Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

33
Capstone Project Capstone Project Final Presentation Final Presentation May 16, 2002 May 16, 2002 Dr. Thomas Robinson CMfgE Dr. Thomas Robinson CMfgE

description

Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE. Agenda. Product Review Goal Review Design Review Manufacturing Quality Finance. TL. Product Review. HITCH MOUNTING RACK WITH FLEXIBLE ACCESSORIES THAT FIT THE ACTIVE LIFESTYLE. TL. - PowerPoint PPT Presentation

Transcript of Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Page 1: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Capstone ProjectCapstone Project

Final PresentationFinal Presentation

May 16, 2002May 16, 2002

Dr. Thomas Robinson CMfgEDr. Thomas Robinson CMfgE

Page 2: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Agenda

Product ReviewProduct Review

Goal ReviewGoal Review

Design ReviewDesign Review

ManufacturingManufacturing

QualityQuality

FinanceFinance

TL

Page 3: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Product Review

HITCH MOUNTING RACK WITH FLEXIBLE HITCH MOUNTING RACK WITH FLEXIBLE ACCESSORIES THAT FIT THE ACTIVE ACCESSORIES THAT FIT THE ACTIVE

LIFESTYLE.LIFESTYLE.

TL

Page 4: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Bao Doan - Quality Engineer

James Rice - Research and Development Specialist

Jim Lambert - Marketing

Lindsey Erickson - Design Engineer

Ramon Tejada - Controller

Randy Renwand - Director of Operations

Tim Legris - Project Manager

TL

Page 5: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Company Goals

Determine manufacturing capability Determine manufacturing capability

by July 31st 2002by July 31st 2002

Verify design through market surveys Verify design through market surveys

Proof and Pilot run verification Proof and Pilot run verification

Prepare for rollout utilizing yield management Prepare for rollout utilizing yield management

TL

Page 6: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Company Goals Continued

Determine ideal FleXhitch retailer and stock 20 stores with 5 Determine ideal FleXhitch retailer and stock 20 stores with 5 units each units each

Product for sale in stores by November 1st 2002Product for sale in stores by November 1st 2002

Implement KANBAN manufacturing processImplement KANBAN manufacturing process

Develop Marketing strategy to enter the new vehicle marketDevelop Marketing strategy to enter the new vehicle market

Capture 50% of Southern California market by December 2003Capture 50% of Southern California market by December 2003

Perform Market Analysis and improve sales approach to meet Perform Market Analysis and improve sales approach to meet goalsgoals

Implement a Focus Team to reduce production costs by 30% Implement a Focus Team to reduce production costs by 30% and increase yield by 40% and increase yield by 40% TL

Page 7: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Company Goals Continued

Be a nationwide producer of hitch accessories by Be a nationwide producer of hitch accessories by January 1st, 2006January 1st, 2006

Consistently high quality to promote brand recognition Consistently high quality to promote brand recognition

Product available as an option on new vehicles worldwideProduct available as an option on new vehicles worldwide

Provide Distributor FranchisesProvide Distributor Franchises

TL

Page 8: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

TIMELINETIMELINE

TL

TASKS 1/31 2/7 2/14 2/21 2/28 3/7 3/14 3/21 3/28 4/4 4/11 4/18 4/25 5/2 5/9 5/16

1st Progress ReportDevelop Prototypes2nd Progress Report3rd & Final Progress ReportFinal Written Report

Action/DevelopmentCompletion DateGoals Met 100%

Page 9: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Product Plan - One Year Projection

Universal Hitch

Motorcycle Rack

Storage Rack with removable rail

Gas Can Rack

Tail Light Kit

LE

Page 10: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Product Plan - Five Year Projection

Golf Bag Rack

Lockable Tool box

Lumber Rack

Winch Rack

Barbecue Rack

LE

Page 11: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

External Manufacturing Benchmarking

RR

Select process Select process

All Processes for most common productAll Processes for most common product

Identify leaders for each processIdentify leaders for each process

Smaller Company = Smaller Company = SPORTSRACKSPORTSRACK

Collect DataCollect Data

Margin = 50%, Productivity = 80%, Efficiency Margin = 50%, Productivity = 80%, Efficiency = 90%= 90%

Analyze DataAnalyze Data

Process vs. ProcessProcess vs. Process

Page 12: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Plant Projection - 1 Year

Manufacturing Systems Manufacturing Systems

‘‘Little’ JIT - Schedule inventory, Ensure Little’ JIT - Schedule inventory, Ensure resources, followed by Kanban resources, followed by Kanban

MechanizationMechanization

CAD & CAM, Combine some operationsCAD & CAM, Combine some operations

Human ResourcesHuman Resources

Five flexible operatorsFive flexible operators

FacilityFacility

50,000 sq.ft. 2/3 manufacturing. 1/3 warehouse50,000 sq.ft. 2/3 manufacturing. 1/3 warehouse

RR

Page 13: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Plant Projection - 3 Year

Manufacturing Systems Manufacturing Systems

MRP beginsMRP begins

MechanizationMechanization

CIM - network computers and machinesCIM - network computers and machines

Human ResourcesHuman Resources

Two Leads, Five flexible operatorsTwo Leads, Five flexible operators

FacilityFacility

50,000 sq.ft. 2/3 manufacturing. 1/3 warehouse50,000 sq.ft. 2/3 manufacturing. 1/3 warehouse

RR

Page 14: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Plant Projection - 5 Year

Manufacturing Systems Manufacturing Systems

‘‘Big’ JIT - Big’ JIT - Eliminate all waste, MRPIIEliminate all waste, MRPII

MechanizationMechanization

Some automatic loading and unloadingSome automatic loading and unloading

Human ResourcesHuman Resources

One supervisor, Three Leads, Seven flexible One supervisor, Three Leads, Seven flexible operators operators

FacilityFacility

50,000 sq.ft. 3/4 manufacturing. 1/4 warehouse50,000 sq.ft. 3/4 manufacturing. 1/4 warehouse

RR

Page 15: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Router (Document #ROU001) for Universal Hitch FH-UHI-001

Page 16: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Supply Chain

RR

Steel MillSteel Mill Steel VendorSteel Vendor

FlexhitchFlexhitchCoatingCoating

RetailerRetailer CustomerCustomer

DecisionDecision

OperationOperation

StorageStorage

TransitTransit

Page 17: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Supply Chain Continued

Computerized order trackingComputerized order tracking

Minimize ‘Bull-whip’ EffectMinimize ‘Bull-whip’ Effect

Innovative Flexhitch productsInnovative Flexhitch products

Higher Margins = Higher InstabilityHigher Margins = Higher Instability

Match a Responsive Supply ChainMatch a Responsive Supply Chain

Mis-match an Efficient Supply ChainMis-match an Efficient Supply Chain

OutsourcingOutsourcing

Material forming and cuttingMaterial forming and cutting

Coating and PlatingCoating and PlatingRR

Page 18: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Flexible Plant Layout with Flowchart

WAREHOUSE WAREHOUSE INCOMING MATERIALINCOMING MATERIAL

CELL 1CELL 1

SHIPPING DOCKSHIPPING DOCK

OOFFFFIICCEESS

CELL 2CELL 2

CELL 3CELL 3

CELL 4CELL 4

CELL 5CELL 5

RECEIVING DOCKRECEIVING DOCK

WAREHOUSE WAREHOUSE FINISHED GOODSFINISHED GOODS

QUALITY ASSURANCE BASEQUALITY ASSURANCE BASE

001001

002002003003

004004

008008

006006007007 009009 00100010

005005

Page 19: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Quality Goals

Manufacture a high quality product

Less than 1% customer returns in the first year

Train employees to follow instructions & procedures

Establish a Continuous Improvement team

In process inspections

Achieve ISO 9001 certification by April 31st, 2003

ISO Oversight Committee

Implement Good Manufacturing Practices (GMP)

Internal auditingBD

Page 20: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Managers ofmajor functions

GENERAL MANAGER

QUALITY MANAGER

MANUFACTURE MANAGER

MAKETING MANAGER

QUALITY CONTROL

RELIABILITY ENGINEERING

QUALITY ASSURANCE

INSPECTIONQA LAB

Quality Organization

Page 21: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Organization Structure

Page 22: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Quality ManualPurpose

Describe the policies & control structure of the Quality Management System used to achieve the mission at Flexhitch.

Content

Documents Flexhitch Processes

Includes 20 sub-sections

Follows ISO 9001 guidelines

Continuous Improvement

Work instructions and methods

Application to Flexhitch

Specific work procedures and instructionsBD

Page 23: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Work Procedures

In process inspections at workstations

Developed for Flexhitch Surface Coating Finish

Dimensional

Hole alignment

Surface finish

Joints

Strength

Additional procedures for each new product

BD

Page 24: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Quality Procedure for Surface Finish

Color Test

Alternate Color Test Method

Adhesion

General Appearance

Solvent Resistance

BD

Page 25: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Develop work procedures and checklists for each critical manufacturing process

Continue to develop and modify working documents to achieve ISO certification

Oversight Committee ensures focus on the continuous quality improvement process

Future Quality Efforts

BD

Page 26: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Promotional Objectives & Strategies

1. Greatest Challenge 1st Year: Lack of Market Awareness

2. Strategies for Enhancing Market Awareness

A. Sales display at place of business

B. Company website (on-line & B-to-B sales)

C. Employees promotion

D. Car & Truck Dealership

E. Print Advertising

F. Local Cable outlets

RT

Page 27: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Cash Flow Analysis – 1st Year

1. Total Operating Costs (rounded) $ 1,215,000

2. Financing A. Cost of borrowing 1.215M @ 8.1% $ 98,415

Total Costs of Operations $ 1,313,000

3. Operating Costs per Day (261 operating days)

A. $ 1.313 million / 261 = $ 5,032

Average Capital Recovery ($5, 032 / 48 units = ) $ 105 Cost Per Item

RT

Page 28: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Rate of Return – 1st Year

Average Capital Recovery Cost per Item $ 105.00

Average Capital Recovery Cost per Item+ 18% Internal Rate of Return $ 123.00

RT

Page 29: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Projected Productivity Schedule

Year PPDay x DPM = PPMonth = Accum. % Increase

1 48 22 960 = N/A

2 62 22 1, 344 = 28.5

3 110 22 2, 419 = 44

5 219 22 4, 838 = 50

RT

Page 30: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Cash Flow Analysis – 2nd Year

1. Total Operating Costs (rounded) $ 1,000,000

2. Financing A. Cost of borrowing 1.215M @ 8.1% $ 81,000

Total Costs of Operations $ 1,081,000

3. Operating Costs per Day (261 operating days)

A. $ 1.081 million / 261 = $ 4,141

Average Capital Recovery ($4, 141 / 62 units = ) $ 67 Cost Per Item

RT

Page 31: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Rate of Return – 2nd Year

Average Capital Recovery Cost per Item $ 67.00

Average Capital Recovery Cost per Item+ 18% Internal Rate of Return $ 79.00

Internal Rate of Return if Prices are Unchanged $ 123.00

RT

Page 32: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Cash Flow Analysis – 5th Year

1. Total Operating Costs (rounded) $ 1,000,000

2. Financing A. Cost of borrowing 1.215M @ 8.1% $ 81,000

Total Costs of Operations $ 1,081,000

3. Operating Costs per Day (261 operating days)

A. $ 1.081 million / 261 = $ 4,141

Average Capital Recovery ($4, 141 / 219 units = ) $ 18 Cost Per Item

RT

Page 33: Capstone Project Final Presentation May 16, 2002 Dr. Thomas Robinson CMfgE

Click here for more information…

>> >> www.FleXhitch.comwww.FleXhitch.com << <<

FleXhitch498 Flexhitch Way

Long Beach, CA 90000Phone: (562) 985 - FLEX

Fax: (562) 985 - 0000