AGENDA ITEM: __________
REQUEST FOR REMISSION OF CIVIL PENALTY ASSESSMENT
DWR Case Number: PC-2018-0033 Region: Raleigh County: Durham
Assessed Entity: JTT Properties LLC
CASE BACKGROUND AND ASSESSMENT • 4-10-18 DWR staff from RRO conducted an inspection/site visit (based on a
complaint) and observed removal of trees and grading in Zone 1 & 2 of the riparian buffer for approximately 600 linear feet; 750 linear feet stream segment impacted by ditching, excavation, grading, and the placement of large boulders/rip rap; approximately 1000 linear feet of stream impacted by sediment deposition; in excess of 250 feet of stream impacted by sediment depositions that ranged in depth from 4-6 inches to as much as 10 inches in places.
• 6-12-18 DWR issued a Notice of Violation and Recommendation for Enforcement. DWR RRO did not received a written response to the dated NOV prior to issuance of the CPA.
• 3-7-19 JTT Properties LLC was assessed a civil penalty of $22,133.16 ($22,000.00 civil penalty plus $ 133.16 investigative costs): • $7,500 for violation of Title 15A NCAC 02B .0211 (2) by impacting
approximately 750 linear feet of stream from ditching, excavating,grading, placement of large boulder/ rip rap fill, and deposition ofsediment
• $2,500 for violation of Title 15A NCAC 02B .0211 (12) by impactingapproximately 250 linear feet of stream from the deposition of 4-10inches of sediment
• $7,000 for violation of Title 15A NCAC 02B .0233 (4) by impactingZone 1 of the riparian buffer from the removal of vegetation and gradingalong approximately 600 linear feet of stream
• $2,000 for violation of Title 15A NCAC 02B .0231(b) by impactingapproximately 0.1 acres of wetlands from land clearing, grading,ditching, and riprap fill
• $3,000 for violation of Title 15A NCAC 02H .0501 and .0502 by theunauthorized impacts to streams and wetlands without first applying forand securing a 401 Water Quality Certification as required by Section401 of the Federal Water Pollution Control Act.
• 3-25-19 Green card indicated delivery of the assessment document.
REMISSION REQUEST • 4-4-19 Remission request signed by James E. Puryear on behalf of JTT Properties
LLC • On/near 4-16-19 DWR received the (hand-delivered) request for remission from JTT
Properties LLC. The request included a “Justification for Remission
CP19-10
Page 1 of 99
![Page 2: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/2.jpg)
Request” and a “Waiver of Right to an Administrative Hearing and Stipulation of Facts.”
• 8-9-19 The Director of DWR considered the information contained in the remission request and did not find grounds to modify the civil penalty assessment.
• 8-21-19 Green card indicated delivery of the remission decision document. REQUEST FOR ORAL PRESENTATION • JTT Properties LLC did not request an oral presentation before the Environmental
Management Commission’s Committee on Civil Penalty Remissions.
• JTT Properties LLC has not been assessed civil penalties for any previous violations within the past 5 years.
DWR RECOMMENDATION • The Division of Water Resources opposes any remission or mitigation of the penalty and
recommends that the Director’s decision be upheld.
Page 2 of 99
![Page 3: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/3.jpg)
DWR NOTICE OF VIOLATION
DWR Notice of Violation
Photographs from DWR
Page 3 of 99
![Page 4: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/4.jpg)
Page 4 of 99
![Page 5: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/5.jpg)
Page 5 of 99
![Page 6: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/6.jpg)
Page 6 of 99
![Page 7: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/7.jpg)
Page 7 of 99
![Page 8: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/8.jpg)
Page 8 of 99
![Page 9: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/9.jpg)
Page 9 of 99
![Page 10: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/10.jpg)
Page 10 of 99
![Page 11: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/11.jpg)
Page 11 of 99
![Page 12: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/12.jpg)
Page 12 of 99
![Page 13: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/13.jpg)
Page 13 of 99
![Page 14: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/14.jpg)
Page 14 of 99
![Page 15: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/15.jpg)
Page 15 of 99
![Page 16: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/16.jpg)
RESPONSE TO NOTICE OF VIOLATION
Page 16 of 99
![Page 17: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/17.jpg)
Page 17 of 99
![Page 18: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/18.jpg)
Page 18 of 99
![Page 19: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/19.jpg)
Page 19 of 99
![Page 20: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/20.jpg)
Page 20 of 99
![Page 21: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/21.jpg)
Page 21 of 99
![Page 22: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/22.jpg)
Page 22 of 99
![Page 23: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/23.jpg)
Page 23 of 99
![Page 24: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/24.jpg)
Page 24 of 99
![Page 25: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/25.jpg)
Page 25 of 99
![Page 26: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/26.jpg)
Page 26 of 99
![Page 27: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/27.jpg)
Page 27 of 99
![Page 28: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/28.jpg)
Page 28 of 99
![Page 29: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/29.jpg)
Page 29 of 99
![Page 30: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/30.jpg)
Page 30 of 99
![Page 31: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/31.jpg)
Page 31 of 99
![Page 32: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/32.jpg)
ENFORCEMENT CASE INFORMATION
Assessment Factors
Assessment Letter
Findings & Decision & Assessment of Civil Penalties
Regional Office Enforcement Recommendation and Case Factors
Page 32 of 99
![Page 33: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/33.jpg)
Page 33 of 99
![Page 34: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/34.jpg)
Page 34 of 99
![Page 35: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/35.jpg)
Page 35 of 99
![Page 36: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/36.jpg)
Page 36 of 99
![Page 37: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/37.jpg)
Page 37 of 99
![Page 38: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/38.jpg)
Page 38 of 99
![Page 39: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/39.jpg)
Page 39 of 99
![Page 40: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/40.jpg)
Page 40 of 99
![Page 41: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/41.jpg)
Page 41 of 99
![Page 42: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/42.jpg)
Page 42 of 99
![Page 43: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/43.jpg)
Page 43 of 99
![Page 44: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/44.jpg)
Page 44 of 99
![Page 45: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/45.jpg)
Page 45 of 99
![Page 46: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/46.jpg)
Page 46 of 99
![Page 47: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/47.jpg)
Page 47 of 99
![Page 48: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/48.jpg)
Page 48 of 99
![Page 49: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/49.jpg)
Page 49 of 99
![Page 50: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/50.jpg)
Page 50 of 99
![Page 51: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/51.jpg)
Page 51 of 99
![Page 52: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/52.jpg)
Page 52 of 99
![Page 53: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/53.jpg)
Page 53 of 99
![Page 54: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/54.jpg)
Page 54 of 99
![Page 55: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/55.jpg)
Page 55 of 99
![Page 56: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/56.jpg)
Page 56 of 99
![Page 57: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/57.jpg)
Page 57 of 99
![Page 58: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/58.jpg)
Page 58 of 99
![Page 59: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/59.jpg)
Page 59 of 99
![Page 60: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/60.jpg)
Page 60 of 99
![Page 61: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/61.jpg)
Page 61 of 99
![Page 62: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/62.jpg)
Page 62 of 99
![Page 63: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/63.jpg)
Page 63 of 99
![Page 64: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/64.jpg)
Page 64 of 99
![Page 65: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/65.jpg)
REMISSION INFORMATION
Waiver of Right to an Administrative Hearing and Stipulation of Facts
Remission Request
Director’s Remission Consideration (Memo & Factors)
Director’s Decision Letter
(No oral request or new information submitted)
Page 65 of 99
![Page 66: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/66.jpg)
Page 66 of 99
![Page 67: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/67.jpg)
Page 67 of 99
![Page 68: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/68.jpg)
Page 68 of 99
![Page 69: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/69.jpg)
Page 69 of 99
![Page 70: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/70.jpg)
Page 70 of 99
![Page 71: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/71.jpg)
rev 1.0 – 2.05.2015
Remission Request Summary and Recommendation To: Jeff Poupart Date: 8/9/19 From: Rick Bolich Region: RRO Through: Niki Maher, 401 & Buffer Permitting Branch Assessed Party: JTT Properties LLC County: Durham Case No.: PC-2018-0033 Permit No.: n/a Case Background and Assessment
• 4-10-18 DWR staff from RRO conducted an inspection/site visit (based on a complaint) and observed removal of trees and grading in Zone 1 & 2 of the riparian buffer for approximately 600 linear feet; 750 linear feet stream segment impacted by ditching, excavation, grading, and the placement of large boulders/rip rap; approximately 1000 linear feet of stream impacted by sediment deposition; in excess of 250 feet of stream impacted by sediment depositions that ranged in depth from 4-6 inches to as much as 10 inches in places.
• 6-12-18 Notice of Violation and Enforcement Recommendation issued. DWR RRO did not received a written response to the dated NOV prior to issuance of the CPA.
• 3-7-19 JTT Properties LLC was assessed a civil penalty of $22,133.16 ($22,000.00 civil penalty plus $ 133.16 investigative costs): • $7,500 for violation of Title 15A NCAC 02B .0211 (2) by impacting
approximately 750 linear feet of stream from ditching, excavating, grading, placement of large boulder/ rip rap fill, and deposition of sediment
• $2,500 for violation of Title 15A NCAC 02B .0211 (12) by impacting approximately 250 linear feet of stream from the deposition of 4-10 inches of sediment
• $7,000 for violation of Title 15A NCAC 02B .0233 (4) by impacting Zone 1 of the riparian buffer from the removal of vegetation and grading along approximately 600 linear feet of stream
• $2,000 for violation of Title 15A NCAC 02B .0231(b) by impacting approximately 0.1 acres of wetlands from land clearing, grading, ditching, and riprap fill
• $3,000 for violation of Title 15A NCAC 02H .0501 and .0502 by the unauthorized impacts to streams and wetlands without first applying for and securing a 401 Water Quality Certification as required by Section 401 of the Federal Water Pollution Control Act.
• 3-25-19 Green card indicated delivery of the assessment document Remission Request (Summary)
• 4-2-19 DWR RRO received email correspondence from violator • 4-4-19 Remission request signed • On/ near 4-16-19
Remission request received (hand-delivered)
• 4-22-19 DWR RRO received a response to the 6-12-18 NOV via e-mail from Sean Clark with Sage Ecological Services (after having assessed the CPA)
Page 71 of 99
![Page 72: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/72.jpg)
rev 1.0 – 2.05.2015
Mr. Puryear, registered Agent for JTT Properties LLC states that JTT Properties is a small property management LLC that he runs, himself, on a small budget for his family. He states that they were trying to improve the property by evening it out. He explains that he had done this once before in conjunction with a tenant who rents the property without issue, but the second (most recent) time, he had involved another individual whom he trusted to know the rules and regulations in hauling fill onto and grading the site. He states he would have not been working in the stream if he had known better about it, that he has since understood that this second person may have not followed regulations at other sites, but he and his tenant were unaware of this second person’s ethics at the time. He explains the stream area had alternated between being totally dry for periods of time and running when the pond was running over the years they have owned the property. Mr. Puryear explains he was emailing regularly with the Corps of Engineers (as requested in the first site visit with DWR and the Corps), so did not respond to the NOV, an oversight due to his unfamiliarity with the process. He states that he hired Sage Ecological Services to assist them with timely repairs and have followed their instruction as well as those offered by the Corps. They have removed instream sediment by hand with buckets, and are continuing with repairs, though work has been hampered by weather and lack of equipment. Stream and buffer work (including removal of sediment, repair of banks, buffer planting, and installation of silt fence) resumed 4-3-2019, he said. He also explained that the contractor is conducting other site improvements away from the stream, but that work is secondary to stream and buffer repair. Mr. Puryear explains that the penalties would financially cripple his small organization, costing $5-10,000 for consulting fees. He reiterates that they were misdirected about activates on the site and have never been involved in environmental troubles. Please see the attached provided remission request information for more details.
JTT Properties LLC requests remission based on the following remission factors:
(a) one or more of the civil penalty assessment factors in G.S. 143B-282.1(b) were wrongfully applied to the detriment of the petitioner
(not indicated by the assessed party)
(b) the violator promptly abated continuing environmental damage resulting from the violation
(not indicated by the assessed party)
(c) the violation was inadvertent or a result of an accident (not indicated by the assessed party)
(d) the violator had not been assessed civil penalties for any previous violations; JTT Properties LLC states: “We have never been involved in any kind of trouble and certainly not any harmful environmental situations.”
Page 72 of 99
![Page 73: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/73.jpg)
rev 1.0 – 2.05.2015
(e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions.
JTT Properties LLC states: “We are a small organization and the penalties that have been laid upon us would cripple us financially. The bills alone from Sage will cost us 5 to $10,000.00 alone.”
Enforcement History
• No record of prior enforcement Notes
DWR RRO performed a follow-up inspection on 7/11/19 and made the following observations: • Bare root trees that appeared to be ample in number and size/age had been planted in the
riparian area, but were planted in June, outside the window of time recommended for optimal survival.
• Riparian matting was in place, but rilling had occurred underneath, contributing additional instream sedimentation.
• The steep slope on the dam below the pond had been rilling/gullying, causing sediment to enter the stream after significant rainfall despite the silt fence. One attempt to seed the slope failed due to the poor quality of the fill, and efforts are continuously needed to remove instream sediment downstream of the dam.
• It appeared that though off-property sediment had been removed from the stream by hand, a bucket loader had been used to remove instream sediment on the subject property from recent deposition, further impacting streambed and banks.
• Some of the rock placed instream had been removed, but a significant amount remained. • To date, DWR RRO has still not received required documentation (planting plan, monitoring
plan) for review/ approval. Remission Recommendation from Regional Office and Central Office
• DWR RRO Regional Office Recommendation (check one) Request Denied Full Remission Retain Enforcement Costs? Yes No Partial Remission %_____________ $_____________ (enter amount remitted) Comment:
The overall status of the site is unstable. Though remedial work has occurred, it was attempted only recently (outside the optimal planting season), and it is anticipated that repeated efforts will be necessary for any success at stabilization/recovery. In addition, communication from the violator has only occurred after having been assessed a civil penalty, and DWR has yet to receive any of the required written documentation. For these reasons, DWR RRO recommends no remittance.
• DWR Central Office Recommendation (check one) Request Denied Full Remission Retain Enforcement Costs? Yes No Partial Remission %_____________ $_____________ (enter amount remitted)
Comment: DWR CO concurs with RRO’s recommendation.
Page 73 of 99
![Page 74: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/74.jpg)
Page 74 of 99
![Page 75: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/75.jpg)
Page 75 of 99
![Page 76: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/76.jpg)
Page 76 of 99
![Page 77: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/77.jpg)
Page 77 of 99
![Page 78: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/78.jpg)
Page 78 of 99
![Page 79: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/79.jpg)
Page 79 of 99
![Page 80: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/80.jpg)
Page 80 of 99
![Page 81: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/81.jpg)
Page 81 of 99
![Page 82: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/82.jpg)
Page 82 of 99
![Page 83: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/83.jpg)
Page 83 of 99
![Page 84: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/84.jpg)
Supporting Case Documentation
Proof of Ownership
Additional Correspondence (USACE)
Additional photos
Page 84 of 99
![Page 85: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/85.jpg)
Page 85 of 99
![Page 86: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/86.jpg)
Page 86 of 99
![Page 87: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/87.jpg)
Page 87 of 99
![Page 88: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/88.jpg)
Page 88 of 99
![Page 89: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/89.jpg)
Page 89 of 99
![Page 90: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/90.jpg)
Page 90 of 99
![Page 91: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/91.jpg)
Page 91 of 99
![Page 92: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/92.jpg)
Page 92 of 99
![Page 93: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/93.jpg)
Page 93 of 99
![Page 94: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/94.jpg)
Page 94 of 99
![Page 95: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/95.jpg)
Page 95 of 99
![Page 96: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/96.jpg)
Page 96 of 99
![Page 97: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/97.jpg)
Page 97 of 99
![Page 98: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/98.jpg)
Page 98 of 99
![Page 99: CASE BACKGROUND AND ASSESSMENT - North Carolina Management...• JTT Properties LLC did not request an oral presentation before the Environmental Management Commission’s Committee](https://reader034.fdocuments.us/reader034/viewer/2022052020/6034ef6a9e3bbd08de5e3d45/html5/thumbnails/99.jpg)
Page 99 of 99