Agenda
• Housekeeping Items
• Opening Remarks
• Presentation
• Closing Remarks
![Page 3: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/3.jpg)
Projects To Be Discussed
• EN00636 - 107th Ave DCR (Ben Wilson)
• EN00646 - Old Town DCR (Craig Bolze)
• UT00274 - CAP Pump Station Rehab (Kurt Mahoney)
• CS00146 - Stadium Trail Phase 1 (Craig Bolze)
• CS00232 - Stadium Trail Phase 2 (Craig Bolze)
![Page 4: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/4.jpg)
![Page 5: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/5.jpg)
EN00636107th Ave; Williams Rd to Hatfield Rd
Design Concept Report(Ben Wilson)
![Page 6: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/6.jpg)
` PROJECT CORRIDOR
Project Corridor: 107th Ave; Williams Rd to Hatfield Rd
![Page 7: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/7.jpg)
• Project Management– Schedule Preparation and Updates– Conduct and Attend Meetings– Project Progress Reports– Agency Coordination
• Field Data Collection and Survey/Base Map Preparation
• Utility Data Acquisition and Coordination• Environmental Assessment; Cultural
Resources, Biological Assessment, Clean Water Act
• Geotechnical/Pavement Study• Drainage Analysis and Preliminary Drainage
Design
Scope of Work Elements• Roadway/Intersection Geometrics
Alternatives Analysis– Access Management– Interim Improvements/Alternative
Cross-Sections– Truck Traffic/Parking
• Traffic Study• Noise Study• Coordination with Other Concurrent Work • Cost Estimates, Phasing, Delivery Method• Public Outreach Involvement• Design Concept Report Including 15%
Plans
![Page 8: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/8.jpg)
• Private Development– Cemex Expansion– SEC Pinnacle Peak Rd & 107th Ave
• Pinnacle Peak Rd Extension• Reclaimed Waterline• Patterson Well Pump to Waste Line
• SW Gas - High Pressure Gas Main Re-Alignment in Hatfield Rd/107th Ave
• CS00165 NRT and Hatfield Trail Segments. Hatfield segment crosses 107th Ave, extends from New River to the Agua Fria
107th Ave; Williams Rd to Hatfield Rd
![Page 9: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/9.jpg)
Photograph taken from Hatfield Rd looking south. Shows dip section in 107th Ave and transmission towers and lines crossing and running adjacent to 107th Ave.
107th Ave; Williams Rd to Hatfield Rd
![Page 10: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/10.jpg)
Inset photo taken from the north side of Pinnacle Peak Rd showing the inlet side of the channel and culvert crossing east of 107th Ave.
107th Ave; Williams Rd to Hatfield Rd
Photograph taken from 107th Ave looking north at Pinnacle Peak Rd intersection. Note transmission tower at northwest corner.
![Page 11: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/11.jpg)
Project Schedule
Milestones
• Consultant Meeting - April 29, 2021
• Advertise June/July 2021
• Begin Work Late 2021
• 9 Months for Study
![Page 12: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/12.jpg)
Questions
![Page 13: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/13.jpg)
![Page 14: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/14.jpg)
EN00646Old Town Streetscape
83rd Ave; Monroe St to Grand Ave(Craig Bolze)
![Page 15: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/15.jpg)
Study Focus Areas• 83rd Ave Streetscape: Monroe
St to Grand Ave• Osuna Park / Gateway
Streetscape• 83rd Ave: Grand Ave to
Washington St• 83rd Ave Realignment: Cotton
Crossing to Monroe St
Study Area: 83rd Ave; Cotton Crossing to Grand Ave
![Page 16: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/16.jpg)
• Develop Place Making Themes and Streetscape Concepts
• Accessibility/Pedestrian Circulation• Parking/Signage/Wayfinding• Sustainability/Low Impact Design/Livability• Traffic Study/Circulation/Transit Connections• Roadway and Intersection Geometrics• Existing Utility Inventory and Mapping• Field Data Collection and Survey/Base Map• Land Ownership• Existing and Proposed Right of
Way/Easements• Proposed Development Within the Study Area
Scope of Work Elements• Capacity of Existing Water, Sewer, Storm
Drain, Comm, Elec, Infrastructure• Proposed Utility Modifications/Relocations• Drainage Characterization• Review and evaluate all existing
information relevant to the project – plans, reports, etc.
• Reclaimed Water Extension to Old Town• Public Outreach• Coordination with Other Concurrent Work • Design Concept Report Including 15%
Plans
![Page 17: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/17.jpg)
Study AreaPrevious Studies
• Old Town Conceptual Design (DPS 2019)• Old Town Traffic Study (B&N 2014)• Old Town Specific Area Plan (2011)• Old Town Revitalization Plan (2009)• Downtown Area Drainage Master Plan Update
DCR (KH 2007)• DCR Washington St & 83rd Ave (AKG 1995)• EN00286 Washington St Alley Improvements• P-0314 84th Ave Improvements From
Washington to Monroe
The concepts developed in the Old Town Conceptual Design study will inform this study.
Madison St.
83rd
Ave
84th
Ave
Jefferson St.
Washington St.
Peoria Ave.
Monroe St.
Peoria Ave.
Women’s Club & Community Center
Cen
tral
Sc
hool
Driftwood Axiom
Edwards Hotel
Peoria Performing Arts Center
Municipal Complex
Jail
Peoria Place PAD
Willhelm Automotive
Retail
Exis
ting
Dev
elop
men
t
![Page 18: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/18.jpg)
Study AreaC
ity-O
wne
d Pa
rcel
s
Concurrent Studies• Vintage Partners Memorandum of
Understanding & Development Master Plan• Peoria Place PAD• Lighting Study• Grand Ave Corridor Revitalization Area
(DPS)• Grand Ave Pedestrian Bridge• Small Cell Site - Cotton Crossing & 83rd Ave
Madison St.
83rd
Ave
84th
Ave
Jefferson St.
Washington St.
Peoria Ave.
Monroe St.
Peoria Ave.
Municipal ComplexPeoria Place PAD
![Page 19: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/19.jpg)
Concepts
Osuna Park: Entry Concepts
![Page 20: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/20.jpg)
Concepts
Osuna Park: Entry Concepts
![Page 21: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/21.jpg)
Concepts
Osuna Park: Entry Concepts
![Page 22: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/22.jpg)
Concepts
83rd Avenue: Streetscape Concepts
![Page 23: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/23.jpg)
Concepts
Website:https://www.peoriaed.com/programs-and-incentives/old-town-commercial-revitalization-program
![Page 24: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/24.jpg)
Concepts: 83rd Ave Re-Alignment; Cotton Crossing to Monroe St
![Page 25: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/25.jpg)
Utilities: Utility Schematic for 83rd Ave
Not Shown:• UG Elec• Comm
![Page 26: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/26.jpg)
Project Schedule
Schedule is In-Development and Will Likely Change - These Are My Thoughts On A Conceptual Working Schedule:
• Scoping/Consultant Outreach: April - May 2021• Solicitation Advertisement/Consultant Selection June - July 2021• Final Scope/Contract Negotiation: August - September 2021• Preparation of DCR: September 2021 - June 2022• Design & Preconstruction Coordination: June 2022 - July 2023• Construction: August 2023 - January 2025• Closeout: February 2025
![Page 27: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/27.jpg)
![Page 28: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/28.jpg)
UT00274CAP Pump Station Rehabilitation
(Kurt Mahoney)
![Page 29: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/29.jpg)
163rdAVE
Project Location: 163rd Ave North of Jomax at CAP Canal
![Page 30: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/30.jpg)
Scope of Work Elements• Project Management
– Schedule Preparation and Updates– Conduct and Attend Meetings– Project Progress Reports
• Pre-Design Services– Field Data Collection and Survey/Base
Map Preparation– Land Ownership/Advanced Coordination
w/ CAP– Utility Data Acquisition and Coordination
• Design and Construction Document Preparation
– 30%, 60%, 90%, Final PS&E– Proposed Utility
Modifications/Relocations– Permitting– Surge Analysis– Condition Assessment Tech Memo 16”
Main– MOPO Development/Coordination
• Site must remain in Operation during Construction
• Post-Design Services– Construction Observation– As-Built Preparation
![Page 31: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/31.jpg)
Project Schedule
Milestones• Advertise June/July 2021
– Site Visit June/July• Begin Design Mid/Late-2021• 9 Months for Design• Begin Construction Mid-2022
2021 2022May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
![Page 32: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/32.jpg)
![Page 33: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/33.jpg)
Stadium TrailCS00146 Phase 1: 83rd Ave to 73rd Ave
CS00232 Phase 2: 75th Ave to Skunk Creek(Craig Bolze)
![Page 34: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/34.jpg)
Stadium Trail
• Phase 1 - Design Consultant Selection
• Phase 2 - Initiating Project
• Stadium Point at P83
![Page 35: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/35.jpg)
Scope of Work Elements - Stadium Trail Ph 2• Survey and Base Map Preparation• Pedestrian Bridge Crossing Skunk Creek
• Undercrossing of Existing 75th Ave Bridge
• Coordination with New Development• Connections with Existing Trail System• Bridge Selection and Aesthetics• Structural Analysis and Design• Hydrologic and Hydraulic Analysis in Support of Bridge and Bank Stabilization Design
![Page 36: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/36.jpg)
Project Schedule - Stadium Trail Ph 1CS00146
![Page 37: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/37.jpg)
Project Schedule - Stadium Trail Ph 2CS00232
![Page 38: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/38.jpg)
![Page 39: Capital Improvement Program Project Overview](https://reader030.fdocuments.us/reader030/viewer/2022012803/61bd1f6361276e740b0f95ab/html5/thumbnails/39.jpg)
Questions?Website:
https://www.peoriaaz.gov/government/departments/development-and-
engineering/cip-overview-meetings