Canutillo Phase II Floodwall/Levee Design Xochitl Aranda, P.E. Civil Engineer International Boundary and Water Commission United States Section Engineering Services Division January 12, 2017

Transcript of Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design...

Page 1: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

Canutillo Phase IIFloodwall/Levee Design

Xochitl Aranda, P.E.Civil Engineer

International Boundary and Water CommissionUnited States Section

Engineering Services DivisionJanuary 12, 2017

Page 2: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

• The USIBWC constructed the Rio Grande Canalization Project (RGCP) in the 1930’s and 1940’s as a water delivery and flood control project, covering 106 river miles from PerchaDam, NM to American Dam in El Paso, TX.

Background

Page 3: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...
Page 4: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

• The American Recovery and Reinvestment Act of 2009 allocated funds to the USIBWC for the rehabilitation of levees. Also used for the Rio Grande Canalization Project levee rehabilitation to meet FEMA levee accreditation standards.

RGCP Levee Rehabilitation

Page 5: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

• The Canutillo Phase II Project comprises a portion of the rehabilitation project and includes levee segment Canutillo East 2 (CE2)

• It extends from upstream of Vinton Bridge to upstream of Borderland Bridge on the east side of the Rio Grande

• It has a reach of 5.66 miles• Adjacent properties consist of residential and

commercial use.

Project Location

Page 6: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...
Page 7: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...
Page 8: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

Earthen Levee

Page 9: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

Geographic Limitations

Page 10: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

Floodwall

Page 11: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

Contributing Arroyos

Page 12: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

Box Culvert

Page 13: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

Flood Protection

Page 14: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

FEMA Levee Accreditation

Page 15: Canutillo Phase II Floodwall Levee Design - ibwc.gov · Canutillo Phase II Floodwall/Levee Design ... loading conditions for Case as defined in the U.S. Army Corps of Engineers ...

DISCUSSION/QUESTIONS