![Page 1: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/1.jpg)
CANOPY DAYLIGHTING EVALUATION
British Columbia Institute of Technology (BCIT) Prepared for: Alexandre Hebert Prepared by: Adam Franklin, EIT, LEED Green Assoc. Project No. 2014151 Date: May 15, 2014
![Page 2: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/2.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. i
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY ...............................................................................................1
2. METHODOLOGY ............................................................................................................3
2.1 OBJECTIVES ......................................................................................................................... 3 2.2 EVALUATION METHODOLOGY ............................................................................................ 3
3. EXISTING CONDITIONS ...............................................................................................4
3.1 LIGHTING SYSTEMS DESCRIPTION ...................................................................................... 4 3.2 ILLUMINATION LEVELS ....................................................................................................... 5
4. PROPOSED UPGRADES .................................................................................................6
4.1 PURPOSE OF PROPOSED UPGRADES .................................................................................... 6 4.2 GENERAL UPGRADE OVERVIEW ......................................................................................... 6 4.3 IMPACT OF MODIFICATIONS ON LIGHTING LEVELS ............................................................ 6 4.4 UPGRADE OPTIONS AND ESTIMATED COSTS ...................................................................... 6 4.5 ADDITIONAL AND RELATED COSTS .................................................................................... 7
5. DAYLIGHTING SIMULATION RESULTS ..................................................................9
5.1 EXISTING CONDITIONS ........................................................................................................ 9 5.2 DAYLIGHTING OPTION #1: SOLATUBES .............................................................................. 9 5.3 DAYLIGHTING OPTION #2: SKYLIGHTS ............................................................................. 10 5.4 DAYLIGHTING OPTION #3: SOLATUBES AND SKYLIGHTS ................................................. 10
6. ENERGY & COST SAVINGS ANALYSIS ..................................................................11
6.1 ENERGY CONSUMPTION .................................................................................................... 11 6.2 ESTIMATED ENERGY SAVINGS .......................................................................................... 11 6.3 ECONOMIC ANALYSIS ....................................................................................................... 11
7. RECOMMENDATIONS .................................................................................................13
8. IMPLEMENTATION AND MONITORING ...............................................................14
8.1 IMPLEMENTATION OF RETROFIT ....................................................................................... 14
LIST OF APPENDICES
APPENDIX A: CONTACT INFORMATION APPENDIX B: LIGHTING SIMULATION RESULTS
![Page 3: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/3.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 1
1. EXECUTIVE SUMMARY
The following report details the daylighting feasibility review conducted by Prism Engineering
for the Carpentry Practicum Area Canopy located at the BCIT Burnaby Campus, 3700
Willingdon Avenue, in Burnaby BC.
In this report we outline the existing conditions of the current lighting system, evaluate the energy
saving potential and cost effectiveness of different daylighting options, and provide
recommendations for the implementation of the project.
The intent of this project is increase the amount of daylight provided to the carpentry area to
offset and reduce the need for artificial lighting. The proposed strategy is to install skylights
and/or “Solatube” daylighting systems in the existing canopy.
The options and recommendations presented in the report are designed to maximize energy
savings through daylight harvesting. The potential annual energy and costs savings for each
option are outlined in the table below. We recommend implementing the Solatubes and Skyllights
option, shown below in bold.
Table 1: Summary of Potential Energy and Cost Savings
Daylighting
Option Lighting Option
Demand
Savings
(kW)
Annual
Energy
Savings
(kWh)
Annual
Energy
Savings
(%)
Annual
Electrical Cost
Savings
($)
Annual
Maintenance
Cost Savings
($)
No Change
Controls Only - 16,394 55% $1,475 -
HID Bi-level - 19,145 64% $1,723 -
New LED
Luminaires 10 25,342 85% $3,316 $2,000
Solatubes
Controls Only - 20,203 68% $1,818 -
HID Bi-level - 24,386 82% $2,195 -
New LED
Luminaires 10 27,540 92% $3,514 $2,000
Skylights
Controls Only - 20,203 68% $1,818 -
HID Bi-level - 22,639 76% $2,037 -
New LED
Luminaires 10 26,807 90% $3,448 $2,000
Solatubes &
Skylights
Controls Only - 22,687 76% $2,042 -
HID Bi-level - 26,042 87% $2,344 -
New LED
Luminaires 10 28,238 95% $3,577 $2,000
Maintenance cost savings are an estimate and are based on today’s market and labour rates and
will vary depending on lighting usage.
The estimated implementation costs and financial performance of each upgrade option is
summarized in the table below.
![Page 4: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/4.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 2
Table 2: Summary of Project Costs and Financial Performance
Daylighting
Option Lighting Option
Total
Budget
Costs
($)
Total
Annual
Cost
Savings ($)
Simple
Payback
(yrs)
NPV
(20 yr)
IRR
(20 yr)
No Change
Controls Only $10,000 $1,475 6.8 $9,723 15%
HID Bi-level $22,000 $1,723 12.8 $1,032 7%
New LED
Luminaires $35,000 $5,316 6.6 $32,266 15%
Solatubes
Controls Only $130,000 $1,818 71.5 -$105,694 -8%
HID Bi-level $142,000 $2,195 64.7 -$112,663 -7%
New LED
Luminaires $155,000 $5,514 28.1 -$85,090 -2%
Skylights
Controls Only $60,000 $1,818 33.0 -$35,694 -3%
HID Bi-level $72,000 $2,037 35.3 -$44,764 -3%
New LED
Luminaires $85,000 $3,448 15.6 -$15,972 4%
Solatubes &
Skylights
Controls Only $140,000 $2,042 68.6 -$112,706 -8%
HID Bi-level $152,000 $2,344 64.9 -$120,671 -8%
New LED
Luminaires $165,000 $5,577 29.6 -$94,251 -2%
Simple payback, net present value (NPV), and internal rate of return (IRR) are all calculated
based on the Total Budget Costs.
The IRR and NPV are based on a 20 year equipment life and include a 2.5% escalation in utility
rates. Additionally, the NPV includes a 6% discount rate.
The lighting upgrade recommendations were selected based on the following criteria:
Energy savings potential;
Costs of maintenance; and
Improving illumination conditions (as need be).
In addition to the energy cost savings, other benefits will be generated by implementation of
recommendations contained in this report; including reduced greenhouse gas production
(indirectly).
![Page 5: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/5.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 3
2. METHODOLOGY
2.1 Objectives
This evaluation was defined to meet the following objectives:
to review the lighting systems and determine the electrical energy consumption for lighting in
the area;
to investigate the viability of installing a Solatube Daylighting System and/or activating the
unfinished skylights;
to analyze the existing lighting systems and propose energy savings measures;
to recommend cost effective lighting and daylight harvesting controls upgrades;
to determine project costing and carry out financial analysis.
2.2 Evaluation Methodology
2.2.1 Lighting Audit and Analysis
The lighting audit consisted of on-site verification of quantities, wattages, and control methods of
the existing lighting system. Additionally, light levels were recorded throughout the area in order
to determine the existing illumination conditions and estimate the amount of daylight
contribution.
2.2.2 Daylighting Simulations
Daylight simulations were conducted for the existing conditions and all potential upgrade options
for variety of different times and weather conditions. The results were used to determine the
amount of artificial lighting required to meet the target illumination levels as recommended by
the Illuminating Engineering Society of North America (IESNA).
2.2.3 Energy Analysis
Lighting energy use was determined based on the verified quantities and wattages of the existing
luminaires and estimates of operating hours. Potential energy savings for the various options were
determined based on the daylighting simulation results and the corresponding anticipated
reduction in operating hours.
2.2.4 Measure Selection Criteria
Measures proposed for implementation on this project have been selected based on the viability
of the measure against the following criteria:
appropriateness for tasks performed in the space;
condition of existing lighting systems;
cost to retrofit existing system vs. cost to replace systems;
low maintenance requirements;
overall impact on occupants and general acceptance of changes.
The intent of the outlined criteria is to provide guidelines to determine which lighting measure is
appropriate for the tasks performed.
2.2.5 Cost/Benefit Analysis
Lighting retrofit alternatives were evaluated. Measures were selected and omitted to maximize
energy savings and minimize overall project costs.
![Page 6: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/6.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 4
3. EXISTING CONDITIONS
3.1 Lighting Systems Description
The canopy covering the carpentry practicum area is also referred to as the Elevated Research
Platform (ERP) and is a 1,300 m2 (14,000 ft
2) structure that was constructed in 2007.
Figure 1: Carpentry Canopy / ERP
The canopy also acts as a green roof where plant experiments and other horticulture research take
place, as can be seen in Figure 2.
Figure 2: Green Roof Located on Top of the ERP
More recently, a living wall has been installed on the vertical wall structure of the North stairway
that provides access to the top of the canopy. The living wall can be seen in Figure 3 below.
Figure 3: Living Wall
![Page 7: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/7.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 5
The lighting inside the practicum area is provided by 45 high bay luminaires that utilize 320 watt
pulse-start metal halide lamps.
The canopy is open to the North and South sides, with smaller clerestory breaks in the structure
along the West and East side near buildings NE2 and NE4 that allow for daylight infiltration to
the space.
Additionally, there are five 8’ x 9’ skylights that are not being utilized and are currently capped
off with plywood. These skylights were included as part of initial design of the canopy, however,
they were never fully completed and no glazing has been installed.
3.2 Illumination Levels
Illumination levels were measured throughout the canopy. The time period, weather conditions,
and recorded illumination levels, along with the target levels as recommended by the IESNA, are
outlined in tables below. The high bay lighting system was ‘ON’ at the time of the measurements.
Table 3: Time Period and Weather Conditions During Illumination Level Measurements
Day Time Weather Conditions
April 22, 2014 2:10 PM – 2:30 PM Sunny with Light Clouds
Table 4: Recorded and Recommended Illumination Levels
Area Measured Levels (Lux)
IESNA
Recommended Illumination
Levels (Average Lux)
North End 1,500 – 2,580 500 – 1000
Center 807 – 1,400 500 – 1000
South End 1,507 – 80,730 500 – 1000
Living Wall 6,458 – 8,611 N/A
![Page 8: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/8.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 6
4. PROPOSED UPGRADES
4.1 Purpose of Proposed Upgrades
The purpose of the proposed modifications are as follows:
Provide supplemental daylight to the work areas under the canopy;
Utilize daylight harvesting controls to reduce the operating hours of the artificial light sources;
Reduce energy consumption; and
Improve the visual environment and quality of lighting for occupants.
4.2 General Upgrade Overview
We have reviewed several potential upgrade options. The proposed upgrades typically include
one or more of the following actions:
Install new daylight harvesting control system;
Uncap existing skylights and install required lensing;
Install new Solatube Daylighting Systems;
Install bi-level HID controllers on existing luminaires to enable bi-level (High / Low) control;
Replace existing luminaires with new lower wattage LED high bay luminaires.
4.3 Impact of Modifications on Lighting Levels
The impact of the modifications on existing lighting levels should be neutral, with little change
evident to occupants. Although in illumination level may decrease in certain areas, typically
levels will be maintained or increased throughout the carpentry area.
4.4 Upgrade Options and Estimated Costs
4.4.1 Daylighting Option #1: Solatubes
This daylighting option includes the following actions:
Install 25 – 29” Solatube light pipes in the main area; and
Install 1 – 29” Solatube light pipe above the Living Wall feature on the North side.
The budget costs (material and labour) for this option is: $120,000
4.4.2 Daylighting Option #2: Skylights
This daylighting option includes the following actions:
Install skylight panels in the five existing skylight wells; and
Install 1 – 29” Solatube light pipe above the Living Wall feature on the North side.
The panels would be a Kalwall high-performance translucent skyroof system that would control
direct glare, reduce solar gain, and offer greater diffusion of light entering the space from the
skylights. Diffuse lighting is more controlled and more usable than direct sunlight penetration
entering into a space.
The budget costs (material and labour) for this option is: $50,000
4.4.3 Daylighting Option #3: Solatubes and Skylights
This daylighting option combines the Solatube and Skylight options described above and includes
the following actions:
![Page 9: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/9.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 7
Install 16 – 29” Solatube light pipes in the main area;
Install 1 – 29” Solatube light pipe at the Living Wall feature on the North side; and
Install skylight panels in the five existing skylight wells.
The budget costs (material and labour) for this option is: $130,000
4.4.4 Lighting Option #1: Daylight Harvesting
This lighting option includes the following actions:
Install photosensors and a control system configured to create three control zones within
the space;
Create and install a lighting zone map above the low voltage switches.
The low voltage control system with integrated daylight harvesting photosensors would switch
the existing HID luminaires ‘On’ and ‘Off’ based on the amount of ambient daylight contribution
in each of the three zones. The center zone will be re-wired into three sub zones to allow for
further control.
The budget costs (material and labour) for this option is: $10,000
4.4.5 Lighting Option #2: HID Bi-level retrofit and Daylight Harvesting
This lighting option includes the following actions:
Install bi-level HID controllers on all 45 metal halide highbays;
Install photosensors and a control system configured to create three control zones within
the space; and
Create and install a lighting zone map above the low voltage switches.
As the first threshold for daylight contribution is reached, all luminaires in the two rows of lights
at the North and South zones at the ends of the canopy would turn off. At the second threshold
level, half of the luminaires in the center zone will switch to ‘low’ mode operation. The third
threshold will trigger the remaining luminaires in the centre zone to switch to ‘low’ mode
operation.
The metal halide highbays would operate at 100% light output and 100% system power in ‘high’
mode operation, then drop to 45% light output and 55% system power in ‘low’ mode operation.
The budget costs (material and labour) for this option is: $22,000
4.4.6 Lighting Option #3: New LED High-bays and Daylight Harvesting
This lighting option includes the following actions:
Replace the existing luminaires with 45 new 155W LED highbay luminaires complete
with integrated daylight sensors and 0-10V dimming control;
Create and install a lighting zone map above the low voltage switches
This option will allow each individual luminaire to dim and switch ‘Off’ independently according
to the amount of ambient daylight contribution in each area of the canopy.
The budget costs (material and labour) for this option is: $35,000
4.5 Additional and Related Costs
Solatube pricing includes materials for tubes, collectors and mounting cap / curb, and installation
labour for the tubes.
![Page 10: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/10.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 8
Roofing costs have been included as part of the budget costs for each options. These costs include
the work to cut the holes to accommodate the light tubes, building of the mounting surround or
curb from roof to the mounting cap, and roofing work to seal the membrane and waterproof the
installation. These costs are estimates only and should be verified by a roofing or general
contractor.
Cost estimates do not include permit costs of an estimated 7% of project value.
Costs associated with additional architectural, structural engineering, or other consulting services
have not been included in the budget costs.
RJC (Reed Jones Cristoffersen Consulting Engineers) has previously performed consulting on the
envelope and roofing for this structure and other structures at BCIT; therefore, it is recommended
that they be engaged to review the structure in light of the intent of this project. They would be
able to advise of any impediments to implementation that should be taken into account and any
additional, yet unidentified costs related to the items / concerns that they may find from an
assessment.
Taxes are not included in pricing.
![Page 11: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/11.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 9
5. DAYLIGHTING SIMULATION RESULTS
We conducted daylight simulations for each of the three daylighting options. The results are
detailed in the following sections.
The carpentry area was divided into three separate calculation zones, North, Center, and South, in
order to more accurately estimate the ambient daylight contribution in each area. Detailed
drawings illustrating the three calculation zone, lighting layout, and simulation results can be
found in Appendix B.
Table 5 below outlines the various parameters utilized for the daylighting simulations and
analysis.
Table 5: Parameters for Daylighting Simulations
Location: Vancouver, BC
Date: March 21
Sky Conditions: Overcast
Times: 9:00AM / 12:00PM / 3:00PM
Target Illumination Level (average): 750 lux
March 21 represents an average day that occurs most frequently throughout the year. The amount
of daylight contribution will typically increase during the summer months and decrease during
the winter months.
5.1 Existing Conditions
Time of
Day
North Center South
Avg lux Avg lux Avg lux
9:00AM 1138 366 1328
12:00PM 1839 576 2153
3:00PM 1384 451 1617
Under the existing conditions the luminaires in the two outside rows at North and South ends are
typically not required for the majority of an average day. The Center area requires between 50%
and 100% of the artificial lighting throughout the day to meet the target light levels.
5.2 Daylighting Option #1: Solatubes
Time of
Day
North Center South
Avg lux Avg lux Avg lux
9:00AM 1260 610 1511
12:00PM 1972 825 2339
3:00PM 1529 696 1802
For this option the Center area requires between 10% and 75% of the artificial lighting during the
morning hours. During the afternoon hours all three zones can be shut ‘Off’ while still meeting
the target light levels. The North and South zones can be ‘Off’ during the morning hours as well.
![Page 12: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/12.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 10
5.3 Daylighting Option #2: Skylights
Time of
Day
North Center South
Avg lux Avg lux Avg lux
9:00AM 1230 494 1382
12:00PM 1926 745 2213
3:00PM 1456 599 1679
For this option the Center area requires between 25% and 100% of the artificial lighting during
the morning hours. During the afternoon hours all three zones can be shut ‘Off’ while still
meeting the target light levels. The North and South zones can be ‘Off’ during the morning hours
as well.
5.4 Daylighting Option #3: Solatubes and Skylights
Time of
Day
North Center South
Avg lux Avg lux Avg lux
9:00AM 1263 702 1456
12:00PM 2034 953 2295
3:00PM 1445 808 1863
For this option the Center area requires between 10% and 75% of the artificial lighting until
approximately 10:00 AM. After 10:00 Am all three zones can be shut ‘Off’ while still meeting
the target light levels. The North and South zones can be ‘Off’ during the majority of the day.
![Page 13: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/13.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 11
6. ENERGY & COST SAVINGS ANALYSIS
6.1 Energy Consumption
The existing HID system currently consumes an estimated 29,810 kWh annually. This estimate is
based on the current system operating 8 hours a day, 5 days a week, 45 weeks per year.
6.2 Estimated Energy Savings
The potential energy savings for each of the upgrade options are presented in the table below.
Table 6: Summary of Potential Energy and Cost Savings for Lighting Upgrade Options
Daylighting
Option Lighting Option
Demand
Savings
(kW)
Annual Energy
Savings
(kWh)
Annual Energy
Savings
(%)
Annual Electrical
Cost Savings
($)
No Change
Controls Only - 16,394 55% $1,475
HID Bi-level - 19,145 64% $1,723
New LED
Luminaires 10 25,342 85% $3,316
Solatubes
Controls Only - 20,203 68% $1,818
HID Bi-level - 24,386 82% $2,195
New LED
Luminaires 10 27,540 92% $3,514
Skylights
Controls Only - 20,203 68% $1,818
HID Bi-level - 22,639 76% $2,037
New LED
Luminaires 10 26,807 90% $3,448
Solatubes &
Skylights
Controls Only - 22,687 76% $2,042
HID Bi-level - 26,042 87% $2,344
New LED
Luminaires 10 28,238 95% $3,577
6.3 Economic Analysis
The estimated implementation costs and financial performance for each of the lighting options are
summarized in the table below.
Table 7: Summary of Lighting Upgrade Costs and Financial Performance
Daylighting
Option Lighting Option
Budget
Costs
($)
Annual
Energy Cost
Savings
($)
Annual
Maintenance
Cost Savings
($)
Simple
Payback
(yrs)
NPV
(20 yr)
IRR
(20 yr)
No Change
Controls Only $10,000 $1,475 - 6.8 $9,723 15%
HID Bi-level $22,000 $1,723 - 12.8 $1,032 7%
New LED
Luminaires $35,000 $3,316 $2,000 6.6 $32,266 15%
![Page 14: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/14.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 12
Daylighting
Option Lighting Option
Budget
Costs
($)
Annual
Energy Cost
Savings
($)
Annual
Maintenance
Cost Savings
($)
Simple
Payback
(yrs)
NPV
(20 yr)
IRR
(20 yr)
Solatubes
Controls Only $10,000 $1,818 - 5.5 $14,306 19%
HID Bi-level $22,000 $2,195 - 10.0 $7,337 10%
New LED
Luminaires $35,000 $3,514 $2,000 6.3 $34,910 16%
Skylights
Controls Only $10,000 $1,818 - 5.5 $14,306 19%
HID Bi-level $22,000 $2,037 - 10.8 $5,236 9%
New LED
Luminaires $35,000 $3,448 $2,000 6.4 $34,028 16%
Solatubes
& Skylights
Controls Only $10,000 $2,042 - 4.9 $17,294 22%
HID Bi-level $22,000 $2,344 - 9.4 $9,329 10%
New LED
Luminaires $35,000 $3,577 $2,000 6.3 $35,749 16%
The following table outlines the economic analysis with the budget costs for the different
daylighting options included.
Table 8: Summary of Total Project Budget Costs and Financial Performance
Daylighting
Option Lighting Option
Total Budget
Costs
($)
Simple Payback
(yrs)
NPV
(20 yr)
IRR
(20 yr)
No Change
Controls Only $10,000 6.8 $9,723 15%
HID Bi-level $22,000 12.8 $1,032 7%
New LED
Luminaires $35,000 6.6 $32,266 15%
Solatubes
Controls Only $130,000 71.5 -$105,694 -8%
HID Bi-level $142,000 64.7 -$112,663 -7%
New LED
Luminaires $155,000 28.1 -$85,090 -2%
Skylights
Controls Only $60,000 33.0 -$35,694 -3%
HID Bi-level $72,000 35.3 -$44,764 -3%
New LED
Luminaires $85,000 15.6 -$15,972 4%
Solatubes &
Skylights
Controls Only $140,000 68.6 -$112,706 -8%
HID Bi-level $152,000 64.9 -$120,671 -8%
New LED
Luminaires $165,000 29.6 -$94,251 -2%
![Page 15: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/15.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 13
7. RECOMMENDATIONS
Based on the results of our investigation, we recommend that BCIT implement the following
options:
Daylighting Option #3: Solatubes and Skylights
Lighting Option #3: New LED High-bays and Daylight Harvesting
The total estimated budget cost for these options is: $165,000
Utilizing the Solatube Daylighting Systems in addition to activating the skylights will maximize
the amount of daylight entering the space. As a result, the amount of artificial illumination
required to meet the IESNA recommended light levels will be minimized.
LED technology offers a number of advantages over the existing metal halide system, including:
Higher lamp efficacy (65 to 100+ lumens per watt or greater)
Long life expectancy (L70 rated life of 50,000+ hours)
Full Dimming Capability is Typically Standard
Instant On Operation
Zero Mercury Content
Additionally, the LED high-bay luminaires with individual daylight sensors provide more
potential for energy savings as each luminaire can dim and turn ‘Off’ independently throughout
the day based on the amount of daylight in each area. This also simplifies the installation as no
additional control system or re-wiring for zoning would be required.
Furthermore, the LED luminaires can significantly reduce maintenance costs compared to the
existing systems. The LED luminaires have a rated life of 50,000+ hours compared to 20,000
hours for metal halide lamps. Moreover, the life expectancy of LED systems is not impacted by
frequent dimming or switching as is typically the case for HID systems.
![Page 16: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/16.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd. 14
8. IMPLEMENTATION AND MONITORING
8.1 Implementation of Retrofit
The next phase of the project is the implementation of the energy management measures. This
would include design, specification, tender, and commissioning of the project.
The following steps outline a potential approach:
8.1.1 Designs and Specifications
Prism will provide detailed designs and specifications for the purchase and installation of
equipment for the project. Furthermore, test areas can be set up to demonstrate the suitability of
certain retrofit measures.
Separate specifications will be provided for the lighting and mechanical measures. The tender
packages will include product specifications and installation standards. The specifications will
also include general terms and conditions addressing issues such as contractor liability, contractor
insurance requirements and proper disposal of obsolete equipment.
We will meet with your assigned representative to review the designs and specification and to
address your specific needs. Prism’s familiarity with the building and recommended measures
will ensure that all measures are implemented according to the intent of the study.
8.1.2 Lighting Drawing Preparation
Prior to the implementation of the project, drawings will be produced to assist in the installation
of new lighting, repositioning of lighting or removal of excess lighting. These drawings will be
provided on an as required basis.
8.1.3 Tender and Contract Preparation
Contractor(s) invited to submit pricing will be selected based on their ability to perform the work
taking into account the Owner’s preferences. The tender will include a site meeting between
Prism and the invited contractors to thoroughly review the specification documents and scope of
work. Proposed equipment will be pre-approved by Prism Engineering prior to acceptance.
8.1.4 Tender Review and Recommendation
The bid review will include an evaluation of all tenders submitted by the invited contractors,
including compliance, price, installation schedule and contractor experience. Our
recommendations will be based on the fact that we are not affiliated with any products, suppliers
or contractors.
8.1.5 Installation Overview
We will review shop drawings submitted by contractors and will conduct field reviews to ensure
the installation complies with the specifications. We will assist in resolving any issues that might
occur during the course of the installation. Emphasis will be given regarding site clean up and
non-interference with occupants use of the building during the project.
8.1.6 Review and Testing
We will provide a final review of the equipment installed as part of the project to ensure
compliance with the specification requirements.
8.1.7 Project Management
Prism will work with Building’s project management team. We will meet with you to report on
the project as required and will make recommendations on contractor payment of various stages
of the project.
![Page 17: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/17.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd.
APPENDIX A: CONTACT INFORMATION
CLIENT CONTACT British Columbia Institute of Technology (BCIT)
Address 3700 Willingdon Ave, Burnaby, BC, V5G 3H2
Contact Name Alexandre Hebert
Title Energy and Sustainability Manager
Telephone (604) 451-7011
Email [email protected]
CONSULTANT CONTACT PRISM ENGINEERING LTD.
Address 320 – 3605 Gilmore Way, Burnaby, BC, V5G 4X5
Telephone (604) 298-4858
Fax (604) 298-8143
Website www.prismengineering.com
Contact Name Casey Gaetz, LC
Title Associate
Telephone (604) 205-5501
Email [email protected]
Contact Name Adam Franklin, EIT, LEED Green Associate
Title Electrical Engineer
Telephone (604) 205-5518
Email [email protected]
Contact Name
Alison Bodine
Title Electrical Designer
Telephone (604) 205-5525
Email [email protected]
![Page 18: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/18.jpg)
Daylighting Evaluation Report ERP Canopy, BCIT
Prism Engineering Ltd.
APPENDIX B: LIGHTING SIMULATION RESULTS
![Page 19: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/19.jpg)
BCIT E
RP C
ANOPY D
AYLIGHTING S
IMULATION
SKYLIGHTS A
ND S
OLATUBES
MARCH 2
1 9
:00AM O
VERCAST S
KY
Designer
AB & AF
Date
08/05/2014
Scale
Not to Scale
Drawing No.
1 of 1
Luminaire Schedule
Symbol QTY DescriptionLumens Per
LampLLF Wattage
17 Solatube SkyVault Daylighting System 9902 0.92 0
45 320W PS MH High Bay 22000 0.65 365
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min Avg/Max
Centre 702 lux 880 lux 339 lux 2.6:1 2.1:1 0.8:1
North 1263 lux 2682 lux 246 lux 10.9:1 5.1:1 0.5:1
South 1456 lux 3180 lux 339 lux 9.4:1 4.3:1 0.5:1
Simulation Results (Daylight Only)
![Page 20: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/20.jpg)
BCIT E
RP C
ANOPY D
AYLIGHTING S
IMULATION
SOLATUBES O
NLY
MARCH 2
1 9
:00AM O
VERCAST S
KY
Designer
AB & AF
Date
15/05/2014
Scale
Not to Scale
Drawing No.
1 of 1
Luminaire Schedule
Symbol QTY DescriptionLumens Per
LampLLF Wattage
26Solatube SkyVault Daylighting System with
Single-Glazed Dome9902 0.92 0
45 320W PS MH High Bay 22000 0.65 365
Simulation Results (Daylight Only)
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min Avg/Max
Centre 610 lux 815 lux 214 lux 3.8:1 2.9:1 0.7:1
North 1260 lux 2651 lux 260 lux 10.2:1 4.8:1 0.5:1
South 1511 lux 3387 lux 261 lux 13.0:1 5.8:1 0.4:1
![Page 21: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/21.jpg)
BCIT E
RP C
ANOPY D
AYLIGHTING S
IMULATION
SKYLIGHTS O
NLY
MARCH 2
1 9
:00AM O
VERCAST S
KY
Designer
AB & AF
Date
15/05/2014
Scale
Not to Scale
Drawing No.
1 of 1
Luminaire Schedule
Symbol QTY DescriptionLumens Per
LampLLF Wattage
1Solatube SkyVault Daylighting System with
Single-Glazed Dome9902 0.92 0
45 320W PS MH High Bay 22000 0.65 365
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min Avg/Max
Centre 494 lux 780 lux 292 lux 2.7:1 1.7:1 0.6:1
North 1230 lux 2706 lux 236 lux 11.5:1 5.2:1 0.5:1
South 1382 lux 3280 lux 284 lux 11.5:1 4.9:1 0.4:1
Simulation Results (Daylight Only)
![Page 22: CANOPY DAYLIGHTING EVALUATION - BCIT Commons · Daylighting Evaluation Report ERP Canopy, BCIT Prism Engineering Ltd. 6 4. PROPOSED UPGRADES 4.1 Purpose of Proposed Upgrades The purpose](https://reader033.fdocuments.us/reader033/viewer/2022043012/5fa8d5535d73904fc4589b61/html5/thumbnails/22.jpg)
BCIT ERP DAYLIGHT SIMULTION
EXISTING CONDITIONS
MARCH 21 9:00AM OVERCAST SKY
Designer
AB & AF
Date
15/05/2014
Scale
Not to Scale
Drawing No.
2 of 2
Luminaire Schedule
Symbol QTY DescriptionLumens Per
LampLLF Wattage
45 320W PS MH High Bay 22000 0.65 365
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min Avg/Max
Centre 366 lux 548 lux 162 lux 3.4:1 2.3:1 0.7:1
North 1168 lux 2660 lux 208 lux 12.8:1 5.6:1 0.4:1
South 1328 lux 3281 lux 201 lux 16.3:1 6.6:1 0.4:1
Simulation Results (Daylight Only)