CAREM 25 CURRENT STATUS Ing. Ignacio de Arenaza CAREM Management | National Atomic Energy Commision of Argentina (CNEA) 17th INPRO Dialogue Forum on Opportunities and Challenges in Small Modular Reactors Ulsan, South Korea | 2-5 July 2019

Transcript of CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe...

Page 1: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

CAREM25 CURRENT STATUS

Ing. Ignacio de ArenazaCAREM Management | National Atomic Energy Commision of Argentina (CNEA)

17th INPRO Dialogue Forum on Opportunities and Challenges in Small Modular Reactors

Ulsan, South Korea | 2-5 July 2019

Page 2: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 2

First NPP fully designed in Argentina

Integral PWR type

Integrated Primary System

Natural circulation

Self-pressurized

100 MW / 32 MWe

Enriched UO2 fuel (3,1 and 1,8%)

Passive safety systems

Pressure suppression containment type

Operating cycle length of 18 months

CAREM PROTOTYPE - BASIC FACTS

CAREM25 CURRENT STATUS

Page 3: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 3

PASSIVE SAFETY SYSTEMSA) CoreB) Steam generators1) Safe Shutdown System2) Diverse Shutdown System3) Containment building4) Medium Pressure Injection

System5) Pressure Suppression Pool6) Removal Heat Decay System7) RPV relief valve8-11) Containment building

pressure equalizer

≥36hr passivecapability

CAREM25 CURRENT STATUS

Page 4: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 4

PASSIVE CAPABILITY EXTENSION

A) Core (hot source)B) Steam generators (cold source)

1) Pressure SuppressionContainment2) Pressure SuppressionPool3) Pressure relief tubes RS4) RPS Pressure Relief Valve5) RSSECR Pressure Relief Tubes6) RSSECR Relief Membrane7) Spraying the containment8) Hydrogen Recombiners9) PSSECR autonomous condenser10) Autonomousreplacement of

PSSECR inventory11) Autonomouscooling PS12) Autonomousspraying of RPR13) AutonomousVents RPS

CAREM25 CURRENT STATUS

Page 5: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

CURRENT STATUS

Page 6: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 7

PRESSURE VESSEL

11 mts

3,35 mts

CAREM25 CURRENT STATUS

Page 7: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 8

PRESSURE VESSEL

ESTIMATEDPROGRESS:

52%

CAREM25 CURRENT STATUS

Page 8: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 8

STEAM GENERATORS

Capa#1

Capa#7

externa

Camisa tubos

Interna

Carcaza

Carcaza

Baffles

condensadoCabezal del

CondensadoVapor

IngresoaguaPrimario

SalidaaguaPrimario

• 12 modules in parallel, divided in 2 independent subsystems

• Each of them consists of 52 tubes of about 35 m long, arranged in 6 coiled layers.

CAREM25 CURRENT STATUS

Page 9: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 11

STEAM GENERATORS

Already delivered: 700 Inconel-690 tubes, 35m long each

ESTIMATEDPROGRESS:

48%

Next steps:

• Manufacture of onepre-series SG

• Production of the 12 modules (once manufacturing process is validated)

CAREM25 CURRENT STATUS

Page 10: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 10

CORE / F.A.61 Fuel Assemblies:• Fuel active length: 1,4m • Maximum enrichment: 3,1% (U02)• Reactivity control: CR, BP• Cladding: Zr-4

DesignerManufacturer

CAREM25 CURRENT STATUS

Page 11: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 14

FUEL ASSEMBLIES

ESTIMATEDPROGRESS:

51%Under production:

- Fuel assemblies

Pre-production stage:

- Fuel pellets

CAREM25 CURRENT STATUS

Page 12: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

Fast Shutdown System

Adjustment & Control System

03/07/2019 12

CONTROL RODS DRIVES MECHANISMSCAREM25 CURRENT STATUS

Page 13: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 13

CAPEMCONTROL RODS DRIVES MECHANISMS TESTING FACILITY

• IFE (integral effect test)• Closed loop of water at

high pressure and temperature (320ºC -120bar)

• Self-pressurized• Main flow: 20m3 / h• Main container:

o Houses the mechanisms and the fuel assembly.

o Simulates flow by natural circulation.

o Flange with instrumentation connections.

STRART UP:

Nov 2019

CAREM25 CURRENT STATUS

Page 14: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 14

CAREM PROTOTYPE SITE

CAREM25 CURRENT STATUS

Page 15: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

• Reactor Building• Containment• Spent Fuel Pool• Safety & Process Systems• Control Room

• Turbine Building• Service Building

• Offices• Changing rooms• Emergency Control Room

03/07/2019 15

CAREM PROTOTYPE BUILDING

• Reactor Building• Containment• Spent Fuel Pool• Safety & Process Systems• Control Room

• Turbine Building• Service Building

• Offices• Changing rooms• Emergency Control Room

CAREM25 CURRENT STATUS

Page 16: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 16

CAREM PROTOTYPE BUILDING

CAREM25 CURRENT STATUS

Page 17: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 17

CAREM PROTOTYPE BUILDING

ESTIMATEDPROGRESS:

52%

CAREM25 CURRENT STATUS

Page 18: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 18

CONTAINMENT LINER

ESTIMATEDPROGRESS:

78%

CAREM25 CURRENT STATUS

Page 19: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 19

BALANCE OF PLANT

ESTIMATEDPROGRESS:

62%

• Basic design: 100.00%• Detail design: 99.87%

Turbo-generator and auxiliary equipment supply: 100%

CAREM25 CURRENT STATUS

Page 20: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 20

OVERALL PROGRESS (MAR19)

Phases Accumulated physicalprogress (%)

CNEA facilities 100,00%

Site preparation 100,00%

Design 90,60%

Supplies 53,20%

Construction 61,70%

EM assembly 0,6%

Start up 0,00%

TOTAL 55,93%

CAREM25 CURRENT STATUS

Page 21: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

03/07/2019 21

Goals achieved:

• Funding

• HHRR training

• Licencing of non-heavy water reactor

• Supply chain development

• Construction/manufacturingbeginning

CAREM25 CURRENT STATUS

Page 22: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

• Argentina is leading the PWR SMR design-construction process with the FOAK CAREM25

• Established supply chain for main local components

• Handful of lessons learnt not possible without the FOAK

• SMR cost structure knowledge

• Readiness for commercial plant based on the prototype design criteria. Economic asessment modules of ≈100MWe

2203/07/2019

FINAL REMARKS

CAREM25 CURRENT STATUS

Page 23: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

2303/07/2019

VIDEO – Apr 2019CAREM25 CURRENT STATUS

Page 24: CAREM25 CURRENT STATUS - Nucleus Arenaza-CAREM.pdf · A) Core B) Steam generators 1) Safe ShutdownSystem 2) Diverse ShutdownSystem 3) Containmentbuilding 4) Medium Pressure Injection

THANK YOU FOR YOUR ATTENTION

Ignacio de Arenaza Head of Civil and Electrical Engineering Department | CAREM - CNEA

[email protected]