CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...
Transcript of CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...
![Page 1: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/1.jpg)
CATHODIC PROTECTION STANDARD DRAWINGS
TABLE OF CONTENTS
DRAWING
NO.
DESCRIPTION DATE
CP-1 TWO WIRE TEST STATION 7/2016
CP-2 FOUR WIRE AND INSULATOR TEST STATION 7/2016
CP-3 CASING TEST STATION 7/2016
CP-4 CONCRETE TEST BOX 7/2016
CP-5 CONCRETE METER BOX 7/2016
CP-6 WIRING DIAGRAM – TWO WIRE TEST BOX 7/2016
CP-7 WIRING DIAGRAM – 4 WIRE, CASING AND
INSULATOR TEST BOX
7/2016
CP-8 TEST STATION LOCATION PLAN 7/2016
CP-9 ALUMINO-THERMIC WELD 7/2016
CP-9A TEST WIRE CONNECTION – STEEL BAR
ALTERNATE
7/2016
CP-10 PIPE JOINT BONDING FOR INLINE PIPE JOINTS 7/2016
CP-11 PIPE JOINT BONDING FOR PIPE FITTINGS 7/2016
CP-12 JOINT BONDING – CML&C STEEL PIPE 7/2016
CP-13 INSULATING FLANGE KIT ASSEMBLY 7/2016
CP-14 INSULATING FLANGE COATING ABOVE GRADE
AND BURIED
7/2016
![Page 2: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/2.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
TWO WIRE TEST STATION
CP-1
1 OF 17/2016
![Page 3: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/3.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
FOUR WIRE & INSULATOR TEST STATION
CP-2
1 OF 17/2016
![Page 4: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/4.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
CASING TEST STATION
CP-3
1 OF 17/2016
![Page 5: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/5.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
CONCRETE CATHODIC PROTECTION TEST BOX
CP-4
1 OF 17/2016
![Page 6: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/6.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
CONCRETE METER BOX
CP-5
1 OF 17/2016
![Page 7: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/7.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
WIRING DIAGRAM -TWO WIRE TEST BOX
CP-6
1 OF 17/2016
![Page 8: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/8.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
WIRING DIAGRAM
4 WIRE, CASING & INSULATOR TEST BOX
CP-7
1 OF 17/2016
![Page 9: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/9.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
TEST STATION LOCATION PLAN
CP-8
1 OF 17/2016
![Page 10: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/10.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
ALUMINO-THERMIC WELD
CP-9
1 OF 17/2016
![Page 11: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/11.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
TEST WIRE CONNECTION - STEEL BAR ALTERNATE
CP-9A
1 OF 17/2016
![Page 12: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/12.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
PIPE JOINT BONDING FOR INLINE PIPE JOINTS
CP-10
1 OF 17/2016
![Page 13: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/13.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
PIPE JOINT BONDING FOR PIPE FITTINGS
CP-11
1 OF 17/2016
![Page 14: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/14.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
JOINT BONDING - CML&C STEEL PIPE
CP-12
1 OF 17/2016
![Page 15: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/15.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
INSULATING FLANGE KIT ASSEMBLY
CP-13
1 OF 17/2016
![Page 16: CATHODIC PROTECTION STANDARD DRAWINGS TABLE OF ...](https://reader031.fdocuments.us/reader031/viewer/2022020103/58495cbf1a28aba93a8dfa44/html5/thumbnails/16.jpg)
DATE
APPROVED BY
ENGINEERING
MANAGER
SHEET
STD. DWG.YORBA LINDA WATER DISTRICT
INSULATING FLANGE COATING
ABOVE GRADE & BURIED
CP-14
1 OF 17/2016