Page 1: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Cambi AS Skysstasjon 11APb 78 N-1371 Asker Norway

www.cambi.com E-mail: [email protected]: +47 66 77 98 00 Fax: +47 66 77 98 20

Norwegian Days’11 October 12 2011, VilniusBy Stefan Sandbacka

Page 2: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

• Established in 1989

• Today, 80 employees

• Built and delivered the first biogas plant in 1995 at Hamar, Norway

• Technology supplier within advanced anaerobic digestion technology

• Own patent: Thermal Hydrolysis Process

• Delivered > 25 biogas plants world wide, 7 plants under construction

• 800 GWh/year with renewable energy

• 300,000 ton/year reduction of CO₂ emissions

• Turnover 2010:                 NOK 227 mill (€ 28 mill)

• Est. turnover 2011:          NOK 411 mill (€ 51 mill)

Awarded the Oslo City Waste Biogas plant 2011, Contract value 43 mill Euro.

• ( largest contract in the company’s history)

CAMBI

Page 3: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

THE FOUNDER Odd Egil Solheim

Still testing out new ideas!

Page 4: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Biosolids:

Plants for enhanced biogas production from municipal & industrial

sludge

Biowaste:

Plants for biogas from source-separated organic waste

Biorenewables: • Biogas production from organic residues• Ligno-cellulosic biomass pre-treatment for bio-ethanol & biogas

Operations:

Cambi Operations provides support and operation services to

maximize plant performance

CAMBI’S BUSINESS AREAS

Page 5: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

………………….TO A BRIGHTER FUTURE – WITH BIOGAS

(First prototype)

Page 6: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

CAMBI THP PROCESS

Page 7: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

BIOGAS PRODUCTION

The Dublin THP digestion plant ... can produce 3.5m³/day of biogas per m³ of digester

capacity, which is 350% of the normal situation.”

Dublin, Ireland

Conventional treatment CAMBI THP

Page 8: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

CAMBI SIGNIFICANTLY REDUCES CARBON FOOTPRINT

”… installation of anaerobic digestion … significantly reduces carbon foot print, especially if dewaterability is improved” (Auty and Blake, 2008, Barber, 2009)

“… [The] thermal hydrolysis pretreatmentsystem at … Davyhulme … will reduce [United Utilities’] carbon footprint by 8% - the equivalent of removing 270,000 cars off the road for 30 years.”, March-April 2009, Worldwater

Page 9: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Benefits from the Cambi process

• Higher breakdown of material - produces more biogas

• Higher dewaterability – less cake with higher fertilizer value

• Higher digester load – smaller plant – smaller investment

• Sterilized sludge – can be spread on farmland

Page 10: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

General project information• Employer:

– Vilniaus Vandenys, the municipal Water and Wastewater Company of Vilnius

• Contractor– Consortium WTE Wassertechnik GmbH/Cambi AS– Regarding the internal relations in the Consortium Cambi in reality acts as a subcontractor to

WTE

• Localisation of plant: Vilnius, Lithuania• Existing sludge treatment plant, will be modified and extended

• Total Project value: App 58 mill EUR

• Cambi Project value: 5.9 mill EUR

• Key dates:• Contract award: 03.11.2008• Detailed engineering completed: 30.06.2009• Restart of project: 01.10.2010• Start Cambi installation: April 2011• Construction complete:15.11.2011• Start up of THP: 15.01.2012

Page 11: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Scope of work- Consortium

• Develop and modernize the sludge treatment systems at Vilnius Waste Water Treatment Plant (WWTP)

• Sludge thickening, digestion, sludge dewatering and low-temperature drying as well as the utilization of the produced biogas in a combined heat and power station.

• After modernisation, plant will treat sludge from Vilnius WWTP and surrounding water treatments plants

• New sludge treatment system will be integrated in existing buildings

• Turn Key delivery

Page 12: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Scope of work - CambiTurn key supply of Thermal Hydrolysis Plant (THP) which includes:

• Thermal Hydrolysis Plant (THP)– 1 pulper, 5 reactors, 1 flashtank and integrated control system

• 3 sludge coolers– Heat exchanger and fin-fan coolers

• Design and engineering related to the supplied plant

• Installation of supplied equipment

• Commissioning of all supplied plant on water

• Training of operators

• Operating and maintenance manual

Page 13: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

THP-plant

Page 14: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Sludge coolers

Page 15: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Experience from cooperation with Lithuanian companies

• Local company (RIFAS) is used for detailed design and installation of Control system and MCC.– Experience so far is good. (We do not know the conclusion until the plant has

started.)– Communication might sometimes be challenging due to missing English skills

among some of the employees.

• Local site representative hired through company Evikta– Evikta was engaged by WTE for construction application process– Experience is good– He is fluent in Lithuanian and English– Knowledge about local regulations– Personal/company authorisation is required for approval of installation work– Evikta is also used for minor mechanical modifications. Experience is good

with respect to quality and costs.

Page 16: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Experience from cooperation with Innovation Norway

• Innovation Norway was used for engaging the site representative

• Suggested potential companies that could offer the site representative service in addition to evaluation of companies suggested by Cambi.

• Prepared an evaluation of potential candidates

• Support during interwiev

• Support for writing the contract

Page 17: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Challenges related to the project in Vilnius

• Process for construction application– Detailed engineering (Technical design) had to be

completed for construction application.– A Lithuanian company (Evikta) prepared the

documentation for the application. – 5 months approval period for evaluation of the

application for Litianianian authorities was indcated at project start.

– The evaluation period was extended due to internal processes inside Lithuanian authorities

Page 18: Cambi AS Skysstasjon 11A Pb 78 N-1371 Asker Norway  E-mail: office@cambi.no Tel: +47 66 77 98 00 Fax: +47 66 77 98 20 Norwegian Days’11 October.

Future possibilities

• Sludge centers

• Biowaste plants

• Farm residuals