Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign –...

20
Canadian PBN Implementation ICAO PBN Symposium October 16 th , 2012

Transcript of Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign –...

Page 1: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Canadian PBN Implementation

ICAO PBN Symposium October 16th, 2012

Page 2: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

• Examples of Canadian PBN implementation – Total system approach – Business case analysis – Collaborative development

Briefing points

2

Page 3: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Windsor-Toronto-Montreal (WTM) Airspace Redesign – Project Objectives

Enhance the efficiency of operations through the optimization of airspace design and technology

while maintaining safety

Page 4: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

WTM Geographic Scope WTM Geographic Scope

Page 5: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

CYYZ – Toronto Pearson 235,467 Movements in 1983

Windsor-Montreal Corridor ~1,700 IFR flights per day

Busiest Corridor in Canada

Page 6: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

CYYZ – Toronto Pearson 430,000 Movements in 2011

• 18th Busiest Airport in the World • Busiest Airport in Canada

Windsor-Montreal Corridor ~3,000 IFR flights per day

Busiest Corridor in Canada Air Traffic Management Strategy

developed in 1989

Page 7: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START
Page 8: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START
Page 9: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START
Page 10: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START
Page 11: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START
Page 12: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

WTM STAR Pre-WTM STAR

Page 13: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Business Case Analysis • ROI on behalf of our customers • Supports customers’ investment in equipment and the

costs of operational approvals • Timed investments by all parties • WTM – Landing Westbound

– Runway 24 Utilization – 54% ~ 181 days of use – Annualized = 181 X 25,915 kg = 4,690,615 kg – Annualized = 181 X 19.63 hrs = 3,553.03 hours – Avoided Fuel = 5,441,569 (Litres)

– Avoided Fuel Cost = $ 4,353,255 ($0.80/litre CAD)

– Avoided GHG Emissions = 14,307 (Metric Tons of C02e)

Page 14: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Simulation • Fast-time and real-time simulation • Customers’ aircraft simulators • Desktop Flight Management System models

Page 15: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Simulation versus real-life

Page 16: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Project specific • WTM – Windsor/Toronto/Montreal

Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services

Project - ongoing • START – Montreal STAR redesign Regional • FIR AOCMs - Twice a year hosted in

each FIR - Vancouver, Edmonton, Winnipeg, Toronto, Montreal, Moncton, Gander

National • NAV CANADA Performance-Based

Navigation Working Group - Monthly webinar/telecon

• ATOCC – Air Transport Operations Consultation Committee – Twice yearly

• Civil Aviation Regulatory Advisory Committee PBN Working Group – Quarterly meetings

Customer Consultation

NAV CANADA winner of IATA Eagle Award 2001, 2010, 2011

Page 17: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

PBN in the near term Alberta Airspace & Services Project

• New 14,000 foot parallel runway in May 2014 • 7120 foot separation, 5000-6000 foot stagger

Page 18: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Other PBN initiatives • Montreal START Project

– Redsigned STARs, include infrastructure for RNP RF transitions to final (Jan 2013)

• Winnipeg SID/STAR Redesign – RNAV basis, CDO/CCO, RF

• National BCA for implementation of RF path terminators

Page 19: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START

Thank you for your attention

Jeff Cochrane NAV CANADA

Manager, CNS Service Design [email protected]

Items for further discussion • Business case analysis • Collaborative development • Total System Approach

Page 20: Canadian PBN Implementation 3/4 J… · WTM – Windsor/Toronto/Montreal Airspace Redesign – Phase 2 started • AASP – Alberta Airspace and Services Project - ongoing • START