CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY...
Transcript of CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY...
![Page 1: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/1.jpg)
The County Government of Kericho
in Collaboration with
Ministry of Infrastructure, Lands, Housing and Urban Development
Kenya Municipal Programme
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated
Strategic Urban Development Plan for Kericho Town
CAPITAL INVESTMENT PLAN
KERICHO
May 2017
![Page 2: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/2.jpg)
TABLE OF CONTENTS
LIST OF FIGURES ............................................................................................................................. 3
LIST OF TABLES ............................................................................................................................... 4
LIST OF ABBREVIATIONS .............................................................................................................. 5
1. INTRODUCTION ........................................................................................................................... 6
1.1 BACKGROUND .................................................................................................................. 6
1.2 CAPITAL INVESTMENT PLAN ....................................................................................... 6
2. PROJECT PRIORITISATION ....................................................................................................... 7
2.1 INTRODUCTION ................................................................................................................ 7
2.2 IMPLEMENTATION PLAN ............................................................................................... 7
2.3 PRIORITIES ESTABLISHED AT THE WORKSHOP .................................................... 20
3. FUNDING OPTIONS .................................................................................................................... 21
3.1 BACKGROUND ................................................................................................................ 21
3.2 REVENUE PERFORMANCE 2013-2016 ........................................................................ 21
3.3 RECOMMENDATIONS TO ENHANCE THE COUNTY’S REVENUE ....................... 24
3.4 BUDGET FRAMEWORK FOR FY 2016 - 2017 ............................................................. 26
3.5 FUNDING OF PRIORITISED PROJECTS ...................................................................... 28
3.6 PUBLIC PRIVATE PARTNERSHIPS .............................................................................. 30
4. CAPITAL INVESTMENT PLANS............................................................................................... 33
4.1 SUMMARY ....................................................................................................................... 33
4.2 CIP 1: Construction of motorable roads within proposed industrial areas ........................ 35
4.3 CIP 2: Construct dams for surface run-off irrigation ......................................................... 36
4.4 CIP 3: Rehabilitation of existing and increased water reticulation coverage to additional
76,000 households including increase in storage capacity ....................................................... 37
4.5 CIP 4: Upgrade of water treatment works to additional 13,000 m3/day ............................ 38
4.6 CIP 5: Upgrade of sewer reticulation in CBD .................................................................... 40
4.7 CIP 6: Construction of waste transfer stations in CBD, Kapsoit, Brooke and Kapsuser
markets ..................................................................................................................................... 41
4.8 CIP 7: Construction of Fire sub-stations at Kapsuser and Kapsoit, and upgrade of fire station
headquarters ............................................................................................................................. 42
4.9 CIP 8: Street lighting .......................................................................................................... 44
4.10 CIP 9: Construction of proposed and upgrade of existing transport corridors ................ 45
4.11 CIP 10: Construction of early childhood development and primary schools .................. 47
4.12 CIP 11: Construction of secondary schools .................................................................... 48
4.13 CIP 12: Construction of level 5 secondary medical facilities .......................................... 49
4.14 CIP PPP 1: Construction of Amusement Park ................................................................. 50
4.15 CIP PPP 2: Development of an ecolodge ......................................................................... 51
![Page 3: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/3.jpg)
LIST OF FIGURES
Figure 3-1: Actual Financial Trend (2013-2016) ............................................................................... 23
![Page 4: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/4.jpg)
LIST OF TABLES
Table 2.1 Economic Development Implementation Plan .................................................................... 8
Table 2.2 Environment Projects Implementation Plan ...................................................................... 10
Table 2.3 Recreation Projects Implementation Plan ......................................................................... 11
Table 2.4 Disaster Management Implementation Plan ...................................................................... 11
Table 2.5 Water Supply Implementation Plan ................................................................................... 12
Table 2.6 Sewerage and Sanitation Implementation Plan.................................................................. 12
Table 2.7 Storm Water Drainage Implementation Plan ..................................................................... 13
Table 2.8 Solid Waste Management Implementation Plan ................................................................ 13
Table 2.9 Fire Safety Implementation Plan ....................................................................................... 14
Table 2.10 Electricity and Street Light Implementation Plan ............................................................ 14
Table 2.11 Housing and Informal Settlement Implementation Plan .................................................. 15
Table 2.12 Transportation Implementation Plan................................................................................ 16
Table 2.13 Tourism Management Implementation Plan .................................................................... 17
Table 2.14 Socio- Cultural Development Implementation Plan ........................................................ 18
Table 2.15 Security Projects .............................................................................................................. 18
Table 2.16 Institutional Development Implementation Plan ............................................................. 19
Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ............................. 22
Table 3-3: Revenue Collection Efficiency in 2015-16 ...................................................................... 23
Table 3.4: Budgeted Revenue FY 2016-17 ........................................................................................ 27
Table 3.5: Budgeted Expenditure FY 2016-17 .................................................................................. 27
Table 4.1 Summary of Capital Investment Plan ................................................................................ 33
![Page 5: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/5.jpg)
LIST OF ABBREVIATIONS
CBD Central Business District
CBO
CGK
Community Based Organisations
County Government of Kericho
CCTV Closed Circuit Television
CIP Capital Investment Plan
DMP Disaster Management Plan
EIA Environmental Impact Assessment
EMCA Environmental Management and Coordination Act
GIS Geographical Information System
GoK Government of Kenya
ICT Information and Communication Technology
ISUDP Integrated Strategic Urban Development Plan
KeNHA Kenya National Highways Authority
KeRRA
KFS
Kenya Rural Roads Authority
Kenya Forest Service
KMP
KP
Kenya Municipal Programme
Kenya Power
KURA
KWS
KAA
Kenya Urban Roads Authority
Kenya Wildlife Service
Kenya Airports Authority
NEMA National Environmental Management Authority
NMT Non-Motorized Transport
PPP Public Private Partnership
SEZ Special Economic Zone
SME Small and Medium Sized Enterprises
SWM Solid Waste Management
TOR Terms of Reference
WTP Water Treatment Plan
WWTP Waste Water Treatment Plan
![Page 6: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/6.jpg)
1. INTRODUCTION
1.1 BACKGROUND
This Capital Investment Plan (CIP) seeks to provide practical guidance on the implementation of
the capital development aspects within the Integrated Strategic Urban Development Plan (ISUDP)
for Kericho Town. It is a three year rolling plan, which includes estimated costs and responsibilities
for implementation of agreed investments, as well as a financing plan. The CIP will assist the
County of Kericho in their budget process. In addition, it serves as a key tool for resource
mobilization from national government, line ministries and agencies, as well as development
partners. When used in conjunction with the ISUDP, the CIP provides justification and impact of
the proposed capital projects and initiatives.
Several strategic intervention sectors have been listed in the CIP including economic development,
recreation, water supply, sewerage & sanitation, solid waste management, fire safety, electricity &
street lighting, transportation, tourism management, and socio-cultural development. The
interventions address the priority needs as identified by the stakeholders in concert with the
technical team; and are affordable within the current budgetary environment. This is in line with
the terms of reference that states that a participatory process will be followed that reflects publicly
agreed local priorities for investment in basic infrastructure services and is both financially realistic
and feasible.
1.2 CAPITAL INVESTMENT PLAN
This report addresses these issues as follows:
i. The budgetary limitations
ii. Prioritization of demand
iii. Capital Investment Plans for priority projects
iv. Summary cash flow
![Page 7: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/7.jpg)
2. PROJECT PRIORITISATION
2.1 INTRODUCTION
The identification of capital projects for investment and development was done through a structured
participatory process, involving all key stakeholders, as well as ensuring both relevance and
affordability within the planning period. The key steps followed were:
1. Stage 1 – Review all capital projects in the ISUDP
2. Stage 2 – Prioritize those to be completed or initiated in the first three years, followed by
preliminary costing.
3. Stage 3 – Review priorities established during the workshops drafting the ISUDP, assessing
how realistic the projects are within the County's budget ceilings
4. Stage 4 – Prepare a short list of projects that met criteria in 2 and 3.
5. Stage 5 – Prepare a detailed CIP, which is the whole content of this report.
2.2 IMPLEMENTATION PLAN
The planning period for the ISUDP is 20 years, with the implementation divided in to four phases,
each having a five years duration. Phase I (2017-18 to 2021- 22), Phase II (2022-23 to 2026-27)
Phase III, (2027-28 to 2031-32) and Phase IV (2033-34 to 2036-37). The Identified projects and
their proposed timing and duration for implementation are presented in Table 2.1 – 2.16. The CIP
constitute sector wise implementation plan for the 20 year implementation period. It also contains
the time period for various activities and a list of institutions responsible for implementation.
![Page 8: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/8.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
8
Table 2.1 Economic Development Implementation Plan
Projects
Quantit
y
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Allocate land for new industrial
areas
2.5 Ha CGK & Ministry of Trade
and Industrialization.
Notification of the land
demarcated for industrial development
1 No CGK & Ministry of Trade
and Industrialization.
Allocate land for new
commercial districts (Brooke,
Kapsoit & Kapsuser)
55 Ha CGK & Ministry of Trade
and Industrialization.
Notification of the land
demarcated for commercial
development
1 No CGK & Ministry of Trade
and Industrialization.
Electricity Supply in the
proposed commercial and
industrial area
5 km Kenya Power (KP)
Construct motorable Roads
within proposed Industrial area
5 km CGK & KURA
Construct truck terminals 5 ha CGK, KURA & KeNHA
Formulate county led SMEs
policies
1 No CGK
Lower transaction costs (Policy) 1 No CGK
Policy on cottage industries and
value chain development
1 No CGK
Establish County led SMEs
oriented financial institution
1 No CGK
Establish water harvesting
technologies,
3 No CGK & Ministry of water
Promotion of organic manure and
high yield seeds
1 No CGK & Ministry of
Agriculture
Dams for surface runoff for 5 No CGK & Ministry of Water
![Page 9: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/9.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
9
Projects
Quantit
y
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
irrigation (Peri-urban areas)
Promote soil conservation and
soil fertility
1 Town CGK & Ministry of
Agriculture
Establish County funding for
agricultural based activities
1 No CGK & Ministry of
Agriculture
Allocate Juakali traders
designated areas in Brooke,
Kapsoit & Kapsuser and urban
core
0.5 ha CGK & Ministry of Trade
and Industrialization.
Training & capacity building on products improvement annum)
40 No CGK & Ministry of Trade and Industrialization.
Develop a Town Investment Policy
1 No CGK
Develop Investment Information Centre
1 No CGK
Give incentives to investors including serviced land and tax
holidays (Policy formulation)
1 No CGK
![Page 10: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/10.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
10
Table 2.2 Environment Projects Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
By laws for EIA 1 No
Conservation area management
plans (CBD, Tea Plantations & Forest, Doinyosioyet Wetland,
Kapsoit, Kapsuser, Brooke)
6 No CGK & NEMA
Conserve the Forest areas around
Tea Plantations
10 Sq km CGK & NEMA
Conserve the riparian areas for the
entire Doinyosioyet wetland
system,
10 Sq km Tea companies and KFS
Conserve riparian areas along the
wetlands at Kaposit and Kapsuser
markets
5 Sq km CGK
Conserve riparian area along from the banks of Kimugu River banks
along the entire river basin
5 Sq km CGK
Conserve Public parks (existing
Uhuru Gardens and Moi Gardens
in the CBD)
2 Sq km CGK
![Page 11: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/11.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
Table 2.3 Recreation Projects Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Neighborhood Park 20 1ha CGK
Ward Level Park 2 1ha CGK
Neighbourhood Playground 20 1ha CGK
Stadium 1 5ha CGK
Amusement park 1 30ha CGK
Social Halls/ and Community
Centres
12 0.25ha CGK
Table 2.4 Disaster Management Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Disaster Management Committee 1 No CGK/NEMA
Disaster Management Sub-
Committee in Brooke, Kapsoit,
Kapsuser
3 No CGK/NEMA
Disaster Management By-Law 1 No CGK/NEMA
![Page 12: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/12.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
12
Table 2.5 Water Supply Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Increase water reticulation
coverage to households in the
built up areas
76,000 No CGK, Ministry of Water
& NGOs
Increase tank storage capacity 4 No CGK
Upgrade the water treatment
works
100,000cm/day 1 CGK
Table 2.6 Sewerage and Sanitation Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Increase sewerage coverage and capacity to households in the built
up areas
76,000 No CGK
Upgrade the sewer reticulation in
the CBD
10 Km
sq
CGK
Stop drainage of sewer into rivers
and drainages
1 Town CGK
![Page 13: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/13.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
13
Table 2.7 Storm Water Drainage Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Establish surface runoff
catchments for integration into the land use plan
1 Town CGK
Drainage channels and outfalls integration from the CDB into the
rivers
10 Km sq
CGK
Confine drains to natural drainage
system to the extent possible
1 Town CGK
Land acquisition plan development
for necessary compensation where
necessary in CBD, Kapsoit,
Kapsuser and Brooke
15 Km
sq
CGK
Table 2.8 Solid Waste Management Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
A landfill site be identified and
developed
1 No CGK
A comprehensive study on solid
waste management be undertaken
to work out the best strategy for
waste management in the town.
1 NO CGK
Waste transfer stations in CBD
(main commercial area, bus stage, market, stadium and hospital)
4 No CGK
Waste transfer stations in Kapsoit Market
2 No CGK
Waste transfer stations at Brooke market
2 No CGK
![Page 14: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/14.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
14
Waste transfer station Kapsuser market
1 No CGK
![Page 15: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/15.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
15
Table 2.9 Fire Safety Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Sub-Fire station (Kapsuser,
Kapsoit)
2 No CGK
Fire Station Headquarters
(Upgrade)
1 No CGK
Fire Hydrant (every
neighborhood)
500 No CGK
Table 2.10 Electricity and Street Light Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Grid network Coverage 100 % CGK
Street Lighting 30 km CGK
![Page 16: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/16.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
16
Table 2.11 Housing and Informal Settlement Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Municipal Housing (low cost) 7,000 No CGK
Road improvement to bitumen in residential areas (include
Informal settlements)
40 km CGK
By laws for affordable
building material
CGK
By laws on tenure in Informal
settlements
CGK
![Page 17: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/17.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
17
Table 2.12 Transportation Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
The B1 road in Kericho shall
have only 4 lanes in total; the
two extra lanes will be
allocated to bus stops and non-
motorized transport;
CGK & KeNHA
Connection to Motobo and
Nyagacho improved by two
measures: pavement of the
existing road linking them to
the B1 road after the Kisumu-
Bomet roads junction; a new
road creating a short-cut to
reach the CBD through the
Doinyosoiyet swamp near the
County Referral Hospital;
CGK & KeNHA
Building a multilevel parking
near the CBD
CGK
Prison relocated to Kapsoit
land to be converted into
buspark and multilevel parking
CGK & NLC
A system of bus stop on key
arterials (one each 300 m in the
urban area) ensure to cover all
the main point of interest of the
town
40 No CGK
![Page 18: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/18.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
18
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
NMT lanes in all key roads 25 km CGK, KeNHA and
KURA
Pedestrianize 30% of roads in
CBD
3 km CGK, KURA
Table 2.13 Tourism Management Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Tourism Liason Office 1 No CGK & Ministry of
Tourism
Profiling attractions in the
Circuit in Kericho
(Consultancy)
1 No CGK & Ministry of
Tourism
Strategy to Support
development of hotels through
planning incentives
1 No CGK & Ministry of
Tourism
Establishment of Animal
Sanctuary in Brooke
1 No CGK & Ministry of
Tourism, KWS
Establish a Cultural Centre at Kapsuser
1 No CGK & Ministry of Tourism
Brand the Airport as part of the Tea Farm tour package
1 No CGK, KAA & Tea Company
Create trails into the forest with attractions
20 Km KFS
Develop an Eco Lodge 1 No KFS and CGK
![Page 19: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/19.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
19
Table 2.14 Socio- Cultural Development Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
ECD 46 No CGK
Primary School 46 No Ministry of education
Secondary School 20 No CGK & Ministry of
Health
Level 5: Health facilities 1 No CGK
Level 4: Health facilities 3 No CGK
Cemetery 1 No CGK
Crematorium 1 No CGK
Town Library 1 No CGK
Community Library (Kapsoit,
Brooke, Kapsuser)
3 No CGK
Community Centre (Kapsoit,
Brooke, Kapsuser)
3 No CGK
Orphanage 1 No CGK
Sub-Post Office in Kapsoit
and Kapsuser
2 No Ministry of ICT
Table 2.15 Security Projects
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Police Post (In neighborhoods) 6 No Ministry of Interior
Security
Police Station 9Kapsoit, Kapsuser,
Brooke)
3 No Ministry of Interior
Security
Police County Headquarters
(upgrade)
1 No Ministry of Interior
Security
Prison (relocate to Kapsoit) 1 No Ministry of Interior
![Page 20: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/20.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
20
Security
Juvenile Home (In Brooke) 1 No Ministry of Interior Security
![Page 21: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/21.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
21
Table 2.16 Institutional Development Implementation Plan
Projects
Quantity
Units
YEARS
Institution
Responsibility Phase I Phase II Phase III Phase IV
2017/18-2021/22 2022/23-2026/27 2027/28-2031/32 2032/33-2036/37
Develop a full Planning
Department to include Forward Planning, Development Control
and Research
1 NO CGK
Develop a GIS Unit 1 No CGK
Establish a Town Management Board
CGK
Establish ISUD Plan Monitoring
Units
CGK
Legends
Projects to be implemented in one
year.
Projects to continued.
![Page 22: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/22.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
22
2.3 PRIORITIES ESTABLISHED AT THE WORKSHOP
Possible projects proposed in the draft ISUDP for implementation were subjected to priority
ranking by stakeholders. From the list of projects, stakeholders were asked to rank their top ten in
order of priority. From the individual rankings, overall rankings scores and priority rankings were
determined. Prioritisation ensures that only projects important to the community are implemented,
and that in an environment of scare resources, those most important to them are to be implemented
first.
S/N Project Score Ranking
Priority
1 Water supply to households 37 1
2 Educational facilities (ECD, Primary, Secondary) 37 2
3 Medical facilities 35 3
4 Improvement of roads 33 4
5 Broader sewerage coverage 30 5
6 Improved waste collection and management 29 6
7 Street lighting 27 7
8 Fire stations and fire safety 21 8
9 Improving tourist facilities 20 9
10 Social halls and community centres 19 10
11 Amusement park 14 11
![Page 23: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/23.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
23
3. FUNDING OPTIONS
3.1 BACKGROUND
This chapter presents the County’s revenue and expenditure performance, as well as identifies
potential sources for improving the County’s revenue and strategy for resource mobilization. It also
presents the challenges encountered by the County Government in budget implementation during
the period under review. The aim is to develop an efficient and sustainable revenue generation,
prudent utilization and management of county resources to provide basis for implementation of
projects identified and prioritised under the ISUDP.
The major sources of funds include:
1. Local Revenue: Article 209 (3) of the Constitution empowers the county governments to
impose two types of taxes and charges. These sources of county government revenue in Kenya are property rates and entertainment taxes. The county government can also impose charges for any services they provide in accordance with the stipulated laws.
2. Equitable Share: The equitable share is the money parliament shares vertically between the national and the county governments. The money comes from the revenue the national government raises. The Senate then divides the equitable share of revenue allocated for the counties among them. The equitable share is the biggest source of revenue for the counties.
3. Conditional Grants. 4. Donor Funding.
3.2 REVENUE PERFORMANCE 2013-2016
Over the years, Kericho County has majorly depended on revenue from the national government.
For instance, the equitable national share in the FY 2016/17 constitutes 87 per cent of the total
revenue the county received. It should, however, be noted that the County has a potential of
generating more local revenue and be self-reliant rather than depend on revenue from the national
treasury. The Finance Act (2015) gives the County a legal mandate to collect taxes from
numerous sources within its jurisdiction.
Table 3.1 shows a summary of financial performance of Kericho County for the period
FY2013/14 to FY 2015/2016. The trend indicates an increase of revenue trend over time with a
few exceptions of some strong financial streams.
![Page 24: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/24.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
24
Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16
Summary (Amount in Bilion Ksh.) Revenue FY- 2013/2014 FY- 2014/2015 FY- 2015/2016
Total 3.62 4.814 5.572 Source: County Government of Kericho budget estimates year 2016/2017
3.2.1 Linear Trend of Actual Financial Performance
The actual local revenue performance over the three years indicates a non-stationery trend
projection of the same indicates an upward trend of the financial growth. The unstable financial
trend could be attributed to inadequate revenue streams and inadequate methods of prudent
financial management
The actual revenue reflected in the financial report for the year ending June 2015 was exclusive of
substantial revenue potential covered in the Finance Act (2015). Figure 3.1 shows the local revenue
performance over the period between FY2013/14 to FY 2015/16.
Source: Kericho County Treasury
Figure 3-1: Actual Financial Trend (2013-2016)
3.2.2 Revenue Resource Mapping (FY 2015/16)
The trend illustrates Kericho's dependence mainly on the equitable national share for its revenue.
To finance the budget, the County expected to receive Kshs.4.51 billion (80.9 per cent) as equitable
share of revenue raised nationally, Kshs.193.69 million (3.5 per cent) as total conditional grants,
generate Kshs.440 million (7.9 per cent) from local sources, and had a cash balance of Kshs.431.40
million (7.7 per cent) from FY 2014/15. The conditional grants comprised of Kshs.98.85 million
(1.78 per cent) for Free Maternal Health Care, Kshs.57.23 million (1.0 per cent) from the Road
Maintenance Fuel Levy Fund, Kshs.17.68 million (0.3 per cent) for User Fees Foregone and
Kshs.19.93 million (0.4 per cent) as a grant from DANIDA
![Page 25: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/25.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
25
The total local revenue collected in FY 2015/16 of Kshs.434.44 million consisted of Kshs.43.72
million generated in the first quarter, Kshs.71.57 million in the second quarter, Kshs.133.84 million in
the third quarter, and Kshs.185.31 million in the fourth quarter. The revenue collected was 98.7 per
cent of the annual local revenue target, an increase from Kshs.413.31 million collected in FY
2014/15.
An analysis of the local revenue collected by stream indicated that tea produce cess recorded the
highest performance against the annual target at 165.2 per cent. This was closely followed by liquor
license fees and single business permits at 133.5 per cent and 101.4 per cent, respectively. Table 3.3
provides an analysis of the local revenue collected in FY 2015/16 by revenue stream
Table 3-3: Revenue Collection Efficiency in 2015-16
No Revenue Stream Annual Targeted
Revenue (Kshs.)
Actual Annual
Revenue (Kshs)
Actual
Revenue as a
percentage of
Annual Target
(%)
1 Tea Produce cess 33,145,428 54,756,247 165.2
2 Liquor Licence Fees 8,472,325 11,306,660 133.5
3 Single Business Permit 46,857,719 47,512,322 101.4
4 Market /Trade Fees 23,976,737 23,813,280 99.3
5 Land Rates/Plot rents 71,100,947 70,352,964 98.9
6 Bus park fees 27,257,241 26,231,569 96.2
7 Health Services-F.I.F 140,000,000 130,893,040 93.5
8 Car Parking Fees 13,064,923 12,092,520 92.6
9 Sub-County Public Health 7,613,751 6,763,202 88.8
10 House /Kiosk & Stall rents 11,937,874 10,159,639 85.1
11 Forest produce cess 9,377,609 7,391,955 78.8
12 Advertisements 8,527,273 6,531,082 76.6
13 Plan Approval fees 7,872,109 5,535,671 70.3
14 Other sources 30,796,064 21,100,582 68.5
TOTAL 440,000,000 434,440,733 98.7
Source: Kericho County Treasury
![Page 26: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/26.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
26
3.2.3 Key Issues to be considered to enhance revenues
The following are some of the major challenges encountered in the collection of revenue:
1. Lack of a consolidated revenue data base at the county
2. Lack of coordination between administrators of individual revenue with other revenue
sources in terms of assessment, collection and administration;
3. Inadequate use of technology
4. Inadequate monitoring and evaluation systems
5. Inadequate revenue intelligence and vigilance system
Specifically, challenges for major revenue sources include:
1. Tea Produce Cess: There is lack of sufficient legislation to support cess collection like tea
produce and administration laws.
2. Single Business Permit (SBP)
a) Lack of integration of the SBP with other relevant revenue functions which hinders the
creation of an effective single window system
b) Inadequate human resource who are well trained
c) The SBP is centralized thus collection of revenue is inefficient
3. Land rates/plot rents
a) Lack of integration with other database
b) Lack of co-ordination among the relevant ministries for example there is no proper co-
ordination between Ministry of Land and the revenue collection section
c) The properties are not valued to determine their true values.
d) The land rate collection system is highly centralized and lacks proper communication
with the public.
e) Lack of County legislation to govern the collection of land rates.
3.3 RECOMMENDATIONS TO ENHANCE THE COUNTY’S REVENUE
Kericho County has a potential of generating higher local revenues, from property rates tax
entertainment tax, and other taxes that it is authorised to impose by an Act of Parliament as assigned
to them under Article 209 (2) of the Constitution. In addition, Article 209 (2) also enables counties
to collect fees and user charges for services provided under county legislation.
The Finance Act (2015) also gives the County a legal mandate to collect taxes from additional
revenue streams within its jurisdiction. The following cross-cutting institutional changes may be
considered to enhance the revenue across all revenue streams:
1. Improve coordination in terms of assessment, collection, administration and data sharing-the
integration of various revenue functions is critical to ensuring that all revenue sources are
easily mapped and reliable predictions about revenue potential can be made for all the
revenue sources.
2. Introduce comprehensive monitoring and evaluation systems for each revenue source.
![Page 27: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/27.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
27
3. Institute adequate revenue intelligence and vigilance system and have proactive efforts to
gather information about tax evasion are imminently required.
4. There must be a consistent effort to ensure proper and integrated revenue management that
guarantees the collection of all potential revenue in a manner that is efficient, effective and
accountable. The county government should adequately invest and employ technology
through automation of the revenue collection and administration process. Automation will
eliminate leakages and contribute toward achievement of the set revenue targets.
5. Maximising on business licences, and in so doing, develop the most economic approach to
collecting revenue. This may involve partnering with the Kenya Revenue Authority (KRA).
6. Leverage on domestic tourism as a source of revenue;
7. Create a favourable environment that supports entrepreneurship and attract investments
through reform of the business regulatory frameworks. This will enhance volumes of trade
and consequently create taxation opportunities;
8. Develop a transparent and accountable system of incentives (reward) for early payments and
disincentive (penalties) for those in tax arrears to promote compliance.
9. The County Government could partner with the private sector through Public Private
Partnerships, to devise innovative mechanisms of increasing their revenue collection and
delivery of services; some of the avenues they may explore include:
(a) Tapping into private capital to fund development initiatives, and
(b) Outsourcing services from the private sector to enhance efficient and effective service
delivery.
3.3.1 Other strategies for raising revenue
Apart from the above mentioned sources of improving revenue, the following strategies are also
proposed within the County ISUDP aimed at developing an efficient and sustainable system that
will further raise the revenue for the County. They include:
1. Capacity Building and Enhanced Revenue Administration. Inadequate capacity
coupled with a revenue administration framework that does not fully support
accountability. Revenue administrators and collectors need to be facilitated through
regular capacity building on new and emerging trends in order to keep abreast with the
new ways and systems as well as international standards.
2. An up to date Valuation roll. It is worth noting that the process of getting an up to date
valuation roll is in progress. It is proposed to implement a valuation roll with all
property information of all rateable properties within the County’s boundaries. The roll
should be regularly updated.
3. Inventory for the County Assets. As per the auditor’s report for the year ending June
2015, the County Government of Kericho had no identification, valuation or formal
handing over by the Transition Authority to the County Government despite the assets
being in use. Not identifying, validating and recording on both assets and liabilities of
the defunct local authorities may occasion revenue losses for the County. The County
has since began the process of having an inventory for the county assets
4. Enforcement of the By-Laws and Regulations. It is proposed that County government
ensures that the gazette fees and charges are collected according to the proposed By-
Laws and Regulations.
![Page 28: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/28.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
28
5. Strengthening Institutional Framework. The institutions in the County mandated to
collect revenue should have legal backing to strengthen coordination, and avoid
duplication of efforts.
It will also be prudent for the County Government of Kericho to consider adopting an e-governance
platform which will allow full integration of the consolidated revenue data base at the county and
consequently linked with the Integrated Finance Management Information System (IFMIS).
Some of the proposed specific recommendations for major revenue sources are as follows:
1. Tea Produce CESS
a) Establish more barriers to minimize tax evasion
b) Have a patrol and inspection vehicle dedicated to cess collection
c) A comprehensive review of legislation to ensure cess collection is backed by sufficient
laws.
2. Single Business Permit
a) Integrate the SBP with other revenue database
b) Ensure capacity building of all staff especially those responsible for the administration
of SBP
c) Institute and decentralized collection process to enable better and increased revenue
collection
3. Land rates/plot rents
a) Utililise the GIS database and IT to improve effectiveness
b) Coordination between revenue section and ministry of land to make sure all chargeable
properties are known by revenue section
c) Employ adequate vigilance and revenue systems to be able to gather information on tax
evasion
d) Valuation of properties should be done annually to determine their true values
3.4 BUDGET FRAMEWORK FOR FY 2016 - 2017
The budget estimates for the fiscal year 2016/2017 is anchored on the key budget policy documents
namely: County Integrated Development Plan 2013 – 2017, County Budget Review and Outlook
Paper, County Fiscal Strategy paper and Annual Development Plans.
![Page 29: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/29.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
29
3.4.1 Revenue Projections
The FY 2016/2017 budget the county sources of revenue include: County Revenue i.e. locally
collected, equitable share and conditional grants. The national equitable share forms 87 per cent of
the total county revenue while whole revenue constitutes 9 %, the remaining conditional grants
form 4 per cent of the total revenue. The equitable share as captured in BPS 2016 was Ksh. 4.861
billion, donor funds i.e. Danida is Ksh. 19.93 million while conditional grants is Ksh. 182.331
million and whole revenue including Health Facility Improvement Fund was Ksh. 520.35 million.
Table 3.4: Budgeted Revenue FY 2016-17
Revenue Ksh. %Share to total Equitable share 4.861 B 87
Local revenue – including FIF 520.53M 9
Conditional grants 182.331 M 4
Donor funds (Danida) 19.93 M
Total 5.583 B 100 Source: County Government of Kericho
3.4.2 Expenditure Forecasts
The key policy documents guiding the County Government’s funding allocation decisions include:
the County Integrated Development Plan 2013-2017, County Budget Review and Outlook Paper,
County Fiscal Strategy paper and Annual Development Plans as it provides the development
priorities. In FY 2016/2017, the overall expenditures are matched with the available revenue as per
the Table 3.5.
Table 3.5: Budgeted Expenditure FY 2016-17
Expenditure Ksh. %Share to Total
Recurrent 3.885 B 70
Development expenditure that also includes
health, County Public Service Board
1.698 B
30
Total 5.583 100 Source: County Government of Kericho
In FY 2016/2017 the overall expenditure and net lending are projected at Ksh. 5.582 Billion. The
County spent a total of Kshs.4.81 billion in FY 2015/16, which was 96.0 per cent of the total funds
released for operations. This was an improvement from Kshs.4.28 billion recorded in the FY
2014/15. A total of Kshs.3.14 billion was spent on recurrent activities, while Kshs.1.68 million was
spent on development activities. The recurrent expenditure was 97.7 per cent of the funds released
for recurrent activities while development expenditure accounted for 92.9 per cent of the funds
released for development activities. The expenditure excluded pending bills as at 30th June, 2016
![Page 30: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/30.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
30
that amounted to Kshs.340.37 million for development and Kshs.219.34 million for recurrent
expenditure.
3.4.3 Additional Revenue Sources
The legislation framework created by the Finance Act (2015) gives the County a legal mandate to
collect taxes from additional revenue streams within its jurisdiction. Some of these sources are as
follows:
1. National legislation guiding county revenue collection - The government is developing a national legislation to guide counties on revenue collection. This was due to complaints that
some devolved units had come up with prohibitive taxes that have scared away investors.
The guide is meant to check on the unnecessary levies that are way above what the business
community can afford and remain in business. National Treasury Cabinet Secretary Henry
Rotich noted that a review of the fees charged by counties will also include increasing rates
paid for properties like land that currently doesn't match the current market rates and thus
more revenues for the county.
2. Property rates - The Kenya Revenue Authority (KRA) is partnering with counties to
integrate their revenue collection systems with iTax. At the same time, KRA will be
working with counties to strengthen compliance in the remission of property rates.
3. Tea Produce Cess -The successful roll out of the electronic revenue collection system and the ongoing training of the users will ease in the administrative and low collection costs of
levies thus sealing revenue leakages
3.5 FUNDING OF PRIORITISED PROJECTS
Chapter four elaborates on the funding of the prioritised projects. However this plan has propritized
for implementation, projects that are ongoing or committed on the vision 2030 national government
projects. 3.5.1 National Government Committed Projects
The identified Kenya Vision 2030 national government project and the ongoing project are as
below:
1. SME Parks
2. Tea and Dairy cluster
3. Training of engineers and technicians
4. Develop a County Sports Stadia
5. Rehabilitation of County Health Facilities to Offer Integrated and Comprehensive
Healthcare
6. Early Childhood Development Education (ECDE) mainstreaming by training school
committees PTAs, BOGs in management of Early Childhood, Primary and Secondary
education for managing school resources and teachers
7. Establish Housing Technology Centres in Each Constituency
![Page 31: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/31.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
31
8. Rehabilitation of Kericho Land Registry
9. Rural Electrification programme: power connection to households over 23,ooo households
have been connected
10. Construction, rehabilitation and maintenance of rural roads : - 54 kilometre Brooke-
Chepseon Kebeneti road as well as Kericho Kipchimchim – Thesalia bypass
11. Upgrading of the Premier – Kabianga -Taplotin – Ainamoi – Thesali – Choborge – Kiburgat
road and the Kericho by-pass.
12. Procurement of the 7 billion Londiani dam 3.5.2 Donor finance
The following are on-going projects financed by donor agencies:
1. Kenya Transport Sector Support Project, (KTSSP): Construction Supervision of Grade
Separated Interchanges at Kericho (Junction B1 And C23 ) and Ahero ( Junction B1 And
A1).
2. Capacity building and training in the devolution process.
3. Kenya Electricity Expansion Project (AF-IDA-GPOBA) component World Bank funded.
4. Danish International Development Agency (DANIDA) funding operation of health centers
and dispensaries.
5. Kenya Primary Education Development (PRIEDE) project: A Global Partnership for
Education (GPE) under the supervision of the World Bank
3.5.3 Other ongoing/committed projects
The following are on-going/committed projects by the county government
1. Public Administration:
a) Construction of at least 10 ward offices
2. Finance and economic planning: operationalization of the revenue automation system ERP
a) Preparation of the valuation roll
3. Water, Energy, Environment, Forestry, & natural resource:
a) Water supply across the county
b) Rehabilitation of a dumpsite
4. Trade, Industrialization, cooperative, management, wildlife, and tourism
a) Construction of buildings (market sheds)/installation of cattle weigher
b) Conservation and improvement of tourist sites at Rerisik, Bagao, caves, Fort-tenan
and Tulwap kipsigis
c) Revival of dormant cooperatives, , Miss tourism Kenya Auditions (Kericho county
chapter
5. Education youth affairs, sports, culture and social services
a) Build more ECDE classrooms
b) Improve the status of the Kericho Green Stadium
c) Construction and equipping of a county youth talent complex for development of
youth talents
6. Land, Housing and physical planning
a) Completion of County spatial planning
![Page 32: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/32.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
32
b) Refurbishment of residential buildings
c) Refurbishment of Non-residential buildings
d) Rehabilitation of walkways/access road/car parks
7. Agriculture, livestock and fisheries
a) Rehabilitation of dips
b) Modernization of soin agricultural training center
8. Information communication and e-government
a) Refurbishments of citizen service centers
b) Expand ICT infrastructural development and civil works and electrical works in 6
ICT centers for every sub county
c) Extend wide area networks to 12 youth polytechnics and 6 ICT centers in the county
d) Development of county data center facility
e) Installation of CCTV facilities in major county entities including County
headquarters
9. Health services
a) Completion and equipment of health centers and facilities
b) Installation of health information system
3.6 PUBLIC PRIVATE PARTNERSHIPS
Infrastructure PPPs are cooperative ventures between the public sector (county governments) and
the private sector built on the expertise of each partner that best meets clearly defined public needs
through the appropriate allocation of resources, risks and rewards
Participation of the private sector in the financing, construction, development, operation, or
maintenance of infrastructure or development projects of the Government through concession or
other contractual arrangements; the establishment of the institutions to regulate, monitor and
supervise the implementation of project agreements on infrastructure or development projects and
for connected purposes, are governed by the Public Private Partnerships Act, 2013. The Act will
therefore guide all the projects proposed under a PPP arrangement.
The PPP process is overseen by a Permanent Secretary level PPP Committee that is responsible for
spearheading the PPP process and promoting the understanding and awareness among key
stakeholders and members of the public. Within the National treasury is the PPP unit whose main
functions include, among others:
1. Providing capacity building to, and advising contracting authorities or other parties involved
in the planning, coordinating, undertaking or monitoring of projects under the Act;
2. Rate, compile and maintain an inventory of public private partnership projects that are
highly rated and which are likely to attract private sector investment;
3. Develop an open, transparent, efficient and equitable process for managing the
identification, screening, prioritization, development, procurement, implementation and
monitoring of projects, and ensure that the process is applied consistently to all projects;
4. Make recommendations on the approval or rejection of projects prior to submission to the
Committee for approval;
![Page 33: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/33.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
33
5. Assist contracting authorities, where the unit considers it necessary, to design, identify,
select, prioritise, appraise, evaluate and negotiate projects;
6. Maintain a record of all project documentation;
7. Review and assess requests for Government support in relation to a project and advise the
Committee on the support that should be accorded in relation to the project;
8. Liaise with and assist the contracting authorities in their roles in the various stages of a
project cycle; and
9. Put in place measures to eliminate constraints limiting the realisation of benefits expected
from a public private partnership.
Although several different types of PPP arrangements are allowed under the law, the following are
best suited for the projects recommended to be implemented under PPP:
1. Build-Own-Operate-Transfer - the private party designs, constructs, finances, operates and maintains an infrastructure facility owned by the private party for a specified time
period not exceeding thirty years, or such longer period as may be agreed, after which the
private party transfers the facility to the contracting authority.
2. Build-Own Operate - the private party designs, finances, constructs, operates and maintains
the infrastructure facility and provides services for a specified period of time.
3. Build-Operate-and-Transfer - the private party finances, constructs, operates and maintains an infrastructure facility and transfers the facility to the contracting authority at
the end of a specified term which shall not exceed thirty years.
PPPs come with a certain level of risk. The essence of truly beneficial PPP is the sharing of risks
and rewards between partners. In this context, risks relate to any area of the promised service that
may fail and they are measured with reference to potential consequences and cost of failure and the
likelihood of occurrence. The evaluation of risk is repeated for each identified category of risk. In
transferring risk, the procuring entity aims to incentivize the private sector to manage and minimize
those risks that are within its control. The contractor can thus perform efficiently and cost-
effectively. An appropriate transfer of risk that exposes the private sector companies only to those
risks that they are best placed to manage is likely to offer the best value for money to the public
sector, although the private sector will attach a price for being exposed to risk. This means that the
public sector has to weigh carefully whether to retain certain risks or to accept the increase price
demanded by the private sector company and consequently to increase the overall costs of the
project.
![Page 34: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/34.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
34
4. CAPITAL INVESTMENT PLANS
4.1 SUMMARY
The capital investment plan (CIP) focuses on prioritised projects that are likely to have a significant
impact on the quality of life of the people of Kericho, within a short period of time. The projects
were prioritised through stakeholder engagement, with an emphasis on impact, feasibility and
affordability.
The implementation plan for the ISUDP is over twenty years, i.e. up to 2038. The CIPs, however
are prepared for the first three years, and subsequently in three year rolling plans that are reviewed
annually, as stipulated in the Urban Areas and Cities Act, 2011. The projects within the CIPs
should be factored into the County's annual financial plans, paying special attention to:
1. Analysis of costs over the project life cycle (capital investments and foreseeable costs
including maintenance and operation, repairs and replacement)
2. Exploring ways of maximising co-benefits on community sustainability and resiliency
3. Preparing project-based risk assessment and risk management strategy coveringa broader
scope of possible threats to the city
4. The sources of funding
This should be done in conjunction with building a strong CIP county administrative structure, and
establishing a strong commissioning and delivery capacity. Table 4.1 presents a summary of the
projects selected for implementation in the first three years.
Table 4.1 Summary of Capital Investment Plan
S/N Projects (2017-18 to 2019-2020)
Estimated
Total Cost
(Ksh Millions)
Expected
Expenditure
Years 1-3
(Ksh Millions)
Economic Development
1 Construct motorable roads within proposed
industrial areas (5 km)
200,000,000 200,000,000
2 Dams for surface runoff for irrigation (Peri-urban
areas) 2 of 5 during CIP period
65,155,785 26,062,314
Water Supply
3 Rehabilitation of existing and increased water
reticulation coverage to additional 76,000
households including increase in storage capacity
500,000,000 500,000,000
4 Upgrade of water treatment works to additional
13,000 m3/day
308,531,000 308,531,000
Sewerage and Sanitation
5 Upgrade sewer reticulation in the CBD 200,000,000 200,000,000
Solid Waste Management
![Page 35: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/35.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
35
S/N Projects (2017-18 to 2019-2020)
Estimated
Total Cost
(Ksh Millions)
Expected
Expenditure
Years 1-3
(Ksh Millions)
6 A comprehensive study on solid waste management
be undertaken to work out the best strategy for waste
management in the town.
50,000,000 50,000,000
7 A landfill design and developed 250,000,000 250,000,000
8 Construction of waste transfer stations in CBD,
Kapsoit, Brooke and Kapsuser markets
18,000,000 18,000,000
Fire Safety
9 Construction of Sub-stations (Kapsuser, Kapsoit)
and Upgrade of Headquarters Fire station
42,000,000 42,000,000
Electricity and Street Lighting
10 Street lighting (30 km) 52,326,000 52,326,000
Transportation
11 Construction of proposed and upgrade of existing
transport corridors
2,550,000,000 444,000,000
Socio-Cultural Development
12 ECD and Primary Schools (5 of 46 each within the
CIP period)
1,610,000,000 175,000,000
13 Secondary Schools (2 of 10 within CIP period) 250,000,000 50,000,000
14 Level 5: Secondary referral medical facilities (1 of 3
within CIP period)
75,000,000 25,000,000
Total 5,605,857,000 1,314,857,000 Estimated budgeted expenditure for development
for the Years 2016-17
to 2018-19
5,094,000,000
Projected Net Surplus 3,779,143,000
PROJECTS PROPOSED UNDER PPP
15 Develop an Ecolodge PPP
16 Amusement Park (1, year 1 of 3) PPP
Based on the above summary, approximately Kshs. 1.314 billion will be required to complete the
projects slated for the first three years (2017-2018, 2018-2019, 2019-2020). The 2016-2017 budget
Kericho County budget for development expenditure is presented as Kshs. 1.698 billion. Assuming
conservatively a flat development expenditure budget over the next three years, this will total Kshs.
5.094 billion. This can easily fund the prioritized projects identified in the CIP over the three year
period.
![Page 36: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/36.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
36
4.2 CIP 1: Construction of motorable roads within proposed industrial areas
1. Project name: Construction of motorable roads within proposed industrial areas
2. Client: Kericho County Government
3. Purpose: Provide basic transport communication infrastructure within the industrial areas
4. Site details (a) Project location- Various locations within the county
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description –
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types
Component
Cost
Kshs per km
Total Cost
1 Unit cost of tarmacked roads for 5 km 40,000,000 200,000,000
Total Cost 200,000,000
![Page 37: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/37.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
37
4.3 CIP 2: Upgrade the storm water system
1. Project name: Construct dams for surface run-off irrigation
2. Client: Kericho County Government
3. Purpose: Contain/Control the storm water flow
4. Site details (a) Project location- Various locations within the county
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description – Construction of masonary sub-surface dams, including all site work. Dam capacity enabling 100m
3 daily extraction.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Masonary sub-surface dam, assuming
100m3 water daily extraction. Construct
two (2) during CIP period.
13,031,157 26,062,314
Total Cost 26,062,314
![Page 38: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/38.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
38
4.4 CIP 3: Rehabilitation of existing and increased water reticulation coverage to additional
76,000 households including increase in storage capacity
1. Project name: Construct of a Water tanks
2. Client: Kericho County Government
3. Purpose: Provide all residents with access to potable water
4. Site details (a) Project location- Various locations within the county
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description - 6. Infrastructure necessary to bring clean potable water to 76,000 households spread across the town, including rehabilitation of
existing infrastructure and increase in storage capacity; construction of eight (8) water
kiosks to provide affordable access to potable water for the urban poor who are unable to
afford individual water connections; and rehabilitation and replacement of fire hydrants.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Rehabilitation and extension of existing
water supply system
500,000,000 500,000,000
Total Cost 500,000,000
![Page 39: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/39.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
39
4.5 CIP 4: Upgrade of water treatment works to additional 13,000 m3/day
1. Project name: Upgrade of water treatment works to provide additional 13,000 m3/day
2. Client: Kericho County Government
3. Purpose: Additional capacity will meet demand until 2030.
4. Site details (a) Project location- Kimugu
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description – Construction of new intake at Kimugu river and expansion of Kimugu water treatment facility, as well as
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Treatment works per m3 capacity for
additional 13,000 m3
17,918 232,934,000
2 Intake and river bank protection at Kimugu
River
22,234,412 22,234,412
![Page 40: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/40.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
40
S/N Types Component
Cost Total Cost
3 Raw water main 500mm dia, unit cost per
m, for 12km
4,447 53,362,588
Total Cost 308,531,000
![Page 41: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/41.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
41
4.6 CIP 5: Upgrade of sewer reticulation in CBD
1. Project name: Upgrade of sewer reticulation in CBD
2. Client: Kericho County Government
3. Purpose: Improved sewerage reticulation in the town
4. Site details (a) Project location- varies
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description -
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Rehabilitation sewer network in CBD,
including consultancy and supervision costs
200,000,000 200,000,000
Total Cost 200,000,000
![Page 42: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/42.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
42
4.7 CIP 6: A comprehensive study on solid waste management be undertaken to work out the
best strategy for waste management in the town.
1. Project name: Comprehensive Study on solid waste management in CBD, Kapsoit,
Kapkugerwet and Kapsuser markets
2. Client: Kericho County Government
3. Purpose: More efficient waste collection and disposal within the town
4. Site details (a) Project location- CBD, Kapsoit, Kapkugerwet and Kapsuser markets
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Doing a comprehensive study to the specified, giving out layout strategy and a wasted management plan.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Comprehensive Study on solid waste
management in CBD, Kapsoit,
Kapkugerwet and Kapsuser markets
50,000,000 50,000,000
Total Cost 50,000,000
![Page 43: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/43.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
43
4.7 CIP 7: A landfill site design and development
1. Project name: Landfill site design and development.
2. Client: Kericho County Government
3. Purpose: More efficient waste collection and disposal for Kericho
4. Site details (a) Project location- To be determined by feasibility study.
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description – Location and construction of landfill site.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Landfill identification and development. 250,000,000 250,000,000
Total Cost 250,000,000
![Page 44: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/44.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
44
4.7 CIP 8: Construction of waste transfer stations in CBD, Kapsoit, Brooke and Kapsuser
markets
9. Project name: Construction of waste transfer stations in CBD (4), Kapsoit (2),
Kapkugerwet (2) and Kapsuser (1) markets
10. Client: Kericho County Government
11. Purpose: More efficient waste collection and disposal within the town
12. Site details (a) Project location- CBD, Kapsoit, Kapkugerwet and Kapsuser markets
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
13. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
14. Nature of on-site works: Brief description – Construction of the waste transfer stations at 9 sites
15. Off-site infrastructure (as required with costs): Brief description – N/A
16. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Infrastructure required to temporarily store
and transfer waste for 9 sites including
supervision.
2,000,000 18,000,000
Total Cost 18,000,000
![Page 45: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/45.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
45
4.8 CIP 9: Construction of fire stations at County Headquarters and sub-fire stations at
Kapsuser and Kapsoit.
1. Project name: Construction of Fire sub-stations at Kapsuser and Kapsoit, and upgrade of
fire station headquarters
2. Client: Kericho County Government
3. Purpose: Reduction in response time for fire emergencies
4. Site details (a) Project location- Kapsuser and Kapsoit
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description – Greenfield construction and site works for two sub-stations, and upgrade of existing main station.
7. Off-site infrastructure (as required with costs): Brief description – N/A
![Page 46: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/46.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
46
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 Housing structure, electrical, mechanical
500m2 @ Ksh 25,000/m
2
12,500,000 25,000,000
2 Overhead/site/misc @ 15% 1,875,000 3,750,000
3 Contractor profit @ 3% 375,000 750,000
4 Professional fees/supervision @ 10% 1,250,000 2,500,000
4 Rehabilitation of Fire-Station 10,000,000 10,000,000
Total Cost 42,000,000
![Page 47: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/47.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
47
4.9 CIP 10: Street lighting
1. Project name: Street lighting
2. Client: Kericho County Government
3. Purpose: Improved navigation and security on the identified roads
4. Site details (a) Project location- 30 km of identified roads
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description - Street lighting steel poles are placed at an interval distance of between 30m – 35m. A total of 855 lights to be installed to cover 30km.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost (Kshs)
Total Cost
(Kshs)
1 855 installed streetlights 60,000 51,300,000
2 Supervision @2% 1,026,000
Total Cost 855 52,326,000
![Page 48: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/48.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
48
4.10 CIP 11: Construction of proposed and upgrade of existing transport corridors
1. Project name: Construction of proposed and upgrade of existing transport corridors
2. Client: Kericho County Government
3. Purpose: Improved motorised and non-motorized transport and circulation around and within the town.
4. Site details (a) Project location- various
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description - Widening and tarmacking various roads as provided in the cost table below.
7. Off-site infrastructure (as required with costs): Brief description – N/A
![Page 49: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/49.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
49
8. Costs (Ksh. Millions at 2017 prices)
S/N Types
Avg.
current
right of
way (m)
Prop.
right of
way
(m)
Approx
.
length
(km)
Unit
Cost
(Kshs
Mil./
km)
Total
Cost
(Kshs
Mil.)
Comp.
Cost
(Kshs
Mil.)
1 John Kerich – B1 Loop
Road (unclassified)
6 15 1.5 40 60 60
2 Kapkugerwet –
Kaptebeswet
18 25 12.0 60 720 720
3 Kaptebeswet –
Kapsuser
12 25 7.5 60 450 450
4 All streets within
Kapkugerwet
4 – 6 10 1.8 40 72 72
5 All streets within
Kapsuser
4 – 6 10 1.5 40 60 60
6 All streets within
Kapsoit
4 – 6 10 2.2 40 88 88
7 Nyagacho – Ainamoi –
Kapsoit road
12 25 15.6 60 936 936
8 Motobo/Nyagacho –
Isaac Salat Road
4 – 6 15 2.1 40 84 84
9 Missing Link B1-
Dumpsite
12 15 2 40 80 80
Total Cost 2,550 2550
![Page 50: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/50.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
50
4.11 CIP 12: Construction of early childhood development and primary schools
1. Project name: Construction of early childhood development and primary schools
2. Client: Kericho County Government
3. Purpose: Improved access to educational facilities to meet the needs of a growing propulation
4. Site details (a) Project location- Various
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description – For the additional primary school to be constructed, also construct and equip a two stream ECD school. Equip 16 primary school
classrooms 4 ECD, administration block, play field, fencing and gate, 10 toilets, dining hall,
kitchen, library and 2 large water tanks.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types QT Component
Cost Total Cost
1 Site preparation and construction
of facilities, including supervision
4 30,000,000 120,000,000
2 Basic equipping school 4 5,000,000 20,000,000
Total 140,000,000
![Page 51: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/51.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
51
4.12 CIP 13: Construction of secondary schools
1. Project name: Construction of secondary schools
2. Client: Kericho County Government
3. Purpose: Improved access to education and increased transition rate from primary to
secondary school.
4. Site details
(a) Project location-
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (d) Slope - varied
(e) Soils - varied
(f) Vegetation – varied
6. Nature of on-site works: Brief description – Construct, equip two stream secondary school
with : 16 classrooms: 3 laboratories, 2 administration block, 2 play field, fencing and gate,
12 toilets, 2 dining hall, 2 kitchen, 2 library and 2 large water tanks.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types QT Component
Cost Total Cost
1 Site preparation ,construction and
supervision
2 21,000,000 42,000,000
2 Basic equipping of school classrooms
and labs
2 4,000,000 8,000,000
Total 50,000,000
![Page 52: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/52.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
52
4.13 CIP 14: Construction of level 5 secondary medical facilities
1. Project name: Construction of Construction of level 5 secondary medical facilities
2. Client: Kericho County Government
3. Purpose: Improved healthcare within the County
4. Site details (a) Project location- Kapsiot or Kapsuser
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: Brief description – Greenfield construction of health facility.
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
S/N Types Component
Cost Total Cost
1 80-Bed hospital 462,864,780 462,864,780
Total Cost 462,864,780
4.14 CIP 15 PPP 1: Construction of Amusement Park
1. Project name: Construct of Amusement Park
2. Client: Kericho County Government
![Page 53: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/53.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
53
3. Purpose: To provide additional tourism revenue and employment
4. Site details (a) Project location – To be determined
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: To be determined after feasibility study in line with requirements of PPP Act (2013).
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
To be determined after feasibility study in line with requirements of PPP Act (2013).
![Page 54: CAPITAL INVESTMENT PLAN KERICHO...Table 3-1: Summary of Revenue Streams for the FY 2013/2014 to FY 2015/16 ..... 22 Table 3-3: Revenue Collection Efficiency in 2015-16 ..... 23 Table](https://reader034.fdocuments.us/reader034/viewer/2022052001/6013bc729c9416575f72f417/html5/thumbnails/54.jpg)
Consultancy Services for Digital Topographical Mapping and the Preparation of Integrated Strategic Urban Development Plans Kericho Town, Kenya
54
4.15 CIP 16 PPP 2: Development of an ecolodge
1. Project name: Construction and Development of an Ecolodge
2. Client: Kericho County Government
3. Purpose: To boost tourism in the region, and provide employment.
4. Site details (a) Project location- To be determined
(b) Land registration number ownership and size: N/A
(c) Value (if privately owned) – N/A
5. Topography, soils and geology (a) Slope - varied
(b) Soils - varied
(c) Vegetation – varied
6. Nature of on-site works: To be determined after feasibility study in line with requirements of PPP Act (2013).
7. Off-site infrastructure (as required with costs): Brief description – N/A
8. Costs (Ksh. Millions at 2017 prices)
To be determined after feasibility study in line with requirements of PPP Act (2013).