Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT...

17
Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators

Transcript of Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT...

Page 1: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Campus Kiosk Project

Spring, 2006

University Technology Fee Advisory Board &

College IT Administrators

Page 2: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Sun Ray System

• Thin Client

50 Sun Ray 170

Page 3: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Sun Ray System

• Dual Redundant Servers

Dual processor8GB RAM150GB diskGb Ethernet

Page 4: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Kiosk Countersper CSU Facilities

Page 5: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Kiosk Security

• Barrel & cable with padlock

• Security plate on back of display

Page 6: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Kiosk Locations

Page 7: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Kiosk Installation Priority

(Based purely on traffic & location)• Lory Student Center• Clark A Wing• Engineering (main auditorium foyer)• Clark C Wing• Engineering (Physics Entrance)*• Yates• Wagar*• Weber• Chemistry• Natural Resources• Education• Physiology*• Gifford• Sheperdson*• Natural & Environmental Sciences (NESB)*• Visual Arts*

* exact location not finalized

Page 8: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Project Timeline

Page 9: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Partnership withSun Microsystems

• List Price of Kiosk System:

$72,620• Grant from Sun: $47,620

• UTFAB cost of Kiosk System:

$25,000

Page 10: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

BudgetProposed

Given Current Locations

Sunray 170 (includes monitor) 1,049 1,049

Keyboard & Mouse 39 45

Back-End Servers & Licensing 500 358

Kiosk 600 771

Networking & Power 310 110

Security 50 7

  2,548 2,340

Number of Kiosks 50 50

Total Project 127,400 117,015

   

Sun Grant 70,300 47,620

Proposed to UTFAB 57,100

Approved by UTFAB 60,000 69,395

Page 11: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Next Steps

• Resolve Budget Overage• Locations in Question• Finalize Building Priorities• Identifying kiosks as an UTFAB

project• Kiosk System Policies

Page 12: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Next Steps

Resolve Budget Overage

• Reduce Scope of Project– Eliminate some buildings & re-prioritize– Eliminate some kiosks & re-priorit-ze

• Increase Budget Allocation– by $10K to cover current costs– by $15K to accommodate potential location

changes

Page 13: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Next Steps• Locations in Question

– Physiology replacing Pathology– Change of location in Wagar– Change of location in Engr (Physics)

• Have not heard about– NESB– Shepardson– Visual Arts

• Potential for– change in telecomm & counter costs– delay in installation

• Decision– bring all changes back to UTFAB– allow the location crew to make final choice

(Jason Huitt, Mark Ritschard, Scott Baily, Jim White)

Page 14: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Next Steps

Finalize Building Priorities• Lory Student Center• Clark A Wing• Engineering (main auditorium foyer)• Clark C Wing• Engineering (Physics Entrance)*• Wagar*• Weber• Chemistry• Natural Resources• Education• Physiology*• Yates• Gifford• Sheperdson*• Natural & Environmental Sciences (NESB)*• Visual Arts*

Page 15: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Next Steps

• Identifying kiosks as an UTFAB project and a grant from Sun– Banner above the kiosks?– Leetle stickers on ‘em?– Desktop credits?

Page 16: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Next Steps

• Kiosk System Policies– No authentication (log on)– Home Page (currently CSU)– no USB support (because of no

auth)– Kiosk management & LSC– Users agreeing to be nice?(aka agree-to-this-stuff-before-you-get-to-use-this-

thing)

Page 17: Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.

Future Possibilities

• Authentication– Using eID– Local user space (activates USB)– Smart cards useful for all