CANYON DEL ORO HIGH SCHOOL - Amphitheater Public Schools · pvc plywd. ptn. pr. pt proj. pnl. pl...
Transcript of CANYON DEL ORO HIGH SCHOOL - Amphitheater Public Schools · pvc plywd. ptn. pr. pt proj. pnl. pl...
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
CANYON DEL ORO HIGH SCHOOLROOF REPLACEMENT - PHASE 1
Amphitheater Public Schools
May 2019100% Construction Documents
Job No. 17.14.12
Cover Sheet
SC
KDB
ewwewrewe
EXTERIOREXT.
WITHWATER CLOSET
VENT THRU ROOFVERTICAL
WEIGHT
WROUGHT IRON
WAINSCOT
WALL CLEAN OUT
WINDOW
WATER RESISTANTWATER PROOF
WOOD
GYPSUM WALL BOARD
WATER RESISTANT -
WELDED WIRE MESH
VINYL COMPOSITION TILE
NOMINALNOT IN CONTRACT
MULLIONMETALMOUNTEDMASONRY OPENINGMETAL LATHMISCELLANEOUSMINIMUMMANHOLEMANUFACTURER
OVER OR ON
PAVEMENT
OPPOSITEOPENING
OWNER FURNISHEDOUTSIDE FACEOUTSIDE DIAMETERON CENTER
NOT TO SCALENUMBER
CONTRACTOR INSTALLED
MEMBRANE
NO.
P
OPNG.
O.F.C.I.
OPP.
O/
O.D.O.C.
O.F.
N.T.S.
MTD.
N.I.C.NOM.
MULL.MTL.
MIN.
M.L.MISC.
MO
M.H.MFG.MEMB.
HOLLOW METALH.M.
INTERIORINSULATIONINFORMATIONINSIDE FACE
INTEGRAL COLOR CONCRETE
HOT WATER RETURNHOT WATERHEIGHTHORSEPOWERHORIZONTAL
MECHANICAL
MAXIMUMMATERIALMASONRY
LAVATORY
JANITOR'S CLOSET
MACHINE BOLT
JOINTJOIST
JUNCTION BOX
MASONRY CONTROL JOINTMECH.
MAX.MAT.
MCJM.B.
MAS.
JT.
LAV
J.C.JST.
J.B.
I.F.
INS.INT.
INFO.
ICC.
HT.
HWR
H.P.
H.W.
HORIZ.
FLOOR SINKFLUORESCENTFLOORFLASHINGFINISH
FIRE EXTINGUISHERFOUNDATIONFLOOR CLEAN OUTFLOOR DRAIN
EXISTING
GALVANIZED
HARDWAREHOLLOW COREHOSE BIB
GLUE LAMB BEAM
FURRINGFOOTING
GAUGE
GLASS FIBER
GYPSUM WALL BOARD
FINISH FLOOR ELEVATIONFIRE EXTINGUISHER CABINET
FT. FEET
H.C.H.B.
HDW.
GLBGWB
GALV.GFRC
FTG.FURR.
GA.
FEC
FLUOR.F.S.
FLR.
FIN.F.F.E.
FLSH.
(E)
F.D.
F.E.FDN.FCO
WD.WDW.W.P.W.R.
WCO
WRGWB
WSCT.
W.W.M.WT.
W.I.
W/W.C.
VTRVERT.VCT
PLASTERPLATE
PIECE
PLATE GLASS
PERPENDICULAR
PULL CHAIN
PLASTIC LAMINATE
PANELPAIR
PLYWOOD
PARTITION
PROJECT
PHASEPAINTED
PURLIN
QUARRY TILE
PUBLIC
RADIUSRISER
RECEPTACLEROOF DRAIN
RETURN AIR
ROOMROOFINGREVISIONREQUIREDREENFORCEMENTREGISTERRECESSED
SECTION
SHEETSQUARE FOOT
SOLID CORE
SCHEDULE
SQUARE
SIMILAR
SERVICE SINK
SPECIFICATIONSSHEET METAL
SPEAKER
ROUGH OPENING
STEELSTRUCTURAL
STANDARDSTAINLESS STEEL
STORAGE
TREAD
THICKTHRESHOLDTOP OF BEAM
TELEPHONE
TUBE STEEL
TELEVISION
TOP OF WALLTOP OF MASONRYTOP OF FOOTING
TYPICAL
VENTILATE
TOP OF CURB
POLYVINYL CHLORIDE
PRESSURE TREATED
VITRIFIED CLAY PIPE
UNLESS NOTED OTHERWISE
TELEPHONE TERMINAL BOARD
SHORT LEG VERTICAL
TONGUE AND GROOVE
SUSPENDED CEILING
SOLID CORE WOOD DOOR
S.S.
CPT. CARPET
DRAWING
DOOR
DIMENSIONDRINKING FOUNTAINDETAIL
COLD WATERCERAMIC TILECOUNTERSINK
DOWN SPOUT
DITTODOWN
EXPANSIONEXISTINGEXHAUST
EACH WAYEQUIPMENTEQUALENTRANCEELEVATIONELECTRICALEXPANSION JOINTEACH FACEEACH
ELECTRIC WATER COOLER
EXIST'G.EXP.
E.W.
EXH.EWC
EQUIP.EQ.
E.J.
ELEV.ELEC.
ENT.
E.F.EA.
DWG.
DR.DODN.
D.S.
DIM.D.F.DET.
C.T.CSK.
C.W.
V OR VENT
TYP.
VCP
U.N.O.
T.S.
TVT.T.B.
T.O.W.
T.O.F.T.O.M.
T.O.C.
T
THR.T.O.B.
TH.TEL.T&G
STRUCT.SUSP. CLG.
STL.
STD.S.STL.
STOR.
CERAMICCEMENT PLASTERCEMENT
CATCH BASINCABINET
BUILT UPBETWEENBASEMENT
COLUMN
CONTINUOUSCONSTRUCTIONCONCRETECOMBINATION
CEILINGCENTER LINECONTROL JOINTCIRCUITCAST IRON
CLEAN OUT
CHANNELS
CONCRETE MASONRY UNIT
CUBIC FEET PER MINUTECONTRACTOR INSTALLCONTRACTOR FURNISH
BEARING
COL.
CONST.CONT.
CONC.COMB.
C.O.CMU
C.L.CLG.
CIR.C.I.
C.J.
C.B.
CEM. PLAS.
CFM
C.F.C.I.CER.
CEM.
CAB
B.U.BTWN.BSMT.BRG.
SPECS.
SLV
SPKR.
S.M.
SQ.
SIM.
SQ. FT.
SCHED.SECT.
SHT.
SCWD.S.C.R.O.
REC.
REQ'D.
RM.
REINF.
REV.RFG.
REG.
R.D.RCPT.
RRAD.R.A.
ALTERNATEALLOWANCE
ADJACENTAIR CONDITIONING
ANCHOR BOLT
ALUMINUM
BOTTOM
BLOCKINGBUILDINGBUILDING LINEBOARD
AUTOMATIC
ACOUSTICAL TILEACCESS PANELAMPERE
BEAM
ABBREVIATIONS
ABOVE FINISH FLOOR
AGGREGATE BASE COURSE
ALT
BM.BOT.
BLKG.BLDG.
BDB.L.
@
ALUM
AUTO
A.T.A.P.AMP
AT
ALLOW
ADJ
AFF
A.C.
A.B.A.B.C.
PLAS. LAM.
PUB.
/O
Q.T.
PTD.
PUR.PVC
PLYWD.
PTN.
PR.
PTPROJ.
PNL.
PL
PL.GL.PLAS
PEP.C.
PERP.
ROUGH FRAMING
WELDED WIRE MESH
GYPSUM WALL BOARD
CEMENT PLASTER
RIGID INSULATION
ASPHALT
CEILING TILE
BATT INSULATION
STRUCTURAL STEEL
METAL STUDS (SECTION)
PLYWOOD
FINISH LUMBER
BLOCKING
X
CONCRETE MASONRY UNITS
WOOD STUDS
BRICK
CONCRETE
BASE COURSE
EARTH
NEW WALL (REFER TO KEYNOTE)
EXISTING WALL REMOVED
EXISTING WALL TO REMAIN
MATERIALS
STRUCTURAL STUDS
FULL HEIGHT INSULATION
ACID ETCHED CONCRETEA E C
NUMBERSHEET
PROJECT TEAM
CANYON DEL ORO HIGH SCHOOL25 W CALLE CONCORDIAORO VALLEY, AZ 85704
Project Address TITLESHEET
N.T.S.
Campus Map
N.T.S.
Location Map
C.BD. CEMENT BOARD
INSIDE DIAMETERI.D.
CULTURED MARBLECM.
THISPROJECT
C
INDEXSYMBOLS LEGEND
APPLICABLE CODES
OWNER FURNISHEDOWNER INSTALLED
O.F.O.I.
REINFORCED CONCRETE
ArchitectBRECKENRIDGE GROUP, INC.
1735 E. FORT LOWELL ROAD #12TUCSON, AZ 85719
SHANE CHISM, AIA, LEED APPROJECT MANAGER520.882.9944
Contractor
AMPHITHEATER PUBLIC SCHOOLS701 W. WETMORE ROADTUCSON, AZ 85705
Owner
Owner ContactRICHARD C. LANASACONSTRUCTION PROJECT MANAGERAMPHITHEATER PUBLIC SCHOOLS520.696.5153
1. PROJECT HAS BEEN DESIGNED TO COMPLY WITH 2018 INTERNATIONAL BUILDING CODE
(IBC).
ARCHITECTURAL
G1.0G2.0G3.0
A2.1A2.2A2.3A2.4A2.5A2.6A2.7A2.8A2.9A2.10A3.1A3.2A3.3
COVER SHEETGENERAL INFORMATIONCAMPUS PLAN
ROOF PLAN DROOF PLAN EROOF PLAN JROOF PLAN JEROOF PLAN JWROOF PLAN KROOF PLAN MROOF PLAN NROOF PLAN SROOF PLAN TROOF DETAILSROOF DETAILSROOF DETAILS
THIS PROJECT
CALLE CONCORDIA
HARDY ROAD
LAMBERT LANE
MAGEE ROAD
LA C
AN
AD
A D
R.
LA C
HO
LLA
BLV
D
NO
RTH
ERN
AV
E.
ORA
CLE
RO
AD
TBD
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
General Information
CONSTRUCTION NOTE
ROOM NUMBER
REVISION NUMBER
ELEVATION (plan)
ELEVATION (section)
OPENING SYMBOL
DEMOLITION NOTE
FIXTURE NOTE
DETAILWALL SECTION
BUILDING SECTION
EXTERIOR ELEVATION
INTERIOR ELEVATION
Scale
Detail or Section Name
Scale
Detail or Section Name
WHICH SECTION OR
NUMBER OR LETTER
SECTION OR DETAIL
NUMBER OF SHEET ON
REFERENCED
CONDITION IS
SHEET ON WHICH DETAIL IS DRAWN
IDENTIFICATION
NorthPlan
SC
KDB
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
XX X X
X X
X
X
X
X
X XX X X X X X X
XX
XX
XX
XX
XX
XXXXXXX
XX
X
XX
XX
XX
XX
X X X X X X X X X
X
X
X
XX
X
X
XX
X
XX
XX
XXXX
XX
X
X
X
X
X
XX
X
X
X
X
XX
X
XX
XX
X
X
X X X
XX
X
X
gfg
LADEK
M
N
S
T
JW J JE
C
O
BN
IE BIIW
P
HGGW
FR
A2.2
A2.4A2.3A2.5
A2.6
A2.7
A2.10
A2.8
A2.9
A2.1
W. CALLE CONCORDIA
N.T.S.
Campus Plan
PHASE 1
PHASE 1
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Campus Plan
SC
KDB
Key
NEW WORK, REFER TO INDIVIDUAL SHEETS FOR SCOPE OF WORK.
5
A3.3
7
A3.21
3
RIDGE
SLO
PE
SLO
PE
5
A3.3
12
A3.1
5
A3.2
12
A3.1
6
12
A3.1
7
TYP
TYP
TYP
TYP
TYP
SIM
4
4
11
A3.2
11
12
10 9
8
3'-1
0"
27'-6"
12
A3.2TYP.
12
A3.2TYP.
5
13
15
A3.2
22
8
A3.3
Construction KeynotesConstruction General Notes
01/8'' =1'-0" 8' 24'
Roof Plan D
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL(E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THE CONTRACTOR'SOPERATION. CONTRACTOR SHALL REPLACE DAMAGED IMPROVEMENTS ANDUTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACE WILLBE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIR SHALL MEETCONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BE WITHMATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF EACH WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
9. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING, ROOFPENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED AND REPLACEDU.N.O.
10. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
11. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
12. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
13. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVED COMPARABLEPRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER SUPPORTS; EXTEND
SLIP SHEET 1/2" BEYOND SUPPORT.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DOWNSPOUTS TO BE IN WORKINGCONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINAL INSPECTION.
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 REPLACE MISSING BRICK AT COPING.
5 PROVIDE HEAT STACK COVER.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
6 RAISE (E) CURB AS REQUIRED TO ALLOW FOR PROPER FLASHING.
7 TAPERED INSULATION WITH 1/2" PER 1'-0" SLOPE.
Roof Plan D
8 PROVIDE RUBBER SUPPORT AND SLIP SHEET UNDER EACH DUCT LEG.
9 GUTTER.
10 DOWNSPOUT, SEE DETAIL 19/A3.1.
11 REPLACE HEAT STACK COVER.
12 REMOVE VENT AND CAP BELOW ROOF.
QS
KDB
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
13 PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
AC
AC
AC
AC
AC
AC
AC
AC
AC
5
A3.2
TYP
10
A3.2
1
2
2
2
3 4
8
7
7
SLOPESLOPE
RID
GE
SLOPESLOPE
RID
GE
7
A3.2
3
A3.1
12
A3.2
14
A3.2
TYP
12
A3.2
TYP
TYP
TYP
11
A3.2
TYP TYP
TYP
6
10'-4"
9'-3"
9'-7"
11'-5"
8'-7"
7'-4"
4'-0"
3'-8"
11'-4"
TYP
10
10
TYP
TYP
TYP
6
A3.2
12
A3.2TYP.
11TYP
11TYP
2
5
9
8
A3.2
3'-0"
3'-0
"
12
Construction General Notes
01/8'' =1'-0" 8' 24'
Roof Plan E
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 PARAPET COPING CAP. SALVAGE COPPER TO OWNER.
5
6
7
REPLACE ROOF DRAIN.
PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
PAINT (E) METAL SCREEN PANELS AND STEEL POSTS.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP.
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. THE METAL ROOF DECK SHALL BE CLEANED OF ANY SURFACE CORROSION PRIORTO REROOFING. IN AREAS OF SEVERE CORROSION, STEEL DELAMINATION, OROTHER STRUCTURAL CONCERNS, THE CONTRACTOR SHALL CONTACT THEARCHITECT FOR REPAIR GUIDELINES. SUCH REPAIRS SHALL BE COMPLETED PRIORTO REROOFING.
9. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
10. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
11. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
12. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
13. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
14. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
15. REMOVE ALL PLASTIC ROOF DRAIN DOMES AND PROVIDE CAST IRON ROOF DRAINDOMES AT ALL ROOF DRAINS AND OVERFLOWS.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINS TO BE IN WORKINGCONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINAL INSPECTION.
Construction Keynotes
8 SAND, PRIME, AND PAINT (E) ROOF HATCH.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan E
9 LIFT MECHANICAL UNIT, DEMO (E) CURB & REBUILD CURB SIZED TO MECHANICAL
UNIT.
10 REMOVE UMBRELLA AND LIQUID FLASH EQUIPMENT SUPPORT.
QS
KDB
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
11 RELOCATE JUNCTION BOX TO FIELD TO FACILITATE CURB FLASHING.
12 OWNER TO RAISE (E) GAS LINE TO FACILITATE ROOF REPLACEMENT.
EC
EC
AC
AC
AC
EC
7
A3.3
9
15
A3.2
9
A3.2
6
A3.2
9
A3.2
5
A3.2
SLOPESLOPE
RID
GE
6
A3.3
7
11
8
7
7
11
1
5 11
A3.2
TYP
TYP
12
11
315
3
3
10 11
TYP
TYP
SLOPESLOPE
RID
GE
SLO
PE
SLO
PE
RIDGE
TYP
17'-6"
4
6
8'-9"
SLO
PE
TYP
13
12
A3.2TYP.
14
1414
8
A3.2
TYP
18
TYP
10
15
16
2
18
1717
17
14
14
17
17
01/8'' =1'-0" 8' 24'
Roof Plan J
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION ON ASPHALT-COATED
FIBERGLASS MAT BASE SHEET.
2
3
4 PROVIDE RUBBER SUPPORTS AND SLIP SHEETS UNDER (E) COOLER STAND.
5 PROVIDE EXHAUST VENT COVER.
CRICKET - 1:12 SLOPE MIN.
(E) GUTTER AND DOWNSPOUT TO REMAIN.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan J
6
REMOVE AND REINSTALL FENCING TO FACILITATE ROOF REPLACEMENT.7
PROVIDE HEAT STACK COVER.
8 DOWNSPOUT, SEE DETAIL 19/A3.1.
9 (E) CANOPY TO REMAIN.
10 RAISE (E) CURB AS REQUIRED TO ALLOW FOR PROPER FLASHING.
11 REPLACE CURB CAP.
12 PROVIDE FREEZE RESISTANT HOSE BIBB SPIGOT AT (E) HOSE BIBB.
13 REMOVE WOOD SUPPORTS UNDER EVAPORATIVE COOLER AND REPLACE WITH
COMPOSITE OR RUBBER SUPPORTS.
Construction General Notes
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
9. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
10. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
11. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
12. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
13. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DOWNSPOUTS TO BE INWORKING CONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINALINSPECTION.
15. PAINT ALL (E) METAL ROOF FASCIA.
QS
KDBPLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
14 CUT ABANDONED CONDUIT AND CAP BELOW ROOF.
15 GUTTER.
16 PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
17 REMOVE ABANDONED EQUIPMENT AND CURB. INFILL (E) OPENING WITH WOOD
DECKING TO MATCH (E) WOOD DECKING. NEW DECKING SHALL BEAR ON (E)
STRUCTURE AT TWO POINTS MIN.
18 CUT ABANDONED HOSE BIBB PIPE AND CAP BELOW ROOF.
AC
AC
5
A3.2
6
A3.2
1
8
A3.3
4
12
A3.2
8
A3.2
6
A3.3
2
2
TYP
3
TYP
4
6
5
11
A3.2
SLO
PE
SLO
PE
RIDGE
MATCH SIDEWALK BELOW
9'-11" 14'-3"
3
7
TYP
8
TYP
7
A3.3
6
A3.2
TYP
9
10
12
A3.2TYP.
01/8'' =1'-0" 8' 24'
Roof Plan JE
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4
GUTTER.5
(E) GUTTER AND DOWNSPOUT TO REMAIN.
CRICKET - 1:12 SLOPE MIN.
REMOVE CONDUIT RISER SUPPORT AND LIQUID FLASH ROOF PENETRATION.
Construction General Notes
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
9. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
10. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
11. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
12. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
13. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DOWNSPOUTS TO BE INWORKING CONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINALINSPECTION.
15. PAINT ALL (E) METAL ROOF FASCIA.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan JE
6 REPLACE VENT COVER.
7 REMOVE ABANDONED EQUIPMENT CURB. INFILL (E) OPENING WITH 3/4"
PLYWOOD ROOF SHEATHING TO MATCH (E) SHEATHING ON 2x8 WOOD JOISTS
@ 16" O.C. PERPENDICULAR TO ROOF STRUCTURE. PROVIDE 2x8 BLOCKING W/
JOIST HANGERS AROUND (E) OPENING.
8 CUT ABANDONED GAS PIPING AND CAP BELOW ROOF.
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
9 CUT ABANDONED CONDUIT AND CAP BELOW ROOF.
10 PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
EC EC
EC
EC
EC
AC
EC
3
A3.1
5
A3.2
TYP
7
A3.2
15
A3.2
TYP
1
1
2
4
5
A2.11
2
A3.3
10
A3.2
9
A3.2
14
A3.1
8
A3.2
8
9TYP
9 TYP
3
3
6
TYP
TYP
TYP TYP
TYP
TYP
10
9
A3.2
3
A3.1
TYP
11
A3.2
7
TYP
TYP
SLO
PE
SLO
PE
RIDGE
2 TYP
5
7'-7
"
5'-9
"
6'-5
"
5'-9
"
7'-9
"
5'-9
" 9'-1
"
12
A3.2
TYP
12
A3.2
TYP
TYP
TYP
6
6
7
A3.2
6
6
11
4
TYP
12
13
3'-0"
3'-0
"
Construction General Notes
01/8'' =1'-0" 8' 24'
Roof Plan JW
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 PARAPET COPING CAP.
5
6
PROVIDE RUBBER SUPPORTS AND SLIP SHEETS UNDER (E) COOLER STAND.
REMOVE WOOD SUPPORTS UNDER (E) EVAPORATIVE COOLER AND PROVIDE
COMPOSITE OR RUBBER SUPPORTS.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP.
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
9. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
10. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
11. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
12. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
13. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DOWNSPOUTS TO BE INWORKING CONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINALINSPECTION.
7 POWER WASH, STRIP, AND PAINT (E) METAL WALL PANELS.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan JW
8 SAND, PRIME, AND PAINT (E) ROOF HATCH.
9 PRIME AND PAINT (E) COLLECTOR BOX AND DOWNSPOUT.
10 REPLACE CURB CAP.
11 REPLACE SPLASH BLOCK.
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
12 CUT ABANDONED CONDUIT AND CAP BELOW ROOF.
13 PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
1
A3.2
1
A3.2
10
A3.2
1
1
1
5
2
1
8
A3.2
5
A3.3
3
A3.1
14
A3.1
SIM
2
2
A3.1
5
A3.1
14
A3.1
14
A3.1
14
A3.1
6
A3.2
7
A3.2
5
A3.3
6
A3.2
12
A3.2
5
A3.2
3
A3.1
6
A3.2
14
A3.2
3
A3.1
4
4
4
4
4
4
3
3
3
3
3
3
1
3
A3.1
SIM
4
A3.1
5
8
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
2 TYP
TYP
SIM
TYP
6
12
A3.2
1
5
A3.3
10
10
14
A3.1
13
A3.1
SIM
7
TYP
TYP
TYP
TYP
13'-10"
11'-7"
10'-1"
10'-10"
9'-1"
12'-11"
8'-5
"
6'-9
"
7'-6
"7
'-2
"
6'-4
"
7'-6
"
10
'-1
"
6'-0
"
8'-5
"
6'-1"
8'-10"
10'-4"
5'-0
"
6'-0
"
11
'-1
1"
14
'-9
"
15
'-1
"
11
A3.2
TYP TYP
TYP
TYP
TYP
TYP
1
1
TYP
HIGH LOW
HIGH
LOW
HIGH
LOW
14
A3.1LOW
1
TYP
9
TYP
SIM
1
TYP
10
'-1
"
6'-0
"
8'-5
"
9'-4
"
6'-0
"
5'-5
"
3'-3
"
TYP
TYP
8
11
13
14
1
15
A3.2
12
A3.2
TYP
SIM
SIM
12
11
A3.2
TYP
3'-0
" TY
P
3'-0" TYP
13
Construction General Notes
03/32'' =1'-0" 8' 32'
Roof Plan K
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 PARAPET COPING CAP.
5 REPLACE DRAIN RING AT (E) ROOF DRAIN.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP.
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. THE METAL ROOF DECK SHALL BE CLEANED OF ANY SURFACE CORROSION PRIORTO REROOFING. IN AREAS OF SEVERE CORROSION, STEEL DELAMINATION, OROTHER STRUCTURAL CONCERNS, THE CONTRACTOR SHALL CONTACT THEARCHITECT FOR REPAIR GUIDELINES. SUCH REPAIRS SHALL BE COMPLETED PRIORTO REROOFING.
9. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
10. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
11. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
12. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
13. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
14. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
15. REMOVE ALL PLASTIC ROOF DRAIN DOMES AND PROVIDE CAST IRON ROOF DRAINDOMES AT ALL ROOF DRAINS AND OVERFLOWS.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINS TO BE IN WORKINGCONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINAL INSPECTION.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan K
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
7
8 RAISE EQUIPMENT CURB AS REQUIRED TO ALLOW FOR PROPER FLASHING.
INSTALL SURFACE MOUNTED COUNTER FLASHING BUTTED TO UNDERSIDE OF DECK
AND RE-SEAL DECK FLUES.
9 PROVIDE CAST IRON ROOF DRAIN DOME.
6 COAT ROOF SIDE OF MASONRY WALL W/ ELASTOMERIC COATING.
10 COORDINATE WITH OWNER TO TEMPORARILY RELOCATE ANTENNA AND CONDUIT
TO FACILITATE ROOF REPLACEMENT.
11 REPAIR ROOF HATCH TO LATCH.
12 PROVIDE PLYWOOD SHEATHING BELOW METAL PANEL TO ROOF DECK TO ALLOW
FOR FLASHING ATTACHMENT.
13 CUT ABANDONED CONDUIT AND CAP BELOW ROOF.
14 PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
10
A3.2
3
A3.1
6
A3.2
1
1
1
3
2
2
2
2
1
1
4
A3.3
8
A3.2
14
A3.2
5
A3.2
2
A3.3
7
A3.2
11
A3.2
6
A3.2
13
A3.2
5
A2.10
3
3
3
3
5
5
TYP
TYP
TYPTYP
TYP
TYP
TYP
TYP
TYPTYPTYP
TYP
TYP
4
13
A3.1
7'-6"
5'-7"
6'-8"
7'-6
"
5'-7
"
6'-8
"
TYP
7'-0"
6'-5"
6'-5"
8'-9"
7'-0
"
5'-6
"
6'-1
"
7'-6
"
5'-2
"
7'-4
"
2'-1"
SLO
PE
SLO
PE
RIDGE
TYP
SIM
TYP
TYP
12
A3.2
TYP
TYP
8
TYP
TYP
12
A3.2
TYP
7TYP
6
8
4
3'-0"
3'-0
"
01/8'' =1'-0" 8' 24'
Roof Plan M
Construction General Notes
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. THE METAL ROOF DECK SHALL BE CLEANED OF ANY SURFACE CORROSION PRIORTO REROOFING. IN AREAS OF SEVERE CORROSION, STEEL DELAMINATION, OROTHER STRUCTURAL CONCERNS, THE CONTRACTOR SHALL CONTACT THEARCHITECT FOR REPAIR GUIDELINES. SUCH REPAIRS SHALL BE COMPLETED PRIORTO REROOFING.
9. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
10. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
11. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
12. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
13. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
14. REMOVE ALL SHEET METAL, WOOD AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
15. REMOVE ALL PLASTIC ROOF DRAIN DOMES AND PROVIDE CAST IRON ROOF DRAINDOMES AT ALL ROOF DRAINS AND OVERFLOWS.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINS TO BE IN WORKINGCONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINAL INSPECTION.
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 PARAPET COPING CAP.
5
6
REMOVE AND REINSTALL (E) COPPER PARAPET COPING CAP.
PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan M
7 REPLACE CURB CAP.
8 RAISE (E) CURB AS REQUIRED TO ALLOW FOR PROPER FLASHING.
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
AC
AC
AC
10
A3.2
12
A3.1
1
A3.3
TYP
1
3
2
10
A3.3
10
A3.3
8
A3.2
9
A3.2
6
A3.2
5
A3.2
2
A3.2
12
A3.2
7
7
7
9
1
TYP
TYP
TYP
TYP
4
A3.3
TYP
5
TYP
6
TYP
TYP
TYP
10
TYP
TYP
TYP
7'-6
"
7'-6
"
7'-6
"
6'-3"
6'-3"
6'-3"
9
9
12
A3.2
8
3'-0"
3'-0
"
01/8'' =1'-0" 8' 24'
Roof Plan N
Construction General Notes
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 NOT USED.
5
6
PAINT (E) METAL SCREEN PANELS AND STEEL POSTS.
REPLACE MISSING BRICK AT COPING.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP.
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. THE METAL ROOF DECK SHALL BE CLEANED OF ANY SURFACE CORROSION PRIORTO REROOFING. IN AREAS OF SEVERE CORROSION, STEEL DELAMINATION, OROTHER STRUCTURAL CONCERNS, THE CONTRACTOR SHALL CONTACT THEARCHITECT FOR REPAIR GUIDELINES. SUCH REPAIRS SHALL BE COMPLETED PRIORTO REROOFING.
9. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
10. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
11. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
12. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
13. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
14. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DOWNSPOUTS TO BE INWORKING CONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINALINSPECTION.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan N
7 PROVIDE RUBBER SUPPORT AND SLIP SHEET AT EACH DUCT LEG.
8 CUT ABANDONED CONDUIT AND CAP BELOW ROOF.
9 RELOCATE JUNCTION BOX AND ELECTRICAL CONDUIT PENETRATION TO FIELD TO
FACILITATE ROOF REPLACEMENT.
10 REMOVE AND REINSTALL (E) ELECTRICAL DISCONNECT TO FACILITATE ROOF
REPLACEMENT. PROVIDE RUBBER SUPPORTS UNDER ELECTRICAL DISCONNECT,
LIQUID FLASH ROOF PENETRATIONS PER DETAIL 12/A3.2.
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
8
A3.3
12
A3.1
8
A3.3
1
3
3
3
2
TYP
8
A3.3
9
A3.1
7
A3.2
1
A3.2
13
A3.2
7
7
10
11 11
11
11
6
4
1
8
A3.2
TYP
11
A3.2
5 TYP
11
1010
12
A3.1
12
A3.1
TYP
TYP
SLOPESLOPE
RID
GE
9
TYP
12
TYP
TYP
13
TYP
TYPTYP
14
14
14 14
88
14
01/8'' =1'-0" 8' 24'
Roof Plan S
Construction General Notes
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
9. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
10. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
11. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
12. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
13. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
14. REMOVE ALL PLASTIC ROOF DRAIN DOMES AND PROVIDE CAST IRON ROOF DRAINDOMES AT ALL ROOF DRAINS AND OVERFLOWS.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINS TO BE IN WORKINGCONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINAL INSPECTION.
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 REPOINT LOST MORTAR ON ROOF SIDE OF BRICK PARAPET WALL WITH EPOXY
MORTAR.
5
6
SEAL AND COAT (E) STUCCO WALL.
PRIME AND PAINT (E) DOWNSPOUT.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP. Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan S
7
8
PARAPET COPING CAP.
CUT ABANDONED CONDUIT AND CAP BELOW ROOF.
9 PROVIDE CAST IRON ROOF DRAIN DOME.
10 GUTTER.
11 DOWNSPOUT, SEE DETAIL 19, A3.1.
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
12 REMOVE (E) ROOFTOP SCUPPER.
13 PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
14 REMOVE ABANDONED EQUIPMENT AND CURB. INFILL (E) OPENING WITH 1/2" OR
3/4" PLYWOOD ROOF SHEATHING TO MATCH (E) SHEATHING ON 2x8 WOOD
JOISTS @ 16" O.C. PERPENDICULAR TO ROOF STRUCTURE. PROVIDE 2x8
BLOCKING W/ JOIST HANGERS AROUND (E) OPENING.
3
A3.1
10
A3.2
6
A3.2
TYP
1
2
2
TYP
2
TYP
TYP
3
4
A3.3
15
A3.2
13
A3.1
13
A3.2TYP
TYP
4
16
A3.1
TYP
TYP
11
A3.2
3
A3.3
TYP
5
3
A3.1
SLO
PE
SLO
PE
RIDGE
8'-1
1"
6'-3
"
7'-6
"
3'-1
"
5'-4
"
6'-1
0"
7'-0
"
3'-8
"
6'-5
"
8'-8
"
6
3'-0"
3'-0
"
01/8'' =1'-0" 8' 24'
Roof Plan T
Construction General Notes
1. BUILDING AND SITE WILL BE OCCUPIED DURING CONSTRUCTION.
2. (E) CONDITIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFYALL (E) CONDITIONS.
3. CONTRACTOR SHALL PROTECT EXISTING STRUCTURES AND UTILITIES THAT ARE NOTTO BE REMOVED FROM INJURY OR DAMAGE RESULTING FROM THECONTRACTOR'S OPERATION. CONTRACTOR SHALL REPLACE DAMAGEDIMPROVEMENTS AND UTILITIES IN KIND.
4. ALL SURFACES THAT AN (E) ITEM IS REMOVED FROM SHALL BE PATCHED ANDREPAIRED TO MATCH ORIGINAL CONDITION OF THE SURFACE. IF THE SURFACEWILL BE ALTERED OR CHANGED BY THE CONSTRUCTION, PATCH AND REPAIRSHALL MEET CONSTRUCTION REQUIREMENTS. ALL PATCHING AND REPAIR SHALL BEWITH MATERIALS TO MATCH (E) U.N.O.
5. CONTRACTOR SHALL LEAVE AREAS AFFECTED BY DEMOLITION AND SURROUNDINGAREAS CLEAN AT THE END OF THE WORK DAY. SURROUNDING AREAS NOTINCLUDED IN THE SCOPE OR LIMITS OF WORK SHALL BE PROTECTED FROM DUSTAND DEBRIS.
6. ALL ROOFING TO BE REMOVED AND REPLACED.
7. FOLLOWING THE REMOVAL OF EXISTING ROOFING MATERIAL, THE CONTRACTORSHALL PERFORM A GENERAL CONDITION SITE INSPECTION. NOTIFY ARCHITECT OFCONDITIONS.
8. THE METAL ROOF DECK SHALL BE CLEANED OF ANY SURFACE CORROSION PRIORTO REROOFING. IN AREAS OF SEVERE CORROSION, STEEL DELAMINATION, OROTHER STRUCTURAL CONCERNS, THE CONTRACTOR SHALL CONTACT THEARCHITECT FOR REPAIR GUIDELINES. SUCH REPAIRS SHALL BE COMPLETED PRIORTO REROOFING.
9. CONTRACTOR SHALL TAPE CHARCOAL FILTER ROLLS OVER AIR INTAKES AND SHUTOFF FRESH AIR INTAKES ON HVAC UNITS DURING ROOFING INSTALLATION.
10. ALL ROOF EDGE FLASHING, COPINGS, BASE FLASHING, COUNTER FLASHING,ROOF PENETRATION FLASHING, AND PARAPET SCUPPERS TO BE REMOVED ANDREPLACED U.N.O.
11. PROVIDE CONDUIT WHERE CABLE PENETRATION OCCURS.
12. REMOVE EXISTING PITCH POCKETS. PROVIDE LIQUID FLASHING MEMBRANE AT ALL
PIPE/CONDUIT PENETRATIONS U.N.O.
13. FLOOD COAT A 4-FOOT BY 6-FOOT AREA AROUND ALL DRAINS, SCUPPERS, ANDWATERWAYS, AND 3-FOOT WIDE AREA AROUND ROOF HATCHES WITH WHITE,SINGLE COMPONENT, POLYUREA WITH BRIGHT WHITE GRANULES ASRECOMMENDED BY ROOFING MANUFACTURER; COAT LOW PONDING AREAS IFDISCOVERED.
14. REMOVE ALL SHEET METAL, WOOD, AND PVC BLOCKS SUPPORTING PIPING ANDREPLACE WITH C-PORT RUBBER ROOF PIPE SUPPORTS OR APPROVEDCOMPARABLE PRODUCT. PROVIDE SLIP SHEET UNDER ALL (E) AND NEW RUBBER
SUPPORTS; EXTEND SLIP SHEET 1/2" BEYOND SUPPORT.
15. REMOVE ALL PLASTIC ROOF DRAIN DOMES AND PROVIDE CAST IRON ROOF DRAINDOMES AT ALL ROOF DRAINS AND OVERFLOWS.
16. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINS TO BE IN WORKINGCONDITION UPON PROJECT COMPLETION, AND PRIOR TO FINAL INSPECTION.
Construction Keynotes
1 ROOFING ON COVER BOARD ON ROOF INSULATION.
2
3
4 PARAPET COPING CAP. SALVAGE COPPER TO OWNER.
5 PROVIDE SLIP SHEET UNDER (E) SPLASH BLOCK.
CRICKET - 1:12 SLOPE MIN.
4" CANT STRIP.
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Plan T
PLUMBING STACK
HEAT STACK
EXHAUST
PASSIVE VENT/AIR INTAKE
AIR CONDITIONING UNITAC
EVAPORATIVE COOLING UNITEC
CONDUIT/PIPE PENETRATION
ROOF HATCH
ROOF DRAIN (OVERFLOW WHERE OCCURS)
FLOOD COAT
Symbol Legend
6 PROVIDE SLIP SHEET UNDER (E) UNIT SUPPORTS.
COPING COVER
6" CONCEALED SPLICE PLATE @EACH JOINT
16 GA ANCHOR CHAIR
(4) FASTENERS PER ANCHOR CHAIR
EXTEND PLIES OVER BLOCKINGFASTEN 8" O.C.
RML SEAM TAPE
SILL TRIM
RML SEAM FASTENER 6" O.C.
(E) WALL PANEL
COPING COVER
6" CONCEALED SPLICE PLATE AT EACHJOINT
MIN. 40 MIL. SELF ADHERING UNDERLAYMENT
TWO PIECE COUNTERFLASHING
8"
MIN
2"
COPING COVER
6" CONCEALED SPLICE PLATE ATEACH JOINT
16 GA ANCHOR CHAIR
(4) FASTENERS PER ANCHOR CHAIR
EXTEND PLIES OVER BLOCKINGFASTEN 8" O.C.
(E) MASONRYCAP BLOCK
METAL FLASHING
CANT STRIP
MODIFIED MEMBRANEFLASHING PLY 9" MIN. ONFIELD IN BITUMEN
BASE FLASHING PLY 6" MIN.ON FIELD IN BITUMEN
HPR MODIFIED MEMBRANE
BASE PLY
3 COURSE APPLICATION OFKEE APPROVED MASTIC
ROOF INSULATION
COPING COVER
6" CONCEALED SPLICE PLATE ATEACH JOINT
16 GA ANCHOR CHAIR
(4) FASTENERS PER ANCHOR CHAIR
EXTEND PLIES OVER BLOCKINGFASTEN 8" O.C.
POLYETHERSEALANT
COUNTERFLASHINGFASTENED 8" O.C.THROUGH BUTYLTAPE
POLYETHERSEALANT
TERMINATION BARFASTENED 8" O.C.THROUGH BUTYLTAPE
ELASTOMERICCOATING
8"
MIN
POLYETHER SEALANT
POLYETHER SEALANT
COUNTERFLASHINGANCHORED 8" O.C.THROUGH BUTYL TAPE
TERMINATION BAR FASTENED8" O.C. THROUGH BUTYLTAPE
8"
MIN
ELASTOMERIC COATING
COPING COVER
6" CONCEALED SPLICE PLATE ATEACH JOINT
16 GA ANCHOR CHAIR
(4) FASTENERS PER ANCHOR CHAIR
EXTEND PLIES OVER BLOCKINGFASTEN 8" O.C.(E) MASONRY
CAP BLOCK INSULATION
16 GA. ANCHOR CHAIR
40 MIL. SELF ADHERINGUNDERLAYMENT
COPING COVER
6" CONCEALED SPLICE PL.AT EA. JOINT
(4) FASTENERS PERANCHOR CHAIR
ELASTOMERIC COATING
2 X 8 BLOCKING
2 X 12 BLOCKING
S.M. FLASHING & COUNTER -
FLASHING W/ SCREWS &
WATERTIGHT WASHERS @ 1'-6"
O.C.
CONT. 2 X 8 NAILER W/ 1/2"
BOLTS @ 36" O.C.
REGLET AND COUNTER FLASHING
POLYETHER SEALANT
POLYETHER SEALANT
COUNTERFLASHINGFASTENED 8" O.C. THROUGHBUTYL TAPE
TERMINATION BAR FASTENED8" O.C. THROUGH BUTYLTAPE
8"
MIN
COPING COVER
6" CONCEALED SPLICEPLATE AT EACH JOINT
16 GA ANCHOR CHAIR
(4) FASTENERS PERANCHOR CHAIR
EXTEND PLIESOVER BLOCKINGFASTEN 8" O.C.
CAULK
ELASTOMERIC COATING
16 GA. ANCHOR CHAIR
COPING COVER
6" CONCEALED SPLICE PL.AT EA. JOINT
EXTEND PLIES OVERBLOCKING FASTEN 8" O.C.
(4) FASTENERS PERANCHOR CHAIR
COPING COVER x 10'-0"
6" CONCEALED SPLICE PLATE ATEACH JOINT
(4) FASTENERS PER ANCHOR CHAIR
EXTEND PLIES OVER BLOCKINGFASTEN 8" O.C.
TRIANGULARMETAL CAP
SBS BASE KEE CAPON FLASHING
COPING COVER
6" CONCEALED SPLICE PLATE ATEACH JOINT
16 GA ANCHOR CHAIR
(4) FASTENERS PER ANCHOR CHAIR
EXTEND PLIES OVER BLOCKINGFASTEN 8" O.C.
(4) FASTENERS PER ANCHOR CHAIR
16 GA. ANCHOR CHAIR
MIN. 22 GA. HAT SECTION CLIP
SLOPESLOPESLOPE
SLOPE
SLOPE
SLOPESLOPESLOPE
SLOPE
4"
3 1
/2"
4"
4"
4"
4"
4 1
/2"
4 1
/2"
4 1
/2"
4 1
/2"
7 1
/2" 4
"
4"
4 1
/2"
4 1
/2"
4 1
/2"
4 1
/2"
4"
4"
4"
5 1
/2"
RML SEAM TAPE
(E) WALL PANEL, CUT PANEL AS REQUIRED TO ALLOWFOR PROPER FLASHING
MIN. 40 MIL SELF ADHERING UNDERLAYMENT
MIN. 22 GA. HAT SECTION CLIP
TWO PIECE COUNTERFLASHING
SILL TRIM
TERMINATION BAR FASTENED 8" O.C. THROUGHBUTYL TAPE
3 COURSE APPLICATION OF KEEAPPROVED MASTIC
TERMINATION BAR FASTENED 8" O.C. THROUGHBUTYL TAPE
HPR MODIFIED MEMBRANEWITH A REFLECTIVECOATING
HOT ROOFING ASPHALT
BASE PLY
(E) DECK
COVER BOARD
ROOF INSULATION
NOTE:ALL PLIES SET IN HOT ROOFING ASPHALT, SEESPECIFICATIONS FOR SURFACE COATING
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
CANT STRIP
MEMBRANE FLASHINGPLY
COVER BOARD ONROOF INSULATION
(E) DECK
MEMBRANE FLASHINGPLY
COVER BOARD ONROOF INSULATION
3 COURSE APPLICATIONOF KEE APPROVEDMASTIC
(E) WINDOW
(E) ALUM. FRAME
MTL. FLASHING
FLASHING SET INREGLET AT COLUMNS
MEMBRANE FLASHING
CANT STRIP
3 COURSE APPLICATIONOF KEE APPROVED MASTIC
DOWNSPOUT
FASTENERS
DOWNSPOUTHANGER
(E) WALL
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Details
Scale : 1-1/2" = 1'-0"
Coping Cap
0 8" 2'
1Scale : 1-1/2" = 1'-0"
Coping Cap
0 8" 2'
2
Scale : 1-1/2" = 1'-0"
Surface Mtd. Counterflashing
0 8" 2'
12
Scale : 1-1/2" = 1'-0"
Coping Cap
0 8" 2'
3Scale : 1-1/2" = 1'-0"
Wall Panel w/ Roof Flashing
0 8" 2'
4Scale : 1-1/2" = 1'-0"
Coping Cap
0 8" 2'
5
Scale : 1-1/2" = 1'-0"
Coping Cap
0 8" 2'
6Scale : 1-1/2" = 1'-0" 0 8"
72'Scale : 1-1/2" = 1'-0"
Not Used
0 8"
82'
Scale : 1-1/2" = 1'-0"
Reglet Mtd. Counterflashing
0 8" 2'
13Scale : 1-1/2" = 1'-0"
Wall Panel w/ Roof Flashing
0 8" 2'
14Scale : 1-1/2" = 1'-0" 0 8" 2'
15
Scale : 1-1/2" = 1'-0"
Roof at Elevator Sill
0 8"
16
Scale : 1-1/2" = 1'-0" 0 8" 2'
11
Scale : 1-1/2" = 1'-0"
Triangular Coping Cap
0 8"
92'
Scale : 3" = 1'-0"
Downspout
0 4" 1'
19Scale : 3" = 1'-0" 0 4" 1'
18Scale : 3" = 1'-0" 0 4" 1'
17Typical Section Coated Finish
0 4" 1'
20Scale : 1-1/2" = 1'-0"
QS
KDB
Scale : 1-1/2" = 1'-0"
Not Used
0 8"
102'
Not Used
Not Used
Not UsedNot Used
Not Used
FLEXIBLE WATERPROOF MEMBRANECLOSURE
COMPRESSIBLEINSULATION
CHAMFER EACH SIDE OFWOOD CURB TO DRAIN
METAL CAP SECURED APPROX. 12"
O.C. W/ FASTENERS& NEOPRENE WASHERS
HPR FLASHING FASTENED8" O.C.
FLEXIIBLE VAPOR RETARDER TOSERVE AS INSULATION RETAINERATTACH TO TOP OF CURB
135°
METAL EXPANSIONJOINT COVER
FLASHING RECEIVER
COUNTERFLASHING
CANT STRIP
BASE FLASHING
(E) DUCTWORK
METAL CAP SLOPED TO DRAIN, SECURED
APPROX. 24" O.C. W/ FASTENERS &NEOPRENE WASHERS
HPR FLASHING FASTENED8" O.C.
CONTINUOUS CLEATFASTENED 8" O.C.
SHEET METALOR FLEX-TUBECOLLAR
SHEET METAL ENCLOSURE-CROSSBREAK OR SLOPEFOR DRAINAGE
INSULATE INSIDE OF METALWORK IN COLD CLIMATES
SLOPE PIPES DOWNFROM HOOD MINIMUM4" CLEARANCE FROM PIPETO TOP OF CURB-MINIMUM 2" BETWEENPIPES
FASTENERSAPPROX. 24"O.C.
8"
MIN
MIN. 22 GA. FLANGE TURNED UP 4" ANDFASTENED TO DUCT. 3" LIP DOWN CURBBUTYL TAPE BEHIND, SEALANT ON TOP.INSULATION &
CLADDING
COUNTERFLASHING INSTALLED UNDER
FLANGE/CURB CAP AND FASTENED TOP OFFLASHINGS SECURED THRU BAR 8" O.C. ANDSEALANT ABOVE
NOTE: SANDWICH BASE FLASHING PLYBETWEEN BASE FIELD PLY AND HPRMODIFIED MEMBRANE
FASTENERSMAXIMUM 8"O.C.
(E) DECK
ROOF INSULATION
BASE/PLY SHEET(S)
HPR MODIFIEDMEMBRANE
8"
MIN
.
8"
MIN
1 1/
2"
8"
MIN
LIQUID FLASHINGBOTH SIDES
HPR MODIFIED MEMBRANEFLASHING PLY 9" MIN. ONFIELD
SHEET METAL PITCH PAN
SOLDERED/WELDEDWATERTIGHT 4" MINHEIGHT
OPT: WOOD NAILERS; VARIES DEPENDING UPONSIZE OF PENETRATION
POLYETHER SEALANT
POURABLE SEALANT,2 PART
ROOF INSULATION
NON-SHRINK GROUT
WATERTIGHT SHEET METALRAIN COLLAR OVERLAPPINGPENETRATION POCKET
DRAWBAND
POLYETHERSEALANT
4' MIN
(E) CONDUIT/PIPE PENETRATION
MASK TARGET AREA ON ROOFMEMBRANE WITH TAPE
CLEAN ALL NON-POUROUSAREAS WITH ISOPROPYLALCOHOL
APPLY 32 WET MIL BASE COATOF FLASH OVER MASKED AREA
EMBED GRIP POLYESTER FIRMINTO BASE COAT; APPLY TOPCOAT OVER FABRICEXTENDING 2" PAST SCRIM INALL DIRECTIONS
APPLY MINERALS IMMEDIATELYOR ALLOW FLASH TO CURE15-30 DAYS, THEN INSTALLREFLECTIVE COATING
FASTENER WITH NEOPRENE WASHER
(E) ROOF HATCH
INTEGRAL CAP FLASHING
CONTINUOUS BUTYL TAPE
8"
MIN
.
POLYETHER SEALANT
TERMINATION BAR FASTENED 8" O.C.
TEMPERATURE APPROPRIATEELASTOMERIC SEALANT
STORM COLLARSET IN MASTIC,PRIME FLANGE
UMBRELLA
DRAWBAND ORWELD UMBRELLATO STACK
(E) HEAT STACK
4" MIN
(E) PASSIVE VENT/ AIR
INTAKE
FLASHING FASTENED
8"
MIN
.
8" M
IN
.
PRE-MANUFACTUREDEXPANSION JOINT COVER
CHAMFER EA. SIDE OFWOOD CURB TO DRAIN
COMPRESSIBLEINSULATION
FLEXIBLE WATERMEMBRANE CLOSURE
FLASHING FASTENED 8"O.C.
MTL. CAP SECURED 12"
O.C. W/ FASTENERS &
NEOPRENE WASHERS
(E) METAL EXHAUST FANCOVER
FLASHING FASTENED
8"
MIN
.
(E) MOUNTINGCURB
CONTINUOUS SEALINGMATERIAL ON PERIMETER
REPLACE SHEET METAL CURBCAP WHERE REQUIRED
(E) WOOD NAILER
COUNTERFLASHING(E) MOUNTINGCURB
2"
8"
MIN
.
(E) ROOF DRAIN
COVER BOARD
(E) DECK
INSULATION, FITTIGHT TO DRAIN
MODIFIED ROOF MEMBRANE
BASE PLY
SOFT METAL FLASHING (30" MIN.) SET IN MASTIC,WRAPPED DOWN 2" MIN., PRIME TOP SURFACE
CAP FLASHING PLY9" MIN. ON FIELD
BASE FLASHING PLY6" MIN. ON FIELD
BASE PLY
HPR MODIFIED MEMBRANE
3 COURSEAPPLICATION OF KEEAPPROVED MASTIC
BASE FLASHING PLY 6" MIN. ON FIELD
60MIL THERMOPLASTIC FB MEMBRANE 9"MIN. ON FIELD
COVER BOARD
ROOF INSULATION
CANT STRIP
(E) DECK
SET LEAD FLANGE INMASTIC, PRIME FLANGEBEFORE STRIPPING
BASE PLY
(E) PLUMBING VENT STACK
ROOF INSULATION
ROLL DOWN LEAD FLASHING 1" MINDOWN INTO PIPE
POLYETHER SEALANT
HPR MODIFIEDMEMBRANE
HPR MODIFIED MEMBRANEFLASHING PLY 12" MIN. ONFIELD
BASE FLASHING PLY 8" MIN.ON FIELD
5"
4" MIN
12"
MIN
.
NOTE:ENSURE TOTAL TARGET AREAOF FLASHING IS NO LESSTHAN 16" X 16"
6"
MIN
.
SLOPE = 1/2:12
(E) OVERFLOW
(E) ROOF DRAIN
COVER BOARD
(E) DECK
INSULATION, FIT TIGHT TO DRAIN
HPR MODIFIED ROOF MEMBRANE
BASE PLY
SOFT METAL FLASHING (30" MIN.) SET INMASTIC, WRAPPED DOWN 2" MIN., PRIMETOP SURFACE
CAP FLASHING PLY 9" MIN. ONFIELD
BASE FLASHING PLY 6" MIN. ONFIELD
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.2
16
A3.216
A3.2
Scale : 1-1/2" = 1'-0"
Passive Vent/Air Intake
0 8" 2'Scale : 1-1/2" = 1'-0"
Exhaust Detail
0 8" 2'Scale : 1-1/2" = 1'-0" 0 8" 2'2'
Scale : 1-1/2" = 1'-0"
HVAC Curb
0 8" 2'
Scale : 1-1/2" = 1'-0" 0 8" 2'
Scale : 1-1/2" = 1'-0"
Expansion Joint
0 8" 2'
1Scale : 1-1/2" = 1'-0"
Expansion Joint
0 8" 2'
2
9 678
5Scale : 1-1/2" = 1'-0"
Pitch Pocket w/ Umbrella
0 8" 2'
4Scale : 1-1/2" = 1'-0"
Not Used
0 8"
3
Scale : 1-1/2" = 1'-0"
Hood
0 8" 2'
11
Scale : 1-1/2" = 1'-0"
Roof Hatch
0 8" 2'
10
Scale : 1-1/2" = 1'-0"
Roof Drain
0 8" 2'
13Scale : 1-1/2" = 1'-0"
Roof Drain/Overflow
0 8" 2'
14
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Details
Scale : 1-1/2" = 1'-0"
Heat Stack
0 8"
15Scale : 1-1/2" = 1'-0"
Pipe Penetration
0 8" 2'
12
Ductwork Plumbing Stack
2'
Scale : 1-1/2" = 1'-0"
Cant Detail
0 8" 2'
16
QS
KDB
BASE PLY
ROOF INSULATION
CONTINUOUS CLEAT FASTENED 6" O.C.
WOOD CANT STRIP NAIL TOBLOCKING
EXTEND MEMBRANE OVER BLOCKINGSET METAL IN ROOF CEMENT ANDFASTEN 8" O.C.
(E) DECK
1"
MIN
HPR MODIFIED MEMBRANE
BASE FLASHING PLY 6"MIN. ON FIELD
(E) METAL FASCIA
REINSTALL (E) CONDUCTOR HEAD
POLYETHER SEALANT
(E) DECK
60MIL THERMOPLASTIC FB MEMBRANE9" MIN. ON FIELD
HPR MODIFIED MEMBRANE,EXTEND THROUGH SCUPPER BASE
BASE FLASHING PLY 6" MIN. ON FIELD
SET METAL FLANGE IN ROOF CEMENTAND PRIME PRIOR TO STRIPPING
COUNTERFLASHING FASTENED 8" O.C. COUNTERFLASHING FASTENED 8"O.C.
SET METAL FLANGE IN ROOFCEMENT AND PRIME PRIOR TOSTRIPPING
60MIL THERMOPLASTIC FBMEMBRANE 9" MIN. ON FIELD
BASE FLASHING PLY 6" MIN. ONFIELD
HPR MODIFIED MEMBRANE,EXTEND THROUGH SCUPPER BASE
BASE PLY
ROOF INSULATION, TAPEREDEDGE STRIP LAST 1'-0" AROUNDSCUPPER
(E) CONDUCTORHEAD
GUTTER FASTENED 6" O.C.
EXTEND ONE PLY OVER BLOCKING
GUTTER STRAP
GUTTER BRACKET
(E) DECK
ROOF INSULATION
COVER BOARD
POLYETHERSEALANT
BASE PLY
HPR MODIFIED MEMBRANE
4" MIN
CONTINUOUS CLEATFASTENED 6" O.C.
METAL EDGE SET IN ROOF CEMENT,NAILED 3" O.C. STAGGERED, PRIMEMETAL FLANGE PRIOR TO STRIPPING
BASE FLASHIING PLY 6" MIN. ONFIELD
METAL EDGE SET INROOF CEMENT NAILED 3"O.C. STAGGERED, PRIME
METAL FLANGE PRIOR TOSTRIPPING
4" MIN.
POLYETHER SEALANT
BASE PLY
ROOF INSULATION, TAPEREDEDGE STRIP LAST 1'-0" AROUNDSCUPPER
POLYETHER SEALANT
(E) DECK
SET METAL FLANGE IN ROOF CEMENT ANDPRIME PRIOR TO STRIPPING
60MIL THERMOPLASTIC FB MEMBRANE 9"MIN. ON FIELD
BASE FLASHING PLY 6" MIN. ON FIELD
HPR MODIFIED MEMBRANE, EXTENDTHROUGH SCUPPER BASE
BASE PLY
ROOF INSULATION, TAPERED EDGESTRIP LAST 1'-0" AROUND SCUPPER1/
2"
COUNTERFLASHING FASTENED8" O.C.
SET METAL FLANGE IN ROOFCEMENT AND PRIME PRIOR TOSTRIPPING
60MIL THERMOPLASTIC FBMEMBRANE 9" MIN. ON FIELD
BASE FLASHING PLY 6" MIN.ON FIELD
HPR MODIFIED MEMBRANE
CANT STRIP
2"
POLYETHER SEALANT
WOOD BLOCKING
METAL EDGE SET INROOF CEMENT NAILED 3"O.C. STAGGERED, PRIMEMETAL FLANGE PRIOR TOSTRIPPING
CONTINUOUS CLEATFASTENED 6" O.C.
(E) METAL FASCIA
BASE PLY
COVER BOARD
BASE FLASHING PLY 6" MIN. ON FIELD
ROOF INSULATION
COVER BOARD
HPR MODIFIEDMEMBRANE
COATING
BASE PLY
ROOF INSULATION
COVER BOARD
BASE FLASHING PLY 6"MIN. ON FIELD
ROOF INSULATION
COVER BOARD
GUTTER STRAP
GUTTER BRACKET
CONTINUOUSCLEAT FASTENED6" O.C.
POLYETHERSEALANT
POLYETHER SEALANT
HPR MODIFIED MEMBRANEFLASHING PLY 9" MIN ONFIELD IN BITUMEN
BASE FLASHING PLY 6" MINON FIELD IN BITUMEN
CANT STRIP
SEALANT ALLSIDES
4" MIN.BASE PLY
4" MIN.
ROOF INSULATION
HPR MODIFIED MEMBRANE
HPR MODIFIEDMEMBRANE
1/2"
4" MIN
4"
MA
X1"
MIN
1"
MIN
4"
MA
X
CONTINUOUS CLEAT FASTENED 6" O.C.
WOOD CANT STRIP NAIL TO BLOCKING
EXTEND MEMBRANE OVER BLOCKINGSET METAL IN ROOF CEMENT ANDFASTEN 8" O.C.
(E) DECK
4" MIN
POLYETHERSEALANT ROOF INSULATION
BASE PLY
HPR MODIFIEDMEMBRANE
(E) FASCIA PANEL
6"
6"
WOODBLOCKING
WOOD BLOCKING
6"
6"
6"
(E) CONDUCTOR HEAD
Scale : 1-1/2" = 1'-0"
Scupper Through Wall
0 8" 2'
1Scale : 1-1/2" = 1'-0" 0 8" 2'
2Scale : 1-1/2" = 1'-0"
Scupper Through Wall
0 8" 2'
3Metal Roof Edge
5Scale : 1-1/2" = 1'-0"
Scupper Overflow
0 8" 2'
4
Scale : 1-1/2" = 1'-0"
Not Used
0 8" 2'
9Scale : 1-1/2" = 1'-0"
Raised Metal Edge
0 8" 2'
10
Amph
ithea
ter Pu
blic S
choo
lsCa
nyon
del O
ro Hi
gh Sc
hool
Roof
Rep
lace
men
t - P
hase
1
PROJECT NO:
DATE:
THIS DRAWING IS NOT TO BE USED FORCONSTRUCTION PURPOSES UNTIL SEALED AND SIGNED BY
ARCHITECTS OF BRECKENRIDGE GROUP INC. ARCHITECTS /PLANNERS, OR DESIGNATED CONSULTANTS.
DRAWINGS ARE COPYWRITTEN BY BRECKENRIDGE GROUPARCHITECTS / PLANNERS. ANY REPRODUCTION OR REUSE
WITHOUT WRITTEN PERMISSION IS STRICTLY FORBIDDEN. R
REVISION SCHEDULE:
MAY 2019
17.14.12
# DATE DESCRIPTION ISSUED TO
DRAWN BY:
CHECKED BY:
KLINDT D.BRECKENRIDGE
1
A R I Z O N A
D at e S i gn e d .A.. SU.
. . . . . ... ... . . .. . .
RF
I
TE
I
C
EC TA C
TICRARETSIGER
ET
EDH
NO .76 0 5
REGISTRATION EXPIRATION DATE: 3/31/2020
05
/
3
1
/
1
9
Roof Details
Scale : 1-1/2" = 1'-0"
Roof Edge W/ Gutter
0 8"
82' Scale : 1-1/2" = 1'-0"
Metal Roof Edge
0 8" 2'
67
Scupper Through Wall
Roof Edge W/ Gutter
QS
KDB
Scale : 1-1/2" = 1'-0" 0 8" 2'
Scale : 1-1/2" = 1'-0" 0 8" 2'