CAPSA
Progress Report
![Page 2: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/2.jpg)
Contents
• Previous CAPSA
• Continuity
• Next CAPSA• Date• Theme• Format• Workers• Venue
![Page 3: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/3.jpg)
CAPSA 04
• CAPSA 04 identified many problems areas.– Very great need for technology implementation– Must contextualize technology– Technology Sharing – Best Practice– Human Capital Development– Sustainability– Technical and Quality Issues – Advancing
Technology
![Page 4: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/4.jpg)
Actions so far
• Sabita Study – research needs• RIRAC• HMA User Guide available soon• APT Programme• Bituminous Stabilisation
– TG2 being revised – ETB Guideline - problem solving underway
• Standards and Codes• Investigation of flexible pavement engineering course• TRH3 – SANRAL• SuperSurf• Ultrathin Guidelines available soon• Will not be solving all of the problems in the interim but will
try to ensure old problems that have been solved do not become nightmares.
![Page 5: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/5.jpg)
![Page 6: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/6.jpg)
Theme
• Consolidating Best Practice– HMA – Surface Seals– Bituminous Stabilisation– Component Materials– Structural Design– Asset Preservation & HRD– Delivery & Quality– OHS
![Page 7: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/7.jpg)
Format
• Economic, Learning and Educational– Problem Solving–Minimize Plenaries–Maximise Organised Workshops• Many Invited Papers• Courses• Topics• Discussion and Learning
![Page 8: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/8.jpg)
Workers
• Consolidating Best Practice– HMA AT– Surface Seals DR/IvW– Bituminous Stabilisation KJ– Component Materials BV– Structural Design FJ/IvW– Asset Preservation & HRD PH– Delivery & Quality JO– OHS PM
• Organisers LS and PL
![Page 9: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/9.jpg)
![Page 10: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/10.jpg)
Possible venues
• Cruise liner
• Cape Town
• Durban
• CSIR Conference Centre
• Southern Africa– Botswana–Mozambique
![Page 11: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/11.jpg)
Cruise Liner
• Starlight Cruises – Rhapsody
• 4 nights, 3 days from Durban–Mozambique channel– To Cape Town
• Early April 2004
• Depart 15h00 on Thursday
• Return 08h00 on Monday
![Page 12: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/12.jpg)
Cost Comparisons
Sun City ‘04 Cruise ‘07
Conference R5 500 R4 750
Accommodation(per room/cabin)
R5 000 R8 000
Food R2 000 All in
Total R12 500 R12 750
![Page 13: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/13.jpg)
Cruise Costs
• Breakeven on 350 double cabins sold– 1 delegate per room plus partner
• Shared room with delegates R10 250 per delegate
• 4 rates offered depending on the cabin
• Cash flow a problem
• Relatively high risk
![Page 14: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/14.jpg)
Advantages/Disadvantages
Advantages• Competitive cost• 3 full days of Conference• Over weekend – reduced
disruption to normal work
• Excellent networking• Fixed cost for
accommodation, food and conference theme evenings
• Encourages partner attendance
Disadvantages• Increased financial
risk• Reduced support from
important sectors of the market
• Ability of delegates to motivate attendance
![Page 15: CAPSA](https://reader035.fdocuments.us/reader035/viewer/2022080916/56812de5550346895d933dc3/html5/thumbnails/15.jpg)
We need RPF input into the decision on venue
Ship ? yes or no
If no, what alternative is preferred?