Project to install a ‘temporary’ Sports Hall- a case study by Bees Marquees & Structures
This particular sports hall available from March 2015! Rental or purchase - 1 careful owner, only 2 years old!
Viewings available by appointment;
highly competitive deal waiting to be negotiated!
The need: a school sports hall, built 45 years ago and designed for a 30 year lifespan began to deteriorate. Plans were made to replace it with a new building but whilst planning permission (and funding) was still being considered, the building was deemed no longer safe for use. Our project to provide a temporary sports hall in the meantime was commissioned, with upto 2 years’ usage in mind … although there are similar structures installed elsewhere for 10 times that, so these structures are only as ‘temporary’ if you wish them to be! Many call them ‘permanent temporary’!
Visits to and discussions with the school considered the various possibilities for a site and chose the most suitable & feasible based on a range of factors, also considering the needs of the local community and likely viewpoint of the town planners
A number of designs were considered, including an A-frame roof ‘marquee like’ and a polygon roof structure
A-frame roof,
both structures
Rigid panel walls,
but not insulated
(single layer panel)Rigid panel walls, but
not insulated
(single layer panel)
The chosen design of a 20m x 35m polygon roof structure with thermo roof & insulated walls
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
2'x2'x2'
sunken
concrete
plinth 40cm ø
base plate
on leg
le
gle
gle
gle
g
le
gle
gle
gle
g
le
gle
gle
gle
g
le
gle
gle
gle
g
le
g
le
g
le
g
le
g
le
g
le
g
Grass remains outside of the structure’s footprint & area of plinths
Whole 20m x 35m area under structure (excluding the sunken
concrete plinths to support legs) is filled in with 20 tonnes of
compacted Hoggin, to approx 4" deep
A very brief pictorial summary of the installation process, including some choicesGroundworks: first kill the grass, install sunken concrete plinths to support legs, a DPM and shallow area of hoggin, scree or concrete dust base
The floor above is rolled out
and welded down but the
floor on the left is made
from tiles; it costs more but
could be removed and
installed in your new
building
Doors, partition walls, changing rooms, lighting, heating, dehumidifiers…
Our CAD tool was useful in supporting the funding and planning application stage by letting us show an impression of the project from initial space, through construction to finished item
CAD impression of the outside of the finished sports hall (next 7 pages)
(at this stage the plan was to create in these colours, but in the end they chose white)
Some photos from the installation
The finished item - outside
This particular sports hall available from March 2015! Rental or purchase - 1 careful owner, only 2 years old!
Viewings available by appointment;
highly competitive deal waiting to be negotiated!
This particular sports hall available from March 2015! Rental or purchase - 1 careful owner, only 2 years old!
Viewings available by appointment;
highly competitive deal waiting to be negotiated!
Rough price examples based on the chosen 20m x 35m new sports hall design featured hereTurn-key project based on a min 24 month lease: £140K for Y1 then £7K per month
Or, for an outright purchase:·Same 20m x 35m, as a turn-key project would be £250K (includes installation, groundworks, sub-base floors, specialist floor cover, internal partitioning, heating, lighting, electrics, separate storage rooms)
·Same 20m x 35m sports hall featured here as structure only (no groundworks, no installation/assembly, no content) would be £95K
·The same design but for a 5m longer structure (20m x 40m), as structure only (no groundworks, no installation/assembly, no content) would be £125K
·As above but including installation (not groundworks, floor, content/fixtures etc) £140K·25m x 80m x 4m side height £235K delivered but not installed·40m x 80m x 5m side height £700K including installation for a timber framed design
Storage 10m x 5m x 3m leg
2.5
0
2.5
0
p
o
w
e
r
p
o
i
n
t
p
o
w
e
r
p
o
i
n
t
2.50
2.50
HeatHeat
Gas heater with
ducts & diffuser
Heat Heat
Gas heater with
ducts & diffuser
· 20m span x 35m long x 4m eave height
· POLYGON design Sports Hall
· Thermo PVC (inflated) gables and roof
· Metal sandwich panel insulated/cavity walls
· Timber floor system with non-slip vinyl surface
· 20m internal partition wall (rigid) with gable (soft, single skin)
· 1 set of double doors main entrance centre gable
· 1 sets of double doors to hall opposite entrance
· 2 sets of double doors, each to changing room
· 2 x 5m rigid partition wall forming a changing room (but no plans to roof over
the changing rooms; partition wall is only eave-height)
· 2 sets of double doors long side away from road
· Lighting & Heating
· 2 x multi power points; extension of/drawn from building
2.50 2.50
Funding considerations... outright purchase versus rental/lease, loan/HP, grant, subsidy, Olympic legacy, partnership…Project considerations... Cost of & time for planning permission, land ownership, environmental protection orders, soil survey, whe
A quick roundup of some other sports halls, timber-framed included
Inflated
“Thermo” roof
It’s not just sports halls we install as “permanent temporary” structures; here’s a function / hospitality / conference suite for a hotel
The combination of features give this “marquee” the feel of a built venue; a quiet and very well insulated interior (perfect for conferences) on a firm, sturdy floor… and all installed preserving the protected trees!
Permanent
install electrics
Thick, warm, duvet-
like, acoustic lining
(under the pretty
stuff)
Strong, sub-
base floor, over
foundations
Cavity, thick,
double panel
ISO walls
Thick, double
glazed windows
& doors
Monitored by
quiet air
compressor