Case Study - Van Elle · car park as part of the project. The apartment building itself was a three...

1
Case Study: Timber Frame Residenal Apartments, Hull www.van-elle.co.uk 01773 580 580 [email protected] Project Overview As the development had a city centre locaon, providing car park- ing was going to be imperave to selling the apartments. With this in mind Armstrong Construcon had designed a basement car park as part of the project. The apartment building itself was a three storey mber frame design, set to be the highest mber frame building in Yorkshire. Van Elle designed and installed the conguous piled wall and bearing piles. In addion, Van Elle designed the capping beams and temporary propping system giving an overall service allowing the structure to progress out of the ground. The small site was a bit of a challenge Van Elle designed the wall with a small but powerful restricted access rig in mind, which was capable of working within the ght access condions. Result Van Elle carried out some further site invesgaons, using Strata a Van Elle group SI team. This allowed us to produce a cost effec- ve soluon suitable for the condions and ensured the job was- nt faced with any unexpected problems. Combining this with u- lising the best rigs for the job ensured the programme ran smoothly and was managed efficiently. The programme was completed seven days ahead of schedule, saving our client both me and money. Technical informaon We installed 204 No conguous piles to 13.5m deep, 58 No bear- ing piles to 18m deep. Rig: Llamada 130 Client: Armstrong Construcon Sector: Housing Services Provided: Piled Walls Locaon: Hull Year: 2006

Transcript of Case Study - Van Elle · car park as part of the project. The apartment building itself was a three...

Page 1: Case Study - Van Elle · car park as part of the project. The apartment building itself was a three storey timber frame design, set to be the highest timber frame building in Yorkshire.

Case Study: Timber Frame Residential Apartments, Hull

Client:

Consulting Engineer:

Services Provided:

Location:

Value:

Year:

www.van-elle.co.uk

01773 580 580

[email protected]

Project Overview As the development had a city centre location, providing car park-ing was going to be imperative to selling the apartments. With this in mind Armstrong Construction had designed a basement car park as part of the project. The apartment building itself was a three storey timber frame design, set to be the highest timber frame building in Yorkshire. Van Elle designed and installed the contiguous piled wall and bearing piles. In addition, Van Elle designed the capping beams and temporary propping system giving an overall service allowing the structure to progress out of the ground. The small site was a bit of a challenge Van Elle designed the wall with a small but powerful restricted access rig in mind, which was capable of working within the tight access conditions. Result Van Elle carried out some further site investigations, using Strata a Van Elle group SI team. This allowed us to produce a cost effec-tive solution suitable for the conditions and ensured the job was-n’t faced with any unexpected problems. Combining this with uti-lising the best rigs for the job ensured the programme ran smoothly and was managed efficiently. The programme was completed seven days ahead of schedule, saving our client both time and money. Technical information We installed 204 No contiguous piles to 13.5m deep, 58 No bear-ing piles to 18m deep. Rig: Llamada 130

Client:

Armstrong Construction

Sector:

Housing

Services Provided: Piled Walls

Location:

Hull