Capital Improvement Project Contracts/Amendments Signed by President
Date Project Vendor Description Amount
2/23/2015 AATC Little Diversified Architectural Consulting Pre-Design Services 20,000$
5/14/2015 AATC Rodgers Builders, Inc. Pre-Construction Services Agreement 102,000$
7/21/2015 AATC Little Diversified Architectural Consulting Design Agreement 961,500$
2/12/2016 AATC Construction Manager at Risk contract General Contract - Construction Manager at Risk services 1,781,804$
4/7/2016 AATC Rodgers Builders, Inc. Construction contract - Preliminary Guaranteed Maximum Price 13,576,526$
9/16/2015
Automotive Shop
Building Repair &
Renovations Resolute Construction Construction Contract 344,000$
5/4/2015 Facilities Master Plan Clark-Patterson-Lee Phase I Scope of Services: "Programming and Facility Analysis 27,000$
10/30/2015
HVAC Stairwell, Lighting
Repair & Renovation
Study Design Agreement Dewberry Engineers Inc. Design Fee Agreement 72,500$
8/2/2016
HVAC Stairwell, Lighting
Repair & Renovation
Study Design Agreement H.M. Kern Corporation General Contract - HVAC 617,000$
10/30/2015 Waterline Replacement Pipline Utilities, Inc. Waterline Replacement Project 422,819$
8/20/2018
Performance
Contracting Piedmont Service Group Investment Grade Audit
The cost of the IGA
will become part of
the performance
contracting cost.
8/27/2018
Advertising and Graphic
Design Renovation
Project Isley Construction Construction contract for renovation project 108,000$
3/7/2019 Backfill Project BSA Lifestructures, Inc. Design contract for renovation project 525,000$
10/24/2019
CulinaryExpansion/
Renovation Project MHAworks, Inc. Design contract for renovation project 100,000$
12/17/2019 Pre-Backfill Project Romeo Guest Associates, Inc. Construction contract for renovation project 117,600$
1/8/2020
Biotechnology Center of
Excellence and Parking
Project Clark Nexsen, Inc.
Programming contract for Biotechnology Center of Excellence and
Parking Project. The State Construction Office requires the College have
two separate contracts with Clark Nexsen - one for programming and
one for design 113,509$
2/13/2020
Biotechnology Center of
Excellence and Parking
Project The Christman Company Pre-Construction Services Agreement 125,890$
3/17/2020
Biotechnology Center of
Excellence and Parking
Project Clark Nexsen, Inc.
Advanced planning portion of design fee for the Biotechnology
Center of Excellence and Parking Project. This agreement covers the
period up to the construction documents phase of the project. 924,885$
5/4/2020
CulinaryExpansion/
Renovation Project MHAworks, Inc.
Additional Services Contract to add services from a structural
engineering firm. 7,100$
5/20/2020 Backfill Project BSA Lifestructures, Inc.
Amendment No. 1 to Backfill Project design agreement: For additional
services in connection with providing Structural Engineering services
($6,500) and Food Service - Snack Bar & Kitchen Revisions ($15,470),
the lump sum fee is hereby increased by $21,970 to a new total
of$546,970. 21,970$