Second CATS Workshop – Geneva – January 26th, 2010 Page: 1 CONTRACT-BASED AIR TRANSPORTATION SYSTEM (CATS) Contract of Objectives Concept Presented by Laurent Guichard EUROCONTROL

description

EuroControl/SESAR research project on using "contract of objectives" as a means of managing trajectories in ATM.

Transcript of CATS Contract of Objectives presentation

Page 1: CATS Contract of Objectives presentation

Second CATS Workshop – Geneva – January 26th, 2010 Page: 1

CONTRACT-BASEDAIR TRANSPORTATION SYSTEM

(CATS)

Contract of Objectives Concept

Presented by Laurent GuichardEUROCONTROL

Page 2: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 2Version: 1.0

Objectives of the Concept

Find a simple object to manage all the aspects of the ATM system

Specify how this object is operationalised to support ATM

• Organisational aspect

• Performance aspect

• Business aspect

• Legal aspect

• Planning phase

• Execution phase

Page 3: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 3Version: 1.0

CATS concept: ATM through TW

Object : the Target Windows (TW)• A flight is composed of a set of Target Windows

• These TWs are :

• defined through the Airline trajectory, at transfers of responsibility area (spatial and temporal intervals: variable sizes)

• refined during the planning phase

• through a collaborative process (CDM)

• based on punctuality at destination

• best use of scarce resources

• integrate room of manoeuvre (disruption, uncertainty)

• fixed before departure (signature of the Contract of Objectives)-> (commitment / accountability)

• become Objectives for all the actors/operators

Page 4: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 4Version: 1.0

CATS: TW Organisational aspect

Airport

On ground

Control Unit

Control Unit

Control Unit

Contract of Objectives / RBT

ApproachANSP1 ANSP2 AirportTWR TWR

On groundOn FlightTaxiing Taxiing

Off-BlockTime

LandingTakeoff Target Windows

In-BlockTime

Air side

main objective

Ground side

main objective

1 Flight

Executed RBT Authorized RBT

Negotiated/Contracted

TWs

Agreed RBT

Page 5: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 5Version: 1.0

� Drafting process comprises three phases:• Phase 1: Airport resource management

4 Airports (departure and destination) and airlines4 Examining runway capacities, in order to bring the resources

into line with airline demand on the date when the requested flights are to be performed

• Phase 2: Resource management and anticipation of disruption

4 Airports, airlines and ANSPs (CDM process)4 Incorporation of known or probable medium-term disruptions

• Phase 3: Disruption management4 The TW incorporates the most recent data and any current

disruptive factors which will affect future traffic.4 The "Contract of Objectives " is issued shortly before off-block

time at the airport.4 the Target Windows become fixed.

CATS: TW lifecycle

Page 6: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 6Version: 1.0

CATS: TW lifecycle

TWsAirlines/Airports

SWIMNETTW

negotiation

TWrefinement

CoOTW signed

LIFECYCLE OF TARGET

WINDOWS

(Refinement)

TWsAirlines/Airports

and ANSPs

RENEGOTIATE

Page 7: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 7Version: 1.0

CATS concept: a global framework

CATS concept : Global framework through TW management

Business aspect

Actors’ business model Integration

Business aspect

Actors’ business model Integration

Performance aspect

Monitoring of performance

Performance aspect

Monitoring of performance

Legal aspect

Contractualisation of Target Windows

Contract of ObjectivesSignature

Legal aspect

Contractualisation of Target Windows

Contract of ObjectivesSignature

OrganisationalAspect

SESAR BT management

OrganisationalAspect

SESAR BT management

Page 8: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 8Version: 1.0

� CoO/TW create a link :• between actors through formal commitment • to synchronise the planning and the execution phase within a

consistent and explicit frameworkPlan what is feasible and fly what is planned

� TWs permit to optimize resources at the strategic level• facilitation of the BT, by contractualising the transfer of responsibility

area

• through negotiations

� For controller and aircrew with integration of room of manoeuvre in TW, the CoO gives :• the means of managing the imprecision inherent in air traffic

• the mean to integrate local objectives with global efficiency of the system

CATS: TW Organisational aspect

Page 9: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 9Version: 1.0

� Contract of Objectives (CoO) will be concluded among all involved actors through CDM• Integration of ATM corner point (capacity, environment, …)• Integration of actors’ specificity (business model …)• Cooperation on management of resources

� New way for performing ATM by

Mutually agreed objectives

CATS: TW Business aspect

Page 10: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 10Version: 1.0

� CATS project integrates the legal aspect by ensuring consistency with current rules and regulation

� Safety will never be contractualised

� Accountability is linked with agreed assignment of responsibility (responsibility vs. organisational means)

� CATS concept could be a framework to smoothly shift the ATM paradigm : • E.g. put in place a route charging scheme link to performance

CATS: TW Legal aspect

Page 11: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 11Version: 1.0

� Enhanced collaboration will improve ATM efficiency and predictability (be on time with best used of resources)

� TW is a mean of monitoring performance (SES2 initiative)• Analyse the performance level through fulfilment of TWs

� TW allows post-analysis to continuously improve the system• Identify failure, bottleneck (learn from the past and propose

solutions)

CATS: TW Performance aspect

Page 12: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 12Version: 1.0

CATS concept: a global framework

CATS concept : Global framework through TW management

Business aspect

Actors’ business model Integration

Business aspect

Actors’ business model Integration

Performance aspect

Monitoring of performance

Performance aspect

Monitoring of performance

Legal aspect

Contractualisation of Target Windows

Contract of ObjectivesSignature

Legal aspect

Contractualisation of Target Windows

Contract of ObjectivesSignature

OrganisationalAspect

SESAR BT management

OrganisationalAspect

SESAR BT management

Link planning & execution phase

Link planning & execution phase

Management ofscarce resources

Management ofscarce resources

Accountabilityroute charging,

airport taxes

Accountabilityroute charging,

airport taxesLiabilityLiability

Page 13: CATS Contract of Objectives presentation

© CATS CONSORTIUM 2010 Author: L.GuichardPage: 13Version: 1.0

Thank you for your attention!