FOR FISCAL YEAR:
CAPITAL OUTLAY PROJECT APPLICATION
SCHOOL SYSTEMCode:
2014Cobb County
633
GEORGIA DEPARTMENT OF EDUCATION OFFICEOF POLICY AND BUSINESS OPERATIONS
FACILITIES SERVICES ATLANTA, GEORGIA 30334-5050
REQUIRES:STATE BOARD OF EDUCATION APPROVAL
AND LEGISLATIVE FUNDING
TYPE OF FUNDING:Regular
StatePriority #
fromLocal
FacilitiesPlan
School Name Project Description Funding Source(s)
Regular
The COBB COUNTY Board of Education wishes to submit a Facility Improvement Application for thefollowing projects listed in order of priority to be financed with state capital outlay and local funds.
X116.4 rensHarmony-Leland Elementary FacilityX65.3 modsArgyle Elementary FacilityX51.4 rens & modsBrumby Elementary FacilityX53.3 rens & modsCompton Elementary FacilityX71.4 rens & modsBirney Elementary FacilityX16.6 rensMurdock Elementary FacilityX64.4 modTapp Middle FacilityX77.3 rensMount Bethel Elementary FacilityX74.2 rens & modsGarrison Mill Elementary FacilityX14.6 rens & modsLewis Elementary FacilityX33.5 rens & modsBaker Elementary FacilityX57.2 rensDowell Elementary FacilityX78.2 rens & modsNicholson Elementary FacilityX60.4 rens & modsBryant Elementary FacilityX122 rens & modsFord Elementary FacilityX123 rensKennesaw Elementary FacilityX59.3 rens & modsBlackwell Elementary Facility
CERTIFICATES
1. SCHOOL SITESThe Board of Education certifies that each site for Facilities Improvement Priorities listed above are:
1) sites that this Board of Education holds title in fee simple, free of all encumbrances; and2) all required site approvals have been received. A system's certification of title for a schoolsite must be filed with the Facilities Services offices when making an application.
2. FLOOD PLAIN LETTER OF ASSURANCEThe Board of Education certifies that each site is not in a flood plain area or Coastal High Hazardarea. A letter of assurance must be filed with the Facilities Services offices when making anapplication.
FACILITY IMPROVEMENT APPLICATIONDate: 7/25/2012
DE FORM 0748, Page1, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 3336
00550
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[3060] Harmony-Leland Elementary Facility
Basic Curriculum20 23 3 3 NotesKindergarten - Third Grade Classroom9 9 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center32 35 0 0 0 3 0 3SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
33 36 0 0 0 3 0 3TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] Earned new IUs at local expense due to unearned IUs at other facilities.
NOTES
Wednesday, July 25, 2012 633 - - Program 13060DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 3060 ] Harmony-Leland Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1951 6 6 84,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$421,343$84,000
$337,343
$25,280$5,040
$20,240
$63,201$12,600$50,601
$509,824$101,640$408,184
6 6 $84,000
DE FORM 1103/0748, Page A, Revised September 1995633- 3060- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 3060 ] Harmony-Leland Elementary Facility 2010
6 61951
ITEM COST$34,000Door replacementX$34,081Replace or refinish wall surfaces, to include paintingX$24,786New windowsX
$3,098Provisions for the handicapped to include drinking fountains, lifts, and rampsX$12,393Tackboards, chalkboards, and lockersX$49,572Restroom modernization (Including those for handicapped)X$74,358RewiringX
$108,500RelightingX$30,983New ceilingX$49,572New floor coveringX
Total Cost $421,343
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
Name of School [3060] Harmony-Leland Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $105,499 $263,749 $2,127,575$1,758,327Modifications $66,491 $166,229 $1,340,911$1,108,191New Constructions $0 $0 $0$0
Totals $171,990 $429,978 $3,468,486$2,866,518Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $19,320 $48,300 $389,620$322,000Modifications $32,317 $80,795 $651,744$538,632New Constructions $0 $0 $0$0
Totals $51,637 $129,095 $1,041,364$860,632Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $86,179 $215,449 $1,737,955$1,436,327Modifications $34,174 $85,434 $689,167$569,559New Constructions $0 $0 $0$0
Totals $120,353 $300,883 $2,427,122$2,005,886Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-13060
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Harmony-Leland Elementary Facility - 3060
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $421,343 $25,280 $63,201 $509,824 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0
Totals $421,343 $25,280 $63,201 $509,824Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $337,343 $20,240 $50,601 $408,184 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $337,343 $20,240 $50,601 $408,184Adj. project cost for new fund $101,640
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $20,328 State Funds $81,312
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $81,312 $20,328 $0 $101,640Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $408,184 $408,184Totals $81,312 $20,328 $408,184 $509,824TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $428,512
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Harmony-Leland Elementary Facility - 3060
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $509,824B. State Funds $81,312C. Required Local Funds $33,880D. Additional Local Funds $408,184E. Additional Required Local Funds -$13,552F. Total Local Funds $428,512
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 3626
00425
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[2050] Argyle Elementary Facility
Basic Curriculum22 18 4 Kindergarten - Third Grade Classroom8 6 2 Fourth - Fifth Grade Classroom1 1 ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School1 1 Computer Science - Elementary School
Other Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center35 26 9 0 0 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
36 26 10 0 0 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
NOTES
Wednesday, July 25, 2012 633 - - Program 12050DE FORM 1103/0748, Page A, Revised September 1995
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 2050 ] Argyle Elementary Facility
Kitchen 2010 $15,000 $35,000 $50,000Canopies/Walkways 2010 $30,000 $121,500 $151,500HVAC 2010 $18,640 $5,825 $24,465
TOTAL MODIFICATION COSTS $63,640 $162,325 $225,965
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$225,965$63,640
$162,325
$13,557$3,818$9,739
$33,895$9,546
$24,349
$273,417$77,004
$196,413
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 2050- ModSum-1
NAME OF SCHOOL [ 2050 ] Argyle Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.015MODIFICATION OBJECTIVE AND DESCRIPTION :HoodAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
hood 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $50,000
$50,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 2050- ModSum-1
NAME OF SCHOOL [ 2050 ] Argyle Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :canopy for auto pickupAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
canopy for auto pickup 1500 $101.00 $151,500s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $151,500
$151,500
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 2050- ModSum-1
NAME OF SCHOOL [ 2050 ] Argyle Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.015MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
HVAC for Kitchen - zoned system 2330 $10.50 $24,465s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $24,465
$24,465
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 2050- ModSum-1
Name of School [2050] Argyle Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $69,313 $173,284 $1,397,821$1,155,224Modifications $81,056 $202,642 $1,634,645$1,350,947New Constructions $0 $0 $0$0
Totals $150,369 $375,926 $3,032,466$2,506,171Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $21,840 $54,600 $440,440$364,000Modifications $41,517 $103,795 $837,278$691,966New Constructions $0 $0 $0$0
Totals $63,357 $158,395 $1,277,718$1,055,966Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $47,473 $118,684 $957,381$791,224Modifications $39,539 $98,847 $797,367$658,981New Constructions $0 $0 $0$0
Totals $87,012 $217,531 $1,754,748$1,450,205Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-12050
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Argyle Elementary Facility - 2050
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $225,965 $13,557 $33,895 $273,417 New Constructions $0 $0 $0 $0
Totals $225,965 $13,557 $33,895 $273,417Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $0 $0 $0 $0 Modifications $162,325 $9,739 $24,349 $196,413 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $162,325 $9,739 $24,349 $196,413Adj. project cost for new fund $77,004
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $15,401 State Funds $61,603
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $61,603 $15,401 $0 $77,004Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $196,413 $196,413Totals $61,603 $15,401 $196,413 $273,417TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $211,814
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Argyle Elementary Facility - 2050
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $273,417B. State Funds $61,603C. Required Local Funds $104,267D. Additional Local Funds $196,413E. Additional Required Local Funds -$88,866F. Total Local Funds $211,814
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 5661
00950
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[5052] Brumby Elementary Facility
Basic Curriculum34 39 5 5 NotesKindergarten - Third Grade Classroom15 15 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School1 1 Computer Science - Elementary School
Other Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center55 60 0 0 0 5 0 5SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
56 61 0 0 0 5 0 5TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] Earned new IUs at local expense due to unearned IUs at other facilities.
NOTES
Wednesday, July 25, 2012 633 - - Program 15052DE FORM 1103/0748, Page A, Revised September 1995
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 5052 ] Brumby Elementary Facility
Canopies/Walkways 2010 $30,000 $0 $30,000
TOTAL MODIFICATION COSTS $30,000 $0 $30,000
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$30,000$30,000
$0
$1,800$1,800
$0
$4,500$4,500
$0
$36,300$36,300
$0
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 5052- ModSum-1
NAME OF SCHOOL [ 5052 ] Brumby Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :bus canopyAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
bus canopy 2000 $15.00 $30,000s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $30,000
$30,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 5052- ModSum-1
Name of School [5052] Brumby Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $113,507 $283,770 $2,289,076$1,891,799Modifications $88,030 $220,077 $1,775,290$1,467,183New Constructions $0 $0 $0$0
Totals $201,537 $503,847 $4,064,366$3,358,982Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $20,160 $50,400 $406,560$336,000Modifications $54,208 $135,522 $1,093,208$903,478New Constructions $0 $0 $0$0
Totals $74,368 $185,922 $1,499,768$1,239,478Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $93,347 $233,370 $1,882,516$1,555,799Modifications $33,822 $84,555 $682,082$563,705New Constructions $0 $0 $0$0
Totals $127,169 $317,925 $2,564,598$2,119,504Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-15052
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Brumby Elementary Facility - 5052
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $30,000 $1,800 $4,500 $36,300 New Constructions $0 $0 $0 $0
Totals $30,000 $1,800 $4,500 $36,300Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $0 $0 $0 $0 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $0 $0 $0 $0Adj. project cost for new fund $36,300
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $7,260 State Funds $29,040
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $29,040 $7,260 $0 $36,300Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $0 $0Totals $29,040 $7,260 $0 $36,300TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $7,260
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Brumby Elementary Facility - 5052
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $36,300B. State Funds $29,040C. Required Local Funds $7,260D. Additional Local Funds $0E. Additional Required Local Funds $0F. Total Local Funds $7,260
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 6043
00675
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[3556] Compton Elementary Facility
Basic Curriculum34 28 6 Kindergarten - Third Grade Classroom20 11 9 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School2 1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center59 42 17 0 0 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
60 43 17 0 0 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
NOTES
Wednesday, July 25, 2012 633 - - Program 13556DE FORM 1103/0748, Page A, Revised September 1995
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 3556 ] Compton Elementary Facility
Roof 2030 $81,706 $9,078 $90,784
TOTAL MODIFICATION COSTS $81,706 $9,078 $90,784
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$90,784$81,706
$9,078
$5,447$4,902
$545
$13,618$12,256
$1,362
$109,849$98,864$10,985
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 3556- ModSum-1
NAME OF SCHOOL [ 3556 ] Compton Elementary FacilityBUILDING NUMBER(S) 2030 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :reroof with built up systemAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
built up roof system 11348 $8.00 $90,784s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $90,784
$90,784
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 3556- ModSum-1
Name of School [3556] Compton Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $109,537 $273,844 $2,209,007$1,825,626Modifications $137,410 $343,527 $2,771,120$2,290,183New Constructions $0 $0 $0$0
Totals $246,947 $617,371 $4,980,127$4,115,809Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $1,680 $4,200 $33,880$28,000Modifications $74,160 $185,402 $1,495,575$1,236,013New Constructions $0 $0 $0$0
Totals $75,840 $189,602 $1,529,455$1,264,013Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $107,857 $269,644 $2,175,127$1,797,626Modifications $63,250 $158,125 $1,275,545$1,054,170New Constructions $0 $0 $0$0
Totals $171,107 $427,769 $3,450,672$2,851,796Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-13556
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Compton Elementary Facility - 3556
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $90,784 $5,447 $13,618 $109,849 New Constructions $0 $0 $0 $0
Totals $90,784 $5,447 $13,618 $109,849Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $0 $0 $0 $0 Modifications $9,078 $544 $1,362 $10,984 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $9,078 $544 $1,362 $10,984Adj. project cost for new fund $98,865
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $19,773 State Funds $79,092
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $79,092 $19,773 $0 $98,865Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $10,984 $10,984Totals $79,092 $19,773 $10,984 $109,849TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $30,757
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Compton Elementary Facility - 3556
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $109,849B. State Funds $79,092C. Required Local Funds $19,773D. Additional Local Funds $10,984E. Additional Required Local Funds $0F. Total Local Funds $30,757
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 5949
00775
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0173] Birney Elementary Facility
Basic Curriculum41 33 7 Kindergarten - Third Grade Classroom12 12 1 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School2 1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center58 48 10 0 0 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
59 49 10 0 0 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
NOTES
Wednesday, July 25, 2012 633 - - Program 10173DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0173 ] Birney Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1973 17 17 238,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$1,302,875$238,000
$1,064,875
$78,172$14,280$63,892
$195,431$35,700
$159,731
$1,576,478$287,980
$1,288,498
17 17 $238,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0173- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0173 ] Birney Elementary Facility 2010
17 171973
ITEM COST$174,400Energy conservation, to include time devices, caulking, and retrofit measuresX$137,000Door replacementX$119,900Replace or refinish wall surfaces, to include paintingX
$87,200New windowsX$2,375Provisions for the handicapped to include drinking fountains, lifts, and ramps (X
$28,000Tackboards, chalkboards, and lockersX$261,600RewiringX$155,000RelightingX$163,000New ceilingX$174,400New floor coveringX
Total Cost $1,302,875
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0173 ] Birney Elementary Facility
HVAC 2010, $328,463 $154,177 $482,640HVAC 2010, $31,547 $19,153 $50,700
TOTAL MODIFICATION COSTS $360,010 $173,330 $533,340
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$533,340$360,010$173,330
$32,000$21,600$10,400
$80,001$54,002$25,999
$645,341$435,612$209,729
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0173- ModSum-1
NAME OF SCHOOL [ 0173 ] Birney Elementary FacilityBUILDING NUMBER(S) 2010, SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC - zoned systemAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
HVAC replacement 40220 $12.00 $482,640s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $482,640
$482,640
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0173- ModSum-1
NAME OF SCHOOL [ 0173 ] Birney Elementary FacilityBUILDING NUMBER(S) 2010, SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC - zoned system with duct replacementAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
HVAC replacement 3380 $15.00 $50,700s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $50,700
$50,700
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0173- ModSum-1
Name of School [0173] Birney Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $172,361 $430,903 $3,475,948$2,872,684Modifications $141,356 $353,391 $2,850,685$2,355,938New Constructions $0 $0 $0$0
Totals $313,717 $784,294 $6,326,633$5,228,622Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $36,120 $90,300 $728,420$602,000Modifications $84,272 $210,681 $1,699,495$1,404,542New Constructions $0 $0 $0$0
Totals $120,392 $300,981 $2,427,915$2,006,542Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $136,241 $340,603 $2,747,528$2,270,684Modifications $57,084 $142,710 $1,151,190$951,396New Constructions $0 $0 $0$0
Totals $193,325 $483,313 $3,898,718$3,222,080Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10173
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Birney Elementary Facility - 0173
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $1,302,875 $78,172 $195,431 $1,576,478 Modifications $533,340 $32,000 $80,001 $645,341 New Constructions $0 $0 $0 $0
Totals $1,836,215 $110,172 $275,432 $2,221,819Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,064,875 $63,892 $159,731 $1,288,498 Modifications $173,330 $10,399 $26,000 $209,729 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,238,205 $74,291 $185,731 $1,498,227Adj. project cost for new fund $723,592
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $144,718 State Funds $578,874
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $578,874 $144,718 $0 $723,592Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,498,227 $1,498,227Totals $578,874 $144,718 $1,498,227 $2,221,819TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,642,945
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Birney Elementary Facility - 0173
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,221,819B. State Funds $578,874C. Required Local Funds $144,718D. Additional Local Funds $1,498,227E. Additional Required Local Funds $0F. Total Local Funds $1,642,945
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 6151
00800
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0375] Murdock Elementary Facility
Basic Curriculum53 34 8 11 NotesKindergarten - Third Grade Classroom2 13 11 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School2 1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center60 50 10 11 11 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
61 51 10 11 11 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] 11 K-3 classrooms used by grades 4-5
NOTES
Wednesday, July 25, 2012 633 - - Program 10375DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0375 ] Murdock Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1975 26 21 294,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$902,540$294,000$608,540
$54,152$17,640$36,512
$135,381$44,100$91,281
$1,092,073$355,740$736,333
26 21 $294,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0375- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0375 ] Murdock Elementary Facility 2010
26 211975
ITEM COST$114,000Door replacementX$154,930Replace or refinish wall surfaces, to include paintingX$116,194New windowsX
$14,524Provisions for the handicapped to include drinking fountains, lifts, and rampsX$61,077Tackboards, chalkboards, and lockersX
$272,801Restroom modernization (Including those for handicapped)X$169,014RelightingX
Total Cost $902,540
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
Name of School [0375] Murdock Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $104,083 $260,208 $2,099,012$1,734,721Modifications $55,256 $138,142 $1,114,342$920,944New Constructions $0 $0 $0$0
Totals $159,339 $398,350 $3,213,354$2,655,665Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $17,640 $44,100 $355,740$294,000Modifications $29,865 $74,664 $602,287$497,758New Constructions $0 $0 $0$0
Totals $47,505 $118,764 $958,027$791,758Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $86,443 $216,108 $1,743,272$1,440,721Modifications $25,391 $63,478 $512,055$423,186New Constructions $0 $0 $0$0
Totals $111,834 $279,586 $2,255,327$1,863,907Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10375
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Murdock Elementary Facility - 0375
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $902,540 $54,152 $135,381 $1,092,073 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0
Totals $902,540 $54,152 $135,381 $1,092,073Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $608,540 $36,512 $91,281 $736,333 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $608,540 $36,512 $91,281 $736,333Adj. project cost for new fund $355,740
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $71,148 State Funds $284,592
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $284,592 $71,148 $0 $355,740Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $736,333 $736,333Totals $284,592 $71,148 $736,333 $1,092,073TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $807,481
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Murdock Elementary Facility - 0375
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $1,092,073B. State Funds $284,592C. Required Local Funds $71,148D. Additional Local Funds $736,333E. Additional Required Local Funds $0F. Total Local Funds $807,481
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
06-08 7042
00650
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE3(3-4-4)
[0475] Tapp Middle Facility
Basic Curriculum40 24 16 Middle School Classroom4 2 2 Middle School Sp. Ed. (pair of rooms)16 9 7 Science Lab - Middle School1 1 Art - Middle School2 1 1 Instrumental Music - Middle School1 1 Choral Music - Middle School
Instrumental / Choral - Middle School Computer Science - Middle School
Middle School Exploration2 1 1 Business Lab - Middle School1 1 Technology Lab - Middle School
Family and Consumer Science - Middle Healthcare Science Lab - Middle School Agriculture Lab - Middle School
Other Drama - Middle School Theater Sp. Ed. Family Living Center
1 1 NotesOther Instructional1 1 Media Center69 41 28 0 0 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Middle School
Unearned UNEARNED
70 42 28 0 0 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Middle School1 1 Administration3 3 Team Planning1 1 Counseling
[Other Instructional] auxillary gym
NOTES
Wednesday, July 25, 2012 633 - - Program 10475DE FORM 1103/0748, Page A, Revised September 1995
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0475 ] Tapp Middle Facility
HVAC ALL $1,102,045 $1,102,045 $2,204,090
TOTAL MODIFICATION COSTS $1,102,045 $1,102,045 $2,204,090
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$2,204,090$1,102,045$1,102,045
$132,245$66,122$66,123
$330,614$165,307$165,307
$2,666,949$1,333,474$1,333,475
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0475- ModSum-1
NAME OF SCHOOL [ 0475 ] Tapp Middle FacilityBUILDING NUMBER(S) ALL SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC zoned systemAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
HVAC zoned system 157435 $14.00 $2,204,090s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $2,204,090
$2,204,090
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0475- ModSum-1
Name of School [0475] Tapp Middle Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $226,608 $566,522 $4,569,941$3,776,811Modifications $220,712 $551,780 $4,451,027$3,678,535New Constructions $0 $0 $0$0
Totals $447,320 $1,118,302 $9,020,968$7,455,346Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $35,280 $88,200 $711,480$588,000Modifications $74,588 $186,470 $1,504,193$1,243,135New Constructions $0 $0 $0$0
Totals $109,868 $274,670 $2,215,673$1,831,135Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $191,328 $478,322 $3,858,461$3,188,811Modifications $146,124 $365,310 $2,946,834$2,435,400New Constructions $0 $0 $0$0
Totals $337,452 $843,632 $6,805,295$5,624,211Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10475
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Tapp Middle Facility - 0475
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $2,204,090 $132,245 $330,614 $2,666,949 New Constructions $0 $0 $0 $0
Totals $2,204,090 $132,245 $330,614 $2,666,949Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $0 $0 $0 $0 Modifications $1,102,045 $66,122 $165,307 $1,333,474 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,102,045 $66,122 $165,307 $1,333,474Adj. project cost for new fund $1,333,475
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $266,695 State Funds $1,066,780
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $1,066,780 $266,695 $0 $1,333,475Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,333,474 $1,333,474Totals $1,066,780 $266,695 $1,333,474 $2,666,949TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,600,169
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Tapp Middle Facility - 0475
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,666,949B. State Funds $1,066,780C. Required Local Funds $266,695D. Additional Local Funds $1,333,474E. Additional Required Local Funds $0F. Total Local Funds $1,600,169
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 6061
00950
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0278] Mount Bethel Elementary Facility
Basic Curriculum53 39 14 NotesKindergarten - Third Grade Classroom
15 14 1 1 NotesFourth - Fifth Grade Classroom1 1 ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center59 60 0 14 14 1 0 1SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
60 61 0 14 14 1 0 1TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] 14 K-3 classrooms used by grades 4-5[Fourth - Fifth Grade Classroom] Earned new IU at local expense due to unearned IUs at other facilities.
NOTES
Wednesday, July 25, 2012 633 - - Program 10278DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0278 ] Mount Bethel Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1978 30 30 420,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$1,854,294$420,000
$1,434,294
$111,257$25,200$86,057
$278,144$63,000
$215,144
$2,243,695$508,200
$1,735,495
30 30 $420,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0278- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0278 ] Mount Bethel Elementary Facility 2010
30 301978
ITEM COST$151,000Door replacementX$274,406Replace or refinish wall surfaces, to include paintingX$130,050New windowsX
$16,256Provisions for the handicapped to include drinking fountains, lifts, and rampsX$68,174Tackboards, chalkboards, and lockersX
$260,100Restroom modernization (Including those for handicapped)X$390,150RewiringX$279,828RelightingX$284,330New floor coveringX
Total Cost $1,854,294
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
Name of School [0278] Mount Bethel Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $152,330 $380,827 $3,072,004$2,538,847Modifications $86,944 $217,360 $1,753,373$1,449,069New Constructions $0 $0 $0$0
Totals $239,274 $598,187 $4,825,377$3,987,916Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $50,400 $126,000 $1,016,400$840,000Modifications $56,710 $141,776 $1,143,661$945,175New Constructions $0 $0 $0$0
Totals $107,110 $267,776 $2,160,061$1,785,175Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $101,930 $254,827 $2,055,604$1,698,847Modifications $30,234 $75,584 $609,712$503,894New Constructions $0 $0 $0$0
Totals $132,164 $330,411 $2,665,316$2,202,741Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10278
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Mount Bethel Elementary Facility - 0278
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $1,854,294 $111,257 $278,144 $2,243,695 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0
Totals $1,854,294 $111,257 $278,144 $2,243,695Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,434,294 $86,057 $215,144 $1,735,495 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,434,294 $86,057 $215,144 $1,735,495Adj. project cost for new fund $508,200
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $101,640 State Funds $406,560
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $406,560 $101,640 $0 $508,200Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,735,495 $1,735,495Totals $406,560 $101,640 $1,735,495 $2,243,695TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,837,135
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Mount Bethel Elementary Facility - 0278
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,243,695B. State Funds $406,560C. Required Local Funds $101,640D. Additional Local Funds $1,735,495E. Additional Required Local Funds $0F. Total Local Funds $1,837,135
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 4443
00675
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0185] Garrison Mill Elementary Facility
Basic Curriculum39 27 1 11 NotesKindergarten - Third Grade Classroom
11 11 Fourth - Fifth Grade Classroom ElementarySp. Ed. (Pair of Rooms)
1 1 Art - Elementary School1 1 Music - Elementary School1 1 Computer Science - Elementary School
Other Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center43 42 1 11 11 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
44 43 1 11 11 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] 11 K-3 classrooms used by grades 4-5
NOTES
Wednesday, July 25, 2012 633 - - Program 10185DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1984 38 38 532,000 02011 1993 5 4 56,000 02020 1988 1 1 14,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$1,883,707$602,000
$1,281,707
$113,022$36,120$76,902
$282,556$90,300
$192,256
$2,279,285$728,420
$1,550,865
44 43 $602,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0185- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0185 ] Garrison Mill Elementary Facility 2010
38 381984
ITEM COST$194,000Door replacementX$183,750New ceilingX$279,000RelightingX$294,000Restroom modernization (Including those for handicapped)X
$76,169Tackboards, chalkboards, and lockersX$18,375Provisions for the handicapped to include drinking fountains, lifts, and rampsX
$147,000New windowsX$294,000New floor coveringX$235,881Replace or refinish wall surfaces, to include paintingX
Total Cost $1,722,175
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0185 ] Garrison Mill Elementary Facility 2011
5 41993
ITEM COST$20,188New ceilingX$32,300Restroom modernization (Including those for handicapped)X
$8,075Tackboards, chalkboards, and lockersX$2,019Provisions for the handicapped to include drinking fountains, lifts, and rampsX
$16,150New windowsX$30,000Door replacementX$32,300New floor coveringX
Total Cost $141,032
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 2
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0185 ] Garrison Mill Elementary Facility 2020
1 11988
ITEM COST$10,000Door replacementX$10,500New ceilingX
Total Cost $20,500
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 3
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary Facility
HVAC 2010; 2011;2020 $600,425 $428,875 $1,029,300
HVAC 2010 $15,000 $30,000 $45,000
TOTAL MODIFICATION COSTS $615,425 $458,875 $1,074,300
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$1,074,300$615,425$458,875
$64,458$36,925$27,533
$161,145$92,314$68,831
$1,299,903$744,664$555,239
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0185- ModSum-1
NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary FacilityBUILDING NUMBER(S) 2010; 2011; 2020 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC systemAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
new HVAC system - zoned 85775 $12.00 $1,029,300s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $1,029,300
$1,029,300
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0185- ModSum-1
NAME OF SCHOOL [ 0185 ] Garrison Mill Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Hood for kitchenAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
Hood for kitchen 1 $45,000.00 $45,000lmp.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $45,000
$45,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0185- ModSum-1
Name of School [0185] Garrison Mill Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $113,022 $282,556 $2,279,285$1,883,707Modifications $148,650 $371,627 $2,997,790$2,477,513New Constructions $0 $0 $0$0
Totals $261,672 $654,183 $5,277,075$4,361,220Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $36,120 $90,300 $728,420$602,000Modifications $69,249 $173,122 $1,396,521$1,154,150New Constructions $0 $0 $0$0
Totals $105,369 $263,422 $2,124,941$1,756,150Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $76,902 $192,256 $1,550,865$1,281,707Modifications $79,401 $198,505 $1,601,269$1,323,363New Constructions $0 $0 $0$0
Totals $156,303 $390,761 $3,152,134$2,605,070Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10185
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Garrison Mill Elementary Facility - 0185
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $1,883,707 $113,022 $282,556 $2,279,285 Modifications $1,154,425 $69,265 $173,164 $1,396,854 New Constructions $0 $0 $0 $0
Totals $3,038,132 $182,287 $455,720 $3,676,139Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,281,707 $76,902 $192,256 $1,550,865 Modifications $506,000 $30,360 $75,900 $612,260 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,787,707 $107,262 $268,156 $2,163,125Adj. project cost for new fund $1,513,014
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $302,603 State Funds $1,210,411
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $1,210,411 $302,603 $0 $1,513,014Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $2,163,125 $2,163,125Totals $1,210,411 $302,603 $2,163,125 $3,676,139TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,465,728
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Garrison Mill Elementary Facility - 0185
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $3,676,139B. State Funds $1,210,411C. Required Local Funds $302,603D. Additional Local Funds $2,163,125E. Additional Required Local Funds $0F. Total Local Funds $2,465,728
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 6153
00850
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0287] Lewis Elementary Facility
Basic Curriculum55 36 6 13 NotesKindergarten - Third Grade Classroom
13 13 Fourth - Fifth Grade Classroom ElementarySp. Ed. (Pair of Rooms)
2 1 1 Art - Elementary School2 1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center60 52 8 13 13 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
61 53 8 13 13 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] 13 K-3 classrooms used by grades 4-5
NOTES
Wednesday, July 25, 2012 633 - - Program 10287DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0287 ] Lewis Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1986 15 15 210,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$1,383,959$210,000
$1,173,959
$83,037$12,600$70,437
$207,594$31,500
$176,094
$1,674,590$254,100
$1,420,490
15 15 $210,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0287- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0287 ] Lewis Elementary Facility 2010
15 151986
ITEM COST$182,028Energy conservation, to include time devices, caulking, and retrofit measuresX$130,000Door replacementX$125,144Replace or refinish wall surfaces, to include paintingX
$91,014New windowsX$11,377Provisions for the handicapped to include drinking fountains, lifts, and rampsX$48,452Tackboards, chalkboards, and lockersX
$182,028Restroom modernization (Including those for handicapped)X$318,120RelightingX$113,768New ceilingX$182,028New floor coveringX
Total Cost $1,383,959
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0287 ] Lewis Elementary Facility
Kitchen 2010 $15,000 $35,000 $50,000HVAC 2010 $23,632 $13,293 $36,925
TOTAL MODIFICATION COSTS $38,632 $48,293 $86,925
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$86,925$38,632$48,293
$5,215$2,317$2,898
$13,039$5,795$7,244
$105,179$46,744$58,435
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0287- ModSum-1
NAME OF SCHOOL [ 0287 ] Lewis Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Kitchen HoodAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
Kitchen Hood 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $50,000
$50,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0287- ModSum-1
NAME OF SCHOOL [ 0287 ] Lewis Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.034MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC kitchenAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
HVAC kitchen 2954 $12.50 $36,925s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $36,925
$36,925
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0287- ModSum-1
Name of School [0287] Lewis Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $181,595 $453,988 $3,662,172$3,026,589Modifications $119,953 $299,883 $2,419,058$1,999,222New Constructions $0 $0 $0$0
Totals $301,548 $753,871 $6,081,230$5,025,811Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $43,680 $109,200 $880,880$728,000Modifications $53,718 $134,295 $1,083,316$895,303New Constructions $0 $0 $0$0
Totals $97,398 $243,495 $1,964,196$1,623,303Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $137,915 $344,788 $2,781,292$2,298,589Modifications $66,235 $165,588 $1,335,742$1,103,919New Constructions $0 $0 $0$0
Totals $204,150 $510,376 $4,117,034$3,402,508Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10287
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Lewis Elementary Facility - 0287
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $1,383,959 $83,037 $207,594 $1,674,590 Modifications $86,925 $5,215 $13,039 $105,179 New Constructions $0 $0 $0 $0
Totals $1,470,884 $88,252 $220,633 $1,779,769Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,173,959 $70,437 $176,094 $1,420,490 Modifications $48,293 $2,897 $7,244 $58,434 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,222,252 $73,334 $183,338 $1,478,924Adj. project cost for new fund $300,845
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $60,169 State Funds $240,676
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $240,676 $60,169 $0 $300,845Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,478,924 $1,478,924Totals $240,676 $60,169 $1,478,924 $1,779,769TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,539,093
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Lewis Elementary Facility - 0287
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $1,779,769B. State Funds $240,676C. Required Local Funds $144,375D. Additional Local Funds $1,478,924E. Additional Required Local Funds -$84,206F. Total Local Funds $1,539,093
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 6351
00800
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0189] Baker Elementary Facility
Basic Curriculum45 34 11 Kindergarten - Third Grade Classroom13 13 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)2 1 1 Art - Elementary School1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center62 50 12 0 0 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
63 51 12 0 0 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
NOTES
Wednesday, July 25, 2012 633 - - Program 10189DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0189 ] Baker Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2011 1993 9 3 42,000 02012 1996 14 8 112,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$578,936$154,000$424,936
$34,736$9,240
$25,496
$86,840$23,100$63,740
$700,512$186,340$514,172
23 11 $154,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0189- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0189 ] Baker Elementary Facility 2011
9 31993
ITEM COST$34,000Door replacementX$29,170New ceilingX$35,004RelightingX$10,000Restroom modernization (Including those for handicapped)X
$2,917Provisions for the handicapped to include drinking fountains, lifts, and rampsX$23,336New windowsX$46,672New floor coveringX$32,087Replace or refinish wall surfaces, to include paintingX
Total Cost $213,186
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0189 ] Baker Elementary Facility 2012
14 81996
ITEM COST$44,000Door replacementX$53,750New ceilingX$64,500RelightingX$10,000Restroom modernization (Including those for handicapped)X
$5,375Provisions for the handicapped to include drinking fountains, lifts, and rampsX$43,000New windowsX$59,125Replace or refinish wall surfaces, to include paintingX$86,000New floor coveringX
Total Cost $365,750
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 2
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0189 ] Baker Elementary Facility
HVAC 2010; 2011;2012 $746,676 $533,340 $1,280,016
Kitchen 2010 $15,000 $35,000 $50,000
TOTAL MODIFICATION COSTS $761,676 $568,340 $1,330,016
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$1,330,016$761,676$568,340
$79,800$45,700$34,100
$199,502$114,251
$85,251
$1,609,318$921,627$687,691
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0189- ModSum-1
NAME OF SCHOOL [ 0189 ] Baker Elementary FacilityBUILDING NUMBER(S) 2010; 2011; 2012 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC systemAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
replace HVAC 106668 $12.00 $1,280,016s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $1,280,016
$1,280,016
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0189- ModSum-1
NAME OF SCHOOL [ 0189 ] Baker Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Hood for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
Hood for Kitchen 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $50,000
$50,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0189- ModSum-1
Name of School [0189] Baker Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $113,184 $282,961 $2,282,549$1,886,404Modifications $125,941 $314,854 $2,539,821$2,099,026New Constructions $0 $0 $0$0
Totals $239,125 $597,815 $4,822,370$3,985,430Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $9,240 $23,100 $186,340$154,000Modifications $79,121 $197,803 $1,595,608$1,318,684New Constructions $0 $0 $0$0
Totals $88,361 $220,903 $1,781,948$1,472,684Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $103,944 $259,861 $2,096,209$1,732,404Modifications $46,820 $117,051 $944,213$780,342New Constructions $0 $0 $0$0
Totals $150,764 $376,912 $3,040,422$2,512,746Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10189
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Baker Elementary Facility - 0189
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $578,936 $34,736 $86,840 $700,512 Modifications $1,330,016 $79,800 $199,502 $1,609,318 New Constructions $0 $0 $0 $0
Totals $1,908,952 $114,536 $286,342 $2,309,830Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $424,936 $25,496 $63,740 $514,172 Modifications $568,340 $34,100 $85,251 $687,691 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $993,276 $59,596 $148,991 $1,201,863Adj. project cost for new fund $1,107,967
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $221,593 State Funds $886,374
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $886,374 $221,593 $0 $1,107,967Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,201,863 $1,201,863Totals $886,374 $221,593 $1,201,863 $2,309,830TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $1,423,456
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Baker Elementary Facility - 0189
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,309,830B. State Funds $886,374C. Required Local Funds $232,726D. Additional Local Funds $1,201,863E. Additional Required Local Funds -$11,133F. Total Local Funds $1,423,456
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 6263
00975
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0190] Dowell Elementary Facility
Basic Curriculum45 41 4 Kindergarten - Third Grade Classroom10 15 4 1 1 NotesFourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School1 1 Computer Science - Elementary School
Other Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center61 62 0 4 4 1 0 1SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
62 63 0 4 4 1 0 1TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration
Counseling
[Fourth - Fifth Grade Classroom] Earned new IU will be at local expense due to unearned IUs at other facilities.
NOTES
Wednesday, July 25, 2012 633 - - Program 10190DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0190 ] Dowell Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1989 38 38 FUNDED
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$2,108,493$532,000
$1,576,493
$126,509$31,920$94,589
$316,274$79,800
$236,474
$2,551,276$643,720
$1,907,556
38 38 $532,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0190- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0190 ] Dowell Elementary Facility 2010
38 381989
ITEM COST$294,460Energy conservation, to include time devices, caulking, and retrofit measuresX$208,000Door replacementX$202,441Replace or refinish wall surfaces, to include paintingX$147,230New windowsX
$18,404Provisions for the handicapped to include drinking fountains, lifts, and rampsX$124,000Tackboards, chalkboards, and lockersX$294,460Restroom modernization (Including those for handicapped)X$341,000RelightingX$184,038New ceilingX$294,460New floor coveringX
Total Cost $2,108,493
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
Name of School [0190] Dowell Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $169,623 $424,059 $3,420,741$2,827,059Modifications $89,877 $224,694 $1,812,528$1,497,957New Constructions $3,825 $3,188 $70,763$63,750
Totals $263,325 $651,941 $5,304,032$4,388,766Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $0 $0 $0$0Modifications $55,341 $138,353 $1,116,050$922,356New Constructions $3,825 $3,188 $70,763$63,750
Totals $59,166 $141,541 $1,186,813$986,106Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $169,623 $424,059 $3,420,741$2,827,059Modifications $34,536 $86,341 $696,478$575,601New Constructions $0 $0 $0$0
Totals $204,159 $510,400 $4,117,219$3,402,660Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10190
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Dowell Elementary Facility - 0190
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $2,108,493 $126,509 $316,274 $2,551,276 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0
Totals $2,108,493 $126,509 $316,274 $2,551,276Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,576,493 $94,589 $236,474 $1,907,556 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,576,493 $94,589 $236,474 $1,907,556Adj. project cost for new fund $643,720
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $128,744 State Funds $514,976
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $514,976 $128,744 $0 $643,720Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,907,556 $1,907,556Totals $514,976 $128,744 $1,907,556 $2,551,276TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,036,300
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Dowell Elementary Facility - 0190
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,551,276B. State Funds $514,976C. Required Local Funds $128,744D. Additional Local Funds $1,907,556E. Additional Required Local Funds $0F. Total Local Funds $2,036,300
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 4033
00500
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0391] Nicholson Elementary Facility
Basic Curriculum24 20 4 Kindergarten - Third Grade Classroom12 9 3 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center39 32 7 0 0 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
40 33 7 0 0 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration
CounselingNOTES
Wednesday, July 25, 2012 633 - - Program 10391DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0391 ] Nicholson Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1989 40 33 462,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$1,629,265$462,000
$1,167,265
$97,755$27,720$70,035
$244,390$69,300
$175,090
$1,971,410$559,020
$1,412,390
40 33 $462,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0391- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0391 ] Nicholson Elementary Facility 2010
40 331989
ITEM COST$221,000Door replacementX$208,450Replace or refinish wall surfaces, to include paintingX$151,600New windowsX
$18,950Provisions for the handicapped to include drinking fountains, lifts, and rampsX$6,558Tackboards, chalkboards, and lockersX
$303,200Restroom modernization (Including those for handicapped)X$226,807RelightingX$189,500New ceilingX$303,200New floor coveringX
Total Cost $1,629,265
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0391 ] Nicholson Elementary Facility
Kitchen 2010 $15,000 $35,000 $50,000HVAC 2010 $26,232 $49,158,768 $49,185,000
TOTAL MODIFICATION COSTS $41,232 $49,193,768 $49,235,000
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$49,235,000$41,232
$49,193,768
$2,954,100$2,473
$2,951,627
$7,385,250$6,185
$7,379,065
$59,574,350$49,890
$59,524,460
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0391- ModSum-1
NAME OF SCHOOL [ 0391 ] Nicholson Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :Hood for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
Hood for Kitchen 1 $50,000.00 $50,000lmp.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $50,000
$50,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0391- ModSum-1
NAME OF SCHOOL [ 0391 ] Nicholson Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 189MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
HVAC for kitchen 3279 $15,000.00 $49,185,000s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $49,185,000
$49,185,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0391- ModSum-1
Name of School [0391] Nicholson Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $97,755 $244,390 $1,971,410$1,629,265Modifications $3,012,863 $7,532,159 $60,759,416$50,214,394New Constructions $0 $0 $0$0
Totals $3,110,618 $7,776,549 $62,730,826$51,843,659Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $27,720 $69,300 $559,020$462,000Modifications $39,117 $97,794 $788,869$651,958New Constructions $0 $0 $0$0
Totals $66,837 $167,094 $1,347,889$1,113,958Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $70,035 $175,090 $1,412,390$1,167,265Modifications $2,973,746 $7,434,365 $59,970,547$49,562,436New Constructions $0 $0 $0$0
Totals $3,043,781 $7,609,455 $61,382,937$50,729,701Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10391
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Nicholson Elementary Facility - 0391
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $1,629,265 $97,755 $244,390 $1,971,410 Modifications $49,235,000 $2,954,100 $7,385,250 $59,574,350 New Constructions $0 $0 $0 $0
Totals $50,864,265 $3,051,855 $7,629,640 $61,545,760Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,167,265 $70,035 $175,090 $1,412,390 Modifications $49,193,768 $2,951,626 $7,379,065 $59,524,459 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $50,361,033 $3,021,661 $7,554,155 $60,936,849Adj. project cost for new fund $608,911
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $121,782 State Funds $487,129
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $487,129 $121,782 $0 $608,911Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $60,936,849 $60,936,849Totals $487,129 $121,782 $60,936,849 $61,545,760TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $61,058,631
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Nicholson Elementary Facility - 0391
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $61,545,760B. State Funds $487,129C. Required Local Funds $268,924D. Additional Local Funds $60,936,849E. Additional Required Local Funds -$147,142F. Total Local Funds $61,058,631
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 6161
00950
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0592] Bryant Elementary Facility
Basic Curriculum46 39 7 NotesKindergarten - Third Grade Classroom8 15 7 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)2 2 Art - Elementary School2 2 Music - Elementary School1 1 Computer Science - Elementary School
Other Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center60 60 0 7 7 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
61 61 0 7 7 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] 7 K-3 classrooms used by grades 4-5
NOTES
Wednesday, July 25, 2012 633 - - Program 10592DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0592 ] Bryant Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1991 44 44 616,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$2,909,310$616,000
$2,293,310
$174,558$36,960
$137,598
$436,396$92,400
$343,996
$3,520,264$745,360
$2,774,904
44 44 $616,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0592- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0592 ] Bryant Elementary Facility 2010
44 441991
ITEM COST$356,708Energy conservation, to include time devices, caulking, and retrofit measuresX$243,000Door replacementX$245,237Replace or refinish wall surfaces, to include paintingX$178,354New windowsX
$22,294Provisions for the handicapped to include drinking fountains, lifts, and rampsX$121,354Tackboards, chalkboards, and lockersX$356,708Restroom modernization (Including those for handicapped)X$535,062RewiringX$279,000RelightingX$214,885New ceilingX$356,708New floor coveringX
Total Cost $2,909,310
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0592 ] Bryant Elementary Facility
Canopies/Walkways 2010 $30,000 $0 $30,000
TOTAL MODIFICATION COSTS $30,000 $0 $30,000
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$30,000$30,000
$0
$1,800$1,800
$0
$4,500$4,500
$0
$36,300$36,300
$0
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0592- ModSum-1
NAME OF SCHOOL [ 0592 ] Bryant Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :bus canopyAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
bus canopy 2000 $15.00 $30,000s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $30,000
$30,000
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0592- ModSum-1
Name of School [0592] Bryant Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $225,894 $564,737 $4,555,545$3,764,914Modifications $138,229 $345,573 $2,787,621$2,303,819New Constructions $0 $0 $0$0
Totals $364,123 $910,310 $7,343,166$6,068,733Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $51,240 $128,100 $1,033,340$854,000Modifications $94,259 $235,649 $1,900,901$1,570,993New Constructions $0 $0 $0$0
Totals $145,499 $363,749 $2,934,241$2,424,993Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $174,654 $436,637 $3,522,205$2,910,914Modifications $43,970 $109,924 $886,720$732,826New Constructions $0 $0 $0$0
Totals $218,624 $546,561 $4,408,925$3,643,740Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10592
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Bryant Elementary Facility - 0592
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $2,909,310 $174,558 $436,396 $3,520,264 Modifications $30,000 $1,800 $4,500 $36,300 New Constructions $0 $0 $0 $0
Totals $2,939,310 $176,358 $440,896 $3,556,564Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $2,293,310 $137,598 $343,996 $2,774,904 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $2,293,310 $137,598 $343,996 $2,774,904Adj. project cost for new fund $781,660
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $156,332 State Funds $625,328
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $625,328 $156,332 $0 $781,660Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $2,774,904 $2,774,904Totals $625,328 $156,332 $2,774,904 $3,556,564TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,931,236
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Bryant Elementary Facility - 0592
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $3,556,564B. State Funds $625,328C. Required Local Funds $156,332D. Additional Local Funds $2,774,904E. Additional Required Local Funds $0F. Total Local Funds $2,931,236
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 5351
00800
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0292] Ford Elementary Facility
Basic Curriculum45 33 2 10 NotesKindergarten - Third Grade Classroom3 13 10 Fourth - Fifth Grade Classroom1 1 ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center52 50 2 10 10 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
53 51 2 10 10 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] 10 K-3 classrooms used by grades 4-5
NOTES
Wednesday, July 25, 2012 633 - - Program 10292DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 0292 ] Ford Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1991 40 40 560,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$1,625,368$560,000
$1,065,368
$97,522$33,600$63,922
$243,805$84,000
$159,805
$1,966,695$677,600
$1,289,095
40 40 $560,000
DE FORM 1103/0748, Page A, Revised September 1995633- 0292- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 0292 ] Ford Elementary Facility 2010
40 401991
ITEM COST$302,516Energy conservation, to include time devices, caulking, and retrofit measuresX$161,000Door replacementX$238,118Replace or refinish wall surfaces, to include paintingX$151,258New windowsX
$18,907Provisions for the handicapped to include drinking fountains, lifts, and rampsX$285,200RelightingX$189,073New ceilingX$279,296New floor coveringX
Total Cost $1,625,368
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0292 ] Ford Elementary Facility
HVAC 2010; 2011 $637,903 $455,645 $1,093,548
TOTAL MODIFICATION COSTS $637,903 $455,645 $1,093,548
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$1,093,548$637,903$455,645
$65,612$38,274$27,338
$164,032$95,685$68,347
$1,323,192$771,862$551,330
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0292- ModSum-1
NAME OF SCHOOL [ 0292 ] Ford Elementary FacilityBUILDING NUMBER(S) 2010; 2011 SPACE NUMBER(S) MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC individual unit systemAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
individual units HVAC 91129 $12.00 $1,093,548s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $1,093,548
$1,093,548
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0292- ModSum-1
Name of School [0292] Ford Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $111,239 $278,099 $2,243,331$1,853,993Modifications $113,825 $284,564 $2,295,482$1,897,093New Constructions $0 $0 $0$0
Totals $225,064 $562,663 $4,538,813$3,751,086Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $42,840 $107,100 $863,940$714,000Modifications $69,676 $174,192 $1,405,150$1,161,282New Constructions $0 $0 $0$0
Totals $112,516 $281,292 $2,269,090$1,875,282Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $68,399 $170,999 $1,379,391$1,139,993Modifications $44,149 $110,372 $890,332$735,811New Constructions $0 $0 $0$0
Totals $112,548 $281,371 $2,269,723$1,875,804Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10292
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Ford Elementary Facility - 0292
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $1,625,368 $97,522 $243,805 $1,966,695 Modifications $1,093,548 $65,612 $164,032 $1,323,192 New Constructions $0 $0 $0 $0
Totals $2,718,916 $163,134 $407,837 $3,289,887Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,065,368 $63,922 $159,805 $1,289,095 Modifications $455,645 $27,338 $68,347 $551,330 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,521,013 $91,260 $228,152 $1,840,425Adj. project cost for new fund $1,449,462
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $289,892 State Funds $1,159,570
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $1,159,570 $289,892 $0 $1,449,462Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $1,840,425 $1,840,425Totals $1,159,570 $289,892 $1,840,425 $3,289,887TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,130,317
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Ford Elementary Facility - 0292
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $3,289,887B. State Funds $1,159,570C. Required Local Funds $289,892D. Additional Local Funds $1,840,425E. Additional Required Local Funds $0F. Total Local Funds $2,130,317
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-02 6156
00825
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[1603] Kennesaw Elementary Facility
Basic Curriculum54 51 3 Kindergarten - Third Grade Classroom2 2 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School1 1 Computer Science - Elementary School
Other Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center60 55 5 0 0 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
61 56 5 0 0 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
NOTES
Wednesday, July 25, 2012 633 - - Program 11603DE FORM 1103/0748, Page A, Revised September 1995
NAME OF SCHOOL [ 1603 ] Kennesaw Elementary Facility
BUILDINGNUMBER
DATE OF CONSTRUCTION
NUMBER OFUNITS
NUMBER OF UNITS EARNED
FUNDS EARNEDFOR ENTITLEMENT
SUMMARY OF RENOVATIONS
YEARFUNDED
2010 1992 45 40 560,000 0
NET FUNDS EARNED FORENTITLEMENT
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COST
$2,396,317$560,000
$1,836,317
$143,779$33,600
$110,179
$359,448$84,000
$275,448
$2,899,544$677,600
$2,221,944
45 40 $560,000
DE FORM 1103/0748, Page A, Revised September 1995633- 1603- RenSum-1Wednesday, July 25, 2012
(CHECK SCOPE AND LIST COSTS FOR EACH ACTIVITY. DO NOT PROJECT INFLATION OR FEES INTO ESTIMATE).COST ESTIMATE FOR ITEMS ON CHECK LIST
NAME OF SCHOOL:
OCC.DATE: AVAILABLE UNITS:
BUILDING NUMBER:
EARNED UNITS:
[ 1603 ] Kennesaw Elementary Facility 2010
45 401992
ITEM COST$365,576Energy conservation, to include time devices, caulking, and retrofit measuresX$246,000Door replacementX$251,334Replace or refinish wall surfaces, to include paintingX$100,000New windowsX
$22,849Provisions for the handicapped to include drinking fountains, lifts, and rampsX$94,621Tackboards, chalkboards, and lockersX
$365,576Restroom modernization (Including those for handicapped)X$356,300RelightingX$228,485New ceilingX$365,576New floor coveringX
Total Cost $2,396,317
Signature on file
Signature of Architect
DE FORM 1103/0748, Page B1, Revised September 1995Wednesday, July 25, 2012
RENOVATIONS BUDGET
Page 1
Name of School [1603] Kennesaw Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $176,159 $440,398 $3,552,543$2,935,986Modifications $138,638 $346,597 $2,795,882$2,310,647New Constructions $0 $0 $0$0
Totals $314,797 $786,995 $6,348,425$5,246,633Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $47,040 $117,600 $948,640$784,000Modifications $94,446 $236,116 $1,904,669$1,574,107New Constructions $0 $0 $0$0
Totals $141,486 $353,716 $2,853,309$2,358,107Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $129,119 $322,798 $2,603,903$2,151,986Modifications $44,192 $110,481 $891,213$736,540New Constructions $0 $0 $0$0
Totals $173,311 $433,279 $3,495,116$2,888,526Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-11603
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Kennesaw Elementary Facility - 1603
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $2,396,317 $143,779 $359,448 $2,899,544 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0
Totals $2,396,317 $143,779 $359,448 $2,899,544Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $1,836,317 $110,179 $275,448 $2,221,944 Modifications $0 $0 $0 $0 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $1,836,317 $110,179 $275,448 $2,221,944Adj. project cost for new fund $677,600
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $135,520 State Funds $542,080
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $542,080 $135,520 $0 $677,600Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $2,221,944 $2,221,944Totals $542,080 $135,520 $2,221,944 $2,899,544TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $2,357,464
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Kennesaw Elementary Facility - 1603
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $2,899,544B. State Funds $542,080C. Required Local Funds $135,520D. Additional Local Funds $2,221,944E. Additional Required Local Funds $0F. Total Local Funds $2,357,464
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
CURRICULUM AND SPACE NEEDSPROJECTED FOR SCHOOL YEAR 2016 - 2017
NAME GRADES INSTRUCTIONAL UNITS AVAILABLEFTELOCAL
EARNEDLOCAL
K-05 5245
00700
Grades and Spaces UnitsAccept
UnitsEarned
Local UnitsUnearned
UnitsGained
UnitsLost
EarnedNew Units
Local NewUnits
UnitsTo Be
Constr.Notes
TEAMS PER GRADE
[0399] Blackwell Elementary Facility
Basic Curriculum47 30 7 10 NotesKindergarten - Third Grade Classroom1 11 10 Fourth - Fifth Grade Classroom
ElementarySp. Ed. (Pair of Rooms)1 1 Art - Elementary School1 1 Music - Elementary School
Computer Science - Elementary SchoolOther
Theater Sp. Ed. Family Living Center Other Instructional
1 1 Media Center51 44 7 10 10 0 0 0SUB TOTAL:
Physical Education1 1 Physical Education - Elementary School
Unearned UNEARNED
52 45 7 10 10 0 0 0TOTAL:Support Areas
1 1 Kitchen and All Support Areas1 1 Cafeteria - Elementary School1 1 Administration1 1 Counseling
[Kindergarten - Third Grade Classroom] 10 K-3 classrooms used by grades 4-5
NOTES
Wednesday, July 25, 2012 633 - - Program 10399DE FORM 1103/0748, Page A, Revised September 1995
TYPE OF MODIFICATION BLDG NO. ENTITLEMENTFUNDS
LOCALFUNDS
ARCHITECT'SESTIMATE
NAME OF SCHOOL [ 0399 ] Blackwell Elementary Facility
HVAC 2010 $28,216 $24,689 $52,905
TOTAL MODIFICATION COSTS $28,216 $24,689 $52,905
ARCHITECT'S ESTIMATEENTITLEMENT FUNDSLOCAL FUNDS
NETAMOUNTS
ARCHITECT'SFEES (MAX 6%)
CONTINGENCIES(MAX 15%)
TOTAL MOD +FEES COSTS
$52,905$28,216$24,689
$3,174$1,692$1,482
$7,936$4,232$3,704
$64,015$34,140$29,875
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
SUMMARY OF MODIFICATIONS
633- 0399- ModSum-1
NAME OF SCHOOL [ 0399 ] Blackwell Elementary FacilityBUILDING NUMBER(S) 2010 SPACE NUMBER(S) 1.062MODIFICATION OBJECTIVE AND DESCRIPTION :HVAC for KitchenAvailable instructional units to be modified:Approvable instructional units after modification:
00
Cost Estimate: (itemize actual cost. Do not project inflation or fees into estimate)
ITEM UNITS UNIT COST TOTAL
MODIFICATIONS DETAIL
HVAC for kitchen 3527 $15.00 $52,905s.f.xTOTAL ESTIMATED COST
Signature on file
Signature of Architect
Architect's Cost Estimate
TOTAL $52,905
$52,905
Wednesday, July 25, 2012DE FORM 1103/0748, Page A, Revised September 1995
633- 0399- ModSum-1
Name of School [0399] Blackwell Elementary Facility
Project Cost Estimates for this SchoolConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $141,630 $354,076 $2,856,210$2,360,504Modifications $80,770 $201,925 $1,628,864$1,346,169New Constructions $0 $0 $0$0
Totals $222,400 $556,001 $4,485,074$3,706,673Construction Budget Project Cost
Costs Eligible for Earning EntitlementConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $37,800 $94,500 $762,300$630,000Modifications $53,423 $133,559 $1,077,374$890,392New Constructions $0 $0 $0$0
Totals $91,223 $228,059 $1,839,674$1,520,392Construction Budget Project Cost
Local Costs for Activities above State ParticipationConstruction Cost
from previouspages
Architect's Fees Contingencies Total Costs
Renovations $103,830 $259,576 $2,093,910$1,730,504Modifications $27,347 $68,366 $551,490$455,777New Constructions $0 $0 $0$0
Totals $131,177 $327,942 $2,645,400$2,186,281Construction Budget Project Cost
FACILITY NEEDS SUMMARY633 - - FacNeeds-10399
DE FORM 1103/0748, Page D, Revised September 1995Wednesday, July 25, 2012
System: Cobb County - 633School: Blackwell Elementary Facility - 0399
Project Cost Estimate for this SchoolConstruction
Costs Architect Fee Contingencies Total Costs Renovations $0 $0 $0 $0 Modifications $52,905 $3,174 $7,936 $64,015 New Constructions $0 $0 $0 $0
Totals $52,905 $3,174 $7,936 $64,015Less Cost of activities above stateparticipation
ConstructionCosts Architect Fee Contingencies Total Costs
Renovations $0 $0 $0 $0 Modifications $24,689 $1,481 $3,703 $29,873 New Constructions $0 $0 $0 $0 Additional Required Local $0 $0 $0 $0 Athletic Reduction $0 $0 $0 $0
Totals $24,689 $1,481 $3,703 $29,873Adj. project cost for new fund $34,142
Req. LocalPercentage Adjustments Req. Local
Required Local Funds 0.200000000% 0.000000000% $6,828 State Funds $27,314
State Funds Required Local Additional Local Total FundsSUMMARY FOR SYSTEM BUDGET
REGULAR $27,314 $6,828 $0 $34,142Athletic Reduction $0 $0 $0 $0Additional Required Local $0 $0 $29,873 $29,873Totals $27,314 $6,828 $29,873 $64,015TOTAL REQUIRED AND ADDITIONAL LOCAL FUNDS NEEDED $36,701
TOTAL PROJECT COST
Project SummaryDE FORM 0748, Page 1, Revised July, 2002
SCHOOL SYSTEM: Cobb County - 633NAME OF THE SCHOOL: Blackwell Elementary Facility - 0399
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701
Will this system participate at this level? Yes
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701
Will this system participate at this level? Yes
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701
Will this system participate at this level? Yes
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $64,015B. State Funds $27,314C. Required Local Funds $159,288D. Additional Local Funds $29,873E. Additional Required Local Funds -$152,460F. Total Local Funds $36,701
Will this system participate at this level? YesCOMMENTS:
PROJECT FUNDING SUMMARY FOR ALL ENTITLEMENT LEVELS
DE FORM 0748, Revised July, 2002
TOTALS OF ALL PROJECTS FOR Cobb County - 633
Regular$200,000,000
ENTITLEMENT LEVEL
A. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999
$160,000,000ENTITLEMENT LEVELA. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999
$120,000,000ENTITLEMENT LEVELA. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999
$80,000,000ENTITLEMENT LEVELA. Total Project Cost $90,826,710B. State Funds $8,281,711C. Required Local Funds $2,567,785D. Additional Local Funds $80,474,573E. Additional Required Local Funds -$497,359F. Total Local Funds $82,544,999
Amount of local funds in the current approved budget as a line item and specifically designed for thisapplication. Funds will be transferred to the capital outlay account prior to the end of this fiscal year.
SYSTEM CERTIFICATIONThe Board of Education certifies that it has carefully reviewed this application for state capital outlay funds and agrees that allinformation included is, to the best of its knowledge, true and correct, and the project(s) as proposed in this application arecomplete and that none of the projects will require substantial modifications or additions prior to completion.
(Date of Local Board Approval) (Chairperson)Witness my hand and official signature with the seal of the System Board ofEducation affixed here to this ______ day of ____________, 20____.
$2,070,426
(Superintendent)
SYSTEM SUMMARY OF ALL PROJECTS