FOR FISCAL YEAR : CAPITAL OUTLAY PROJECT APPLICATION SCHOOL SYSTEM Code: 2014 Cobb County 633 GEORGIA DEPARTMENT OF EDUCATION OFFICE OF POLICY AND BUSINESS OPERATIONS FACILITIES SERVICES ATLANTA, GEORGIA 30334-5050 REQUIRES: STATE BOARD OF EDUCATION APPROVAL AND LEGISLATIVE FUNDING TYPE OF FUNDING: Regular

Transcript of CAPITAL OUTLAY PROJECT APPLICATION 9 ATTACH 2DRAFT Co… · for fiscal year: capital outlay project...

FOR FISCAL YEAR:

CAPITAL OUTLAY PROJECT APPLICATION

SCHOOL SYSTEMCode:

2014Cobb County

633

GEORGIA DEPARTMENT OF EDUCATION OFFICEOF POLICY AND BUSINESS OPERATIONS

FACILITIES SERVICES ATLANTA, GEORGIA 30334-5050

REQUIRES:STATE BOARD OF EDUCATION APPROVAL

AND LEGISLATIVE FUNDING

TYPE OF FUNDING:Regular

StatePriority #

fromLocal

FacilitiesPlan

School Name Project Description Funding Source(s)

Regular

The COBB COUNTY Board of Education wishes to submit a Facility Improvement Application for thefollowing projects listed in order of priority to be financed with state capital outlay and local funds.

X116.4 rensHarmony-Leland Elementary FacilityX65.3 modsArgyle Elementary FacilityX51.4 rens & modsBrumby Elementary FacilityX53.3 rens & modsCompton Elementary FacilityX71.4 rens & modsBirney Elementary FacilityX16.6 rensMurdock Elementary FacilityX64.4 modTapp Middle FacilityX77.3 rensMount Bethel Elementary FacilityX74.2 rens & modsGarrison Mill Elementary FacilityX14.6 rens & modsLewis Elementary FacilityX33.5 rens & modsBaker Elementary FacilityX57.2 rensDowell Elementary FacilityX78.2 rens & modsNicholson Elementary FacilityX60.4 rens & modsBryant Elementary FacilityX122 rens & modsFord Elementary FacilityX123 rensKennesaw Elementary FacilityX59.3 rens & modsBlackwell Elementary Facility

CERTIFICATES

1. SCHOOL SITESThe Board of Education certifies that each site for Facilities Improvement Priorities listed above are:

1) sites that this Board of Education holds title in fee simple, free of all encumbrances; and2) all required site approvals have been received. A system's certification of title for a schoolsite must be filed with the Facilities Services offices when making an application.

2. FLOOD PLAIN LETTER OF ASSURANCEThe Board of Education certifies that each site is not in a flood plain area or Coastal High Hazardarea. A letter of assurance must be filed with the Facilities Services offices when making anapplication.

FACILITY IMPROVEMENT APPLICATIONDate: 7/25/2012

DE FORM 0748, Page1, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 3336

00550

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[3060] Harmony-Leland Elementary Facility

Basic Curriculum20 23 3 3 NotesKindergarten - Third Grade Classroom9 9 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center32 35 0 0 0 3 0 3SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

33 36 0 0 0 3 0 3TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] Earned new IUs at local expense due to unearned IUs at other facilities.

NOTES

Wednesday, July 25, 2012 633 - - Program 13060DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 3060 ] Harmony-Leland Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1951 6 6 84,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$421,343$84,000

$337,343

$25,280$5,040

$20,240

$63,201$12,600$50,601

$509,824$101,640$408,184

6 6 $84,000

DE FORM 1103/0748, Page A, Revised September 1995633- 3060- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 3060 ] Harmony-Leland Elementary Facility 2010

6 61951

ITEM COST$34,000Door replacementX$34,081Replace or refinish wall surfaces, to include paintingX$24,786New windowsX

$3,098Provisions for the handicapped to include drinking fountains, lifts, and rampsX$12,393Tackboards, chalkboards, and lockersX$49,572Restroom modernization (Including those for handicapped)X$74,358RewiringX

$108,500RelightingX$30,983New ceilingX$49,572New floor coveringX

Total Cost $421,343

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

Name of School [3060] Harmony-Leland Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $105,499 $263,749 $2,127,575$1,758,327Modifications $66,491 $166,229 $1,340,911$1,108,191New Constructions $0 $0 $0$0

Totals $171,990 $429,978 $3,468,486$2,866,518Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $19,320 $48,300 $389,620$322,000Modifications $32,317 $80,795 $651,744$538,632New Constructions $0 $0 $0$0

Totals $51,637 $129,095 $1,041,364$860,632Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $86,179 $215,449 $1,737,955$1,436,327Modifications $34,174 $85,434 $689,167$569,559New Constructions $0 $0 $0$0

Totals $120,353 $300,883 $2,427,122$2,005,886Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-13060

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Harmony-Leland Elementary Facility - 3060

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $421,343 $25,280 $63,201 $509,824 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0

Totals $421,343 $25,280 $63,201 $509,824Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $337,343 $20,240 $50,601 $408,184 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $337,343 $20,240 $50,601 $408,184Adj. project cost for new fund $101,640

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $20,328 State Funds $81,312

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $81,312 $20,328 $0 $101,640Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $408,184 $408,184Totals $81,312 $20,328 $408,184 $509,824TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $428,512

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Harmony-Leland Elementary Facility - 3060

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 3626

00425

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[2050] Argyle Elementary Facility

Basic Curriculum22 18 4 Kindergarten - Third Grade Classroom8 6 2 Fourth - Fifth Grade Classroom1 1 ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School1 1 Computer Science - Elementary School

Other Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center35 26 9 0 0 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

36 26 10 0 0 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

NOTES

Wednesday, July 25, 2012 633 - - Program 12050DE FORM 1103/0748, Page A, Revised September 1995

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 2050 ] Argyle Elementary Facility

Kitchen 2010 $15,000 $35,000 $50,000Canopies/Walkways 2010 $30,000 $121,500 $151,500HVAC 2010 $18,640 $5,825 $24,465

TOTAL MODIFICATION COSTS $63,640 $162,325 $225,965

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$225,965$63,640

$162,325

$13,557$3,818$9,739

$33,895$9,546

$24,349

$273,417$77,004

$196,413

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 2050- ModSum-1

NAME OF SCHOOL [ 2050 ] Argyle Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.015MODIFICATION OBJECTIVE AND DESCRIPTION :HoodAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

hood 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $50,000

$50,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 2050- ModSum-1

NAME OF SCHOOL [ 2050 ] Argyle Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :canopy for auto pickupAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

canopy for auto pickup 1500 $101.00 $151,500s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $151,500

$151,500

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 2050- ModSum-1

NAME OF SCHOOL [ 2050 ] Argyle Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.015MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

HVAC for Kitchen - zoned system 2330 $10.50 $24,465s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $24,465

$24,465

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 2050- ModSum-1

Name of School [2050] Argyle Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $69,313 $173,284 $1,397,821$1,155,224Modifications $81,056 $202,642 $1,634,645$1,350,947New Constructions $0 $0 $0$0

Totals $150,369 $375,926 $3,032,466$2,506,171Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $21,840 $54,600 $440,440$364,000Modifications $41,517 $103,795 $837,278$691,966New Constructions $0 $0 $0$0

Totals $63,357 $158,395 $1,277,718$1,055,966Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $47,473 $118,684 $957,381$791,224Modifications $39,539 $98,847 $797,367$658,981New Constructions $0 $0 $0$0

Totals $87,012 $217,531 $1,754,748$1,450,205Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-12050

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Argyle Elementary Facility - 2050

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $225,965 $13,557 $33,895 $273,417 New Constructions $0 $0 $0 $0

Totals $225,965 $13,557 $33,895 $273,417Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $0 $0 $0 $0 Modifications $162,325 $9,739 $24,349 $196,413 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $162,325 $9,739 $24,349 $196,413Adj. project cost for new fund $77,004

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $15,401 State Funds $61,603

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $61,603 $15,401 $0 $77,004Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $196,413 $196,413Totals $61,603 $15,401 $196,413 $273,417TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $211,814

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Argyle Elementary Facility - 2050

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 5661

00950

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[5052] Brumby Elementary Facility

Basic Curriculum34 39 5 5 NotesKindergarten - Third Grade Classroom15 15 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School1 1 Computer Science - Elementary School

Other Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center55 60 0 0 0 5 0 5SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

56 61 0 0 0 5 0 5TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] Earned new IUs at local expense due to unearned IUs at other facilities.

NOTES

Wednesday, July 25, 2012 633 - - Program 15052DE FORM 1103/0748, Page A, Revised September 1995

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 5052 ] Brumby Elementary Facility

Canopies/Walkways 2010 $30,000 $0 $30,000

TOTAL MODIFICATION COSTS $30,000 $0 $30,000

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$30,000$30,000

$0

$1,800$1,800

$0

$4,500$4,500

$0

$36,300$36,300

$0

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 5052- ModSum-1

NAME OF SCHOOL [ 5052 ] Brumby Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :bus canopyAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

bus canopy 2000 $15.00 $30,000s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $30,000

$30,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 5052- ModSum-1

Name of School [5052] Brumby Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $113,507 $283,770 $2,289,076$1,891,799Modifications $88,030 $220,077 $1,775,290$1,467,183New Constructions $0 $0 $0$0

Totals $201,537 $503,847 $4,064,366$3,358,982Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $20,160 $50,400 $406,560$336,000Modifications $54,208 $135,522 $1,093,208$903,478New Constructions $0 $0 $0$0

Totals $74,368 $185,922 $1,499,768$1,239,478Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $93,347 $233,370 $1,882,516$1,555,799Modifications $33,822 $84,555 $682,082$563,705New Constructions $0 $0 $0$0

Totals $127,169 $317,925 $2,564,598$2,119,504Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-15052

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Brumby Elementary Facility - 5052

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $30,000 $1,800 $4,500 $36,300 New Constructions $0 $0 $0 $0

Totals $30,000 $1,800 $4,500 $36,300Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $0 $0 $0 $0 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $0 $0 $0 $0Adj. project cost for new fund $36,300

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $7,260 State Funds $29,040

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $29,040 $7,260 $0 $36,300Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $0 $0Totals $29,040 $7,260 $0 $36,300TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $7,260

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Brumby Elementary Facility - 5052

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 6043

00675

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[3556] Compton Elementary Facility

Basic Curriculum34 28 6 Kindergarten - Third Grade Classroom20 11 9 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School2 1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center59 42 17 0 0 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

60 43 17 0 0 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

NOTES

Wednesday, July 25, 2012 633 - - Program 13556DE FORM 1103/0748, Page A, Revised September 1995

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 3556 ] Compton Elementary Facility

Roof 2030 $81,706 $9,078 $90,784

TOTAL MODIFICATION COSTS $81,706 $9,078 $90,784

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$90,784$81,706

$9,078

$5,447$4,902

$545

$13,618$12,256

$1,362

$109,849$98,864$10,985

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 3556- ModSum-1

NAME OF SCHOOL [ 3556 ] Compton Elementary FacilityBUILDING NUMBER(S) 2030 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :reroof with built up systemAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

built up roof system 11348 $8.00 $90,784s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $90,784

$90,784

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 3556- ModSum-1

Name of School [3556] Compton Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $109,537 $273,844 $2,209,007$1,825,626Modifications $137,410 $343,527 $2,771,120$2,290,183New Constructions $0 $0 $0$0

Totals $246,947 $617,371 $4,980,127$4,115,809Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $1,680 $4,200 $33,880$28,000Modifications $74,160 $185,402 $1,495,575$1,236,013New Constructions $0 $0 $0$0

Totals $75,840 $189,602 $1,529,455$1,264,013Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $107,857 $269,644 $2,175,127$1,797,626Modifications $63,250 $158,125 $1,275,545$1,054,170New Constructions $0 $0 $0$0

Totals $171,107 $427,769 $3,450,672$2,851,796Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-13556

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Compton Elementary Facility - 3556

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $90,784 $5,447 $13,618 $109,849 New Constructions $0 $0 $0 $0

Totals $90,784 $5,447 $13,618 $109,849Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $0 $0 $0 $0 Modifications $9,078 $544 $1,362 $10,984 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $9,078 $544 $1,362 $10,984Adj. project cost for new fund $98,865

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $19,773 State Funds $79,092

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $79,092 $19,773 $0 $98,865Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $10,984 $10,984Totals $79,092 $19,773 $10,984 $109,849TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $30,757

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Compton Elementary Facility - 3556

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 5949

00775

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0173] Birney Elementary Facility

Basic Curriculum41 33 7 Kindergarten - Third Grade Classroom12 12 1 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School2 1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center58 48 10 0 0 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

59 49 10 0 0 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

NOTES

Wednesday, July 25, 2012 633 - - Program 10173DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0173 ] Birney Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1973 17 17 238,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$1,302,875$238,000

$1,064,875

$78,172$14,280$63,892

$195,431$35,700

$159,731

$1,576,478$287,980

$1,288,498

17 17 $238,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0173- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0173 ] Birney Elementary Facility 2010

17 171973

ITEM COST$174,400Energy conservation, to include time devices, caulking, and retrofit measuresX$137,000Door replacementX$119,900Replace or refinish wall surfaces, to include paintingX

$87,200New windowsX$2,375Provisions for the handicapped to include drinking fountains, lifts, and ramps (X

$28,000Tackboards, chalkboards, and lockersX$261,600RewiringX$155,000RelightingX$163,000New ceilingX$174,400New floor coveringX

Total Cost $1,302,875

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0173 ] Birney Elementary Facility

HVAC 2010, $328,463 $154,177 $482,640HVAC 2010, $31,547 $19,153 $50,700

TOTAL MODIFICATION COSTS $360,010 $173,330 $533,340

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$533,340$360,010$173,330

$32,000$21,600$10,400

$80,001$54,002$25,999

$645,341$435,612$209,729

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0173- ModSum-1

NAME OF SCHOOL [ 0173 ] Birney Elementary FacilityBUILDING NUMBER(S) 2010, SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC - zoned systemAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

HVAC replacement 40220 $12.00 $482,640s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $482,640

$482,640

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0173- ModSum-1

NAME OF SCHOOL [ 0173 ] Birney Elementary FacilityBUILDING NUMBER(S) 2010, SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC - zoned system with duct replacementAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

HVAC replacement 3380 $15.00 $50,700s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $50,700

$50,700

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0173- ModSum-1

Name of School [0173] Birney Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $172,361 $430,903 $3,475,948$2,872,684Modifications $141,356 $353,391 $2,850,685$2,355,938New Constructions $0 $0 $0$0

Totals $313,717 $784,294 $6,326,633$5,228,622Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $36,120 $90,300 $728,420$602,000Modifications $84,272 $210,681 $1,699,495$1,404,542New Constructions $0 $0 $0$0

Totals $120,392 $300,981 $2,427,915$2,006,542Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $136,241 $340,603 $2,747,528$2,270,684Modifications $57,084 $142,710 $1,151,190$951,396New Constructions $0 $0 $0$0

Totals $193,325 $483,313 $3,898,718$3,222,080Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10173

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Birney Elementary Facility - 0173

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $1,302,875 $78,172 $195,431 $1,576,478 Modifications $533,340 $32,000 $80,001 $645,341 New Constructions $0 $0 $0 $0

Totals $1,836,215 $110,172 $275,432 $2,221,819Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,064,875 $63,892 $159,731 $1,288,498 Modifications $173,330 $10,399 $26,000 $209,729 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,238,205 $74,291 $185,731 $1,498,227Adj. project cost for new fund $723,592

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $144,718 State Funds $578,874

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $578,874 $144,718 $0 $723,592Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,498,227 $1,498,227Totals $578,874 $144,718 $1,498,227 $2,221,819TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,642,945

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Birney Elementary Facility - 0173

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 6151

00800

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0375] Murdock Elementary Facility

Basic Curriculum53 34 8 11 NotesKindergarten - Third Grade Classroom2 13 11 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School2 1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center60 50 10 11 11 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

61 51 10 11 11 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] 11 K-3 classrooms used by grades 4-5

NOTES

Wednesday, July 25, 2012 633 - - Program 10375DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0375 ] Murdock Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1975 26 21 294,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$902,540$294,000$608,540

$54,152$17,640$36,512

$135,381$44,100$91,281

$1,092,073$355,740$736,333

26 21 $294,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0375- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0375 ] Murdock Elementary Facility 2010

26 211975

ITEM COST$114,000Door replacementX$154,930Replace or refinish wall surfaces, to include paintingX$116,194New windowsX

$14,524Provisions for the handicapped to include drinking fountains, lifts, and rampsX$61,077Tackboards, chalkboards, and lockersX

$272,801Restroom modernization (Including those for handicapped)X$169,014RelightingX

Total Cost $902,540

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

Name of School [0375] Murdock Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $104,083 $260,208 $2,099,012$1,734,721Modifications $55,256 $138,142 $1,114,342$920,944New Constructions $0 $0 $0$0

Totals $159,339 $398,350 $3,213,354$2,655,665Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $17,640 $44,100 $355,740$294,000Modifications $29,865 $74,664 $602,287$497,758New Constructions $0 $0 $0$0

Totals $47,505 $118,764 $958,027$791,758Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $86,443 $216,108 $1,743,272$1,440,721Modifications $25,391 $63,478 $512,055$423,186New Constructions $0 $0 $0$0

Totals $111,834 $279,586 $2,255,327$1,863,907Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10375

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Murdock Elementary Facility - 0375

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $902,540 $54,152 $135,381 $1,092,073 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0

Totals $902,540 $54,152 $135,381 $1,092,073Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $608,540 $36,512 $91,281 $736,333 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $608,540 $36,512 $91,281 $736,333Adj. project cost for new fund $355,740

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $71,148 State Funds $284,592

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $284,592 $71,148 $0 $355,740Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $736,333 $736,333Totals $284,592 $71,148 $736,333 $1,092,073TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $807,481

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Murdock Elementary Facility - 0375

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

06-08 7042

00650

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE3(3-4-4)

[0475] Tapp Middle Facility

Basic Curriculum40 24 16 Middle School Classroom4 2 2 Middle School Sp. Ed. (pair of rooms)16 9 7 Science Lab - Middle School1 1 Art - Middle School2 1 1 Instrumental Music - Middle School1 1 Choral Music - Middle School

Instrumental / Choral - Middle School Computer Science - Middle School

Middle School Exploration2 1 1 Business Lab - Middle School1 1 Technology Lab - Middle School

Family and Consumer Science - Middle Healthcare Science Lab - Middle School Agriculture Lab - Middle School

Other Drama - Middle School Theater Sp. Ed. Family Living Center

1 1 NotesOther Instructional1 1 Media Center69 41 28 0 0 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Middle School

Unearned UNEARNED

70 42 28 0 0 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Middle School1 1 Administration3 3 Team Planning1 1 Counseling

[Other Instructional] auxillary gym

NOTES

Wednesday, July 25, 2012 633 - - Program 10475DE FORM 1103/0748, Page A, Revised September 1995

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0475 ] Tapp Middle Facility

HVAC ALL $1,102,045 $1,102,045 $2,204,090

TOTAL MODIFICATION COSTS $1,102,045 $1,102,045 $2,204,090

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$2,204,090$1,102,045$1,102,045

$132,245$66,122$66,123

$330,614$165,307$165,307

$2,666,949$1,333,474$1,333,475

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0475- ModSum-1

NAME OF SCHOOL [ 0475 ] Tapp Middle FacilityBUILDING NUMBER(S) ALL SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC zoned systemAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

HVAC zoned system 157435 $14.00 $2,204,090s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $2,204,090

$2,204,090

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0475- ModSum-1

Name of School [0475] Tapp Middle Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $226,608 $566,522 $4,569,941$3,776,811Modifications $220,712 $551,780 $4,451,027$3,678,535New Constructions $0 $0 $0$0

Totals $447,320 $1,118,302 $9,020,968$7,455,346Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $35,280 $88,200 $711,480$588,000Modifications $74,588 $186,470 $1,504,193$1,243,135New Constructions $0 $0 $0$0

Totals $109,868 $274,670 $2,215,673$1,831,135Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $191,328 $478,322 $3,858,461$3,188,811Modifications $146,124 $365,310 $2,946,834$2,435,400New Constructions $0 $0 $0$0

Totals $337,452 $843,632 $6,805,295$5,624,211Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10475

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Tapp Middle Facility - 0475

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $2,204,090 $132,245 $330,614 $2,666,949 New Constructions $0 $0 $0 $0

Totals $2,204,090 $132,245 $330,614 $2,666,949Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $0 $0 $0 $0 Modifications $1,102,045 $66,122 $165,307 $1,333,474 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,102,045 $66,122 $165,307 $1,333,474Adj. project cost for new fund $1,333,475

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $266,695 State Funds $1,066,780

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $1,066,780 $266,695 $0 $1,333,475Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,333,474 $1,333,474Totals $1,066,780 $266,695 $1,333,474 $2,666,949TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,600,169

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Tapp Middle Facility - 0475

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 6061

00950

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0278] Mount Bethel Elementary Facility

Basic Curriculum53 39 14 NotesKindergarten - Third Grade Classroom

15 14 1 1 NotesFourth - Fifth Grade Classroom1 1 ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center59 60 0 14 14 1 0 1SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

60 61 0 14 14 1 0 1TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] 14 K-3 classrooms used by grades 4-5[Fourth - Fifth Grade Classroom] Earned new IU at local expense due to unearned IUs at other facilities.

NOTES

Wednesday, July 25, 2012 633 - - Program 10278DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0278 ] Mount Bethel Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1978 30 30 420,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$1,854,294$420,000

$1,434,294

$111,257$25,200$86,057

$278,144$63,000

$215,144

$2,243,695$508,200

$1,735,495

30 30 $420,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0278- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0278 ] Mount Bethel Elementary Facility 2010

30 301978

ITEM COST$151,000Door replacementX$274,406Replace or refinish wall surfaces, to include paintingX$130,050New windowsX

$16,256Provisions for the handicapped to include drinking fountains, lifts, and rampsX$68,174Tackboards, chalkboards, and lockersX

$260,100Restroom modernization (Including those for handicapped)X$390,150RewiringX$279,828RelightingX$284,330New floor coveringX

Total Cost $1,854,294

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

Name of School [0278] Mount Bethel Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $152,330 $380,827 $3,072,004$2,538,847Modifications $86,944 $217,360 $1,753,373$1,449,069New Constructions $0 $0 $0$0

Totals $239,274 $598,187 $4,825,377$3,987,916Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $50,400 $126,000 $1,016,400$840,000Modifications $56,710 $141,776 $1,143,661$945,175New Constructions $0 $0 $0$0

Totals $107,110 $267,776 $2,160,061$1,785,175Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $101,930 $254,827 $2,055,604$1,698,847Modifications $30,234 $75,584 $609,712$503,894New Constructions $0 $0 $0$0

Totals $132,164 $330,411 $2,665,316$2,202,741Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10278

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Mount Bethel Elementary Facility - 0278

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $1,854,294 $111,257 $278,144 $2,243,695 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0

Totals $1,854,294 $111,257 $278,144 $2,243,695Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,434,294 $86,057 $215,144 $1,735,495 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,434,294 $86,057 $215,144 $1,735,495Adj. project cost for new fund $508,200

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $101,640 State Funds $406,560

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $406,560 $101,640 $0 $508,200Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,735,495 $1,735,495Totals $406,560 $101,640 $1,735,495 $2,243,695TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,837,135

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Mount Bethel Elementary Facility - 0278

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 4443

00675

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0185] Garrison Mill Elementary Facility

Basic Curriculum39 27 1 11 NotesKindergarten - Third Grade Classroom

11 11 Fourth - Fifth Grade Classroom ElementarySp. Ed. (Pair of Rooms)

1 1 Art - Elementary School1 1 Music - Elementary School1 1 Computer Science - Elementary School

Other Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center43 42 1 11 11 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

44 43 1 11 11 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] 11 K-3 classrooms used by grades 4-5

NOTES

Wednesday, July 25, 2012 633 - - Program 10185DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1984 38 38 532,000 02011 1993 5 4 56,000 02020 1988 1 1 14,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$1,883,707$602,000

$1,281,707

$113,022$36,120$76,902

$282,556$90,300

$192,256

$2,279,285$728,420

$1,550,865

44 43 $602,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0185- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0185 ] Garrison Mill Elementary Facility 2010

38 381984

ITEM COST$194,000Door replacementX$183,750New ceilingX$279,000RelightingX$294,000Restroom modernization (Including those for handicapped)X

$76,169Tackboards, chalkboards, and lockersX$18,375Provisions for the handicapped to include drinking fountains, lifts, and rampsX

$147,000New windowsX$294,000New floor coveringX$235,881Replace or refinish wall surfaces, to include paintingX

Total Cost $1,722,175

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0185 ] Garrison Mill Elementary Facility 2011

5 41993

ITEM COST$20,188New ceilingX$32,300Restroom modernization (Including those for handicapped)X

$8,075Tackboards, chalkboards, and lockersX$2,019Provisions for the handicapped to include drinking fountains, lifts, and rampsX

$16,150New windowsX$30,000Door replacementX$32,300New floor coveringX

Total Cost $141,032

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 2

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0185 ] Garrison Mill Elementary Facility 2020

1 11988

ITEM COST$10,000Door replacementX$10,500New ceilingX

Total Cost $20,500

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 3

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary Facility

HVAC 2010; 2011;2020 $600,425 $428,875 $1,029,300

HVAC 2010 $15,000 $30,000 $45,000

TOTAL MODIFICATION COSTS $615,425 $458,875 $1,074,300

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$1,074,300$615,425$458,875

$64,458$36,925$27,533

$161,145$92,314$68,831

$1,299,903$744,664$555,239

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0185- ModSum-1

NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary FacilityBUILDING NUMBER(S) 2010; 2011; 2020 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC systemAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

new HVAC system - zoned 85775 $12.00 $1,029,300s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $1,029,300

$1,029,300

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0185- ModSum-1

NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Hood for kitchenAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

Hood for kitchen 1 $45,000.00 $45,000lmp.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $45,000

$45,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0185- ModSum-1

Name of School [0185] Garrison Mill Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $113,022 $282,556 $2,279,285$1,883,707Modifications $148,650 $371,627 $2,997,790$2,477,513New Constructions $0 $0 $0$0

Totals $261,672 $654,183 $5,277,075$4,361,220Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $36,120 $90,300 $728,420$602,000Modifications $69,249 $173,122 $1,396,521$1,154,150New Constructions $0 $0 $0$0

Totals $105,369 $263,422 $2,124,941$1,756,150Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $76,902 $192,256 $1,550,865$1,281,707Modifications $79,401 $198,505 $1,601,269$1,323,363New Constructions $0 $0 $0$0

Totals $156,303 $390,761 $3,152,134$2,605,070Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10185

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Garrison Mill Elementary Facility - 0185

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $1,883,707 $113,022 $282,556 $2,279,285 Modifications $1,154,425 $69,265 $173,164 $1,396,854 New Constructions $0 $0 $0 $0

Totals $3,038,132 $182,287 $455,720 $3,676,139Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,281,707 $76,902 $192,256 $1,550,865 Modifications $506,000 $30,360 $75,900 $612,260 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,787,707 $107,262 $268,156 $2,163,125Adj. project cost for new fund $1,513,014

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $302,603 State Funds $1,210,411

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $1,210,411 $302,603 $0 $1,513,014Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $2,163,125 $2,163,125Totals $1,210,411 $302,603 $2,163,125 $3,676,139TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,465,728

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Garrison Mill Elementary Facility - 0185

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 6153

00850

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0287] Lewis Elementary Facility

Basic Curriculum55 36 6 13 NotesKindergarten - Third Grade Classroom

13 13 Fourth - Fifth Grade Classroom ElementarySp. Ed. (Pair of Rooms)

2 1 1 Art - Elementary School2 1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center60 52 8 13 13 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

61 53 8 13 13 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] 13 K-3 classrooms used by grades 4-5

NOTES

Wednesday, July 25, 2012 633 - - Program 10287DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0287 ] Lewis Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1986 15 15 210,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$1,383,959$210,000

$1,173,959

$83,037$12,600$70,437

$207,594$31,500

$176,094

$1,674,590$254,100

$1,420,490

15 15 $210,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0287- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0287 ] Lewis Elementary Facility 2010

15 151986

ITEM COST$182,028Energy conservation, to include time devices, caulking, and retrofit measuresX$130,000Door replacementX$125,144Replace or refinish wall surfaces, to include paintingX

$91,014New windowsX$11,377Provisions for the handicapped to include drinking fountains, lifts, and rampsX$48,452Tackboards, chalkboards, and lockersX

$182,028Restroom modernization (Including those for handicapped)X$318,120RelightingX$113,768New ceilingX$182,028New floor coveringX

Total Cost $1,383,959

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0287 ] Lewis Elementary Facility

Kitchen 2010 $15,000 $35,000 $50,000HVAC 2010 $23,632 $13,293 $36,925

TOTAL MODIFICATION COSTS $38,632 $48,293 $86,925

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$86,925$38,632$48,293

$5,215$2,317$2,898

$13,039$5,795$7,244

$105,179$46,744$58,435

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0287- ModSum-1

NAME OF SCHOOL [ 0287 ] Lewis Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Kitchen HoodAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

Kitchen Hood 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $50,000

$50,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0287- ModSum-1

NAME OF SCHOOL [ 0287 ] Lewis Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.034MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC kitchenAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

HVAC kitchen 2954 $12.50 $36,925s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $36,925

$36,925

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0287- ModSum-1

Name of School [0287] Lewis Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $181,595 $453,988 $3,662,172$3,026,589Modifications $119,953 $299,883 $2,419,058$1,999,222New Constructions $0 $0 $0$0

Totals $301,548 $753,871 $6,081,230$5,025,811Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $43,680 $109,200 $880,880$728,000Modifications $53,718 $134,295 $1,083,316$895,303New Constructions $0 $0 $0$0

Totals $97,398 $243,495 $1,964,196$1,623,303Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $137,915 $344,788 $2,781,292$2,298,589Modifications $66,235 $165,588 $1,335,742$1,103,919New Constructions $0 $0 $0$0

Totals $204,150 $510,376 $4,117,034$3,402,508Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10287

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Lewis Elementary Facility - 0287

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $1,383,959 $83,037 $207,594 $1,674,590 Modifications $86,925 $5,215 $13,039 $105,179 New Constructions $0 $0 $0 $0

Totals $1,470,884 $88,252 $220,633 $1,779,769Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,173,959 $70,437 $176,094 $1,420,490 Modifications $48,293 $2,897 $7,244 $58,434 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,222,252 $73,334 $183,338 $1,478,924Adj. project cost for new fund $300,845

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $60,169 State Funds $240,676

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $240,676 $60,169 $0 $300,845Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,478,924 $1,478,924Totals $240,676 $60,169 $1,478,924 $1,779,769TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,539,093

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Lewis Elementary Facility - 0287

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 6351

00800

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0189] Baker Elementary Facility

Basic Curriculum45 34 11 Kindergarten - Third Grade Classroom13 13 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center62 50 12 0 0 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

63 51 12 0 0 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

NOTES

Wednesday, July 25, 2012 633 - - Program 10189DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0189 ] Baker Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2011 1993 9 3 42,000 02012 1996 14 8 112,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$578,936$154,000$424,936

$34,736$9,240

$25,496

$86,840$23,100$63,740

$700,512$186,340$514,172

23 11 $154,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0189- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0189 ] Baker Elementary Facility 2011

9 31993

ITEM COST$34,000Door replacementX$29,170New ceilingX$35,004RelightingX$10,000Restroom modernization (Including those for handicapped)X

$2,917Provisions for the handicapped to include drinking fountains, lifts, and rampsX$23,336New windowsX$46,672New floor coveringX$32,087Replace or refinish wall surfaces, to include paintingX

Total Cost $213,186

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0189 ] Baker Elementary Facility 2012

14 81996

ITEM COST$44,000Door replacementX$53,750New ceilingX$64,500RelightingX$10,000Restroom modernization (Including those for handicapped)X

$5,375Provisions for the handicapped to include drinking fountains, lifts, and rampsX$43,000New windowsX$59,125Replace or refinish wall surfaces, to include paintingX$86,000New floor coveringX

Total Cost $365,750

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 2

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0189 ] Baker Elementary Facility

HVAC 2010; 2011;2012 $746,676 $533,340 $1,280,016

Kitchen 2010 $15,000 $35,000 $50,000

TOTAL MODIFICATION COSTS $761,676 $568,340 $1,330,016

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$1,330,016$761,676$568,340

$79,800$45,700$34,100

$199,502$114,251

$85,251

$1,609,318$921,627$687,691

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0189- ModSum-1

NAME OF SCHOOL [ 0189 ] Baker Elementary FacilityBUILDING NUMBER(S) 2010; 2011; 2012 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC systemAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

replace HVAC 106668 $12.00 $1,280,016s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $1,280,016

$1,280,016

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0189- ModSum-1

NAME OF SCHOOL [ 0189 ] Baker Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Hood for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

Hood for Kitchen 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $50,000

$50,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0189- ModSum-1

Name of School [0189] Baker Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $113,184 $282,961 $2,282,549$1,886,404Modifications $125,941 $314,854 $2,539,821$2,099,026New Constructions $0 $0 $0$0

Totals $239,125 $597,815 $4,822,370$3,985,430Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $9,240 $23,100 $186,340$154,000Modifications $79,121 $197,803 $1,595,608$1,318,684New Constructions $0 $0 $0$0

Totals $88,361 $220,903 $1,781,948$1,472,684Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $103,944 $259,861 $2,096,209$1,732,404Modifications $46,820 $117,051 $944,213$780,342New Constructions $0 $0 $0$0

Totals $150,764 $376,912 $3,040,422$2,512,746Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10189

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Baker Elementary Facility - 0189

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $578,936 $34,736 $86,840 $700,512 Modifications $1,330,016 $79,800 $199,502 $1,609,318 New Constructions $0 $0 $0 $0

Totals $1,908,952 $114,536 $286,342 $2,309,830Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $424,936 $25,496 $63,740 $514,172 Modifications $568,340 $34,100 $85,251 $687,691 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $993,276 $59,596 $148,991 $1,201,863Adj. project cost for new fund $1,107,967

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $221,593 State Funds $886,374

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $886,374 $221,593 $0 $1,107,967Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,201,863 $1,201,863Totals $886,374 $221,593 $1,201,863 $2,309,830TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,423,456

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Baker Elementary Facility - 0189

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 6263

00975

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0190] Dowell Elementary Facility

Basic Curriculum45 41 4 Kindergarten - Third Grade Classroom10 15 4 1 1 NotesFourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School1 1 Computer Science - Elementary School

Other Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center61 62 0 4 4 1 0 1SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

62 63 0 4 4 1 0 1TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration

Counseling

[Fourth - Fifth Grade Classroom] Earned new IU will be at local expense due to unearned IUs at other facilities.

NOTES

Wednesday, July 25, 2012 633 - - Program 10190DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0190 ] Dowell Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1989 38 38 FUNDED

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$2,108,493$532,000

$1,576,493

$126,509$31,920$94,589

$316,274$79,800

$236,474

$2,551,276$643,720

$1,907,556

38 38 $532,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0190- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0190 ] Dowell Elementary Facility 2010

38 381989

ITEM COST$294,460Energy conservation, to include time devices, caulking, and retrofit measuresX$208,000Door replacementX$202,441Replace or refinish wall surfaces, to include paintingX$147,230New windowsX

$18,404Provisions for the handicapped to include drinking fountains, lifts, and rampsX$124,000Tackboards, chalkboards, and lockersX$294,460Restroom modernization (Including those for handicapped)X$341,000RelightingX$184,038New ceilingX$294,460New floor coveringX

Total Cost $2,108,493

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

Name of School [0190] Dowell Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $169,623 $424,059 $3,420,741$2,827,059Modifications $89,877 $224,694 $1,812,528$1,497,957New Constructions $3,825 $3,188 $70,763$63,750

Totals $263,325 $651,941 $5,304,032$4,388,766Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $0 $0 $0$0Modifications $55,341 $138,353 $1,116,050$922,356New Constructions $3,825 $3,188 $70,763$63,750

Totals $59,166 $141,541 $1,186,813$986,106Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $169,623 $424,059 $3,420,741$2,827,059Modifications $34,536 $86,341 $696,478$575,601New Constructions $0 $0 $0$0

Totals $204,159 $510,400 $4,117,219$3,402,660Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10190

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Dowell Elementary Facility - 0190

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $2,108,493 $126,509 $316,274 $2,551,276 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0

Totals $2,108,493 $126,509 $316,274 $2,551,276Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,576,493 $94,589 $236,474 $1,907,556 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,576,493 $94,589 $236,474 $1,907,556Adj. project cost for new fund $643,720

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $128,744 State Funds $514,976

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $514,976 $128,744 $0 $643,720Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,907,556 $1,907,556Totals $514,976 $128,744 $1,907,556 $2,551,276TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,036,300

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Dowell Elementary Facility - 0190

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 4033

00500

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0391] Nicholson Elementary Facility

Basic Curriculum24 20 4 Kindergarten - Third Grade Classroom12 9 3 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center39 32 7 0 0 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

40 33 7 0 0 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration

CounselingNOTES

Wednesday, July 25, 2012 633 - - Program 10391DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0391 ] Nicholson Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1989 40 33 462,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$1,629,265$462,000

$1,167,265

$97,755$27,720$70,035

$244,390$69,300

$175,090

$1,971,410$559,020

$1,412,390

40 33 $462,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0391- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0391 ] Nicholson Elementary Facility 2010

40 331989

ITEM COST$221,000Door replacementX$208,450Replace or refinish wall surfaces, to include paintingX$151,600New windowsX

$18,950Provisions for the handicapped to include drinking fountains, lifts, and rampsX$6,558Tackboards, chalkboards, and lockersX

$303,200Restroom modernization (Including those for handicapped)X$226,807RelightingX$189,500New ceilingX$303,200New floor coveringX

Total Cost $1,629,265

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0391 ] Nicholson Elementary Facility

Kitchen 2010 $15,000 $35,000 $50,000HVAC 2010 $26,232 $49,158,768 $49,185,000

TOTAL MODIFICATION COSTS $41,232 $49,193,768 $49,235,000

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$49,235,000$41,232

$49,193,768

$2,954,100$2,473

$2,951,627

$7,385,250$6,185

$7,379,065

$59,574,350$49,890

$59,524,460

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0391- ModSum-1

NAME OF SCHOOL [ 0391 ] Nicholson Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Hood for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

Hood for Kitchen 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $50,000

$50,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0391- ModSum-1

NAME OF SCHOOL [ 0391 ] Nicholson Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 189MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

HVAC for kitchen 3279 $15,000.00 $49,185,000s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $49,185,000

$49,185,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0391- ModSum-1

Name of School [0391] Nicholson Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $97,755 $244,390 $1,971,410$1,629,265Modifications $3,012,863 $7,532,159 $60,759,416$50,214,394New Constructions $0 $0 $0$0

Totals $3,110,618 $7,776,549 $62,730,826$51,843,659Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $27,720 $69,300 $559,020$462,000Modifications $39,117 $97,794 $788,869$651,958New Constructions $0 $0 $0$0

Totals $66,837 $167,094 $1,347,889$1,113,958Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $70,035 $175,090 $1,412,390$1,167,265Modifications $2,973,746 $7,434,365 $59,970,547$49,562,436New Constructions $0 $0 $0$0

Totals $3,043,781 $7,609,455 $61,382,937$50,729,701Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10391

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Nicholson Elementary Facility - 0391

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $1,629,265 $97,755 $244,390 $1,971,410 Modifications $49,235,000 $2,954,100 $7,385,250 $59,574,350 New Constructions $0 $0 $0 $0

Totals $50,864,265 $3,051,855 $7,629,640 $61,545,760Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,167,265 $70,035 $175,090 $1,412,390 Modifications $49,193,768 $2,951,626 $7,379,065 $59,524,459 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $50,361,033 $3,021,661 $7,554,155 $60,936,849Adj. project cost for new fund $608,911

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $121,782 State Funds $487,129

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $487,129 $121,782 $0 $608,911Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $60,936,849 $60,936,849Totals $487,129 $121,782 $60,936,849 $61,545,760TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $61,058,631

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Nicholson Elementary Facility - 0391

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 6161

00950

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0592] Bryant Elementary Facility

Basic Curriculum46 39 7 NotesKindergarten - Third Grade Classroom8 15 7 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School1 1 Computer Science - Elementary School

Other Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center60 60 0 7 7 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

61 61 0 7 7 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] 7 K-3 classrooms used by grades 4-5

NOTES

Wednesday, July 25, 2012 633 - - Program 10592DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0592 ] Bryant Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1991 44 44 616,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$2,909,310$616,000

$2,293,310

$174,558$36,960

$137,598

$436,396$92,400

$343,996

$3,520,264$745,360

$2,774,904

44 44 $616,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0592- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0592 ] Bryant Elementary Facility 2010

44 441991

ITEM COST$356,708Energy conservation, to include time devices, caulking, and retrofit measuresX$243,000Door replacementX$245,237Replace or refinish wall surfaces, to include paintingX$178,354New windowsX

$22,294Provisions for the handicapped to include drinking fountains, lifts, and rampsX$121,354Tackboards, chalkboards, and lockersX$356,708Restroom modernization (Including those for handicapped)X$535,062RewiringX$279,000RelightingX$214,885New ceilingX$356,708New floor coveringX

Total Cost $2,909,310

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0592 ] Bryant Elementary Facility

Canopies/Walkways 2010 $30,000 $0 $30,000

TOTAL MODIFICATION COSTS $30,000 $0 $30,000

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$30,000$30,000

$0

$1,800$1,800

$0

$4,500$4,500

$0

$36,300$36,300

$0

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0592- ModSum-1

NAME OF SCHOOL [ 0592 ] Bryant Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :bus canopyAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

bus canopy 2000 $15.00 $30,000s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $30,000

$30,000

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0592- ModSum-1

Name of School [0592] Bryant Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $225,894 $564,737 $4,555,545$3,764,914Modifications $138,229 $345,573 $2,787,621$2,303,819New Constructions $0 $0 $0$0

Totals $364,123 $910,310 $7,343,166$6,068,733Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $51,240 $128,100 $1,033,340$854,000Modifications $94,259 $235,649 $1,900,901$1,570,993New Constructions $0 $0 $0$0

Totals $145,499 $363,749 $2,934,241$2,424,993Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $174,654 $436,637 $3,522,205$2,910,914Modifications $43,970 $109,924 $886,720$732,826New Constructions $0 $0 $0$0

Totals $218,624 $546,561 $4,408,925$3,643,740Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10592

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Bryant Elementary Facility - 0592

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $2,909,310 $174,558 $436,396 $3,520,264 Modifications $30,000 $1,800 $4,500 $36,300 New Constructions $0 $0 $0 $0

Totals $2,939,310 $176,358 $440,896 $3,556,564Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $2,293,310 $137,598 $343,996 $2,774,904 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $2,293,310 $137,598 $343,996 $2,774,904Adj. project cost for new fund $781,660

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $156,332 State Funds $625,328

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $625,328 $156,332 $0 $781,660Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $2,774,904 $2,774,904Totals $625,328 $156,332 $2,774,904 $3,556,564TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,931,236

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Bryant Elementary Facility - 0592

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 5351

00800

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0292] Ford Elementary Facility

Basic Curriculum45 33 2 10 NotesKindergarten - Third Grade Classroom3 13 10 Fourth - Fifth Grade Classroom1 1 ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center52 50 2 10 10 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

53 51 2 10 10 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] 10 K-3 classrooms used by grades 4-5

NOTES

Wednesday, July 25, 2012 633 - - Program 10292DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 0292 ] Ford Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1991 40 40 560,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$1,625,368$560,000

$1,065,368

$97,522$33,600$63,922

$243,805$84,000

$159,805

$1,966,695$677,600

$1,289,095

40 40 $560,000

DE FORM 1103/0748, Page A, Revised September 1995633- 0292- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 0292 ] Ford Elementary Facility 2010

40 401991

ITEM COST$302,516Energy conservation, to include time devices, caulking, and retrofit measuresX$161,000Door replacementX$238,118Replace or refinish wall surfaces, to include paintingX$151,258New windowsX

$18,907Provisions for the handicapped to include drinking fountains, lifts, and rampsX$285,200RelightingX$189,073New ceilingX$279,296New floor coveringX

Total Cost $1,625,368

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0292 ] Ford Elementary Facility

HVAC 2010; 2011 $637,903 $455,645 $1,093,548

TOTAL MODIFICATION COSTS $637,903 $455,645 $1,093,548

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$1,093,548$637,903$455,645

$65,612$38,274$27,338

$164,032$95,685$68,347

$1,323,192$771,862$551,330

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0292- ModSum-1

NAME OF SCHOOL [ 0292 ] Ford Elementary FacilityBUILDING NUMBER(S) 2010; 2011 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC individual unit systemAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

individual units HVAC 91129 $12.00 $1,093,548s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $1,093,548

$1,093,548

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0292- ModSum-1

Name of School [0292] Ford Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $111,239 $278,099 $2,243,331$1,853,993Modifications $113,825 $284,564 $2,295,482$1,897,093New Constructions $0 $0 $0$0

Totals $225,064 $562,663 $4,538,813$3,751,086Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $42,840 $107,100 $863,940$714,000Modifications $69,676 $174,192 $1,405,150$1,161,282New Constructions $0 $0 $0$0

Totals $112,516 $281,292 $2,269,090$1,875,282Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $68,399 $170,999 $1,379,391$1,139,993Modifications $44,149 $110,372 $890,332$735,811New Constructions $0 $0 $0$0

Totals $112,548 $281,371 $2,269,723$1,875,804Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10292

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Ford Elementary Facility - 0292

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $1,625,368 $97,522 $243,805 $1,966,695 Modifications $1,093,548 $65,612 $164,032 $1,323,192 New Constructions $0 $0 $0 $0

Totals $2,718,916 $163,134 $407,837 $3,289,887Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,065,368 $63,922 $159,805 $1,289,095 Modifications $455,645 $27,338 $68,347 $551,330 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,521,013 $91,260 $228,152 $1,840,425Adj. project cost for new fund $1,449,462

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $289,892 State Funds $1,159,570

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $1,159,570 $289,892 $0 $1,449,462Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,840,425 $1,840,425Totals $1,159,570 $289,892 $1,840,425 $3,289,887TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,130,317

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Ford Elementary Facility - 0292

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-02 6156

00825

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[1603] Kennesaw Elementary Facility

Basic Curriculum54 51 3 Kindergarten - Third Grade Classroom2 2 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School1 1 Computer Science - Elementary School

Other Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center60 55 5 0 0 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

61 56 5 0 0 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

NOTES

Wednesday, July 25, 2012 633 - - Program 11603DE FORM 1103/0748, Page A, Revised September 1995

NAME OF SCHOOL [ 1603 ] Kennesaw Elementary Facility

BUILDINGNUMBER

DATE OF CONSTRUCTION

NUMBER OFUNITS

NUMBER OF UNITS EARNED

FUNDS EARNEDFOR ENTITLEMENT

SUMMARY OF RENOVATIONS

YEARFUNDED

2010 1992 45 40 560,000 0

NET FUNDS EARNED FORENTITLEMENT

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COST

$2,396,317$560,000

$1,836,317

$143,779$33,600

$110,179

$359,448$84,000

$275,448

$2,899,544$677,600

$2,221,944

45 40 $560,000

DE FORM 1103/0748, Page A, Revised September 1995633- 1603- RenSum-1Wednesday, July 25, 2012

(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST

NAME OF SCHOOL:

OCC.DATE: AVAILABLE UNITS:

BUILDING NUMBER:

EARNED UNITS:

[ 1603 ] Kennesaw Elementary Facility 2010

45 401992

ITEM COST$365,576Energy conservation, to include time devices, caulking, and retrofit measuresX$246,000Door replacementX$251,334Replace or refinish wall surfaces, to include paintingX$100,000New windowsX

$22,849Provisions for the handicapped to include drinking fountains, lifts, and rampsX$94,621Tackboards, chalkboards, and lockersX

$365,576Restroom modernization (Including those for handicapped)X$356,300RelightingX$228,485New ceilingX$365,576New floor coveringX

Total Cost $2,396,317

Signature on file

Signature of Architect

DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012

RENOVATIONS BUDGET

Page 1

Name of School [1603] Kennesaw Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $176,159 $440,398 $3,552,543$2,935,986Modifications $138,638 $346,597 $2,795,882$2,310,647New Constructions $0 $0 $0$0

Totals $314,797 $786,995 $6,348,425$5,246,633Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $47,040 $117,600 $948,640$784,000Modifications $94,446 $236,116 $1,904,669$1,574,107New Constructions $0 $0 $0$0

Totals $141,486 $353,716 $2,853,309$2,358,107Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $129,119 $322,798 $2,603,903$2,151,986Modifications $44,192 $110,481 $891,213$736,540New Constructions $0 $0 $0$0

Totals $173,311 $433,279 $3,495,116$2,888,526Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-11603

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Kennesaw Elementary Facility - 1603

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $2,396,317 $143,779 $359,448 $2,899,544 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0

Totals $2,396,317 $143,779 $359,448 $2,899,544Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $1,836,317 $110,179 $275,448 $2,221,944 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $1,836,317 $110,179 $275,448 $2,221,944Adj. project cost for new fund $677,600

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $135,520 State Funds $542,080

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $542,080 $135,520 $0 $677,600Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $2,221,944 $2,221,944Totals $542,080 $135,520 $2,221,944 $2,899,544TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,357,464

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Kennesaw Elementary Facility - 1603

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017

NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL

EARNEDLOCAL

K-05 5245

00700

Grades and Spaces UnitsAccept

UnitsEarned

Local UnitsUnearned

UnitsGained

UnitsLost

EarnedNew Units

Local NewUnits

UnitsTo Be

Constr.Notes

TEAMS PER GRADE

[0399] Blackwell Elementary Facility

Basic Curriculum47 30 7 10 NotesKindergarten - Third Grade Classroom1 11 10 Fourth - Fifth Grade Classroom

ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School

Computer Science - Elementary SchoolOther

Theater Sp. Ed. Family Living Center Other Instructional

1 1 Media Center51 44 7 10 10 0 0 0SUB TOTAL:

Physical Education1 1 Physical Education - Elementary School

Unearned UNEARNED

52 45 7 10 10 0 0 0TOTAL:Support Areas

1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling

[Kindergarten - Third Grade Classroom] 10 K-3 classrooms used by grades 4-5

NOTES

Wednesday, July 25, 2012 633 - - Program 10399DE FORM 1103/0748, Page A, Revised September 1995

TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS

LOCALFUNDS

ARCHITECT'SESTIMATE

NAME OF SCHOOL [ 0399 ] Blackwell Elementary Facility

HVAC 2010 $28,216 $24,689 $52,905

TOTAL MODIFICATION COSTS $28,216 $24,689 $52,905

ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS

NETAMOUNTS

ARCHITECT'SFEES (MAX 6%)

CONTINGENCIES(MAX 15%)

TOTAL MOD +FEES COSTS

$52,905$28,216$24,689

$3,174$1,692$1,482

$7,936$4,232$3,704

$64,015$34,140$29,875

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

SUMMARY OF MODIFICATIONS

633- 0399- ModSum-1

NAME OF SCHOOL [ 0399 ] Blackwell Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.062MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:

00

Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)

ITEM UNITS UNIT COST TOTAL

MODIFICATIONS DETAIL

HVAC for kitchen 3527 $15.00 $52,905s.f.xTOTAL ESTIMATED COST

Signature on file

Signature of Architect

Architect's Cost Estimate

TOTAL $52,905

$52,905

Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995

633- 0399- ModSum-1

Name of School [0399] Blackwell Elementary Facility

Project Cost Estimates for this SchoolConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $141,630 $354,076 $2,856,210$2,360,504Modifications $80,770 $201,925 $1,628,864$1,346,169New Constructions $0 $0 $0$0

Totals $222,400 $556,001 $4,485,074$3,706,673Construction Budget Project Cost

Costs Eligible for Earning EntitlementConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $37,800 $94,500 $762,300$630,000Modifications $53,423 $133,559 $1,077,374$890,392New Constructions $0 $0 $0$0

Totals $91,223 $228,059 $1,839,674$1,520,392Construction Budget Project Cost

Local Costs for Activities above State ParticipationConstruction Cost

from previouspages

Architect's Fees Contingencies Total Costs

Renovations $103,830 $259,576 $2,093,910$1,730,504Modifications $27,347 $68,366 $551,490$455,777New Constructions $0 $0 $0$0

Totals $131,177 $327,942 $2,645,400$2,186,281Construction Budget Project Cost

FACILITY NEEDS SUMMARY633 - - FacNeeds-10399

DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012

System: Cobb County - 633School: Blackwell Elementary Facility - 0399

Project Cost Estimate for this SchoolConstruction

Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $52,905 $3,174 $7,936 $64,015 New Constructions $0 $0 $0 $0

Totals $52,905 $3,174 $7,936 $64,015Less Cost of activities above stateparticipation

ConstructionCosts Architect Fee Contingencies Total Costs

Renovations $0 $0 $0 $0 Modifications $24,689 $1,481 $3,703 $29,873 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0

Totals $24,689 $1,481 $3,703 $29,873Adj. project cost for new fund $34,142

Req. LocalPercentage Adjustments Req. Local

Required Local Funds 0.200000000% 0.000000000% $6,828 State Funds $27,314

State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET

REGULAR $27,314 $6,828 $0 $34,142Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $29,873 $29,873Totals $27,314 $6,828 $29,873 $64,015TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $36,701

TOTAL PROJECT COST

Project SummaryDE FORM 0748, Page 1, Revised July, 2002

SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Blackwell Elementary Facility - 0399

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701

Will this system participate at this level? Yes

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701

Will this system participate at this level? Yes

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701

Will this system participate at this level? Yes

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701

Will this system participate at this level? YesCOMMENTS:

PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS

DE FORM 0748, Revised July, 2002

TOTALS OF ALL PROJECTS FOR Cobb County - 633

Regular$200,000,000

ENTITLEMENT LEVEL

A. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999

$160,000,000ENTITLEMENT LEVELA. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999

$120,000,000ENTITLEMENT LEVELA. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999

$80,000,000ENTITLEMENT LEVELA. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999

Amount of local funds in the current approved budget as a line item and specifically designed for thisapplication. Funds will be transferred to the capital outlay account prior to the end of this fiscal year.

SYSTEM CERTIFICATIONThe Board of Education certifies that it has carefully reviewed this application for state capital outlay funds and agrees that allinformation included is, to the best of its knowledge, true and correct, and the project(s) as proposed in this application arecomplete and that none of the projects will require substantial modifications or additions prior to completion.

(Date of Local Board Approval) (Chairperson)Witness my hand and official signature with the seal of the System Board ofEducation affixed here to this ______ day of ____________, 20____.

$2,070,426

(Superintendent)

SYSTEM SUMMARY OF ALL PROJECTS