OUTER WEST CORRIDOR STUDY & CATO RIDGE LOCAL AREA PLANS
CATO RIDGE LOCAL AREA PLAN & PRECINCT PLANS
PROJECT LIST
GRAHAM MULLER ASSOCIATES CONSORTIUM
PROJECT
NO.
PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILITY
PRIORITY
BUDGET
FUNDING
SOURCE
CATO RIDGE INDUSTRIAL PRECINCT 1 Gravity Sewer System
2 – 1
Enable development to
proceed
Link sewer with
Hammersdale
WWTW
eThekwini Municipality
Water & Sanitation
By 2015 R 15.3 mil eThekwini
Municipality /
Developers
2 Gravity Sewer System
7 – 5 - 2
Enable development to
proceed
Link sewer with
Hammersdale
eThekwini Municipality
Water & Sanitation
By 2015 R 11.5 mil eThekwini
Municipality /
Developers
3 Gravity Sewer System
8 – 17 - 7
Enable development to
proceed
Main trunk sewer eThekwini Municipality
Water & Sanitation
By 2015 R 8.4 mil eThekwini
Municipality /
Developers
4 Gravity Sewer System
11 – 9 - 17
Enable development to
proceed
Main trunk sewer
eThekwini Municipality
Water & Sanitation
By 2015 R 11.1 mil eThekwini
Municipality /
Developers
5 Storm water systems Enable development to
proceed
Not applicable
eThekwini Municipality
Stormwater
Management
Department
By 2015 R 20 mil eThekwini
Municipality /
Developers
6 Water reticulation
network
Enable development to
proceed
Not applicable eThekwini Municipality
Water & Sanitation
By 2015 R 14 mil eThekwini
Municipality /
Developers
7 Acquisition &
registration of
pipeline servitudes
Enable development to
proceed
Main trunk sewer
Portions of the
Storm water system
eThekwini Municipality
Water & Sanitation
By 2015 R 0.5 mil eThekwini
Municipality /
Developers
8 Professional
Engineering Services
Design of sewer,
stormwater & water
systems
eThekwini Municipality
Water & Sanitation
By 2015 R 4.2 mil eThekwini
Municipality /
Developers
9 Gravity Sewer System
15 – 13 - 17
Enable development to
proceed
Main trunk sewer eThekwini Municipality
Water & Sanitation
By 2020 R 5.27 mil eThekwini
Municipality /
Developers
10 Gravity Sewer System
10 – 9
Enable development to
proceed
Secondary trunk
sewer
eThekwini Municipality
Water & Sanitation
By 2020 R 6.8 mil eThekwini
Municipality /
Developers
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
NO.
PROJECT
NAME
PURPOSE
LINKAGE RESPONSIBILITY
PRIORITY
BUDGET
FUNDING
SOURCE
CATO RIDGE INDUSTRIAL PRECINCT 11 Gravity Sewer System 3
- 2 Enable development to proceed
Secondary trunk sewer
eThekwini Municipality Water & Sanitation
By 2020
R7.2 mil eThekwini Municipality / Developers
12 Gravity Sewer
System 4 – 3
Enable development to
proceed
Secondary trunk
sewer
eThekwini Municipality
Water & Sanitation
By 2020 R 7 mil eThekwini
Municipality /
Developers
13 Gravity Sewer
System 19 - 20
Enable development to
proceed
Secondary trunk
sewer
eThekwini Municipality
Water & Sanitation
By 2020
R 4.9 mil eThekwini
Municipality /
Developers
14 Sewer pump station
No 1 & rising main
16 – 15
Enable development to
proceed
Main trunk sewer eThekwini Municipality
Water & Sanitation
By 2020 R 5.1 mil eThekwini
Municipality /
Developers
15 Sewer pump station
No 2 & rising main
14 – 13
Enable development to
proceed
Main trunk sewer eThekwini Municipality
Water & Sanitation
By 2020 R 6 mil eThekwini
Municipality /
Developers
16 Sewer pump station
No 3 & rising main
12 – 11
Enable development to
proceed
Main trunk sewer eThekwini Municipality
Water & Sanitation
By 2020 R 6.5 mil eThekwini
Municipality /
Developers
17 Sewer pump station
No 4 & rising main
18 -13
Enable development to
proceed
Main trunk sewer
eThekwini Municipality
Water & Sanitation
By 2020
R 5.8 mil eThekwini
Municipality /
Developers
18 Sewer pump station
No 5 & rising main
21 - 6
Enable development to
proceed
Main trunk sewer
eThekwini Municipality
Water & Sanitation
By 2020
R 5.53 mil eThekwini
Municipality /
Developers
19 Secondary sewer
reticulations
Enable development to
proceed
Main trunk sewer eThekwini Municipality
Water & Sanitation
By 2020 R 9.5 mil eThekwini
Municipality /
Developers
20 Professional
Engineering
Services
Design of sewer,
stormwater & water
systems
Not applicable
eThekwini Municipality
Municipality
By 2020 R 1.7 mil eThekwini
Municipality /
Developers
*Note – all costs are estimates only and are expressed in 2010 Rands
21 Gravity Sewer System
6 – 5
Enable development to
proceed
Secondary trunk
sewer
eThekwini Municipality
Water & Sanitation
By 2030 R7.5 mil eThekwini
Municipality /
Developers
22 Secondary sewer
reticulations
Enable development to
proceed
Main trunk sewer
eThekwini Municipality
Water & Sanitation
By 2030 R 9.5 mil eThekwini
Municipality /
Developers
23 Storm water systems Enable development to
proceed
Not applicable eThekwini Municipality
Stormwater
Management
Department
By 2030 R 16 mil eThekwini
Municipality /
Developers
24 Water reticulation
network
Enable development to
proceed
Not applicable eThekwini Municipality
Water & Sanitation
By 2030 R 9.0 mil eThekwini
Municipality /
Developers
25 Professional
Engineering Services
Design of sewer,
stormwater & water
systems
Not applicable eThekwini Municipality
Municipality
By 2030 R 1.9 mil eThekwini
Municipality /
Developers
26 Legislative Preparedness Consideration of the Impact of the Draft National List of Threatened Ecosystems (Notice 1477 of 2009, Government Gazette No 32689, 6 November 2009) on the endangered ecosystems once this list is promulgated
Needs to be taken into consideration in IDP and SDF. To determine the impact on development planning in any area where threatened ecosystems exists
Environment Planning
eThekwini Municipality Short Term R50 000 Internal
27 Establishment of Conservation Areas / Parks
Tourism Strategy. The study are contains areas that are impossible to develop due to topography. These could be demarcated as protected areas / tourism areas
Planning Environment
eThekwini Municipality Long Term Unknown Internal and / or external
PROJECT
NO.
PROJECT NAME PURPOSE
LINKAGES RESPONSIBILITY
PRIORITY
BUDGET
FUNDING
SOURCE
CATO RIDGE INDUSTRIAL PRECINCT
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
NO.
PROJECT NAME PURPOSE
LINKAGES RESPONSIBILITY
PRIORITY
BUDGET
FUNDING
SOURCE
CATO RIDGE INDUSTRIAL PRECINCT 28 Environmental Education for alien
invasive eradication and to manage natural resource harvesting
Environment management guidelines
Environment eThekwini Municipality Short to medium term
R200 000 Internal and / or external. NGO’s
29 Biodiversity offset funds To be created to serve as a vehicle for managing core environmental areas and for rehabilitation / maintenance
Environment management guidelines
Environment Planning City Treasury
eThekwini Municipality Short term Unknown Initially internally, but funds to flow in from developers in the long term
30 Early warning system for water resources in Mngeni Catchment
To provide quick and effective reaction time to manage potential impacts to this critical water resource. Mngeni Catchment is main water source for eThekwini Municipality and its protection is vitally important.
Environment eThekwini Municipality Short term Unknown Internally Umgeni Water
31 Planning Scheme Revision Enabling development in
terms of Precinct Plan
Approval of
LAP / Precinct
Plan
eThekwini Municipality
Dev. Management
Short term eThekwini
Municipality
32 Promoting Harrison Flats
tourism development
Utilisation of unique
tourism opportunity
Scheme
revision,
improved
access road
eThekwini Municipality
dev. Management
Short term eThekwini
Municipality
33 Landscaping Eddie Hagan
Drive
Creating appropriate
tourism access
Upgrading
Eddie Hagan
Drive
eThekwini Municipality
Parks
Short term eThekwini
Municipality
34 Natural environment
protection and management
Maintenance of natural
environment
Scheme
revision
eThekwini Municipality
Environment
Short term eThekwini
Municipality
35 Adventure Park for Mountain
Biking & Abseiling / Nature
Reserve / Hunting Area
To stimulate development
of tourism and recreation in
the Craiglea area
KwaXimba
ward tourism
plan.
Valley of a
1000 Hills
Tourism
Routes
eThekwini Municipality
Rural ABM
High R5 million eThekwini
Municipality
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
NO..
PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILITY
PRIORITY
BUDGET*
FUNDING
SOURCE
CATO RIDGE INDUSTRIAL PRECINCT 36 Link Road 1-1 To provide access to land
on the western side of
Eddie Hagan Drive north of
Assmang
Link road from 94044TRK
to MR423
ETA Medium Term R38,886,980 Developer / ETA
37 Link Road 1-2 Link road between Eddie
Hagan Drive and
94044TRK
Link road from Eddie Hagan
Drive to 94044TRK
ETA Medium Term R13,693,680 Developer / ETA
38 Link Road 2-1 To provide access to land
on eastern side of Eddie
Hagan Drive
Link road from 65301TRK
to Drakensberg Street
ETA Medium Term R18,510,180 Developer / ETA
39 Link Road 2-2 To link links 2-1 and 3-1
with Eddie Hagan Drive
Upgrade of 65301TRK for
610m
ETA Medium Term R9,040,200 Developer / ETA
40 Link Road 3-1 To provide access to land
on eastern side of Eddie
Hagan Drive
Link Road from Eddie
Hagan Drive to 65301TRK
ETA Short Term R22,837,620 Developer / ETA
41 Link Road 4-1 To provide access from
R103 to the new link road
from the N3
Link Road from R103 to
Link Road 7-2
ETA Medium Term R3,035,136 Developer / ETA
42 Link Road 4-2 Upgraded Eddie Hagan
Drive
Widening of Eddie Hagan
Drive to two lanes per
direction between R103 and
94042TRK
ETA Medium Term R40,049,568 Developer / ETA
43 Link Road 4-3 Provide access to land on
western side of Eddie
Hagan Drive
Link road from Safal Steel
to Assmang
ETA Short Term R28,469,220 Developer / ETA
44 Link Road 7-1 Relieve pressure on the
Cato Ridge and
Hammarsdale interchanges
New N3 interchange and
associated on and off-slips
SANRAL Medium Term R71,614,800 SANRAL
45 Link Road 7-2 Link road connecting the
new interchange with the
R103 and Eddie Hagan
Drive
Link road between N3 and
R103
ETA Long Term R32,796,660 ETA
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
NO.
PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILITY
PRIORITY
BUDGET
FUNDING
SOURCE
CATO RIDGE INDUSTRIAL PRECINCT
46 Link Road 7-3 Provide access to land on
eastern side of new link
road to R103
Industrial area loop road
from Link 7-2
ETA Long Term R24,245,520 Developer / ETA
47 Link Road 7-4 Provide access to land
between the R103 and new
link road
Link road from R103 to new
Link 7-2
ETA Long Term R9,262,500 Developer / ETA
48 Link Road 8-1 Provide access to land
south of R103
Road south from R103 ETA Short Term R7,365,540 Developer / ETA
49 N3 widening Create more capacity on N3 Widening of N3 to four
lanes per direction between
Peacevale and Cato Ridge
interchanges
SANRAL Medium Term R229,135,725 Developer / ETA
50 MR385/R103 widening
phase 1
Create more capacity on
MR385/R103
Widening of the
MR385/R103 to two lanes
per direction at the
Hammarsdale interchange
ETA Short Term R15,312,024 SANRAL
51 MR385/R103 widening
phase 2
Create more capacity on
MR385/R103
Widening of the
MR385/R103 to two lanes
per direction between
Doornrug Road and
eastbound on-slip
ETA Medium Term R26,387,352 ETA
52 R103 widening phase 3 Create more capacity on
MR385/R103
Widening of the R103 to
two lanes per direction
between the eastbound on-
slip and Eddie Hagan Drive
ETA Long Term R32,366,880 ETA
53 Signalised intersections Upgrade of intersections to
signal controlled
ETA On going R5,586,000 SANRAL / ETA/
Developer
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
No.
PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILITY
PRIORITY
BUDGET
FUNDING
SOURCE
CATO RIDGE INDUSTRIAL PRECINCT
54 Professional Services To provide engineering design
services for the above projects
ETA On going R24,619,280 – proposed
R25,735,272 - additional
(10% of construction fees)
ETA
KZN DoT
Developer
contributions
55 Acquisition of land for
road reserve
Purchase of land from land
owners for the construction of
the road and road reserve
ETA On going R2,461,928 – proposed
R2,573,527 - additional
1% of the construction budget
Developer /
ETA
56 Public Transport Plan Public Transport Plan to analyse
public transport use and to
recommend improvements
ETA Short Term R400,000 (split with the Cato
Ridge Village precinct)
Developer /
ETA
57 Non-Motorised Plan Non-motorised plan to analyse
pedestrian/cycle use and to
recommend improvements
ETA Short Term R200,000 (split with the Cato
Ridge Village precinct )
Developer /
ETA
58 Signage Signing of the new industrial
area
ETA On going R350,000 Developer /
ETA
59
Street Lighting Erect street lighting to provide a
safe environment at night
ETA On going R3,658,380 ETA
Electricity
Developer
contributions
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
NO.
PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILIT
Y
PRIORITY
BUDGET
FUNDING SOURCE
CATO RIDGE VILLAGE PRECINCT
67 Gravity sewer system 3
- 2
Enable development to
proceed
Link sewer with
Hammarsdale WWTW
eThekwini
Municipality
Water &
Sanitation
By 2020 R 7.2 mil eThekwini
Municipality /
Developers
68 Gravity sewer system
4 - 3
Enable development to
proceed
Link sewer with
Hammarsdale WWTW
eThekwini
Municipality
Water &
Sanitation
By 2020 R 7.0 mil eThekwini
Municipality /
Developers
69 Secondary sewer
reticulation
Enable development to
proceed
Link sewer with
Hammarsdale WWTW
eThekwini
Municipality
Water &
Sanitation
By 2020 R 7.5 mil eThekwini
Municipality /
Developers
70 Storm water systems Enable development to
proceed
Not applicable eThekwini
Municipality
Stormwater
Management
Department
By 2020 R 10.0 mil eThekwini
Municipality /
Developers
71 Water reticulation
network
Enable development to
proceed
Not applicable eThekwini
Municipality
Water &
Sanitation
By 2020 R 5.0 mil eThekwini
Municipality /
Developers
72 Professional
Engineering Services
Design of sewer, storm
water & water systems
Not applicable eThekwini
Municipality
Water &
Sanitation
By 2020 R 2..6 mil eThekwini
Municipality /
Developers
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
NO.
PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILIT
Y
PRIORITY
BUDGET
FUNDING SOURCE
CATO RIDGE VILLAGE PRECINCT
73 Planning scheme revision Enabling development in terms of Precinct Plan
Approval LAP / Precinct Plan
eThekwini Municipality Dev. Management
Short term To be established eThekwini Municipality
74 Promoting truck stop relocation
Re-establishment of residential village character
Scheme revision eThekwini Municipality Econ. Development
Short term To be established eThekwini Municipality
75 Village Collector Road establishment
Acquisition of land for road linkage
Scheme revision, road design
ETA Short term To be established eThekwini Municipality
76 Village Collector Road establishment
Establishment of appropriate landscaping
Scheme revision, road design and development
eThekwini Municipality Parks
Short term To be established eThekwini Municipality
77 Buffer village / N2 / Rail Protecting village from noise Scheme revision eThekwini Municipality Dev. Management / Parks
Short term To be established eThekwini Municipality
78 Village Park and Cemetery Creating natural relief and upgrading old cemetery
Scheme revision, truck stop relocation
eThekwini Municipality Parks
Medium term To be established eThekwini Municipality
79 New central park Creating natural relief and separating future commercial and residential development
Scheme revision, commercial / residential development
eThekwini Municipality Parks
Medium term To be established eThekwini Municipality
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT
NO.
PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILIT
Y
PRIORITY
BUDGET
FUNDING SOURCE
CATO RIDGE VILLAGE PRECINCT
80 Village market Establishment of village centre
Scheme revision / land acquisition
eThekwini Municipality Dev. Management / Economic Development
Medium term To be established eThekwini Municipality
81 Village Clinic Establishment of village centre
Scheme revision /land acquisition
DOHealth Medium term To be established eThekwini Municipality
82 Promotion of additional village creche
Establishment of functional village
Scheme revision / land acquisition
eThekwini Municipality Dev. Management
Medium term To be established Private Sector
83 Establishment of secondary school
Access to appropriate local education facilities
Scheme revision, additional residential development
Department of Education
Medium term To be established Department of Education
84 Further Education & Training (FET) College
To provide appropriate skills training to local communities
Not applicable Dept. of Higher Education & Training, Pretoria
High Not Known Dept. of Higher Education & Training, Pretoria
85 Civic hall and offices Access to appropriate local facilities
Scheme revision, land acquisition
eThekwini Municipality Social Development
Medium term To be established eThekwini Municipality
86 Village in – out door recreation
Access to appropriate local facilities
Scheme revision, land acquisition
eThekwini Municipality Parks
Medium term To be established eThekwini Municipality
*Note – all costs are estimates only and are expressed in 2010 Rands
PROJECT NO. PROJECT NAME
PURPOSE
LINKAGE RESPONSIBILI
TY
PRIORITY
BUDGET
FUNDING
SOURCE
CATO RIDGE VILLAGE PRECINCT
87 Link Road 10-1 To provide a more direct
route between School Road
and Selby Road
Link between School Road
and Selby Road
ETA Short Term R3,304,860 Developer / ETA
88 Link road 10-2 To provide access to the
new commercial and
residential areas
Link between Mazeppa
Road and Georgedale
Road
ETA Short Term R9,677,460 Developer / ETA
89 Signage Erect new signs and
replace old signs where
necessary
ETA Short Term R300,000 ETA
90 Street lighting Replace old street lighting
where necessary and erect
new street lighting on the
new links
ETA Short Term R749,100 ETA
Electricity
Developer
contributions
91 Professional fees To provide engineering
design services for the
above projects
ETA Short Term R1,298,232
(10% of construction
fees)
Developer / ETA
92 Acquisition of land
for road reserve
Purchase of land from land
owners for the road reserve
ETA Short Term R129,823 Developer / ETA
93 Public Transport
Plan
Public Transport Plan to
analyse public transport
and to recommend
improvements
ETA Short Term R400,000 (split with the
Cato Ridge Industrial
precinct)
Developer / ETA
94 Non-Motorised Plan Non-motorised plan to
analyse pedestrian/cycle
use and to recommend
improvements
ETA Short Term R200,000 (split with the
Cato Ridge Industrial
precinct)
Developer / ETA
14 *Note – all costs are estimates only and are expressed in 2010 Rands