Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures...
-
Upload
aist-alliance-for-integrated-spatial-technologies -
Category
Documents
-
view
219 -
download
0
Transcript of Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures...
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
1/16
Cape Canaveral Minuteman Launch Complex 31 and 32Department of Defense Historic Structures Documentation Project
1961
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
2/16
Cape Canaveral Minuteman Launch Complex 31 and 32Department of Defense Historic Structures Documentation Project
2008
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
3/16
Minuteman Missile Program
1961 - 1991
Critical component of the U.S. Cold War missile system
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
4/16
Launch Complex 31 and 32 Beehive BlockhousesDepartment of Defense Historic Structures Documentation Project
Cape Canaveral Launch Complex 31 and 32
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
5/16
Minuteman Launch Complex
Blockhouses for the Minuteman Missile were 55 ft. high, made of
reinforced concrete shells covered with sandbags that give it an
unusual beehive appearance.
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
6/16
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
7/16
Task:
Capture detailed data of blockhouse exteriors forarchitectural restoration and condition monitoring
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
8/16
Challenge:
Hazardous conditions and structural instability caused by organicdegradation precluded conventional architectural measurement
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
9/16
Solutions:
Terrestrial LiDAR documentation of structures exteriorfrom ground-based and elevated platforms
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
10/16
Solutions:
3D Laser Scan data used to create CAD drawings and 3D modelsfor engineering analysis and management planning
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
11/16
Method:
Field data acquisition: 2 days Post-processing data: 1 week
3D point clouds of data collected consisting of millions of x, y, and z points
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
12/16
Method:
Field data acquisition: 2 days Post-processing data: 1 week
3D point clouds of data collected consisting of millions of x, y, and z points
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
13/16
Final Product:
Measurable data for engineering studies
Planar view of scan data acquired demonstrating measurement capabilities
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
14/16
Final Product:
Measurable data for engineering studies
Planar view of scan data acquired demonstrating measurement capabilities
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
15/16
Final Products:
Determination of structural integrity and deformation analysis
Note substantial structural deformation apparent in cross sections
Cross section (red)
Cross section (yellow)
-
8/6/2019 Cape Canaveral Minuteman Launch Complex 31 and 32 Department of Defense Historic Structures Documentation Project
16/16
This project was conducted in collaboration with:
Thomas E. Penders, RPA, Archaeologist, 45 CES/CEVP
AndPatrick Air Force Base, Florida
Cape Canaveral Minuteman Launch Complex 31 and 32Department of Defense Historic Structures Documentation Project