![Page 1: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/1.jpg)
Case History: Chilled Water System Optimization at Purdue
Hemant Mehta, P.E. WM Group EngineersMatthew I. High, P.E. Purdue University
![Page 2: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/2.jpg)
BACKGROUND• Purdue first encountered WM Group at an IDEA conference in 2012.
• Purdue contacted WM Group to see if there were any opportunities to optimize the utility costs.
• WM Group performed a system health check analysis at no cost, no obligation and presented their findings in two weeks.
![Page 3: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/3.jpg)
Background• Based on the initial observation Purdue retained WM Group for a
comprehensive analysis of the chilled water system.• The recommendations implemented to date are:
– Installation of side-stream sand filters on the chilled water system– Conversion of the chilled water pumping system from primary/secondary/tertiary to a variable volume
pumping system with primary pumps only– Installation of free and pre-cooling– Minimizing simultaneous heating and cooling for 70 air handling units– Removal of orifice plate on Chiller #6 which increased the entire system pump head requirements when
that chiller was in operation– Enhanced Operator Training
![Page 4: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/4.jpg)
– Cooling system cost is 2.5 times more than heating system
– I have yet to see a perfectly efficient cooling system– At Purdue I am sorry to say that your system is very
sick– There are opportunities to save millions of dollars in
first cost as well as operating costs
This is a copy of our slide we presented to Purdue based on the preliminary FREE analysis on April 12, 2013
![Page 5: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/5.jpg)
• No operators training• Poor and/or signature design• Lack of peer review• Division of responsibility for
– Generation– Distribution – Utilization
Major causes of inefficient Cooling system
![Page 6: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/6.jpg)
• Collect design data of the existing system• Obtain operating logs of at least two to three days per
month for one year• Spend two to three days in operating room to understand
how the system is operated and gain their confidence• Provide guide lines to the operation changes to achieve
“No cost Savings” • Generate Energy Conservation measures for
implementation
System Analysis Approach for FREE System Health Evaluation
![Page 7: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/7.jpg)
• Wade Plant– 22,700 ton installed capacity
• Satellite Plant– 14,100 ton installed capacity
• Total installed 36,800 tons• Operating capacity ~ 28,800• Operating capacity loss of around 8,000 tons
2013 Plant Data
![Page 8: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/8.jpg)
4. Loss of operating capacity by 8,000 tonsMaster plan report stated the following:
Observations during the first visit to the site
![Page 9: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/9.jpg)
5. Short temperature difference of all chillers was higher than normal6. Very high Equivalent Full load hours (EFLH) andWinter cooling load of almost 4,000 tons did not make sense.7. Poor Delta T 7.7 deg F for Wade plant, 9.2 deg F for the satellite plant. Chillers were Design for 15 degree
Observations during the first visit to the site
![Page 10: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/10.jpg)
8. Equipment dispatching was based on decision by operators 9. Pressure drop through one of the old chiller was excessive
Observations during the first visit to the site
![Page 11: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/11.jpg)
• Implementation of Zero/ Low cost savings based on system observation
• Development of Energy Conservation Measures (ECM) for both plants as well as for buildings
• Written Report• Power Point presentation summarizing the final
report
Let’s discuss what was done during the study period of about 16 weeks
![Page 12: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/12.jpg)
• Observation 1 Constant speed electric motor driven pumps were operating parallel to variable speed steam turbine driven pump
Implementation of Zero/ Low cost savings based on system observation
![Page 13: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/13.jpg)
• Throttling of Electric Pumps
Wade Plant Observation
![Page 14: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/14.jpg)
• Simultaneous Operation of Elec and Steam Pumps
Wade Plant Observation
![Page 15: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/15.jpg)
• Observation 2: Total design pumping head was much higher than a normal benchmark for the campus system– As indicated in the last slide plant shaved impeller to
lower TDH from 310 feet to 240 feet.– In addition to these plant pumps, Satellite plant had
primary/ secondary pumping and all the buildings had pump and a stand by pump and more.
Observation 2: Total design pumping head was much higher than a normal benchmark for the campus system
![Page 16: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/16.jpg)
• Observation 2: Total design pumping head was much higher than a normal benchmark for the campus system– Pumping company really got Rich on Purdue and may
be you have the same issue.– If your total pumping head is more than 200 feet,
regardless of size of your campus, most likely something is wrong.
– So what did we do at Purdue during our study?
Implementation of Zero/ Low cost savings based on system observation
![Page 17: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/17.jpg)
• We turned off all building pumps• 1MW power reduction• Zero cost
• How did we convince to shut off all building pumps?
Observation 2: Total design pumping head was much higher than a normal benchmark for the campus system
![Page 18: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/18.jpg)
• Use of Building Pumping Unnecessary
We built a pressure distribution diagram
![Page 19: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/19.jpg)
Observation 3: Balancing contractors had partially closed valves to prevent pumps from running out of the curves.
• My Judgement - Balancing is a crime
![Page 20: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/20.jpg)
• Electric Chillers’ CHW and CW Throttled
Observation 3: Balancing contractors had partially closed valves to prevent pumps from running out of the curves.
![Page 21: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/21.jpg)
• For a hydronic system let control valves do the dynamic balancing.
• Get read of circuit setters, triple duty valves• Open all partially closed valves• Undo the crime of wasting energy for no reason
Please
![Page 22: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/22.jpg)
• Why loss of capacity• Tons = (Flow x Delta T x 500)/12,000• Satellite plant is design as primary secondary
system maintaining constant flow through chillers• Chillers are design for 55 degree return and 40
degree supply i.e. 15 degree Delta T• Your Delta T is 9.2 degree for satellite plant and
Wade plant is 7.7 degree F
Observation 4- Loss of operating capacity
![Page 23: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/23.jpg)
Satellite Chiller Plant• 1 primary pump, 1 chiller
and 3 secondary pumps in operation
• System ∆T of 9.2oF -CH Design is 15oF
• CH Flow = 3,860gpmDecoupler flow = 2gpmSystem flow = 4,246gpmFaulty instruments
![Page 24: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/24.jpg)
Wade Chiller Plant• System ∆T of 7.7oF -
CH Design is 15oF
![Page 25: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/25.jpg)
• Convert pumping system to a variable volume primary pumping
• My first primary pumping design was for a 30,000 ton chilled water plant– Six 5,000 ton chillers– Seven Chilled water pumps
Solution to regain capacity and simple operation
![Page 26: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/26.jpg)
Oldest Primary only Pumping System
![Page 27: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/27.jpg)
Primary only pumping system
Primary Pump
![Page 28: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/28.jpg)
Primary/Secondary pumping system
Primary Pump
![Page 29: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/29.jpg)
Primary with Booster pumps pumping system
Primary Pump
Booster Pump
![Page 30: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/30.jpg)
• Short temperature difference is defined as–Help me out
• At Purdue all most all chillers had high short temperature difference
• Investigation releved that the chemical treatment did not keep up after major system leak
• Filtration system was not adequate
Observation 5- Short temperature difference of all chillers was higher than normal
![Page 31: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/31.jpg)
• High Short Temperature Difference
General Observations
![Page 32: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/32.jpg)
• Average of 6.4 DegF Approach (2-3 DegF design)
High Approach Temperature
![Page 33: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/33.jpg)
High Approach TemperatureAverage of 6.4 DegF Approach (2-3 DegF design)
![Page 34: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/34.jpg)
• Likely Candidate:– Tube fouling due to
insufficient filtration– Typically recommend 0.5
micron sand filtration– Current filtration >1 micron
cartridge filtration
High Evaporator Approach
![Page 35: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/35.jpg)
• Case Study
High Evaporator Approach
![Page 36: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/36.jpg)
Observation 6: Very high Equivalent Full load hours (EFLH) andWinter cooling load of almost 4,000 tons did not make sense.
• If your system EFLH is higher than 2000 you can hit a lottery by savings hundreds of thousands of dollars.
• Purdue EFLH was 3324– Yes, Purdue did save millions by fixing the system
• Main reason of high EFLH is simultaneous heating and cooling
![Page 37: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/37.jpg)
High EFLH
![Page 38: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/38.jpg)
• Red area represents 40% of Load!
Simultaneous heating and cooling
![Page 39: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/39.jpg)
Variable Primary Pumping Conversion• Remove constant speed primary pumps and
rely on existing variable speed secondary pumps.
• Can the existing system pumps handle the head of the chiller and plant piping in addition to the entire campus?
• Replaced primary pumps with spool piece of pipe and ran one whole summer to confirm
• Provided configuration and floor space for free cooling heat exchangers
• Provided energy savings all year long
![Page 40: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/40.jpg)
Refrigerant Head Pressure Control• New modulating
condenser valves• Chiller controls
upgrades for all six chillers would be over $200K
• Initially thought we could control the valve to maintain head pressure with existing Delta V
• Developed our own program to control condenser flow
![Page 41: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/41.jpg)
Measurement & Verification (M&V)• NWCP – all electric producing only
chilled water.• Monitor total building power and
individual chiller power.• Outside air wet bulb temperature
determines potential efficiency.• Each year compare our actual
hourly efficiency and energy use to 2014 projected energy use.
y = 0.0036x + 0.5828
0.00
0.50
1.00
1.50
2.00
2.50
-20 0 20 40 60 80 100
Sat P
lant E
fficie
ncy (
kW/T
on)
O.A. Wetbulb Temperature (°F)
Sat Plant Efficiency vs Wetbulb 2014
![Page 42: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/42.jpg)
How Are We Doing?• FY17 (July 1, 2017 - June 30, 2018)
will be our first full year.
• Heat Exchangers– Over 3.8 Million Ton-hrs with HX’s– Over 1.5 Million kWh saved
• Falling short of our estimated energy savings
• Mild Winter– Projected over 2400 hrs HX operation– This year right at 2000 hrs
• Commissioning / Operator Experience
• Low campus CHW Delta T’s
• HX approach higher than design
![Page 43: Case History: Chilled Water System Optimization at Purdue Big 10... · Case History: Chilled Water System Optimization at Purdue. ... pumping system with primary pumps only ... primary](https://reader031.fdocuments.us/reader031/viewer/2022022010/5b0613987f8b9ad5548c5ec1/html5/thumbnails/43.jpg)
Where are we going?• Increase Automation
• Campus initiatives to reduce cooling loads and increase CHW delta T’s