aspect
Actors’ business model Integration
Performance aspect
Monitoring of performance
Performance aspect
Monitoring of performance
Legal aspect
Contractualisation of Target Windows
Contract of ObjectivesSignature
Legal aspect
Contractualisation of Target Windows
Contract of ObjectivesSignature
OrganisationalAspect
SESAR BT management
OrganisationalAspect
SESAR BT management
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 8Version: 1.0
� CoO/TW create a link :• between actors through formal commitment • to synchronise the planning and the execution phase within a
consistent and explicit frameworkPlan what is feasible and fly what is planned
� TWs permit to optimize resources at the strategic level• facilitation of the BT, by contractualising the transfer of responsibility
area
• through negotiations
� For controller and aircrew with integration of room of manoeuvre in TW, the CoO gives :• the means of managing the imprecision inherent in air traffic
• the mean to integrate local objectives with global efficiency of the system
CATS: TW Organisational aspect
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 9Version: 1.0
� Contract of Objectives (CoO) will be concluded among all involved actors through CDM• Integration of ATM corner point (capacity, environment, …)• Integration of actors’ specificity (business model …)• Cooperation on management of resources
� New way for performing ATM by
Mutually agreed objectives
CATS: TW Business aspect
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 10Version: 1.0
� CATS project integrates the legal aspect by ensuring consistency with current rules and regulation
� Safety will never be contractualised
� Accountability is linked with agreed assignment of responsibility (responsibility vs. organisational means)
� CATS concept could be a framework to smoothly shift the ATM paradigm : • E.g. put in place a route charging scheme link to performance
CATS: TW Legal aspect
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 11Version: 1.0
� Enhanced collaboration will improve ATM efficiency and predictability (be on time with best used of resources)
� TW is a mean of monitoring performance (SES2 initiative)• Analyse the performance level through fulfilment of TWs
� TW allows post-analysis to continuously improve the system• Identify failure, bottleneck (learn from the past and propose
solutions)
CATS: TW Performance aspect
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 12Version: 1.0
CATS concept: a global framework
CATS concept : Global framework through TW management
Business aspect
Actors’ business model Integration
Business aspect
Actors’ business model Integration
Performance aspect
Monitoring of performance
Performance aspect
Monitoring of performance
Legal aspect
Contractualisation of Target Windows
Contract of ObjectivesSignature
Legal aspect
Contractualisation of Target Windows
Contract of ObjectivesSignature
OrganisationalAspect
SESAR BT management
OrganisationalAspect
SESAR BT management
Link planning & execution phase
Link planning & execution phase
Management ofscarce resources
Management ofscarce resources
Accountabilityroute charging,
airport taxes
Accountabilityroute charging,
airport taxesLiabilityLiability
© CATS CONSORTIUM 2010 Author: L.GuichardPage: 13Version: 1.0
Thank you for your attention!
www.cats-fp6.aero/
www.eurocontrol.int/eec/cats