    LGR Column FormworkThe new range of panels: light and handset

  • 7/25/2019 CAT MAN_LGR_EN

    2/36

    IMPORTANT:

    Any safety provisions as directed by the appropriate governingagencies must be observed when using our products.

    The pictures in this brochure are snapshots of situations atdifferent stages of assembly, and therefore are not completeimages. For the purpose of safety, they should not be deemedas definitive.

    All of the indications regarding safety and operationscontained in this brochure, and the data on stress and loads

    should be respected. ULMA Construccins TechnicalDepartment must be consulted anytime that field changesalter our equipment installation drawings.

    Our equipment is designed to work with accessories andelements made by our company only. Combining suchequipment with other systems is not only dangerous but alsovoids any or all our warrantees.

    The company reserves the right to introduce any modificationsdeemed necessary for the technical development of theproduct.

    All rights reserved

    Neither all nor part of this document may be reproduced ortransmitted in any way by any electronic or mechanicalprocedure, including photocopy, magnetic recording or anyother form of information storage or retrieval system withoutthe written permission of ULMA Construccin.

    National Book Catalogue Number: SS-854-2009

  • 7/25/2019 CAT MAN_LGR_EN

    3/36

    LGR Column Formwork

    4

    12

    16

    20

    25

    26

    28

    32

    Product descriptionAssembly, use and disassemblySolutionsHandling and maintenance conditionsLegal and standard references on health and safety

    in the workplace and environmental risksComponents and accessoriesULMA Construccin addressesOur products

    Safety note

    Control note

    Warning note

    Information note

  • 7/25/2019 CAT MAN_LGR_EN

    4/36

    LGR Column Formwork

    4Construccin

    Product description

    The LGR is a light vertical formwork system created for framing rectangularcolumns, and it is focused toward residential building. This system is comprisedof a range of handset panels in all existing sizes.

    The constant research of ULMA Construccin has led to bet for new materialslike plastic. This type of product used in LGR formwork offers advantages to thecustomer-operator and environment: increases durability and the life of theformwork, reduces weight and facilitates its manipulation, is recyclable ...

    Rectangular columns framing system composed of light handset panels.

    The panels shuttering face is made of plastic. The board is riveted tothe metal frame, providing lightweight to the panels and excellentfinishing.

    Fixing elements are integrated in the panel and they cannot be lost.These elements solve the union between panels in a simple way.

    Reduced number of components.

    Permits pouring dwarf wallsjoining laterally the panels using clamps.

    Robust system, metallic frame with reinforced corners, which guarantees alonger useful life for the panels.

    Maximum allowable concrete pressure: 80 kN/m2. Up to a height of 3 m, itis not necessary to control the pouring speed.

    Range of system:

    Panel heights: 3 m, 1 m and 0.5 m.

    Width range: 0.7 m and 0.5 m.

    Main features:

    Bet for new materials

  • 7/25/2019 CAT MAN_LGR_EN

    5/36

    LGR Column Formwork

    5Construccin

    ULMA Construccin has developed the ideal product for maximum efficiency and economy of work in theimplementation of columns and dwarf walls: LGR Column Formwork.

    Panels:

    The range of LGR panels:

    Height: 3 m, 1 m and 0.5 m

    Width: 0.7 m and 0.5 m

    A product with long life

    The panels are the main elements on column forming.They are positioned and fixed in mill cross shape.

  • 7/25/2019 CAT MAN_LGR_EN

    6/36Construccin

    6

    LGR Column Formwork

    The frame has reinforced corners. These panels havea perimeter frame made of steel profile, which can beused with lateral joint clamps.

    Two different profiles are used to make the ribs thatare welded to the frame to provide frame stiffness:

    - Multipunched steel profile rib supports the safety tiesystem.

    - Rectangular tube, that has a reinforced hole withbushing, permits assembling different formworkaccessories.

    The shuttering face is made of 16 mm thickplastic plywood that fits in the steel frame to whichit is riveted. The plywood edge is protected by theperimeter profile.

    Fixing elements are included in the panel, theycannot be lost and are removable.

    F

    B

    A

    C

    D

    E

    Panels description

    Metal frame

    Lift ring

    Riveted plasticboard

    Reinforce cornerelement

    Tubular rib

    Multipunchedrib

    Bolt

    Sliding nut

    Hollow forcrow bar

    Detail C

    Detail B

    Detail A

    Detail F

    Detail E

    Detail D

  • 7/25/2019 CAT MAN_LGR_EN

    7/36Construccin7

    LGR Column Formwork

    The frames four corners are reinforced with castingelements that are welded to the profiles, which alsoprovide notches that can be used in conjunction with alever to position the panel.

    Detail of the Sliding nut and the Bolt

    The tying system, which is comprised of a Sliding nutand a Bolt, is part of the panel. These complements areinside the multipunched and they can slide along the

    rib. Both components are safely locked in the rib sothat they cannot be lost, but they are removable incase of damage.

  • 7/25/2019 CAT MAN_LGR_EN

    8/36

    LGR Column Formwork

    8Construccin

    Lifting hook

    The Lifting hook is an auxiliary component used for liftingsingle panels or gangs with a crane.

    It is designed to lift a maximum load of 1,200 kg with amaximum sling angle of 30 with respect to the vertical.Two hooks will be used for lifting a full pillar.

    The hook is stamped with the CE mark in compliancewith the European directive 98/37/CE on machinery.

    Lifting:

    Elevation with security and safety

    The Lifting hook must be used following the advices and instructions ofULMA Construccin

    Placement of the Lifting hooks on the panels

  • 7/25/2019 CAT MAN_LGR_EN

    9/36

    LGR Column Formwork

    9Construccin

    Opening the hook

    Basic hooks assembly

    In addition, 3 m height panels have a Ring for liftinginstead of using the Lifting hook.

    The lifting elements must be inspected before each use

    Placing the hook

    Fastening the hook

  • 7/25/2019 CAT MAN_LGR_EN

    10/36

    LGR Column Formwork

    10Construccin

    Elements used during panel assembly to stabilize themagainst wind loads and to plumb the formwork once itis assembled. The system uses adjustable props tosupport both tensile and compression stresses.

    Stabilizing system:

    It is comprised of the following:

    Push-pull prop: tubular body that is adjustable sliding the inner tube to acquire the properlength. The final adjustment is made by a nut. The range of Push-pull prop:

    Push-pull prop 1.55-2.5

    Push-pull prop 2.5-3.85

    Push-pull prop head: an element that joins the panel and the Push-pull prop. It is tied with a Panel bolt and anut through the hole in the ribs.

    Push-pull prop shoe: this element is incorporated in the main push-pull prop 2.5-3.85 and it is used to anchorpush-pull props to the foundation through the holes include on it. Its recommended to use HSA M20X125 Hiltianchors.

    Guaranteed balance

    Stabilizing system

  • 7/25/2019 CAT MAN_LGR_EN

    11/36

    LGR Column Formwork

    11Construccin

    Sharp edges on the columns can be avoided by using Chamfer strips. This is a plastic component that is placed betweentwo panels joined together at 90 angles; it is not necessary to nail it to the plywood because its special shape allows it tobrace the profile. It also has slotted holes necessary to permit passing the Bolt through the lateral holes of the panel.

    Chamfer strip

    Chamfer strip placing on column

    The positioning of the Chamfer strip to the panel is made without anyadditional element

    Column finishing with chamfered corners

    Stabilization settings:

    FORMWORK HEIGHT PUSH-PULL PROP 1.55-2.5 PUSH-PULL PROP 2.5-3.85 DRAWING

    3 m

    a a

    b

    H = 2.4 mL = 2.7 m

    3.5 mH = 2.6 mL = 2.9 m

    4 mH = 3.1 mL = 3.3 m

    H = 0.5 mL = 1.7 m

    4.5 mH = 3.1 mL = 3.4 m

    H = 0.5 mH = 0.6 m

    5 mH = 3.5 mL = 3.85 m

    H = 0.5 mH = 1.6 m

    b

  • 7/25/2019 CAT MAN_LGR_EN

    12/36Construccin

    12

    LGR Column Formwork

    Assemble the other L gang as explained in the

    previous points without stabilizing system, or join therest of the panels one by one with the LGR Bolts andnuts with the column dimensions.

    3

    Assembly, use and disassembly

    LGR column formwork system, for its lightness, allows manual and crane assembly and disassembly.

    Position one panel perpendicular to another (in an L shape), facing the lateral profile holes to the multipunched

    rib holes. Insert the bolts in the panel holes in accordance with the column dimensions to be obtained. Tighten the nuts.

    1

    Manual assembly

    Assemble the Push-pull prop heads and the

    Push-pull props on the panels. Anchor the Push-pull prop shoes using Hilti HSA

    M20x125 anchors.

    Place reinforcement, if this was not done previously.

    2

    Fixing detail

    The assembly process described below refers to a column formwork assembly manipulated without crane. It may varydepending on the required geometry:

  • 7/25/2019 CAT MAN_LGR_EN

    13/36Construccin13

    LGR Column Formwork

    Pour the concrete using the appropriate auxiliaryequipment.

    4 Once the concrete has cured completely, stripping canbegin.

    Release the Bolts and the nuts to dismantle thepanels.

    Perform maintenance work and cleaning on thepanels.

    5

  • 7/25/2019 CAT MAN_LGR_EN

    14/36Construccin

    14

    LGR Column Formwork

    Disassembly basic process

    Disassembly with crane

    2 Start with the column formed and forged.1 Using reglamentary auxiliary equipment, place theLifting hooks on the panels or connect the slings to therings.

    Release the nuts and disconnect the panels withoutdropping.

    Remove the panels from the concreted column with a

    lever.

  • 7/25/2019 CAT MAN_LGR_EN

    15/36Construccin15

    LGR Column Formwork

    Once all the columns are executed, down panelgangs on the ground and disassemble them.

    Perform any maintenance and cleaning work on thepanels.

    4 Remove panel gang with the crane, for followinguses or pours in the implementation of thefollowing pillars.

    3

  • 7/25/2019 CAT MAN_LGR_EN

    16/36

    LGR Column Formwork

    16Construccin

    ColumnsThe LGR panel can be used to frame columns of varyingcross sections (from 15 cm to 60 cm per side), it isadjustable up to 5 cm.

    These column panels have several ribs with holes,punched every 5 cm, through which the Bolts areinserted. Depending on the hole used, the columndimensions will vary.

    PANEL WIDTH 0.7 m Panel 0.5 m Panel

    Minimum column (mm) 300 x 300 150 x 150

    Maximum column (mm) 600 x 600 400 x 400

    Solutions

    The right product for column

    geometries

    Column stabilized with Push-pull props

    Panel fixing with Bolt and Sliding nut

  • 7/25/2019 CAT MAN_LGR_EN

    17/36Construccin17

    LGR Column Formwork

    Vertically connecting panelsTo execute high columns (taller than 3 m), two panels

    must be vertically joined together, always positioningthe small panel below to facilitate and ensure theassembly from the ground.

    The join between two panels is preferably done withtwo Adjustable clamps.

    In these cases, the maximum allowable columnheight is 5 m, always positioning the small panelbelow.

    The concrete pouring speed is limited based on apanel resistance of 80 kN/m2.

    The smaller panel must be placed at the bottom

    Panels join with two clamps

    The clamp ensures the hermetic jointbetween panels; it is also capable ofconnecting fillers up to 12 cm.

  • 7/25/2019 CAT MAN_LGR_EN

    18/36

    Dwarf wallsTo execute columns with a cross section larger than

    60 cm, the panels must be joined laterally using Clamps.

    In these cases, the height of the dwarf walls is limitedto a maximum of 5 m (always positioning the smallpanels below). The panels must be joined face to faceusing intermediate 15 Tie rods.

    For the tying system, besides using these Tie rods, it ispossible to use Sliding nuts incorporated in the panel'smultipunched rib or the Plate washer nut 15, supportedon the outside of the multipunched ribs. To permitrecovering material and reusing it, the rods areprotected by plastic Spacer tubes 22/25 that are

    inserted between panels supported on cones.

    PANELS WIDTH 0.7 + 0.7 m 0.7 + 0.5 m 0.5 + 0.7 m 0.5 + 0.5 m

    Minimum dwarf walls (mm) 1000 850 800 650

    Maximum dwarf walls (mm) 1300 1100 1100 900

    Dwarf wall joined with clamps

    Dwarf walls top view

    Panels tied with Plate washer nut 15

    Panels tied with Sliding nut

    18

    LGR Column Formwork

    Construccin

  • 7/25/2019 CAT MAN_LGR_EN

    19/36

    Work at high elevations, such as pouring concrete,should be carried out from safe and stable workplatforms that prevent workers from falling.

    It can be used independent lifting platforms orworking platforms integrated in the formwork.

    The walkway bracket is installed by inserting its pinin the ribs' tie hole and the stop is supported on thelower ribs to provide stability.

    The platform is created by nailing the wooden planksto the plastic strip on the walkway bracket andinstalling handrails and toeboards using planks.

    Walkway bracket load capacity: 150 Kg/m2.

    The lateral union for dwarf wall solutions, is madeaccording to next criteria:

    Walkway bracketfixing detail

    Work platform on bracket

    The characteristics and qualities of the panel provide excellent finishes

    LGR panel dim. N clamps in height

    LGR panel 3 m 5 clamps

    LGR panel 1 m 2 clamps

    LGR panel 0.5 m 1 clamps

    Construccin

    19

    LGR Column Formwork

  • 7/25/2019 CAT MAN_LGR_EN

    20/36

    LGR Column Formwork

    20Construccin

    Use conditions

    Handling and maintenance conditions

    General use conditions

    Follow the instructions for the project in execution at all times.

    Follow the general manufacturers instructions at all times.

    Formwork shall be put up and stripped by qualified personnel, whoare supervised, overseen and managed by a competent person.

    If working close to high voltage power lines, power should beshut off while work is in progress. If this is not possible, take thenecessary protective measures recommended in the currentapplicable standard.

    Work will not be done on the formwork when wind speeds are inexcess of 60 km/h or when there is ice or snow.

    The crane used must be strong enough for the handling and assemblyof the gangs.

    The auxiliary lifting elements should be appropriate for the loads tobe lifted. They should be checked before each use and discarded iffound to be faulty.

    If the Lifting hook is used, it should be used following the instructionsprovided by the manufacturer.

    If due to conditions of the work environment, the crane operator

    does not have the capacity to view the whole trajectory overwhich the load is moved, the transport operations will be guidedby a signalman, who will communicate with the crane operatorusing predefined signals.

    Under no circumstances shall people loiter beneath or in the pathof elevated loads.

    Formwork

    For stacking formwork panels on the ground, frames will be placedon planks or similar materials and distributed to avoid any damage,facilitating organization, cleanliness and posterior distribution of thepanels to their assembly positions.

    All gang positioning and assembly processes will be performedfollowing safe work procedures.

    They will be levelled and stabilized properly depending on the terrainand/or weather conditions.

    New gang shall not be mounted in the working area until the previousgang has been properly secured.

    Do not leave any element partially assembled.

    The working platforms should never be overloaded. Only elementsrequired for fluid work flow should be stacked on them.

  • 7/25/2019 CAT MAN_LGR_EN

    21/36Construccin21

    LGR Column Formwork

    Assure proper tying between the nut and the bolt so as to makesure that no grout is lost through the joints.

    Make sure that all the plate washer nuts are properly tightened,the push-pull props are properly placed and tightened and thepush-pull prop shoes are correctly tied to the ground.

    Respect the maximum pressures of the formwork system(according to product instructions).

    The formwork surfaces should be checked and cleaned beforepouring concrete.

    Release agent should be applied to a cloth or brush and used toclean the panels after each use. Do not use wire brushes thatcould damage the film on the plywood.

    In general, it is not recommended to use nails, screws or similarfasteners.

    Panels should always be stored after their last use at theconstruction site. Before stacking the panels, they must becleaned. Then, they should be stacked by placing a wooden piecebetween one panel and the next. They should be kept off theground by stacking them on supports that are levelled, and theyshould be stored under a roof.

    Release agent

    Release agent should be used to keep concrete from sticking to the

    formwork, thus increasing number of times a panel can be used.The release agent plays an important role in assuring the quality ofthe concrete surface. It serves the purpose of assuring there are nosurface holes and that colour is uniform.

    It should be applied uniformly and in thin coats at all times. Usageand correct use guidelines should be taken into account at all times.

    The panel surfaces should be cleaned carefully before applying therelease agent.

    It is recommended to clean the metal frame and apply the releaseagent to the frame every 4 or 5 pourings.

    Pouring

    It is recommended to pour the concrete from the lowest possibleheight; never higher than 2 m if it is not poured through a conduit,pipe or other pouring accessory. It is convenient to pour as close aspossible to the base, without pouring directly against the formworkat a single point.

    The condition of the formwork will be overseen while pouringconcrete. Pouring will be stopped if any incident is detected.

    Do not permit concrete to splash on the high sides of the panels so

    as to assure that it does not cause stains.If concrete is poured from a bucket, special care should be taken toavoid hitting the formwork with the bucket and to avoid exceedingthe cranes load limit.

  • 7/25/2019 CAT MAN_LGR_EN

    22/36

    LGR Column Formwork

    22Construccin

    The appropriate compacting system should be used based on theconcrete specifications. This should be appropriate for the vibratorused.

    Internal needle vibrators are better for compacting the concrete onsite, and the external vibrators, which vibrate through the panels,should not be used. The needle vibrator should penetrate theconcrete by 10 to 15 cm.

    The needle vibrator should never come in contact with the formworksurface to assure the expected loads are not exceeded.The vibratorshould penetrate the concrete quickly, and be held still, vertical orslightly inclined for 10 to 30 seconds or until the concrete flows backto the surface.

    Remove the vibrator slowly and carefully.

    Stripping and curing

    Before stripping, the concrete must comply with a minimum resistanceto avoid losing concrete next to the surface since this would affect thesurface resistance and durability of the concrete.

    The time before beginning the dismantling process should beincreased when there are low temperatures or strong winds thatcould result in quickly drying the surface.

    The same time interval should be respected while stripping other

    elements from the construction area. From the surface qualitypoint of view, this is justified since the surface quality is directlylinked to and influenced by the time over which the surface isisolated from the surrounding environment.

    While stripping, check that there are no people near and verify thatthere is no loose material that can fall from the platforms.

    Vertical elements should be stripped from top to bottom.

    Once the gang is stripped, it will be supported on the frameswhere it will then be cleaned and totally disassembled if no moreconcrete is going to be poured.

    Before using any material, it should be checked to confirm that allcomponents are in proper working conditions.

    Personal and collective protective equipment

    Regulatory safety equipment should be used when working, orworking platforms with their corresponding safety handrails shouldbe used (collective safety equipment).

    Personal Protective Equipment to be used should include at least:helmet, safety footwear, gloves and a tool belt.

    Other Personal Protective Equipment should be used depending onthe site guidelines, based on risk assessments.

  • 7/25/2019 CAT MAN_LGR_EN

    23/36Construccin23

    LGR Column Formwork

    Lifting hook The Lifting hook should be used in a way it does not put in danger

    the integrity of people.

    The Lifting hook cannot be used in applications not described in theUsers Guide.

    The Lifting hook can only be used to raise panels and gangs forsystems specifically designed by ULMA Construccin, LGR in thiscase. It will never be used for other applications or other formworksystems.

    In case the Lifting hook does not work properly, it will have to be

    taken back immediately to be repaired.

    The Lifting hook must not suffer strong knocks and excessivecrushing during its handling, storage, transport and, mainly,when shifting the Panel from these Brackets.

    The Lifting hook will remain in a place protected from theatmospheric and aggressive agents to avoid its deterioration.

    In case anyone who manipulates the Lifting hook notices anydeterioration in it, he/she will immediately take it back to have itrepaired.

    The revision and reparation of the Lifting hook will be carried outby the staff authorised by the manufacturer.

    Handling conditions

    Proper storage of components is a fundamental necessity for their

    preservation.Optimal storage conditions are the following:

    - Place the pieces of the same type and dimensions on or inelements that have been exclusively designed for them (baskets,pallets, boxes, etc.).

    - In order to avoid part deformation, do not strap the metal stripstoo tightly.

    - Apply the metal strips sufficiently tight to assure the parts cannotmove.

    - Use protectors to guard the components from the excessive

    pressure exerted by the metal strips.

    - Do not permit parts to hit against one another while the materialis being moved.

    Repairing

    ULMA Construccin has specific equipments for cleaning, repairingpanels and replacing board.

  • 7/25/2019 CAT MAN_LGR_EN

    24/3624

    Construccin

    The self-blocking nut and hexagonal screw are for single use, so long as these elements are released, theseshould be replaced by new ones.

    CONTROL TYPE COMPONENT FAULT REVISION FREQUENCY CRITICAL YES / NO REPAIR

    Make sure that the used wire rope slings to raise the panels areplaced in a symmetric way.

    Check visually the state of the Lifting hook before any use,

    discarding it if any problem. In long term jobsites the components will be revised periodically

    (every six months) by qualified personnel.

    Never stay under the lifted load.

    Panels will be raised slowly, avoiding sudden movements. Whenraising the panel do not stay near it. Lift it some centimetres andcheck the correct placement of the slings.

    If the Lifting hooks are not working properly, the panel will beplaced on the ground and all the mistakes will be corrected.

    If the load has to be guided, cords and other auxiliary means willbe used. These means will be placed in the panel in advance.

    If the crane operator does not have visual control of the wholecourse, the displacement labours of the panels will be guided bysomeone qualified to do it. Never guide the load with the hand.

    Gloves and safety boots with metallic toecap will always be usedfor hand and feet protection when placing Lifting hook and raisingpanels. A helmet will always be used to protect the head.

    Handlings will be carried out in places with enough visibility (morethan 100 Lux).

    Checking instructions

    The hook must be verified at least once a year by qualified personnel from ULMA Construccin or, by someone thathas been previously qualified and authorised by ULMA Construccin.

    For the overhaul of the Lifting hook check the parts specified in the next table:

    LGR Column Formwork

    Visual

    Fixed and mobileparts

    Fissured welding, brokenor with an importantcorrosion

    Every use and every time itgoes out from the store tothe jobsite

    Every use and every time itgoes out from the store tothe jobsite

    Every use and every time it

    goes out from the store tothe jobsite

    Every use and every time itgoes out from the store tothe jobsite

    Every use and every time itgoes out from the store tothe jobsite

    Every use and every time itgoes out from the store to

    the jobsite

    Deflection or excessiveerosion

    Check the bundle of the

    components. Deflections.Missing component.

    Missing component

    Missing component

    Dirt that impedes thefunctioning and mobility of

    moving components

    Staple

    Hexagonal screw nut

    Spring

    Identification plate

    Surface appearance

    Yes Scrap

    Scrap

    Replacecomponents

    Replacecomponents

    Replacecomponents

    Clean

    Yes

    Yes

    No

    No

    No

  • 7/25/2019 CAT MAN_LGR_EN

    25/36Construccin25

    Council Directive 89/391/EEC on the introduction ofmeasures to encourage improvements in the safetyand health of workers at work

    Council Directive 89/654/EEC on the minimumsafety and health requirements for the workplace

    Council Directive 92/57/EEC on the implementationof minimum safety and health requirements attemporary or mobile construction sites

    Council Directive 92/58/EEC on the minimumrequirements for the provision of safety and/orhealth signs at work

    Directives 89/655/EEC- 95/63/EC - 2001/45/ECconcerning the minimum safety and healthrequirements for the use of work equipment byworkers at work

    Council Directive 89/656/EEC on the minimum healthand safety requirements for the use by workers ofpersonal protective equipment at the workplace

    Council Directive 90/269/EEC on the minimum healthand safety requirements for the manual handling ofloads where there is a risk particularly of back injury toworkers

    Directive 2002/44/EC on the minimum health andsafety requirements regarding the exposure of workersto the risks arising from physical agents (vibrations)

    Directive 2003/10/EC on the minimum health andsafety requirements regarding the exposure of workers

    to the risks arising from physical agents (noise)

    UNE-EN 13374 Temporary border protection systems,product specifications, test methods

    Legal and standard references on health and safetyin the workplace and environmental risks

    Agreement statement NEVI Lifting hook

    AGREEMENT STATEMENTAccording to Directive 98/37/CE concerning machines

    Hereby ULMA C y E, S. Coop. declares that the product whose code and name are mentioned below complies with the designand manufacturing aspects concerning peoples safety required by the corresponding European directive concerning the machines98/37/CE, the standard UNE EN 13155 and UNE EN 729, being this the valid statement until the product suffers any modification.

    Code: 1920835Name: NEVI LIFTING HOOK

    Oati, 23th January 2009

    Signed

    Aitor Ayastuy

    Chairman

    Agreement statement Lifting ring

    AGREEMENT STATEMENTAccording to Directive 98/37/CE concerning machines

    Hereby ULMA C y E, S. Coop. declares that the product whose code and name are mentioned below complies with the design andmanufacturing aspects concerning peoples safety required by the corresponding European directive concerning the machines98/37/CE, the standard UNE EN 13155 and UNE EN 729, being this the valid statement until the product suffers any modification.

    Code: 9165401Name: EYE BOLT SCREW M20 DIN580

    Code: 9057200

    Name: HEXAGONAL NUT M20 DIN985-8 ZINC COATED

    Oati, 26th January 2009

    Signed

    Aitor Ayastuy

    Chairman

    LGR Column Formwork

  • 7/25/2019 CAT MAN_LGR_EN

    26/36

    LGR Column Formwork

    26Construccin

    Components and accessories

    NEVI Lifting hook 8 1920835

    Basic elementsWEIGHT (kg) CODE

    LGR PanelLGR Panel 3 x 0.7 74.26 1856050

    LGR Panel 3 x 0.5 58.4 1856065

    NEVI Clamp 3.96 1920851

    LGR PanelLGR Panel 1 x 0.7 29.5 1856060LGR Panel 1 x 0.5 22.6 1856070

    LGR PanelLGR Panel 0.5 x 0.7 16.9 1856075

    LGR Panel 0.5 x 0.5 12.9 1856080

    WEIGHT (kg) CODE

    Chamfer strip LGR 3 m 0.45 1856061(16 units)

  • 7/25/2019 CAT MAN_LGR_EN

    27/36Construccin27

    LGR Column Formwork

    WEIGHT (kg) CODE

    Push-pull prop head 1.5 1856140

    Push-pull prop 1.55 - 2.5 10.3 1856130

    Stabilizing

    Push-pull prop 2.5 - 3.85 19.7 1856120

    Panel bolt 0.4 1861122

    Hexagonal nut 15 0.22 7238001

    ORMA Walkway bracket 12.2 1861094

    WEIGHT (kg) CODE

    Tie rod 15/1 1.7 0230100

    Plate washer nut 15 1.4 1900256

    Spacer tube 22/25 0.3 7230455(75 ml)

    Cone 22 (250 units) 0.006 7230264

    Eye bolt screw 0.3 9165401M20 DIN580

    Hexagonal nut 0.06 9057200

    M20 DIN985-8zinc coated

    Work Platforms - Anchors - Consumables

  • 7/25/2019 CAT MAN_LGR_EN

    28/36

    28Construccin

    ULMA Worldwide

    EUROPE

    GermanyULMA Betonschalungenund Gerste GmbH

    Paul-Ehrlich-Strae 8D-63322 RDERMARKPhone: + 49 6074 9294 0Fax: + 49 6074 9294 101www.ulma-c.de

    Nordwest BranchStresemannallee 4cD-41460 NEUSSPhone: + 49 2131 40201 0Fax: + 49 2131 40201 99

    Sdwest BranchManfred - Wrner - Str. 115D-73037 GPPINGEN

    Phone: + 49 7161 50608 42Fax: + 49 7161 50608 43

    FranceULMA, S.A.R.L.27, rue Gustave EiffelZ.I. de la Marinire91070 BONDOUFLEPhone: + 33 1 69 11 54 50Fax: + 33 1 69 11 54 54www.ulma-c.fr

    IDF chafaudages Branch22 Bis, rue Gustave EiffelZ.I. de la Marinire91070 BONDOUFLEPhone: + 33 1 69 11 63 30Fax: + 33 1 69 11 63 31

    IDF Construction Branch27, rue Gustave EiffelZ.I. de la Marinire91070 BONDOUFLEPhone: + 33 1 69 11 63 40Fax: + 33 1 69 11 63 37

    Eguilles Branch50, alle MeulireZ.I. - Route de Berre13510 EGUILLESPhone: + 33 4 42 64 62 30Fax: + 33 4 42 64 62 31

    Saint Herblain Branch11, rue FondeurZ.I. du Tisserand44800 SAINT HERBLAINPhone: + 33 2 51 80 48 04Fax: + 33 2 51 80 48 05

    La ChapelledArmentires BranchZone IndustrielleRue Andr Ampre59930 LA CHAPELLEDARMENTIRESPhone: + 33 3 20 07 11 86

    Fax: + 33 3 20 07 11 68

    Tarnos Branch40, rue de lIndustrieZ.I. de Tarnos40220 TARNOSPhone: + 33 5 59 64 44 45Fax: + 33 5 59 64 44 84

    Lons Branch9, Avenue LarregainZ.I. du Monhauba64140 LONSPhone: + 33 5 59 62 71 97Fax: + 33 5 59 13 84 33

    ItalyALPI, S.P.A.Zona Industriale EstI-39035 MONGUELFO (BZ)Phone: + 39 0474 947 400Fax: + 39 0474 947 499

    www.alpionline.net

    KazakhstanULMA Kazakhstan01000 ASTANA6/2, Tashenova St. 4th floor, offices 7,9Phone:/Fax: + 7 7172 58 05 19Phone: + 7 7172 37 93 48www.ulma-c.kz

    PolandULMA Construccion Polska S.A.03-115 WARSAWul. Klasykw 10Phone: + 48 22 506 70 00Fax: + 48 22 814 31 31www.ulma-c.pl

    WSCHD REGION

    WARSZAWA Branch

    Warszawa Office03-197 WARSAWul. Laurowa 39Phone: + 48 22 506 72 50Fax: + 48 22 747 19 16

    Olsztyn Office10-467 OLSZTYNul. Sprztowa 3, lok. 18

    Phone: + 48 89 537 73 10Fax: + 48 89 532 04 95

    LUBLIN Branch

    Lublin Office20-327 LUBLINul. Wroska 2Phone: + 48 81 749 72 90Fax: + 48 81 744 04 90

    Biaystok Office15-100 BIAYSTOKul. 1. Armii Wojska Polskiego 9, lok. 203Phone: + 48 85 676 73 00Fax: + 48 85 675 06 53

    Production PlantULMA C y E, S. Coop.

    Ps. Otadui, 3 - P.O. Box 1320560 OATI (Guipzcoa)SPAINPhone: + 34 943 034900

    Fax: + 34 943 034920www.ulma-c.com

  • 7/25/2019 CAT MAN_LGR_EN

    29/3629

    Construccin

    Porto BranchZona Industrial da FeiteiraRua das Casas Queimadas717 Grij4415-439 VILA NOVA DE GAIAPORTOPhone: + 351 227 418 820Fax: + 351 227 418 829

    Czech RepublicULMA Construccin CZ, s.r.o.Prmyslov 1009294 71 BENTKY NAD JIZEROUPhone: + 420 326 910 600Fax: + 420 326 910 601www.ulma-c.com

    Slovak RepublicULMA Construccion SK, s.r.o.Rybnin 38/K

    831 06 BRATISLAVAPhone: + 421 2 4910 2911 - 13, 18Fax: + 421 2 4910 2922www.ulma-c.com

    RomaniaULMA Cofraje s.r.l.Sos Chitilei, 200012405 - Sector 1 - BUCHARESTPhone: + 40 31 425 13 22/23Fax: + 40 31 425 13 24www.ulma-c.ro

    UkraineULMA Formwork Ukraine Ltd.01013 KIEV3, Derevoobrobna St.Phone: + 380 44 255 14 92Fax: + 380 44 255 14 94www.ulma-c.com

    Nowa Sl Office67-100 NOWA SLul. Kociuszki 29Phone: + 48 68 376 77 60Fax: + 48 68 387 02 21 wew. 357

    POUDNIE REGION

    KRAKW Branch

    Krakw Office31-670 KRAKWul. Powstacw 66Phone: + 48 12 620 73 70Fax: + 48 12 647 34 22

    Katowice Office40-203 KATOWICEal. Rodzieskiego 188bPhone: + 48 32 356 74 80Fax: + 48 32 353 33 90

    D Branch94-250 Dul. niwna 4/8Phone: + 48 42 666 73 20Fax: + 48 42 650 03 25

    PortugalULMA Portugal Lda.Zona Industrial - Rua A, s/nVale de Figueira2695 SO JOO DA TALHA - LISBONPhone: + 351 219 947 850Fax: + 351 219 558 022www.ulma-c.pt

    ZACHD REGION

    POZNA Branch61-317 POZNAul. Ostrowska 484

    Phone: + 48 61 838 75 30Fax: + 48 61 863 01 60

    BYDGOSZCZ Branch

    Bydgoszcz Office85-739 BYDGOSZCZul. Fordoska 199Phone: + 48 52 323 76 80Fax: + 48 52 345 25 65

    Szczecin Office70-676 SZCZECINul. Gerarda Merkatora 7Phone: + 48 91 485 77 30Fax: + 48 91 462 53 11

    GDASK Branch80-298 GDASKul. Budowlanych 27Phone: + 48 58 522 78 00Fax: + 48 58 667 02 04

    WROCAW Branch

    Wrocaw Office50-541 WROCAWul. Armii Krajowej 53Phone: + 48 71 391 76 30Fax: + 48 71 367 30 90

  • 7/25/2019 CAT MAN_LGR_EN

    30/36

    30Construccin

    ULMA Worldwide

    AMERICAArgentinaULMA Andamios yEncofrados Argentina, S.A.Bernardo de Irigoyen 722 6ACP1072AAP CAPITAL FEDERALPhone/Fax: + 541 14 3425132www.ulma-c.com.ar

    BrazilULMA Brasil - Frmas eEscoramentos Ltda.Rua Joo Dias Ribeiro, 210Jd. Sagrado Corao de JesusItapevi - SPCEP: 06693-810Phone/Fax: + 55 11 3883 1300www.ulma-c.com.br

    Rio de Janeiro BranchRua Sargento Silva Nunes, 137Ramos - Rio de Janeiro - RJCEP: 21040-231Phone/Fax: + 55 21 2560 2757Phone/Fax: + 55 21 2560 5541

    Centro-Oeste BranchQuadra 3, Lotes 680/700Setor Industrial LesteGama - Brasilia DFCEP: 72445-030Phone/Fax: + 55 61 3556 6226

    Salvador BranchTravessa Dois de Fevereiro, 145Centro - Lauro de Freitas - BACEP: 42700-000Phone/Fax: + 55 71 3288 2003

    Sul BranchRua Dr. Joo Incio, 195/199Navegantes - Poa RSCEP: 90230-180

    Phone/Fax: + 55 51 3337 1003

    ChileULMA Chile - Andamios yMoldajes, S.A.Vizcaya n 325 - Pudahuel(Ruta 68, Camino Noviciado)SANTIAGOPhone: + 56 2 5990530Fax: + 56 2 5990535www.ulma-c.cl

    Norte BranchGeneral Borgoa 934 of. 70ANTOFAGASTAPhone: + 56 5 5246770

    Fax: + 56 5 5246960

    Sur BranchOHiggins 940 of. 904CONCEPCINPhone: + 56 4 12522930Fax: + 56 4 12228321

    USAULMA Form Works, Inc.58 Fifth AvenueHawthorne - NEW JERSEY 07506Phone: + 1 973 636 2040Fax: + 1 973 636 2045www.ulma-c.us

    West Branch (Phoenix)1530 West Houston AvenueGilbert, ARIZONA 85233Phone: + 1 480 304 4942

    Fax: + 1 480 304 4948

    Mid-Atlantic Branch (Baltimore)8235 Patuxent Range RoadJessup, MARYLAND 20794Phone: + 1 443 296 9852Fax: + 1 443 296 9860

    MexicoULMA Cimbras y Andamiosde Mxico S.A. de C.V.Va Gustavo Baz Prada 2160Acceso 554060 Col. La LomaTLALNEPANTLA(Mexico State)

    Phone: + 52 55 5361 6783Fax: + 52 55 2628 3549www.ulma-c.com.mx

    PeruULMA Encofrados Per, S.A.Av. Argentina 2882LIMAPhone: + 51 1 613 6700Fax: + 51 1 613 6710www.ulma-c.com.pe

    Norte BranchCtra. Pomalca, km 2,7Chiclayo - LAMBAYEQUE

    Phone: + 51 7 460 8181Fax: + 51 7 460 8182

    ASIA-AFRICA

    P.R. ChinaULMA Formworks China R.O.

    #1009 Fortunegate Mall1701 West Beijing RoadSHANGHAI, 200040Phone: + 86 21 62887070Fax: + 86 21 62885980www.ulma-c.com

    UAEULMA Formworks UAE L.L.C.Plot No. 597- 547Dubai investments ParkP.O. Box. 282286DUBAIPhone: + 971 4 8858208Fax: + 971 4 8858209www.ulma-c.com

    SingaporeULMA FormworkSingapore PTE. LTD.2 Senoko Way758027 SINGAPOREPhone: + 65 6758 2338Fax: + 65 6758 8523www.ulma-c.com

    Production PlantULMA C y E, S. Coop.

    Ps. Otadui, 3 - P.O. Box 1320560 OATI (Guipzcoa)SPAINPhone: + 34 943 034900

    Fax: + 34 943 034920www.ulma-c.com

  • 7/25/2019 CAT MAN_LGR_EN

    31/3631

    Construccin

    ULMA in Spain

    ANDALUCA Branch

    Pol. Ind. FridexAutova Sevilla - Mlaga, km 4,241500 ALCAL DE GUADAIRA

    (Sevilla)Phone: 95 5630044Fax: 95 5630020

    Camino Nuevo, s/n18210 PELIGROS (Granada)Phone: 958 405028Fax: 958 405328

    ARAGN Branch

    Pol. Ind. El Pradillo IIAneto, 2 - Parcela 2350690 PEDROLA (Zaragoza)Phone: 976 654645

    Fax: 976 654635

    CANARIAS Branch

    Pol. Ind. Las MajorerasLos Llanillos, 3335259 INGENIO (Las Palmas)Phone: 928 789212Fax: 928 789538

    Pol. Ind. Valle de GimarManzana XIII - Parcelas 21 y 2238509 GIMAR (Tenerife)Phone: 922 505020Fax: 922 501101

    CASTILLA Branch

    Ctra. Burgos - Portugal, km 11647270 CIGALES (Valladolid)Phone: 983 581009

    Fax: 983 581021

    Pol. Ind. de Roces, 5Gustavo Eiffel, 4633211 GIJN (Asturias)Phone: 98 5168038Fax: 98 5167513

    CATALUA Branch

    Pol. Ind. Sud - EstPintor Velzquez, 7 y 908213 POLINYA (Barcelona)Phone: 93 7132727Fax: 93 7133643

    Pol. Ind. Son NogueraCas Rossos, 12-1407620 LLUCMAJOR(Illes Balears)Phone: 971 669850Fax: 971 121512

    CENTRO Branch

    Pol. Ind. Sur28863 COBEA (Madrid)Phone: 91 6523199Fax: 91 6528828

    Ctra. N-401 Madrid-C. Real, km 87

    45110 AJOFRN (Toledo)Phone: 925 011000Fax: 925 011008

    GALICIA Branch

    Pol. Ind. Espritu SantoRua Bell, 24-2615650 CAMBRE (La Corua)

    Phone: 981 649802Fax: 981 649060

    Generoso Domnguez, s/nPortela - Tameiga36416 MOS (Pontevedra)Phone: 986 344045Fax: 986 304809

    NORTE Branch

    Pol. Ind. GoiainAv. San Blas, 101170 LEGUTIANO (lava)Phone: 945 001100

    Fax: 945 001111

    Iturritxualde, 348160 DERIO (Vizcaya)Phone: 94 4521425Fax: 94 4522468

    LEVANTE Branch

    Pol. Ind. Los VientosGregal, 7 - Apdo. 7646119 NQUERA (Valencia)

    Phone: 96 1399130Fax: 96 1399096

    Pol. Ind. La SerretaCal, s/n30500 MOLINA DE SEGURA(Murcia)Phone: 968 642679Fax: 968 641276

  • 7/25/2019 CAT MAN_LGR_EN

    32/36

    LGR Column Formwork

    32Construccin

    Our products

    Vertical Formworks

    ORMA Modular FormworkA system for large works andhigh performance

    ENKOFORM V-100Bracing SystemWall and Column Formwork

    with Steel Walers and TimberBeams

    COMAIN Hand-heldFormworkModular Formwork that islight and easy to handle by asingle person

    Circular SheetFormwork BIRAFormwork system designedfor circular wallconfigurations

    LGR Column FormworkColumn formwork using lightpanels

    CLR Circular ColumnFormworkCircular column formwork,designed to solve thedifferent column diameterseasily

    NEVI Modular FormworkVertical handset and gangformwork system

    Formwork ClimbingSystemsClimbing and self-climbingsystems for any height

  • 7/25/2019 CAT MAN_LGR_EN

    33/36Construccin33

    LGR Column Formwork

    Notes

  • 7/25/2019 CAT MAN_LGR_EN

    34/36

    LGR Column Formwork

    34Construccin