Capital Improvement Program Projectmediaassets.abcactionnews.com/document/2018/Big Bend...
Transcript of Capital Improvement Program Projectmediaassets.abcactionnews.com/document/2018/Big Bend...
![Page 1: Capital Improvement Program Projectmediaassets.abcactionnews.com/document/2018/Big Bend Fact...Capital Improvement Program Project Fact Sheet Big Bend Road Widening – Covington Garden](https://reader033.fdocuments.us/reader033/viewer/2022052010/602001bcb903222abe60f0a4/html5/thumbnails/1.jpg)
Capital Improvement Program Project Fact Sheet Big Bend Road Widening – Covington Garden Dr. to Simmons Loop Project Numbers: 69647000 – PLAT ( US 41 to US 301), 69656000 – PD&E
Quick Facts • Location: Gibsonton/Riverview • Length: 1.25 miles, from Covington Garden
Dr. to Simmons Loop
• Category: Planning
Schedule • Project Development & Environmental Study
complete late 2019 (FDOT & County)
• Preliminary Design and Land Acquisition begins Early 2019 (County –transfer to FDOT)
• Design‐Build Procurement begins Early 2020
(FDOT)
• Construction start begins late 2021 • Design‐Build Construction complete Late 2024
(FDOT)
Overview • Widen Big Bend Road from a 4‐lane divided road, from Covington Garden Drive to Simmons Loop to 6‐lanes including enhanced pedestrian, bicycle and bus facilities.
• Improvements to I‐75 interchange to be designed and constructed by Florida Department of Transportation (FDOT)
• Reconstruction of bridge on Old Big Bend Road.
• Reconstruction of bridge on Big Bend Road • Signal improvements at Covington Gardens and Simmons Loop.
• Enhance pedestrian safety features, including wide sidewalks and enhanced crosswalks and signals.
• Improve stormwater drainage.
Benefits• Better accommodate growth and traffic
volume
• Increase the overall mobility along Big Bend and I‐75, while maximizing safety along the corridor
Project Funding • Total: $62.55 FDOT: $8 million
Federal: $1.5 million
County: $53.05 million
Hillsborough County has applied for a Build Grant in the amount of $25 million.
Hillsborough County is also pursuing additional funding from FDOT to offset local County funds
October 2018 Note: The information on this fact sheet is subject to periodic updates.
Questions? Manny Santos, E. I.
Public Works Project Manager (813) 635‐5400
![Page 2: Capital Improvement Program Projectmediaassets.abcactionnews.com/document/2018/Big Bend Fact...Capital Improvement Program Project Fact Sheet Big Bend Road Widening – Covington Garden](https://reader033.fdocuments.us/reader033/viewer/2022052010/602001bcb903222abe60f0a4/html5/thumbnails/2.jpg)
Capital Improvement Program Project Fact Sheet Big Bend Road Widening – US 41 to Covington Gardens Drive and Simmons Loop to US Hwy 301 Project Number: 69647000 – PD&E & Design (US 41 to Covington Gardens) Project Number: 691149000 – PD&E (Simmons Loop to US Hwy 301)
Quick Facts • Location: Gibsonton/Riverview • Length: 1.75 mile, from US 41 to Covington
Gardens Drive and Simmons Loop to US 301
• Category: Planning
Schedule • Project Development & Environmental Study
Begins mid 2019
• Preliminary Design and Land Acquisition begins Early 2021
• Construction begins Late 2023
Overview • Widen Big Bend Road from a 4‐lane divided road, from US 41 to Covington Garden Drive to 6‐lanes including enhanced pedestrian, bicycle and bus facilities.
• Enhance pedestrian safety features, including wide sidewalks and enhanced crosswalks and signals.
• Improve stormwater drainage.
Benefits • Better accommodate growth and traffic
volume
• Increase the overall mobility along Big Bend, while maximizing safety along the corridor
Project Funding Total: $ 20.3 million
Cost Estimate • Total: $20.3 million
PD&E: $1.5 million
Land Acquisition: $4.0 million
Design: $2.5 million
Construction: $12.3 million
October 2018 Note: The information on this fact sheet is subject to periodic updates.
Questions? Manny Santos, E. I.
Public Works Project Manager (813) 635‐5400
![Page 3: Capital Improvement Program Projectmediaassets.abcactionnews.com/document/2018/Big Bend Fact...Capital Improvement Program Project Fact Sheet Big Bend Road Widening – Covington Garden](https://reader033.fdocuments.us/reader033/viewer/2022052010/602001bcb903222abe60f0a4/html5/thumbnails/3.jpg)
![Page 4: Capital Improvement Program Projectmediaassets.abcactionnews.com/document/2018/Big Bend Fact...Capital Improvement Program Project Fact Sheet Big Bend Road Widening – Covington Garden](https://reader033.fdocuments.us/reader033/viewer/2022052010/602001bcb903222abe60f0a4/html5/thumbnails/4.jpg)
BIG BEND ROAD
PROJECT SCHEDULE