PrefaceThe University of Alabama has experienced massive growth over the past ten years. In 2007,
enrollment equaled 25,000 students. For the Fall 2016 semester, enrollment at The University
of Alabama reached a record high of 37,665 students.
Since 2003, The University of Alabama has accommodated this growth by constructing 98
new buildings with a total of 6,242,496 square feet. These new buildings represent a total
project value of over $1 billion. Additionally, there were 68 major renovations and additions
that resulted in 1,162,000 square feet, with a total project value of almost $500,000,000.
The University of Alabama campus now boasts a total of 1,374 acres, 297 buildings, 46 Greek
Houses, over 15,000,000 square feet of campus facilities, and 8,400 beds.
The University of Alabama’s Construction Administration Department proudly offers this
booklet showcasing the current active and planned capital projects on campus. For each
project, you’ll find architectural renderings, location maps, and an overview of the details of
the project.
4 The University of Alabama
Table of Contents
ACTIVE CAPITAL PROJECTS
Adapted Athletics Facility � � � � � � � � � � � � � � � � � � � � � � � � � � � � 6
H�M� Comer Renovation � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 8
Mal Moore Dining Addition � � � � � � � � � � � � � � � � � � � � � � � � � � 10
Moody Music Building Addition � � � � � � � � � � � � � � � � � � � � � � 12
New Freshmen Residence Hall � � � � � � � � � � � � � � � � � � � � � � � � 14
Performing Arts Academic Center � � � � � � � � � � � � � � � � � � � � � 16
Tutwiler Parking Deck � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 18
PLANNED CAPITAL PROJECTS
Bryce Park Food Service � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 22
2nd Avenue Overpass � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 24
Capital Projects Summer 2017 5
Aerial View of North Campus
6 The University of Alabama
Ac t i v e Capital Projects
Capital Projects Summer 2017 7
Adapted Athletics Facility
Capital Projects | Active
8 The University of Alabama
Project Overview:• Budget: $10,000,000• Project Start: Spring 2017• Expected Completion: Late Fall 2017• Total Square Footage: 27,036
The Adapted Athletics Facility at The University of Alabama is the first facility in the country that is dedicated to adapted athletics. The UA Adapted Athletics Program has over 30 student-athletes competing in wheelchair basketball, wheelchair tennis, para-rowing, and adapted golf. UA’s Adapted Athletics program has won 5 national championships in men’s and women’s wheelchair basketball, and 2 national championships in wheelchair tennis. Additionally, over 100 students participate in non-competitive options.
Features:• NCAA regulation game venue for
wheelchair basketball• Locker rooms• Workout/training room• Strength and conditioning room• Team meeting rooms• Study Halls
Coming Winter 2017
Overview and Details
“This kind of commitment really changes expectations of what it means to be an
athlete and what is appropriate in terms of proportional support for student-athletes with
disabilities. This facility will raise the bar nationally for all sports programs for athletes with disabilities
and especially for high performance college student-athletes with disabilities.
- Adapted Athletics Director Dr. Brent Hardin”
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
Capital Projects Summer 2017 9
H�M� Comer Renovation
Capital Projects | Active
10 The University of Alabama
Project Overview:• Budget: $24,600,000• Project Start: April 2017• Expected Completion: Fall 2018• Total Square Footage: 21,486• Complete Interior and Exterior Renovation
Named for Hugh Moss Comer, H.M. Comer was originally constructed in the 1960s. The building houses the administrative and departmental offices for the College of Engineering, a welcome center, and classrooms. It also houses the Capstone Engineering Society.
The purpose of the renovation is to update the building to match North Engineering Research Center (NERC), centralize student services for the college, and create a more open office environment.
Features:• Addition of a new west entrance• Updating the mechanical, electrical, and
plumbing systems• Center for Unique Business Enterprises• A lab incubator to showcase the latest
technology in the college
Coming Fall 2018
Overview and Details
H.M. Comer Pre-Renovation
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
Capital Projects Summer 2017 11
Mal Moore Dining Addition
Capital Projects | Active
12 The University of Alabama
Project Overview:• Budget: $15,100,00• Project Start: Summer 2017• Expected Completion: Summer 2018• Total Square Footage: 24,414• Replaces Bryant Dining
This addition to the Mal Moore Athletic Facility will be a two-story addition to the north side of the building. This dining facility will provide healthier nutritional options for the student-athletes in an effort to meet the new NCAA guidelines for post-workout nutrition.
The dining hall’s close proximity to the training facilities will have a positive effect on student-athlete performance, health and well-being.
Features:• Commercial kitchen• Storage for dry and cold goods• Seating for 440 people• Balcony for outdoor dining options• Covered area for viewing• Offices for nutritional staff• Provide healthy options for student-athletes
Coming Summer 2018
Overview and Details
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
Project Location
Aerial View Looking Southwest
Capital Projects Summer 2017 13
Frank Moody Music Building Addition and Renovation
Capital Projects | Active
Phase I New Addition
14 The University of Alabama
Overview and DetailsProject Overview:• Budget: $14,200,00• Project Start: Summer 2015• Expected Completion: Spring 2018• Total Square Footage: 105,000 total
building, 25,000 addition
The Frank Moody Music Building houses The University of Alabama School of Music along with the Million Dollar Band. The facility also contains a 1,000-seat concert hall.
The purpose of the addition and renovation is to accommodate growth in the music program and to provide a practice hall for the Million Dollar Band. The Million Dollar Band puts on over 50 performances per year and practices at least five days per week. The addition and renovation will create space for the band to practice during inclement weather and hold meetings of the full band.
Features:• Two new band halls• New locker room space• Sectional practice rooms• Support space for the Million Dollar Band
Coming Spring 2018North View - Phase II Exterior Renovation
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
Capital Projects Summer 2017 15
New Freshmen Residence Hall
Capital Projects | Active
16 The University of Alabama
Project Overview:• Budget: $53,200,00• Project Start: March 2017• Expected Completion: Fall 2018• Total Square Footage: 150,516• Replaces Somerville Hall
The New Freshmen Residence Hall will replace Somerville Hall. The building will occupy the space from Ridgecrest East to McCorvey Drive.
As enrollment on campus grows, so does the need for student housing. Hence, the purpose of the project is to address the high demand for on-campus freshmen housing. The residence hall will be co-ed with men and women on separate floors controlled via access control measures.
Features:• 494 beds• Convenience store• Lounges and study areas• 500-person multipurpose community
room• Storm shelter for 1,518 people• Views of Palmer’s Lake
Coming Fall 2018
Overview and Details
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
Site Plan for New Freshmen Residence Hall
Capital Projects Summer 2017 17
Performing Arts Academic Center
Capital Projects | Active
18 The University of Alabama
Project Overview:• Budget: $60,000,000• Expected Project Start: Summer 2019• Expected Completion: 2020• Total Square Footage: 130,088• Provides a multi-functioning, state-
of-the-art venue for performances and infrastructure
The stage is set for a new home for the arts at The University of Alabama. The new Performing Arts Academic Center, which will connect to the restored Bryce Main, will be the grand centerpiece of the nucleus of campus.
The Performing Arts Academic Center will allow the Department of Theatre and Dance to combine all performance and academic functions in a single area of campus.
Features:• 350-seat drama theater• 450-seat dance theater• 250-seat studio theater• Support spaces - scenery shop, control
rooms, and rehearsal halls• Faculty offices and classrooms nearby
Coming in 2020
Overview and Details
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
Aerial Rendering from the North
Capital Projects Summer 2017 19
Tutwiler Parking Deck
Capital Projects | Active
20 The University of Alabama
Project Overview:• Budget: $26,000,000• Project Start: January 2017• Expected Completion: September 2018• Total Spaces: 1,450• Provides additional parking for campus
The Tutwiler Parking Deck will be located at the southeast corner of the Tutwiler Development directly south of Tutwiler Hall.
The addition of the parking deck will provide necessary support to the future Tutwiler Residence Hall and further development of this area of campus.
Features:• 1,450 parking spaces• 7 above-ground levels• Increase available parking in the
immediate area by ~80%• Energy efficient LED lighting• Security and access control features
Coming Fall 2018
Overview and Details
View from 12th Street looking North
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
Capital Projects Summer 2017 21
Partlow Campus - Bryce Adult Psychiatric Hospital and Administration Buildings
22 The University of Alabama
P l a n n e d Capital Projects
Capital Projects Summer 2017 23
Bryce Park Food Service
Capital Projects | Planned
24 The University of Alabama
Project Overview:• Budget: $7,430,000• Project Start: April 2018• Expected Completion: Fall 2018• Total Square Footage: 11,780• Dining hall for Peter Bryce campus
The Bryce Park Food Service project will be strategically located adjacent to the new North Lawn Hall classroom building. The project will provide an engaging and exciting food service venue and student-centric space for programs located on the Peter Bryce campus. The proximity of the project to Bryce Main along with the proposed University Welcome Center located therein will provide an opportunity for campus visitors to experience student life. The project proposal also provides 2,500 square feet of outdoor covered dining to accommodate 115 people.
Features:• Au Bon Pain Bakery Cafe• Dining/lounge areas to seat 240• Covered outdoor dining area overlooking
Peter Bryce Park to seat 115
Coming Fall 2018
Overview and Details
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U
View from Peter Bryce Park Looking Northeast
Capital Projects Summer 2017 25
2nd Avenue Overpass
Capital Projects | Planned
26 The University of Alabama
Project Overview:• Budget: $14,700,000• Project Start: December 2018• Expected Completion: March 2020 • Purpose is to provide an overpass above
the railroad tracks in order to ease campus traffic and improve safety
The 2nd Avenue Overpass is essential to decrease campus traffic delays and improve safety conditions near campus. The overpass will provide an alternative route to ~70,000 vehicles that cross the railroad tracks each day.
Part of the Coleman Coliseum parking lot will be converted into a three-lane road. The plans include bicycle lanes, a pedestrian walkway, and safety barriers.
The design of the project intends to preserve as many parking spaces in the Coleman Coliseum parking lot as possible.
Features:• 10’ bike/pedestrian way• 4’ zone with protective barrier• Two 12’ travel lanes
Coming Spring 2020
Overview and Details
Project Location
ConstructionArea
ALABAMA
CRIMSON TIDE
2665
2664
1235
2667
26662669
2668
2670
63054835
4836
6208
78317832
78337834
2600
1174
3440
3441
3443
3415
34173418
3419
3420
3422
3421
3424
3423
3427
3444
3426
3429
3430
1070
K
4914
5560
I
4292B
4922
4942
5020
1254
5010
9180
4941
6299
A
H
C
D
E
G
J
5016
F
1079
2093
2247
1252 1249
1245
14011251
1250 1034
1170
4930
4260
4259
4258 4257
4256 4255
49374909
4929
4917
43854384
4383 43754376
4377
43794380
43814382
5373
5372
5370 5390
5018
5017
2261
D480
2913
4293
4931
4294
49064915
49284935
49444921
5365
7916
7004
1226
2266
2267
2265
2270
22692193
5386
5389
5024
D286
D282
D280
1160
2271
2263
22622264
7046
7205
7918
7017
7028
7902
7912
79277904
7203
7006
7158
7202
7090
7074
7054
7059
7213
7244
7298
7206
6219
6218 6085
6086
6116
6082
6369
6025
6303
63016302
6118
2933
29242908
21522064
2297
2106
20352332
1021
1022
1214
10401067
1099
1043
1108
1014
1107
10321031
1036
1003
1051
1030
10451027
1167
1013
1199
1155
103311501039
10381172
1175
1173
1072
D288
6119
5391
2602
2601
L
1233
M
78397841
4837
4838
7840
2497
5011
5133
7843D780
6080
7842
78497848
4852
3446
3446
P131
P115
P111
P129
P127
P123
P219
P209
P207
P201
P407
P409
P503
P521
P505
P501
P515
P507
P509
P511
P613 P629
P627
P623P621
P617
P603
P739
P745
P723
P121
P731
P727
P752
P713
P703
P751
D284D284
Sixth Avenue
Elm Drive
Shelby Lane
Marr's Spring Road
Colonial Drive
McCorvey Drive
Mar
gare
t D
rive
Devotie Avenue
Jefferson Avenue
Bryce Lawn Drive
Fourth
Street
Jackson Avenue
Fifth AvenueHackberry Lane
Ninth Street
Fourth Avenue
Sixth AvenueSeventh AvenueEleventh Street
Eighth Avenue
Paul Bryant Drive Twelfth
S
treet
Eighth Street
Frank Thomas Avenue
Second
Street
Fifth Avenue East
Anna Avenue
Paul Bryant
Drive
Magnolia Dr
Colonial Drive
Jack
War
ner P
arkw
ay
Second Avenue
Riverside
Drive
Campus
Drive W
est
Campus Drive East
Tenth Avenue
Capstone
Drive
Wallace Wade Avenue
University
Boulevard
Coliseum Street
University Boulevard
Stad
ium
Drive
Seventh Avenue
Fraternity Lane
McFarland Blvd
Jack Warner Parkway
Marr’s Spring
Crimson Promenade
Gene Stallings Avenue
RecreationFields
Varsity Soccer
BandPractice
Field
McCorvey
Drive
Hackberry Lane
Hackberry Lane
Old Hackberry
Lane
Palmer Lake
Facilities Management,
Library Annex, Motor Pool
& University Warehouse
0.2 miles
Mound
Rotunda
The Park atManderson
Landing
B l a c k W a r r i o r R i v e r
Johnny Stallings Dr.
Red Drew Avenue
Kilgore Lane
N
W S
E
THE UNIVERSITY OF ALABAMA
06/01/15
ConstructionArea
ConstructionArea
ConstructionArea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
13
14
1
2
3
4
5
6
7
8
9
10
12
11
A B C D E F G H I J K M N O P Q R S T U V W X Y ZL
A F G H I J K N O P R S T V W X Y ZLB C D E M Q U