Campaign and Season Student Scheme 2010

20
8/3/2019 Campaign and Season Student Scheme 2010 http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 1/20 1 Campaign & Season Student Scheme (S ) This is for Internal use and not to be shared with Student. Strictly Confidential. 3

Transcript of Campaign and Season Student Scheme 2010

Page 1: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 1/20

1

Campaign

&Season Student

Scheme (S )

This is for Internal use and not to be shared with Student. Strictly Confidential.

3

Page 2: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 2/20

2

Page 3: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 3/20

3

Why New ACCPi10 Launch

 –  Technology is evolving rapidly and the world is moving

towards Digitization

 –  It is Important to be align with the Market Trends and

be ahead of competition viz NIIT and other Small I.T.

institutes

 – Today’s generation is aware of the varioustechnologies used in Market and so are the employers

 –  Therefore looking at the Market Trends and

requirement, Aptech has launched its New curriculum

with upcoming and most talked about technologies inMarket

Page 4: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 4/20

4

Salient Features

 –  Technology platforms from Oracle Sun Java and

Microsoft

 –  Introduction to Cloud Computing and Develop Cloud

application in SalesForce, Windows Azure and Google

AppEngine environments

 – Upgraded Java & .Net technologies

 –  Projects / eProjects

 –  Improved ‘Blended Learning’ delivery methodology

 –  Intensive Practice and Assessment Laboratory

workshops

 –  Laddered Learning Approach

Page 5: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 5/205

Campaign Route

 –  New ACCP launched in 2010, therefore it has been

Named as ACCPi10

 –  Our communication will link to 10 i.e. 10 reasons to

choose the NEW ACCP

 –  Visually depicting the 10 reasons / advantages that

leads the Student to join ACCP

 –  Highlight of the communication is the

 – Introduction to Cloud Computing – technology of 

Tomorrow

 – Latest versions of Java & .Net

 –  New Product is positioned as Tomorrow’s Technology

Today which implies that we are teaching the

upcoming and latest technology in Market

Page 6: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 6/206

 –  Program which gives Good Job / better Career prospect

 –  Project work that gives live experience of handling projects

 –  Program that teaches Latest and market in demand technologies

 – Qualified and Experience Faculties to teach and guide

 –  Industry Exposure through seminars and workshops

 –  Program that is recognized by various International Universities

leading to an Degree program through Academic Credit Transfer

 –  State-of-Art Infrastructure

 – Curriculum which globally accepted and well researched

?Which are the Factors that leads an student

to Join I.T. Institute / Program

Highlighting these factors, The new campaign is created and linked with

number 10

Page 7: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 7/207

Page 8: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 8/208

Launch of New ACCPcareer program

With latest technology

Aptech also Celebrating themost awaited event of

Vietnam  –1000 years ofHanoi celebration

Highlighting 10 reasons / factors which lead to Join

ACCP

Campaign

Page 9: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 9/209

In-center Poster

Page 10: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 10/2010

Outdoor Poster

Page 11: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 11/2011

Banner

Page 12: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 12/2012

Dangler

Page 13: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 13/2013

Insert

Page 14: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 14/20

14

Aptech Announces

Season Student Scheme ( S )3

Page 15: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 15/20

15

Objective of Scheme

 –  University Exam results will be declared on 22nd Aug 2010,

 –  Lot of potential students to join ACCP program

 –  Right time to introduce the scheme

 –  Motivation for students to enrol fast

 –  Focus is on encouraging student to choose

 –  HDSE program instead of CPISM / DISM

 – To pay fees in minimum number of installments

 –  Therefore student receives maximum discount( 20 %) for

enrolment to HDSE and on fee payment plan with 2installments

More

Enrolment

Good

Booking

Target

Achievement

Page 16: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 16/20

16

Option Period Option I Period Option Period Option III Period

DISM 675 1st Installment 608 1st Installment 1,300 1st Installment 1105 1st Installment

2nd Installment 2nd Installment 2nd Installment 2nd Installment

3rd Installment 3rd Installment 3rd Installment 3rd Installment

4th Installment 4th Installment 4th Installment 4th Installment

5th Installment 5th Installment 5th Installment 5th Installment

675 6th Installment 607 6th Installment 6th Installment 6th Installment

7th Installment 7th Installment 7th Installment 7th Installment

8th Installment 8th Installment 8th Installment 8th Installment

9th Installment 9th Installment 9th Installment 9th Installment

Total 1,350 1,215 1,300 1,105

Original Discounted Original Discounted

Installment PaymentCertificate

Installment PaymentInstallment Payment Installment Payment

City: Hanoi & Ho Chi Minh

Date: With Effective from 15th August 2010

 – DISM Scheme

10 % Discount 15 % Discount

2101 fee Plan Name: VN-ACCPi7.1-LVL-1.10-N-DISM-LS0-SPCL1

6602 fee Plan Name: VN-ACCPi7.1-LVL-1.10-N-DISM-LS0-SPCL1

2101 fee Plan Name: VN-ACCPi7.1-LVL-1.10-N-DISM-LS0-SPCL2

6602 fee Plan Name: V VN-ACCP-6602-LVL-1-DISM-LS-SPCL2

City Hanoi & Ho Chi Minh

Page 17: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 17/20

17

Option I Period Option I Period Option III Period Option III Period

HDSE 675 1st Installment 574 1st Installment 1,300 1st Installment 1,040 1st Installment

2nd Installment 2nd Installment 2nd Installment 2nd Installment

3rd Installment 3rd Installment 3rd Installment 3rd Installment

4th Installment 4th Installment 4th Installment 4th Installment

5th Installment 5th Installment 5th Installment 5th Installment

675 6th Installment 574 6th Installment 6th Installment 6th Installment

7th Installment 7th Installment 7th Installment 7th Installment

8th Installment 8th Installment 8th Installment 8th Installment9th Installment 9th Installment 9th Installment 9th Installment

Installment 10th Installment 10th Installment 10th Installment

Installment 11th Installment 11th Installment 11th Installment

675

 

Installment 574 12th Installment 1,300 12th Installment 1,040 12th Installment

Installment 13th Installment 13th Installment 13th Installment

Installment 14th Installment 14th Installment 14th Installment

Installment 15th Installment 15th Installment 15th Installment

Installment 16th Installment 16th Installment 16th Installment

Installment 17th Installment 17th Installment 17th Installment

675

 

Installment 573 18th Installment 18th Installment 18th InstallmentInstallment 19th Installment 19th Installment 19th Installment

Total 2,700 2,295 2,600 2,080

Original Discounted Original Discounted

Installment PaymentCertificate Installment PaymentInstallment Payment Installment Payment

City: Hanoi & Ho Chi Minh

Date: With Effective from 15th August 2010

 –  HDSE Scheme

15 % Discount20 % Discount

2101 fee Plan Name: VN-ACCPi7.1-LVL-1-HDSE-IN-SPCL1

6602 fee Plan Name: VN-ACCP-6602-LVL-1-HDSE-IN-SPCL1

2101 fee Plan Name: VN-ACCPi7.1-LVL-1-HDSE-IN-SPCL 2

6602 fee Plan Name: VN-ACCP-6602-LVL-1-HDSE-IN-SPCL 2

City: Hanoi & Ho Chi Minh

Page 18: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 18/20

18

Option I Period Option I Period Option III Period Option III Period

DISM - HDSE 750 1st Installment 675 1st Installment 1375 1st Installment 1100 1st Installment

2nd Installment 2nd Installment 2nd Installment 2nd Installment

3rd Installment 3rd Installment 3rd Installment 3rd Installment

4th Installment 4th Installment 4th Installment 4th Installment

5th Installment 5th Installment 5th Installment 5th Installment

675 6th Installment 607 6th Installment 6th Installment 6th Installment7th Installment 7th Installment 7th Installment 7th Installment

8th Installment 8th Installment 8th Installment 8th Installment

9th Installment 9th Installment 9th Installment 9th Installment

Total 1,425 1,282 1,375 1,100

CertificateInstallment Payment Installment Payment

Original Discounted Original Discounted

Installment PaymentInstallment Payment

City: Hanoi & Ho Chi Minh

Date: With Effective from 15th August 2010

 –  DISM - HDSE Scheme for Upgrade / Direct Entry

10 % Discount 20 % Discount

Upgrade fee Plan Name: VN-ACCPi7.1-LVL1.10-U-DISM toHDSE-IN1-SP

Direct Entry fee Plan Name: VN-ACCPi7.1-LVL-1.10-D-HDSE-IN1-10SPCL

Upgrade fee plan: VN-ACCPi7.1-LVL-1.10U-DISMtoHDSE-LSO-SP

Direct Entry fee Plan Name: VN-ACCPi7.1-LVL-1.10-D-HDSE-LS0-20SPCL

City: Hanoi & Ho Chi Minh

Page 19: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 19/20

19

Option I Period Option I Period Option III Period Option III Period

CPISM - HDSE 750 1st Installment 675 1st Installment 1,425 1st Installment 1,140 1st Installment

2nd Installment 2nd Installment 2nd Installment 2nd Installment

3rd Installment 3rd Installment 3rd Installment 3rd Installment

4th Installment 4th Installment 4th Installment 4th Installment

5th Installment 5th Installment 5th Installment 5th Installment

675 6th Installment 608 6th Installment 6th Installment 6th Installment

7th Installment 7th Installment 7th Installment 7th Installment8th Installment 8th Installment 675 8th Installment 540 8th Installment

9th Installment 9th Installment 9th Installment 9th Installment

10th Installment 10th Installment 10th Installment 10th Installment

11th Installment 11th Installment 11th Installment 11th Installment

675 12th Installment 607 12th Installment 12th Installment 12th Installment

13th Installment 13th Installment 13th Installment 13th Installment

14th Installment 14th Installment 14th Installment 14th Installment

15th Installment 15th Installment 15th Installment 15th Installment

16th Installment 16th Installment 16th Installment 16th Installment

Total 2,100 1,890 2,100 1,680

CertificateInstallment Payment Installment Payment

Original Discounted Original Discounted

Installment PaymentInstallment Payment

City: Hanoi & Ho Chi Minh

Date: With Effective from 15th August 2010

 –  CPISM - HDSE Scheme for Upgrade / Direct Entry

10 % Discount 20 % Discount

Upgrade fee Plan Name: VN-ACCPi7.1-LVL1.10-U-CPISMtoHDSE-IN1-SP

Direct Entry fee Plan Name: VN-ACCPi7.1-LVL-1.10-D-HDSE-IN1-10SPCL

Upgrade fee plan: VN-ACCPi7.1-LVL1.10-U-CPISMtoHDSE-IN1-SP

Direct Entry fee Plan Name: VN-ACCPi7.1-LVL-1.10-D-HDSE-IN2-20SP

Page 20: Campaign and Season Student Scheme 2010

8/3/2019 Campaign and Season Student Scheme 2010

http://slidepdf.com/reader/full/campaign-and-season-student-scheme-2010 20/20

20

• The schemes are valid till 30th Sep 2010

• In Oct 2010, we intend to plan 2 separate events for ACE & ARENA

• Event notes and artworks will be shared with you soon

•In case any queries please write to us on [email protected]