Transcript of CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.
![Page 1: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/1.jpg)
CAnet 4 Update for DICEOttawa, 11 July 2006
René Hatem
![Page 2: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/2.jpg)
Current Layer 3 network
![Page 3: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/3.jpg)
Current Layer 3 network
![Page 4: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/4.jpg)
Current CAnet 4 network
Van Cal
Edm Sas
Reg Win
Vic
Sea
Tor Ott Mon Hal
Fre
Van Ott MonCal
Sea Chi
Kam Kel
NYC
NYC
Chi
Tor
Win
Edm Cal SeaCISCO ONS 1545 Nortel OME 6500 Nortel HDXc
NYC
Thu
1st and 2nd waves 3rd wave 4th wave 5th wave
![Page 5: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/5.jpg)
Network Topology
Van Cal
Edm Sas
Reg Win
Sea
Tor Ott
Hal
Fre
Van Ott MonCal
SeaChi
Kam Kel
NYCChi
TorWin
Mon
#1
NYC
Edm Cal SeaCISCO ONS 1545 Nortel OME 6500 Nortel HDXc
NYC
Vic
MonNew OME
ThuMon
#2
RISQ
1st and 2nd waves 3rd wave 4th wave 5th wave
![Page 6: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/6.jpg)
10GE LANPHY testing #1
●10GE LANPHY is a new type of the interface card for Nortel OME platform, the general availability is in the first quarter of 2007. The card will provide:
● VCAT capacity, can be sub-rated down to STS3c● 2 x 10GbE LANPHY ports
●The early deployment card is now available. CANARIE will purchase three cards for testing. Nortel will replace them once the general availability of the card is released.●It will support only
● one GE LANPHY port and ● sub-rated down to STS3c-32V (5G).
![Page 7: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/7.jpg)
10GbE LANPHY testing #2
●VCAT support give us the ability to utilize the SONET circuit efficiently.●For examples
● McGill Ultra video conferencing – require only 5G but take up a whole 10G circuit
● TRIUMF would have a 5G LP to CERN, multiple 1G to tier 2 site
![Page 8: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/8.jpg)
Eastern ROADM project
> Eastern ROADM – in partnership with ORANO– Chicago – Windsor/Detroit – Toronto – Ottawa – Montréal –
Albany – Boston – NYC– 20 year IRU from Level3 on Chicago to Detroit and Toronto to
NYC fibre pair– 14 year IRU from TELUS on Detroit to Toronto fibre pair– 34 equipment sites– Nortel CPL (Common Photonic Layer), 50GHz spacing, C-band,
qty72 10G channel capacity
![Page 9: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/9.jpg)
Western ROADM project
> Western ROADM – in partnership with BCNET and NETERA– Seattle – Victoria – Vancouver – Kamloops – Kelowna – Calgary– 12 year IRU from Bell Canada on entire route– 20 equipment sites– Nortel CPL (Common Photonic Layer), 50GHz spacing, C-band,
qty72 10G channel capacity
![Page 10: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/10.jpg)
Why are we doing this?
> LightPath allocations highest on following segments– Vancouver-Calgary– Chicago – Toronto, Toronto – Ottawa, Ottawa – Montréal– Toronto – NYC
> Low cost ROADM technology– low marginal cost of adding wavelengths– low OPEX relative to other DWDM technologies
> Great opportunity to lay longer term CAnet foundation– Eastern: expiry of Level(3) Fiber Co. deak in March 2006– Western: Bell willing to closely match Fiber Co. pricing
> Wavelength insertion/extraction right at the campus
![Page 11: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/11.jpg)
Eastern: Approx. Fibre Path
![Page 12: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/12.jpg)
Eastern: Layer 1 Topology
![Page 13: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/13.jpg)
Eastern: Co-management
> ORANO would own 25% of network capacity (18 λ) between Windsor and Ottawa
> Co-management will be phased-in to reduce complexity and minimize risk; CANARIE to manage on Day1
![Page 14: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/14.jpg)
Process and Deployment Status
1) Contract for Fibre & colo - complete2) Select equipment vendor - complete3) Receive preliminary design and submit PO - complete4) Receive fibre & colo – except 3 segments5) Vendor Perform Site Surveys – complete6) Vendor characterize fibre + validate design – except 4
seg. 7) Design equipment management configs - completed8) Manufacture and hot-stage equipment - under way9) Shipping of equipment – start in August10) Installation and turn-up – estimated complete in Oct '06
![Page 15: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/15.jpg)
Western: Approx fibre path
![Page 16: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/16.jpg)
Western: Layer 1 Topology
![Page 17: CAnet 4 Update for DICE Ottawa, 11 July 2006 René Hatem.](https://reader036.fdocuments.us/reader036/viewer/2022062305/56649cf85503460f949c9230/html5/thumbnails/17.jpg)
Process and Deployment Status
1) Contract for Fibre & colo – July '062) Select equipment vendor - complete3) Receive preliminary design and submit PO – July '064) Receive fibre & colo – 3 mths after contract signing5) Vendor Perform Site Surveys – Oct '066) Vendor characterize fibre + validate design – Oct '06 7) Design equipment management configs – Sep '068) Manufacture and hot-stage equipment – Nov '069) Shipping of equipment – Dec '0610) Installation and turn-up – Feb '07