Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

download Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

of 17

Transcript of Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    1/17

    NBN Co 20111

    NBN Co Briefing

    Cassandra Scott28 April 2011DisclaimerThis document sets out NBN Cos proposals in respect of certain aspects of the National Broadband Network. The contents of this document represent NBNCos current position on the subject matter of this document. The contents of this document should not be relied upon by our stakeholders (or any otherperson) as representing NBN Cos final position on the subject matter of this document, except where stated otherwise. NBN Cos position on the subject

    matter of this document may also be impacted by legislative and regulatory developments in respect of the National Broadband Network.All prices shown in this document are exclusive of any GST. NBN Co Limited 2011

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    2/17

    NBN Co 20112

    NBN Co Limited 2011

    JA Little RC Patterson Sir Charles Todd AJ Mitchell

    Source:Ann Moyal, Clear across Australia, A history of telecommunications, The Most Perfect Invention, page 52Photo: Picture of Charles Todd and his overseers at the Roper River Depot. From left: J.A. Litt le, R.C. Patterson, Todd, and A.J. Mitchell,

    Phase 1: Overland Telegraph 1872

    1

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    3/17

    NBN Co 20113

    Phase 2: Copper Access Network Post WW2

    NBN Co Limited 20112

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    4/17

    NBN Co 20114

    93% Fibre + 7% (Wireless + Satellite)

    Indicative map

    Legend:Grey Wireless coverageRed Fibre townsBlue Transit networkGreen Satellite coverage

    Phase 3: Now - National Broadband Network

    NBN Co Limited 20113

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    5/17

    NBN Co 20115

    Bandwidth Demand

    NBN Co Limited 20114

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    6/17

    NBN Co 20116

    NBN Co Limited 2011

    Demand

    Catch-Up TV1.5Mbps 2Mbps

    IPTV Multicasting3.5 7.5Mbps

    HD Movie or Sport9-29Mbps

    CinematographicExperience29-300Mbps

    HDTV1080p

    HDTV 720p

    VGA 640 x480

    w288p 512 x 288

    450MB

    ~1.5GB-3.4GB

    4 13 GB

    13 135GB

    1HrStreamingDownload

    Online Video512kbps 1Mbps

    900MB

    AverageBit Rate

    Different Screen Resolutions Lead to Different Bitrate

    Streaming

    HD will be the biggest driver of high bandwidth in the near term

    Source: Commercial Strategy Team

    4K (4196 x 2160)

    8K (8392 x 4320)

    960 x 640

    2K (2048 x 1080)

    Sanyo 2010iPhone 2010

    JVC 4K Projector$150k Pro2011 Consumer version

    8K ProjectorPro version only2013 Consumer version

    iPhone 2009

    Larger Screen ResolutionDrives

    Higher Bandwidth Demand

    5

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    7/17

    NBN Co 20117

    Fibre penetration in key economies

    Source: FTTH Council, 2010http://ftthcouncil.com/en/newsroom/2010/02/26/g-20-need-to-speed-up-on-fiber-to-the-home

    Australia isnt currently on the list!

    NBN Co Limited 20116

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    8/17

    NBN Co 20118 NBN Co Limited 2011

    Ubiquity and Standardisation

    In the volume rollout, Retail Service Providers will be able to reach any

    customers in a region, using any of the three technology platforms

    From the same Point of Interconnect

    From the same network interface (NNI)

    Using the same BSS interface

    Using the same processesAt the same price for same/similar product

    Ubiquity with standard products/processes is critical for publicapplications such as eHealth and eEducation

    As important as the speed and throughput improvements

    7

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    9/17

    NBN Co 20119

    NBN Co - Layer 2 Ethernet Access Network Wholesaler

    Retail

    Wholesale

    Retail service providerRetail service providerRetail service providerRetail service provider

    Wholesaler/Aggregator

    NBN - Wholesale Only

    NBN Co Limited 20118

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    10/17

    NBN Co 201110

    Uniform National Wholesale Pricing

    1/ Access price scale

    ($/month per Service - Excluding GST)

    2/ Connectivity pricing

    Connectivity is sold as capacity (Mbps) and can be seen as a proxy for usage (GB/month)

    Additional capacity is available to the RSP in increments that allows them to control their own quality ofservice

    / ( )ownstream Mbps / ( )pstream Mbps Fibre Wireless Satellite12 1 $24 $24 $24

    25 5 $27 - -

    25 10 $30 - -

    50 20 $34 - -

    100 40 $38 - -

    250 100 $70 - -

    500 200 $100 - -

    1000 400 $150 - -

    NBN Co Limited 20119

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    11/17

    NBN Co 201111 NBN Co Limited 2011

    Three technologies one access seeker interface

    FibreAccessNode

    EthernetAggregation

    Switch

    POI

    ACCESS VC CONNECTIVITY VCs

    10

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    12/17

    NBN Co 201112 NBN Co Limited 201111

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    13/17

    NBN Co 201113

    Commissionwork/ tasks

    Designactivities

    Allocate

    Mobiliseresources

    Deliver

    Assess

    Develop whole-of-network designacross components

    Performancemanagement

    Informationmanagement

    Detailed design build activities

    Prioritise andsequence projects for

    rollout

    Developdetailed projectplans and workmodels

    Determinewho doeswhat and onwhat terms

    Plan and deploy material, equipmentand labour to construction locations

    Coordinateprojectdelivery andcontinuousimprovement

    Auditprocesses andcodifylearnings

    ement will allow us to realise quality, cost and operational efficiencies within a safe workplace

    Continuous Improvement Construction Approach

    NBN Co Limited 201112

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    14/17

    NBN Co 201114

    Construction is underway

    NBN Co Limited 201113

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    15/17

  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    16/17

    NBN Co 201116

    Case Study Pharmacy in Scottsdale, Tasmania

    * Image from Google Maps

    See:

    http://www.youtube.com/watch?v=_abQ17glqcg

    www.nbnco.com.au and view theresearch tab for case studies

    15 NBN Co Limited 2011

    http://www.youtube.com/watch?v=_abQ17glqcghttp://www.nbnco.com.au/http://www.nbnco.com.au/http://www.youtube.com/watch?v=_abQ17glqcg
  • 8/6/2019 Cassandra Scott, NBN Co, Broadband Network Policy and Implementation

    17/17

    NBN Co 201117 NBN Co Limited 201116

    Thank you