Call Us First! DO NOT RETURN TO STORE. - Lowes...

71
16826-W STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: [email protected] Our staff is ready to provide assistance April through October M-F 8:00 AM to 4:30 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST

Transcript of Call Us First! DO NOT RETURN TO STORE. - Lowes...

Page 1: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

16826-W

STOP!STOP!

Call Us First!DO NOT RETURN TO STORE.

For immediate help with assembly or product informationcall our toll free number:

1-800-577-9663or email:

[email protected]

Our staff is ready to provide assistanceApril through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM ESTNovember through March M - F 8:00 AM to 5:00 PM EST

Page 2: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

(This page intentionally left blank.)

Page 3: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

- CUSTOMER SERVICE -

Call: 1-800-577-9663 email: [email protected]

BEFORE YOU BEGIN

IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.

•BUILDINGRESTRICTIONSANDAPPROVALS Be sure to check with local building department and homeowners association for specific restrictions and/ or requirements before building.

. •ENGINEEREDDRAWINGSContact our Customer Service Team if engineered drawings are needed to pull local permits.

•SURFACEPREPARATION To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are

listed on page 7.

•CHECKALLPARTSInventory all parts listed on pages 4 - 6. Contact our Customer Service Team if any parts are missing or damaged.

•ADDITIONALMATERIALSYou will need additional materials to complete your shed. See page 3 for required and optional materials and quantities.

11/03/2015

KEEP THIS MANUAL FOR FUTURE REFERENCE

ACTUAL FLOOR SIZE IS 144" x 90" (365,8 x 228,6 cm)

16826-W

METROPOLITAN 12' x 7'-6" (365,8 x 228,6 cm)

ASSEMBLY MANUAL A Backyard Products Company

Page 4: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

2

TOOLS

Safety! Always use approved safety glasses during assembly.

OptionalRequired

HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.

ORIENT LUMBER AND TRIM FOR BEST APPEARANCE

= Assistance Required; two or more people.

= Ensure squareness.

= Important required step or operation.

= Helpful assembly hint.

= Mark part with pencil.

= Beginning of steps for assembly or installation.

= You have fi nished the assembly or installation.

= Level

� Gloves

Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.

Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)

A

� Safety Glasses

� Tape Measure

� Paint Tools

� Ladder

� Caulk Gun

� Hammer

� Level

FINISH

BEGIN

� Pencil

� Phillips Screwdriver

� Drill / Driver� 1/4" Drill Bit� 3/8" Drill Bit� 1/2" Drill Bit� #2 Philips Drive Bit

� Tool Belt/ Nail Pouch

� Chalk Line

� Nail Gun

• gun nails

� Tin Snips (for drip edge)

� Square or

� Utility Knife� Shingle Blades

B C

Page 5: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

3

COMPLETING YOUR SHED You will need these additional materials:

TO VALIDATE YOUR WARRANTY YOU MUST USE THE FOLLOWING:

FOUNDATION OR FLOOR MATERIALS

ADDITIONAL MATERIALS

DRIPEDGE.....................50Feet #15ROOFINGFELTTo cover 106 Sq. Ft. of roof area.

1"GALVANIZEDROOFINGNAILS.........1/4LbFor roofing felt.

REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.

3-TABSHINGLES.............................6Bundles

PAINTFORSIDING..........................2GallonsUse 100% acrylic latex exterior paint. (2) coats recommended. CAULK.................................................3TubesUse acrylic latex exterior caulk that is paintable.

1"GALVANIZEDROOFINGNAILS....3Lbs For shingles. PAINTFORTRIM.............................1QuartUse 100% acrylic latex exterior paint. WOODGLUE.......................ExteriorRated

REINFORCED WOOD FLOOR FRAME (OPTIONAL)

IMPORTANT! The included floor has been designed for general use. Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below). Below is a list of additional materials (not included):

x3

x6

2 x 4 x 87" (5 x 10 x 221 cm) Treated Lumber ea. 3" (7,6 cm) Hot Dipped Galvanized Nails

• This shed kit includes a complete wood floor system.

• This shed kit does not include ANY leveling materials.

• SeetheFLOORLEVELINGsectiononpage7forrecommendedmethodsandsuggestedmaterialstoproperlylevelyour floor,asthiswillvarydependingonyourspecificsite.

Optional 12" (30,1 cm) spacing.

• Standard spacing is 16" (40,7 cm).

Page 6: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

WOODSIZECONVERSIONCHARTNominalBoardSize ActualSize

1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm)

2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)

2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)

1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm)

PARTS IDENTIFICATION AND SIZES

RS RS

Part identification letters are stamped on some parts.

Check these locations for part stamp.

Treated lumber is stamped:

All treated lumber is stamped:

WA

LLS

x4 2 x 4 x 86" (5,1 x 10,2 x 218,4 cm) BLA

x2 2 x 4 x 80-11/16" (5,1 x 10,2 x 204,9 cm) JDA

x2 2 x 4 x 75-3/8" (5,1 x 10,2 x 191,5 cm) JCA

x2 2 x 4 x 86-1/4" (5,1 x 10,2 x 219,1 cm) FHA

x2 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) UM

PARTS LISTINVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.

RA

FTE

RS

TR

IM

x2 1 x 3 x 33 - 1/8" (2,5 x 7,6 x 84,1 cm)BPA

x7 2 x 4 x 64" (5,1 x 10,2 x 162,5 cm)UX

x3 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)SP

x2 2 x 4 x 40" (5,1 x 10,2 x 101,6 cm)SKA

x2 2 x 3 x 33-1/8" (5,1 x 7,6 x 84,1 cm)BQA

x4 19/32 x 2-1/2 x 9" (1,5 x 6,3 x 22,9 cm)EY

x2 2 x 4 x 86-1/8" (5,1 x 10,2 x 203,5 cm) JEA

3/4"(1,9 cm)

2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) x8 RD

x2 2 x 4 x 57-5/8" (5,1 x 10,2 x 146,4 cm)FGA

x1 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)GAA

x11 2 x 3 x 10-1/2" (5,1 x 7,6 x 26,7 cm)BRA

x2 1 x 3 x 72" (2,5 x 7,6 x 182,8 cm) HJx11 2 x 4 x 93-3/16" (1,5 x 10,2 x 236,7 cm)BOA

x2 19/32 x 3-1/2 x 48" (1,5 x 8,8 x 121,9 cm)ZT

x1 19/32 x 3-1/2 x 59-1/4" (1,5 x 8,8 x 150,4 cm)BXR

x1 19/32 x 3-1/2 x 59-1/4" (1,5 x 8,8 x 150,4 cm)HBA

x1 19/32 x 3-1/2 x 59-1/4" (1,5 x 8,8 x 150,4 cm)BXL

x1 19/32 x 3-1/2 x 60-3/8" (1,5 x 8,8 x 153,4 cm)HHA

x1 UN 2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)

x3 TP 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)

x1 19/32 x 3-1/2 x 24-3/8" (1,5 x 8,8 x 61,9 cm)ZZ

4

FLO

OR x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)

2 x 4 x 87" (5,1 x 10,2 x 220,9 cm)x10

x2 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)

Page 7: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

SO

FFIT

DO

OR

PARTS LIST continued...TR

IMC

OR

NE

R/F

RE

IZE

TR

IM

19/32 x 2-1/2 x 91" (1,5 x 6,3 x 231,1 cm)x2 BSA

19/32 x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm)x2 ZX

3/8 x 10-3/8 x 75-1/2" (1 x 26,3 x 191,8 cm)x1

x2 OO 1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,2 cm)

19/32 x 2-1/2 x 26-5/8" (1,5 x 6,3 x 67,6 cm)x2 AH

19/32 x 2-1/2 x 55-1/8" (1,5 x 6,3 x 140 cm)x2 FDA

x1 3/8 x 2 x 72" (0,9 x 5,1 x 182,8 cm)

x1 3/8 x 2 x 73-3/8" (0,9 x 5,1 x 186,4 cm)

x1 3/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)

x1 3/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)

x2 3/8 x 2 x 91-1/4" (0,9 x 5,1 x 231,7 cm)

x1 3/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)

x1 3/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)

x2 3/8 x 2 x 68-3/4" (0,9 x 5,1 x 174,6 cm)

x2 19/32 x 2-1/2 x 41-1/4" (1,5 x 6,3 x 104,8 cm)JFA

x2 19/32 x 2-1/2 x 24-3/8" (1,5 x 6,3 x 61,9 cm)CY

x1 2 x 3 x 59-1/4" (5,1 x 7,6 x 150,5 cm)GKA

x1 PT 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)

x2 OY 2 x 3 x 72" (5,1 x 7,6 x 182,8 cm)

x13/8 x 10-3/8 x 79-5/8" (1 x 26,3 x 202,2 cm)

x2 3/8 x 5-1/4 x 95-1/2" (1 x 13,3 x 242,5 cm)

5

PANEL PARTS LIST

RO

OF P

AN

ELS

FLO

OR

NOTE:Panelpartsarenotstamped.

Floorpanelsare5/8"(1,6cm)thick.Roofpanelsare7/16"(1,1cm)thick.

7/16 x 11-7/8 x 96"(1,1 x 30,2 x 243,8 cm)x2

7/16 x 11-7/8 x 60-1/8"(1,1 x 30,2 x 152,7 cm)x1

7/16 x 48 x 96"(1,1 x 121,9 x 243,8 cm)

x35/8 x 42 x 96"(1,5 x 106,6 x 243,8 cm)

5/8 x 48 x 90"(1,5 x 106,6 x 228,6 cm)

x1

x1

5/8 x 48 x 96"(1,5 x 121,9 x 243,8 cm)

x1

Page 8: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

WALL PANEL & DOORS PARTS LIST

x1LEFTDOOR

x1RIGHTDOOR

x2 BOXES

x4 BOXES

NAIL BOXES (not included)

VENTS / DOOR HARDWARE / WINDOWS

FASTENER/HARDWARE BAG

x13/8 x 42 x 96"

(1 x 106,7 x 243,8 cm)

x13/8 x 48 x 96"

(1 x 121,9x 243,8 cm)

x13/8 x 48 x 96"

(1 x 121,9x 243,8 cm)

x33/8 x 48 x 72"

(1 x 113,3 x 121,9 cm)

x13/8 x 48 x 84"

(1 x 122 x 213,4 cm)

x13/8 x 48 x 84"

(1 x 122 x 213,4 cm)

x13/8 x 42 x 96"

(1 x 106,7 x 243,8 cm)

x23/8 x 23-7/8 x 96"

(1 x 60,6 x 243,8 cm)

6

x255 2" (5,1 cm)

3" (7,6 cm)

x85

x76

x123

x4 1-1/4" (3,2 cm)

3/4" (1,9 cm)

2" (5,0 cm)

3" (7,6 cm)

2" (5,1 cm)

x180 1-1/2" (3,8 cm)

x2

8 x 16" (20,3 x 35,6 cm)

x21-1/2" (3,8 cm)

1/2" (1,2 cm)

x12

x164" Metal Threshold

3/4" (1,9 cm) x11Bagged separately / special coating

x2

Window16-1/4" x 22-1/4"(41,3 x 56,5 cm)

x3

9 X 27" (22,8 x 68,5 cm)

x1

x4

3/4”TechScrewwithdrillpoint

1-1/4” x8

3-PointDoorLockingMechanism

x1

1-1/4” x2

1-1/4” x2

Handle(locking)with Screwsx11 H2.5

Tie Plate

Page 9: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

7

DOOR

FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below.

Leveling materials are not included in this kit.

PREFERRED METHOD - 4x4 TREATED RUNNERS

Measurements to centerof4x4's.

• 3" Screws angled into 4x4.• (2) at each point frame• and 4x4 touch.

• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.

LEVELINGMETHODS

• If you are building your shed on a concrete foundation see the following page.CONCRETE

MATERIALREQUIRED

x2 4" x 4" x 12' (10 x 10 x 365,8 cm)Treated Lumber

FastenersforFrameto4"x4". (3" Screws shown as one option.) Minimum (40) 3" screws / exterior grade.

Useonlywoodtreatedforgroundcontactandfastenersapprovedforusewithtreatedwood.

Alwayssupportframeseams.

Levelinghigherthan16"notrecommended.

LEVELINGMATERIALSGravel

2x4 Treated LumberSolid Masonry Blocks in 1", 2", 4" or 8" thickness

Asphalt Shingles

8" Block4" BlockGravel

Gravel

Do not exceed 16".

4x4 Runner

Shingle

ShingleMaximum between leveling material locations.

48"12"

2x4 Treated Lumber

2" Block

Level

12"

12"(30,5 cm)

12"(30,5 cm)

Page 10: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

8

CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit

on a concrete slab refer to the diagram below.

• A treated 2 x 4" (5,1 x 10,2 cm) sill plate is required when installing your shed on concrete. Hint:Usetreatedlumberinyourkitor purchasefulllengthtreatedlumber. • Use a high quality exterior grade caulk beneath all sill plates. • Fasten 2 x 4" (5,1 x 10,2 cm) sill plates to slab using approved concrete anchors (fastenersnotincluded). • Check local code for concrete foundation requirements.

NOTES

Allow new concrete slabs to cure for at least seven (7) days.

2" x 4" x 12'-0" (5,1 x 10,2 x 365,8 cm)

2" x 4" x 7'-6" (5,1 x 10,2 x 229,6 cm)

Caulk

Requires:x2

x2x1

MUSTbetreatedlumber.

MUSTbetreatedlumber.

144"(365,8cm)144"x90"(365,8x228,6cm) 83"(210,9cm)12'x7'-6"(365,8x228,6cm) 90"(228,6cm)

AActualSize B CBuildingSize

A

BC

4"(10,2 cm)

3-1/2"(8,9 cm)

DOOR

Treated Sill Plate

Caulkbetweensillplateandconcrete.

Page 11: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

9

x10

x2

3" (7,6 cm) x44

2 x 4 x 87" (5,1 x 10,2 x 221 cm)

2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)

PARTSREQUIRED:

Centeronmarks

DOOR

FLOOR FRAME

Look for

StampTREATED

HINT:For easier nailingstandonframe.2

1

Use two 3" nails at each mark.

Orient parts as shown on fl at surface. Measure and mark.BEGIN

You have fi nished your fl oor frame. Proceed to level and square frame.FINISH3

FlushFlush

FlushFlush

TOENAILING

48"(121,9 cm)

48"(121,9 cm)

32"(81,3 cm)

16"(40,6 cm)

48"(121,9 cm)

64"(162,6 cm)

80"(203,2 cm)

90"(228,6 cm)

87"(221 cm)

96"(243,8 cm)

112"(284,5 cm)

128"(325,1 cm)

144"(365,8 cm)

96"(243,8 cm)

Page 12: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

10

FINISH5

LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.

A level and square fl oor frame is required to correctly construct your shed.

BEGIN

2

3

4

1

Use level and check the frame is level before applying fl oor panels.Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 169-13/16" (431,3 cm).

When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. Move to the opposite end of the frame. Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig.A).

Once the fl oor frame is level and square fasten the frame to the 4x4 runners at each point the frame contacts the 4x4 runners.

See page 7 for the preferred fl oor leveling method.

DOOR

First,secureat ends withonefastener.

Second,secureat ends withonefastener.

169-13/16"(431,3 cm)

169-13/16"(431,3 cm)

Fig.A

Page 13: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

11

48"(121,9 cm)

144"(365,8 cm)

6"(15,2 cm)

12"(30,5 cm)

Move to the opposite side. Using the long edge of the panel as a lever, move thepanel side-to-side until the top corner is flush to the floor frame (Fig.B).Secure panel with two 2" nails in the corners.

2

BEGIN1

3

4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.

Ensureyourfloorframeissquarebyinstallingonepanelandsquaringframe.

Fig.A

Check the floor frame is square by measuring diagonally across the frame corners. If the measurements are the same your floor frame is square. The measurement will be approximately 169-13/16" (431,3 cm) (Fig.C).

PARTSREQUIRED:

x1

x50

5/8 x 48 x 96"(1,6 x 121,9 x 243,8 cm)

Gridlinesup

Seam

Seam

2" (5,1 cm)

Flush

Flush

(2)Nails

FLOOR PANELS

3/4" (1,9 cm)

Fig.B Flush

(2)Nails

3/4" (1,9 cm)

Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (FigA). Secure panel with two 2" nails in the corners.

DOOR Fig.C

DOOR

169-13/16" (431,3 cm)

169-13/16" (431,3 cm)

DOOR

Page 14: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

12

42"(106,7 cm)

90" (228,6 cm)

144"(365,8 cm)

6"(15,2 cm)

48"(122 cm)

12"(30,5 cm)

PARTSREQUIRED:

FINISH7 You have fi nished attaching your fl oor panels.

Continue installing panels with rough side up (painted grid lines).

Use grid lines on panel for 2" nails 6" apart on edges, and 12" apart inside panels.

5

76

x1 x1

x91

5/8 x 48 x 90"(1,6 x 60,6 x 122 cm)

5/8 x 42 x 96"(1,6 x 106,7 x 243,8 cm)

Gridlinesup

2" (5,1 cm)

FLOOR PANELS

Flush

Flush

DOORFlush

Flush

Page 15: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

13

DOOR

Backwall

Front wall

Checkthefloorframeislevelafterinstallingfloorpanels.Re-levelifneeded.

HINT:

IMPORTANT!

•Thefloorshouldbeusedasastableworksurfaceforwallconstruction.

• Organizeyourassemblyprocedureduringthebuildprocess toavoidover-handlingofthewalls.

DOOR

Page 16: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

BACK WALL FRAMEPARTSREQUIRED:

HINT: For easier nailing standonframe.

x2 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) TP

x7 2 x 4 x 64" (5,1 x 10,2 x 162,5 cm) UX

x2 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) SPx32

14

3" (7,6 cm)

BEGIN

1

Use two 3" nails at each mark and four 3" nails at seams

Orient parts on edge on floor. Measure and mark.

2

UXx7

TP

SP

SP

TP

144"(365,8 cm)

120"(304,8 cm)

64"(162,5 cm)

1-1/2"(3,8 cm)

96"(243,8 cm)

96"(243,8 cm)

48"(122 cm)

72"(182,9 cm)

48"(122 cm)

24"(61 cm)

96"(243,8 cm)

TOENAILING3"(7,6cm)Nails

Page 17: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

15

BACK WALL PANELS

48 x 72"(121,9 x 213,4 cm)

PARTSREQUIRED:

x1

x452" (5,1 cm)

Fig.BFig.A

3/4" (1,9 cm)

3/4" (1,9 cm)

2 Nails

2 Nails

Place 48x72" panel onto wall frame with primed side up as shown.

Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig.A).

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

•Ensureyourwallframeissquarebyinstallingonepanelandsquaringframe.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails (Fig.B).

4

5

3

3/4"GAUGEBLOCK

GAA

Primedside up

Forsquarenessmaintain3/4"measurementalongpaneledges.

BEGINHERE

3/4"GAUGEBLOCK

•Ensuretopofpanelisoverhangingthetopofframeby4".

6"(15,2 cm)

4"(10,2cm)

3/4"(1,9 cm)

3/4"(1,9 cm)

48"(121,9 cm)

12"(30,5 cm)

Page 18: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

16

48"(121,9 cm)

3/4"(1,9 cm)

4"(10,2 cm)

3/4"(1,9 cm)

12"(30,5 cm)

6"(15,2 cm)

48"(121,9 cm)

4"(10,2 cm)

12"(30,5 cm)

6"(15,2 cm)

Place center 48"x72" panel on frame as shown with primed side facing up.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

6

Place end 48"x72"panel on frame as shown with primed side facing up. Nail using 2" nails 6" apart on edges and 12" apart inside panel.

7

You have fi nished building your back wall.FINISH9

48 x 72"(121,9 x 213,4 cm)

x2

x90

BACK WALL PANELS

PARTSREQUIRED:2" (5,1 cm)

8 Carefully fl ip the BACK wall over.

3/4"GAUGEBLOCK

GAA

3/4"GAUGEBLOCK

Flush

Primedside up

Primedside up

Forsquarenessmaintain3/4"measurementalongpaneledges.

Forsquarenessmaintainflushalongpaneledges.

Page 19: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

17

FRONT WALL FRAME

PARTSREQUIRED:

HINT: For easier nailing standonframe.

x2 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) UMx1 2 x 4 x 57-5/8" (5,1 x 10,2 x 146,4 cm) FGA

x4 2 x 4 x 86" (5,1 x 10,2 x 218,4 cm) BLAx1 2 x 4 x 86-1/4" (5,1 x 10,2 x 219,1 cm) FHAx1 2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm) UN

2 x 4 x 40" (5,1 x 10,2 x 101,6 cm) x2 SKA2 x 4 x 16-1/2" (5,1 x 10,2 x 42 cm) x1 RD

x343" (7,6 cm)

BEGIN

1

Use two 3" nails at each mark and four 3" nails at seams.

For front wall, orient parts on edge on floor. Measure and mark.

2

Flush

Flush

Flush

Flush

39" (99,1 cm)

24" (61 cm)

16-1/2" (42 cm)

40" (101,6 cm)

40" (101,6 cm)

24" (61 cm)

24" (61 cm)

16" (40,6 cm)

16" (40,6 cm)

57-5/8" (146,4 cm)

84-7/8" (215,6 cm)

94-1/2" (240,1 cm)89"

(226,1 cm)

69-1/2" (176,5 cm)

86-1/4" (219,1 cm)

144" (365,8 cm)

120" (304,8 cm)

104-1/2" (265,4 cm)

BLAx4

UMx2

UNRD

FHAFGA

SKASKA 64" (162,6cm)

Page 20: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

18

FRONT WALL FRAME

PARTSREQUIRED:

HINT:For easier nailingstandonframe.

2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) x3 RDx12

3" (7,6 cm)

Use two 3" nails at each mark.

Orient parts on edge as shown. Measure and mark.3

4

64"(162,6cm)

You have fi nished building your front wall frame.FINISH5

27-1/2"(69,9 cm)

115-3/8"(293,1 cm)

57-3/8"(145,7 cm)

28-3/8"(72,1 cm)

27-1/2"(69,9 cm)

27-1/2"(69,9 cm)

RDx3

Page 21: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

3/8 x 48 x 96"(1 x 121,9 x 243,8 cm)x1

19

PARTSREQUIRED:FRONT WALL PANELS

x402" (5,1 cm)

Place 48x96" left panel primed side up onto wall frame centered in door opening as shown.

Nail panel with two 2" nails 6" (15,2 cm) apart. Maintain 64" (162,5 cm) measurement between studs and square frame.

2

1

MAINTAIN64"DIMENSIONBETWEENSTUDS

Handlepanelswithcaretoavoidbreakage.

•Holdthe3/4"measurementalongleftedgeofpanel.Useagaugeblock.

•Ensuretopofpanelisoverhangingthetopofframeby6".

UNTILFRONTPANELSAREINSTALLED,HANDLECAREFULLYTOAVOIDBREAKINGATCORNERSANDEDGES.

CENTER CENTER

Primedside up

3/4"GAUGEBLOCK

Handlepanelswithcaretoavoidbreakage.

3/4"GAUGEBLOCK

6"(15,2 cm)

3/4"(1,9cm)

Forsquarenessmaintain3/4"measurementalongpaneledge.

Maintain Square

6"(15,2cm)

BEGINHERE

Page 22: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

3/8 x 48 x 96"(1 x 121,9 x 243,8 cm)

x1

OOx12 x 3 x 69" (5,1 x 7,6 x 175,3 cm) TEMPORARY SUPPORT

20

PARTSREQUIRED:FRONT WALL PANELS

x402" (5,1 cm)

x23" (7,6 cm)

Place 48x96" right panel primed side up onto wall frame flush to left panel.

Nail panel with two 2" nails 6" (15,2 cm) apart. Maintain 64" (162,5 cm) measurement between studs and square frame.

4

5

3

Use OO as a brace to maintain 64" (162,6 cm) opening. Use two 3" screws to attach.

MAINTAIN64"DIMENSIONBETWEENSTUDS

•Holdthe3/4"measurementalongrightedgeofpanel.Useagaugeblock.

•Ensuretopofpanelisoverhangingthetopofframeby6".

Primedside up

Forsquarenessmaintain3/4"measurementalong

paneledge.

Overhangtop6".

3/4"(1,9cm)

3/4"GAUGEBLOCK

Maintain Square

3/4"GAUGEBLOCK

InstallOOafterpanelsfortemporarybrace.

3"(7,6cm)Screw 3"(7,6cm)

Screw

Flush

Flush

6"(15,2cm)

6"(15,2 cm)

Page 23: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

3/8 x 23-7/8 x 96" (1 x 60,6 x 243,8 cm)x2

21

PARTSREQUIRED:FRONT WALL PANELS

x682" (5,1 cm)

Repeat steps 6 and 7 to attach the right panel.8

10

Place 23-7/8x96" panel onto wall frame fl ush to left 48x96" panel with primed side up as shown.• Ensure top of panel is overhanging the top of frame by 6".

Nail the panel using 2" nails 6" apart on edges.7

6

You have fi nished building your front wall.FINISH9

Carefully fl ip the FRONT WALL over.

6"(15,2 cm)

Flush

FlushFlush

Flush

6"(15,2cm)

6"(15,2cm)

MAINTAIN64"DIMENSIONBETWEENSTUDS

6"(15,2 cm)

Primedside up

Primedside up

Page 24: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

22

PARTSREQUIRED:

DOOR

First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.Angle nail to hit fl oor frame (Fig.B).

3

You have fi nished standing your BACK WALL.FINISH5

Secure side wall bottom plate to fl oor using 3" nails (Fig.B). 4

2

3" (7,6 cm)x12

2" (5,1 cm) x25

BACK WALL INSTALLATION

DOOR

3"Nailsintobottomplate.

3"(7,6cm)Screwsx2

BEGINStand backwall on fl oor. It is important to secure the backwall in the following order. ENSURE4"MEASUREMENTISATTOPOFBACKWALLASSEMBLY.

Center back wall assembly on the 144" fl oor dimension.1

144"(365,8 cm)

4"(10,2 cm)

Nail2"nailsfirst.

2"(5,1cm)Nails

3"(7,6cm)Nails

Fig.B

Use (2) JDA as a temporary brace. Level wall and secure JDA with two 3" screws (Fig.A).

x22 x 4 x 80-11/16" (5,1 x 10,2 x 204,9 cm) JDA

3" (7,6 cm)x2

Fig.A

JDA

TEMPORARY

Page 25: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

23

2" (5,1 cm)

PARTSREQUIRED(TEMPORARY):

DOOR

First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.Angle nail to hit fl oor frame (Fig.B).

3

You have fi nished standing your FRONT WALL. FINISH5

Secure front wall bottom plates to fl oor using (8) 3" nails (Fig.B). 4

3" (7,6 cm)x8

3" (7,6 cm)x4

x14

FRONT WALL INSTALLATION

BOAx2

3"Nailsintobottomplate.

3"(7,6cm)Screwsx4

LEVEL

BEGINStand front wall on fl oor.

Center front wall assembly on the 144" front fl oor dimension.

Use (2) BOA as temporary braces. Level wall and secure BOA with two 3" screws.

2

1 144"(365,8 cm)

Nail2"nailsfirst.

2"(5,1cm)Nails

3"(7,6cm)Nails

Fig.B

2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) x2 BOA

Fig.A

Page 26: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

24

PARTSREQUIRED:

DOOR

You have fi nished installing your DOUBLERS. FINISH4

3" (7,6 cm)x32

DOUBLER INSTALLATION

x1 2 x 4 x 48" (5,1 x 10,2 x 122 cm) SP

x1 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) TP

BEGIN

1

2 Use two 3" nails at each stud and four 3" nails at seam.

For back wall, orient parts on fl at on top of wall frame.BESUREDOUBLERSAREFLUSH.

3 For front wall, use 3" nails as shown. Use (4) 3" nails at seam.

BESUREDOUBLERSAREFLUSH.

SP

TP

3"(7,6cm)Nails

Stagger seams

Flush

Flush

Flush

x1 2 x 4 x 86-1/4" (5,1 x 10,2 x 219,1 cm) FHA

x1 2 x 4 x 57-5/8" (5,1 x 10,2 x 146,4 cm)FGA

3"(7,6cm)Nails

Flush

Flush

Flush

FGA

FHA

Stagger seams

Page 27: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

DOOR

25

2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) x2 BOA

BOA

BOA

3" (7,6 cm)x8

OUTER RAFTER INSTALLATIONPARTSREQUIRED:

3"(7,6cm) Screw

3"(7,6cm) Screw

BEGINRest one outer rafter on front and back wall doublers. Ensure rafter is flush to back wall panel (Fig.A) and flush to end of back wall doubler (Fig.B).

Secure back of outer rafter using 3" screw installed centered into outer rafter end (Fig.A) and afterwards toenailed into inside of rafter (Fig.B).

Secure front of outer rafter using 3" screws installed centered into outer rafter end (Fig.C) and afterwards toenailed into inside of rafter (Fig.D).

Repeat Steps 1-4 for opposite side outer rafter.

Orient front of outer rafter flush to front wall panel (Fig.C) and flush to end of front wall doubler (Fig.D).

1

2

4

5

3

3"(7,6cm) Screw

Flush

Fig.A

3"(7,6cm) Screw

Flush

Fig.C

3"(7,6cm)Screw toenailed

Flush

Fig.B

3"(7,6cm)Screw

toenailed

Flush

Fig.D

DONOTOVER-DRIVESCREWTHROUGHPANEL.

Page 28: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

26

2" (5,1 cm)x20

OUTER RAFTER INSTALLATIONPARTSREQUIRED:

x2 H2.5TiePlate

Attach tie plates with 2" nails as shown.6

You have fi nished installing your outer rafters.FINISH7

2"(5,1cm)Nails

Page 29: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

27

3" (7,6 cm)x54

RAFTERSPARTSREQUIRED:

2 x 4 x 93-3/16" (5,1 x 10,2 x 236,7 cm) x9 BOA

Place rafter on front and back wall doublers. Line up rafter centered with marks. Ensure rafter is flush to back wall panel (Fig.A) and flush down on top of back wall doubler (Fig.B).Secure back of rafter using 3" screw installed centered into outer rafter end (Fig.A).

Toenail each end of rafter into doubler using 3" screws (Fig.B,Fig.D).

Repeat steps 2 through 5 to install (6) remaining rafters.

Line up rafter centered with marks on front doubler. Ensure rafter is flush to front wall panel (Fig.C). and resting flush on top of front doubler (Fig.C). Secure front of rafter using 3" screw installed centered into outer rafter end (Fig.C).

2

3

5

6

DONOTOVER-DRIVESCREWTHROUGHPANEL.

BEGINStarting at end as shown, measure and mark location of each rafter.1

4

3"(7,6cm) Screw

Flush

Fig.CFlush

BEGINHERE

10"(25,4 cm)

26" (66,1 cm)42" (106,7 cm)

58" (147,4 cm)74" (188 cm)

DOOR

90" (228,6 cm)

106" (269,3 cm)122" (309,9 cm)

138" (350,5 cm)

Fig.D

3"(7,6cm)Screws

toenailed

3"(7,6cm) Screw

Flush

Fig.A

3"(7,6cm)Screws

toenailed

FlushFig.B

Page 30: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

28

OUTER RAFTER INSTALLATIONPARTSREQUIRED:

You have fi nished installing your rafters.FINISH

8

x9 H2.5TiePlate

Attach (9) tie plates with 1-1/2" nails as shown.7

•Attachfarlefttieplatereversedpositionfromothers(Fig.A).

•HINT:Look for the"Simpson" name on the tie plate.

1-1/2"(3,8cm)Nails

Fig.A

LEFT

RIGHT

DOOR

1-1/2" (3,8 cm)x90

Page 31: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

3/8 x 48 x 84"(1 x 121,9 x 213,4 cm)

x1 3/8 x 42 x 96"(1 x 106,7 x 243,8 cm)

x1

29

PARTSREQUIRED:SIDE WALL PANELS

x121-1/2" (3,8 cm)

3/8 x 42 x 96"(1 x 106,7 x 243,8 cm)

x1 3/8 x 48 x 84"(1 x 121,9 x 213,4 cm)

x1

x32" (5,1 cm)

1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)x1 OO

Place 42x96" panel primed side out onto OO ledge board flush with front wall stud. Ensure 1" overhang at bottom of panel. Secure panel with two 2" nails in the corners (Fig.A). Ensure the measurement between the panel edges are the same along the entire length (Fig.B). Angle nails to hit floor frame (Fig.C).

Attach OO as a support-ledge to to help install side wall panels. Measure down from floor 1" and mark. Ensure OO is level and centered. Secure to floor joist with two 3" screws.

Move to the top of panel. Using the long edge of the panel as a lever move the panel side-to-side until top of panel is flush with front wall stud. Secure upper corner with (1) 1-1/2" nail into rafter (Fig.D). Ensure 1" panel overhang at bottom of panel (Fig.D).

3

2

1

Fig.D

1-1/2"Nail

Flush

1"(2,5 cm)

BEGIN

Fig.A

Fig.C

Fig.B

2" Nails

42"(106,7 cm)

1"(2,5 cm)

Primedside out

Flush

Flush

SameMeasurement

3" (7,6 cm)x2

1" (2,5 cm) 1" (2,5 cm)

TEMPORARYSUPPORT

3" Screws

LEVEL

OO

OO

Page 32: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

30

PARTSREQUIRED:SIDE WALL PANELS (continued)

x162" (5,1 cm)

x451-1/2" (3,8 cm)

Fig.A

2"(5,1cm)Nails

1-1/2"(3,2cm)Nails

1-1/2"(3,2cm)Nails

1-1/2"(3,2cm)Nails

6"(15,2 cm)

6"(15,2 cm)

6"(15,2 cm)

6"(15,2 cm)

2"(5,1cm)Nail

Remove temporary ledger OO.5

Place 48x84" panel onto side wall fl ush with bottom of 42x96" panel with primed side up, as shown. Secure panel with 2" nails in three corners (Fig.E). Ensure the measurement between the panel edges are the same along the entire length (Fig.B). Angle nails to hit fl oor frame (Fig.C).

4

Fig.EPrimedside up

Fig.C Fig.B

1-1/2"Nails

2" Nail

Flush

Flush

42"(106,7 cm)

SameMeasurement

6 Nail lower edge of panel to fl oor using 2" nails 6" apart. Angle nail to hit fl oor frame (Fig.A).

Nail side wall panels to rafter and wall studs using 1-1/2" nails 6" apart as shown.7

Repeat Steps1-7 to attach the opposite side panels.8

You have fi nished installing your side panels. Proceed to install SIDE WALL STUDS.FINISH9

OO

Page 33: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

31

PARTSREQUIRED:SIDE WALL STUDS

x22 x 4 x 80-11/16" (5,1 x 10,2 x 204,9 cm) JDA

x22 x 4 x 86-1/8" (5,1 x 10,2 x 218,8 cm)

JEA

x22 x 4 x 72-5/8" (5,1 x 10,2 x 184,5 cm) JCA 3" (7,6 cm)

x18

16-1/2"(41,9 cm)

16-1/2"(41,9 cm)

2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) x1 RD TEMPORARYGUIDE

Repeat Steps 1-2 to attach the opposite side SIDE WALL STUDS.

3

Fig.B

Fig.A

CenterJDAonseam of wall

panels.

JEAJDA JCA

RD

3"(7,6cm)Screw

DOOR

MARK

BEGINInstall JDA centered at seam of side wall panels (FigA). Use a square to ensure 90 degree squareness of studs (JDA,JCAandJEA).

Mark locations of studs and ensure 90 degrees angle at top of each stud.

HINT: Use RD as a guide to hold 16-1/2" between studs.

Secure side wall studs with 3" screws into end rafters and fl oor frame (FigB).

1

2

2

You have fi nished installing your SIDE WALL STUDS.

Proceed to fi nish nailing side wall panels.

FINISH4

Flush to rafter

Flush to rafterFlush to rafter

Page 34: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

32

PARTSREQUIRED:SIDE WALL PANELS

1-1/2"(3,2cm)Nails

6"(15,2 cm)

12"(30,5 cm)

x581-1/2" (3,8 cm)

You have fi nished nailing your SIDE WALL PANELS.FINISH11

Nail side wall panels to inside wall studs using 1-1/2" nails 6" apart along panel seam and 12" apart in middle of panels as shown.

Measure, align and mark side wall studs 24" from center of panel seam as shown.

9

9

Repeat Step9 to nail the opposite side panels.10

20"(50,8 cm)

20"(50,8 cm)

Page 35: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

33

WINDOWSONRIGHTSIDEWALL

WINDOWSONLEFTSIDEWALL

CHOOSEYOURSIDEWALLWINDOWSLOCATIONATTHISTIME.

STOP

SIDE WALL WINDOW FRAMING

PARTSREQUIRED:3" (7,6 cm)

x16

2 x 4 x 16-1/2" (5,1 x 10,2 x 41,9 cm) x4 RD

Choose the side wall you want to install your windows on.

From inside, measure and mark locations of (4) RD. Secure with 3" screws.2

3"(7,6cm)Screws

AnglenailtohitRD

3-1/2"(8,9 cm)

24-1/2"(62,2 cm)

41-1/2"(105,4 cm)

1BEGIN

Page 36: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

34

SIDE WALL WINDOW CUTOUT

PARTSREQUIRED:

3/8" (1,0 cm)Drill Bit

Using a 3/8" drill bit, drill a hole through both wall panels in each corner of window framing.

From outside, mark straight lines connecting the holes.

Cut along lines using a saw. Carefully trim panel openings after cutting as necessary.

3

3

4

You have fi nished preparing your SIDE WALL for window installation.FINISH5

Pre-drill hole3/8"(1.0cm)

Page 37: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

9" (22,9 cm)

35

ROOF PANELS

PARTSREQUIRED: x42" (5,1 cm)

11-7/8x96"(30,2x244cm)

7/16 x 11-7/8 x 96"(1,1 x 30,2 x 244 cm)

x17/16 x 11-7/8 x 60-1/4"(1,1 x 30,2 x 152,7 cm)

x1

11-7/8x60-1/4"(30,2x152,7cm)

Roofpanelsmaycauseseriousinjuryuntilsecurelyfastened.

1BEGIN

Place the 11-7/8x96"lower roof panel with the rough side up (painted-grid lines side) with 2-7/8" overhang from back wall panel (FigA). Ensure the panel measures 3/4" (1,9 cm) along the length of the rafter(Fig.B). Secure panel with 2" nails as shown.

DOOR

DOOR

Place the 11-7/8x60-1/4"lower roof panel with the rough side up flush to installed 11-7/8x96"panel. Ensure the 11-7/8x60-1/4"roof panel measures 2-7/8" (8,3 cm) overhanging back wall panel (FigB) and is also flush with installed panel (FigC).

Secure panel with 2" nails as shown.

2

Flush Fig.C

2-7/8" (8,3 cm)

2-7/8" (8,3 cm)

2-7/8" (8,3 cm)

2-7/8" (8,3 cm)

Fig.A

NOTE: Measurement from back wall panel.

3/4" (1,9 cm)

Fig.B

GaugeBlock

Flush

2-7/8" (8,3 cm)

Fig.BNOTE: Measurement from back wall panel.

9"

(22,9 cm) Measureup9"andsnapachalkline.

Page 38: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

36

x17/16 x 48 x 96"(1,1 x 121,9 x 244 cm)

x4

ROOF PANELS

PARTSREQUIRED:2" (5,1 cm)

48x96"(121,9x244cm)

3/4"GAUGEBLOCK

GAA

Two Nails

Two Nails

Move to the outside edge. Using the long edge of the panel as a lever move the panel side-to-side until the outside long edge is at 6" (15,2 cm) measurement overhanging the outer rafter (FigD).

Secure with two nails.

Youmayneedtomoveyourentireroofframetomakepanellineupwith6"overhangmeasurement(Fig.D).

4

You must square the roof by attaching one 48x96" panel at this time. You will use the panel's long edge as a lever to bring your roof into square. Place the 48x96"roof panel as shown with the rough side up. Use a gauge block to ensure the panel measures 3/4" (1,9 cm) along the length of the rafter(Fig.A) Panel should be flush with top edge of lower installed roof panel.

Secure with two nails.

Roofpanelsmaycauseseriousinjuryuntilsecurelyfastened.

DOOR

DOOR

3

3/4" (1,9 cm)

Fig.A

GaugeBlock

Flush

Flush

6" (15,2 cm)

6" (15,2 cm)

NOTE: Measurement from rafter edge.

Fig.D

6" (15,2 cm)

Page 39: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

37

7/16 x 48 x 96"(1,1 x 121,9 x 244 cm)

x27/16 x 11-7/8 x 96"(1,1 x 30,2 x 244 cm)

x1

x167

ROOF PANELS

PARTSREQUIRED:2" (5,1 cm)

11-7/8x96"(30,2x244cm)

12"(30,5 cm

)

6"(15,2 cm

)

6"

(15,2 cm)

Flush

Fig.G

Flush

Flush

DOORFINISH

8 You have fi nished installing your ROOF PANELS.

DOOR

Nail the fi rst 48x96"roof panel using 2" nails 6" apart on edge and 12" apart inside panel.

Locate the second 48x96" roof panel with the rough side up fl ush to fi rst panel along edge and at both corners (Fig.E,F). Repeat nailing pattern.

Nail the third 48x96"roof panel with the rough side up fl ush to second 48x96"panel. Repeat nailing pattern.

Ensure the 48x96"roof panel is fl ush to installed roof panels (Fig.F,G).

Nail the 11-7/8x96"roof panel with the rough side up fl ush to third 48x96"panel using 2" nails 6" apart.

Ensure the 11-7/8x96"roof panel is fl ush to installed roof panels (Fig.E,F).

5

6

7

48x96"(121,9x244cm)

48x96"(121,9x244cm)

12"(30,5 cm

)

12"(30,5 cm

)

6" (1

5,2 cm)

6" (1

5,2 cm)

DOOR

Flush

Flush

Fig.E

Flush

Flush

Fig.E

Flush

Fig.F

Flush

Fig.F

Page 40: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

38

90o

RAFTER EXTENSIONS

PARTSREQUIRED:

2 x 3 x 10-1/2" (5,1 x 7,6 x 26,7 cm) x11 BRA

x282" (5,1 cm)

Line up each rafter extension BRA 90 degrees square with rafters as shown. Secure rafter extensions with screws through roof panels (Fig.A).

• At roof panel seams use 4 screws (Fig.B).

• Use screws at rafter ends as a guide to line up BRA with rafter ends.

•Lineupwithrafterscrew.

• Ensure BRA extensions at each side are fl ush with side wall panels (Fig.C).

FINISH

2

Fig.B

Fig.A

SQUARE

SQUARE

DOOR

• DONOTOVER-DRIVESCREWSTHROUGHROOFPANELS.

You have fi nished installing your RAFTER EXTENSIONS.

BEGIN

1

FlushFig.C

Fig.C Flush

Flush

Tight

Page 41: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x21 x 3 x 72" (2,5 x 7,6 x 182,8 cm)

x21 x 3 x 33 - 1/8" (2,5 x 7,6 x 84,1 cm)BPA

HJ

39

2" (5,1 cm)x16PARTSREQUIRED:

SIDE RAKE FRAMING

1 Align BPAedge fl ush with rafter extension BRA(FigA). Attach with (3) 2" nails (FigB).BEGIN

HJBPA

BRA

2

3

4

Attach HJ fl ush with BPAwith (5) 2" nails. (FigA,FIg.B)

Repeat Steps 1-2 on opposite side.

You have fi nished installing your gable rake framing.FINISH

Fig.B

2" Finish Nail

Flush

Flush at seam

Angled EndsFlush

Fig.A

Page 42: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

40

PARTSREQUIRED:

SIDE SOFFIT

x202" (5,1 cm)

1

2

Attach 95-1/2" soffi t BR primed side down fl ush to front wall panel (Fig.A). Secure to side rake frame BPA using (7) 2" fi nish nails (Fig.A,B).

Repeat Step 1 on opposite side.

BEGIN

You have fi nished installing your side soffi t panels.FINISH3

2" Finish Nails

2" Finish Nails

FRONTWALLPANEL

x23/8 x 5-1/4 x 95-1/2" (1 x 13,3 x 242,5 cm)

Fig.A

Fig.B95-1/2"(242,5cm)

Flush

Flush

Flush

BPABPA

BPA

BR

BR

Page 43: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

3/8 x 10-3/8 x 75-1/2" (1 x 26,3 x 191,8 cm)x1 x1

3/8 x 10-3/8 x 79-5/8" (1 x 26,3 x 202,2 cm)

41

1 Attach 75-1/2" soffi t primed side down under rafter extensions BRA fl ush to side wall soffi t (Fig.A). Ensure soffi t is fl ush to front wall panel. Secure to BRA using (12) 2" fi nish nails as shown. Toenail at right side of soffi t into BRA(Fig.B).

Attach 79-5/8" soffi t primed side down under rafter extensions BRA fl ush to side wall soffi t (Fig.C). Ensure soffi t is fl ush to front wall panel. Secure to BRA using (12) 2" fi nish nails as shown. Toenail at left side of soffi t into BRA(Fig.D).

BEGIN

PARTSREQUIRED: x242" (5,1 cm)

FRONT SOFFIT

2

You have fi nished installing your front soffi t panels.FINISH3

2" Finish Nails

Fig.A

Fig.C

75-1/2"(191,8cm)

79-5/8"(202,2cm)

BRA

Flush

Flush

Fig.B

BRA

Fig.DBRA

Flush

Flush

BPA

Page 44: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

FRONT FASCIA TRIM

42

PARTSREQUIRED:2" (5,1 cm)

x24

FINISH3 You have fi nished installing your front fascia

Measure 1/4" past left roof panel and line up HHA primed side out and fl ush up under roof panels (Fig.A). Right side of HHA is approximately 3/4" from center of rafter extension BRA. Secure HHA with 2" fi nish nails into BRA (Fig.B).

BEGIN1

Position ZXprimed side out, fl ush with HHAand fl ush up under roof panels.Secure ZX with 2" fi nish nails into BRA (Fig.B).

2

x119/32 x 3-1/2 x 60-3/8" (1,5 x 8,8 x 153,4 cm)HHA

19/32 x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm)x1 ZX

2" Finish Nails

2" Finish Nails

1/4"

3/4"APPROXIMATELY

60-3/8"(153,4cm)

FRONTWALL

Flush

Flush

Flush

Flush

Flush

BRA

HHA

ZXHHA

Fig.B

BRA

2" Finish Nails

Fig.B

BRA

2" Finish Nails

1/4"

Fig.A

Page 45: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

SIDE FASCIA TRIM ASSEMBLY

43

FINISH5 You have fi nished assembling the side fascia trim.

Place BXRandZTprimed side up and fl ush with BQA and OY. Attach with 2" fi nished nails as shown (Fig.B,C).

Place BXRandZTprimed side up and fl ush with BQA and OY. Attach with 2" fi nished nails as shown (Fig.D,E).

Fig.A

Fig.C

PARTSREQUIRED: x282" (5,1 cm)x2

2 x 3 x 33-1/8" (5,1 x 7,6 x 84,1 cm)BQA

x219/32 x 3-1/2 x 48" (1,5 x 8,8 x 121,9 cm)ZT

x119/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm)BXR

x119/32 x 3 - 1/2 x 59 - 1/4" (1,5 x 8,8 x 150,4 cm)BXL

x2 OY2 x 3 x 72" (5,1 x 7,6 x 182,8 cm)

BEGIN1

2

4

3

OY

OY

BQA

BQA

Fig.B

EdgesofBXRandBQAareflush.

BXL ZT

OYBQA

Fig.D

EdgesofBXRandBQAareflush.

BXRZT

OY BQA

To build left side fascia assembly place BQA and OY end to end on a fl at surface (Fig.A).

Fig.C

Flush

Fig.E

Flush

To build right side fascia assembly place BQA and OY end to end on a fl at surface (Fig.C).

Page 46: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

SIDE FASCIA TRIM

44

PARTSREQUIRED: x122" (5,1 cm)

BEGIN

1

Hold left side fascia assembly tight to front fascia trim (Fig.B).

Place left side fascia assembly between roof sheathing and side soffi t (Fig.A).

You are fi nished installing your side fascia trim.FINISH7

6 Repeat Steps 1-5 on opposite side to install right fascia.

5 Nail front fascia to side fascia with (2) 2" fi nished nails (Fig.D).

x182" (5,1 cm)

Secure fascia assembly under roof panels fl ush with front fascia board using (7) 2" screws through roof sheathing (Fig.A).

Nail through side soffi t into fascia assembly with (7) 2" fi nish nails (Fig.C).

2

3

4

x1

x1

LEFTFASCIAASSEMBLY

LEFTFASCIAASSEMBLY

RIGHTFASCIAASSEMBLY

2" Finish Nails

Flush

Fig.D

2" Finish Nails

ROOFSHEATHING

Fig.B

Tight

FRONTFASCIA

LEFTFACIAASSEMBLY

2" Screws

Fig.A

Flush

ROOFSHEATHING

SIDESOFFIT

2" Screws

Fig.C

2" Finish Nails

SIDEOFSHED

Page 47: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x119/32 x 3-1/2 x 59-1/2" (1,5 x 8,8 x 151,1 cm)HBA

x1 GKA2 x 3 x 59-1/2" (5,1 x 7,6 x 151,1 cm)

19/32 x 3-1/2 x 96" (1,5 x 8,8 x 243,8 cm)x1 ZX

2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) x1 PT

REAR FASCIA TRIM

PARTSREQUIRED:

45

x2

x162" (5,1 cm)

x102" (5,1 cm)

3" (7,6 cm)

Place PT andGKAfl ush to roof sheathing and fl ush to back wall panel (Fig.A).BEGIN1

Secure PT and GKA with 2" wood screws through roof sheathing (Fig.A). 2

Nail HBA and ZXto PT and GKA using 2" nails (Fig.C).Ensure trim is primed side out.

4

Secure side fascia trim ZT to HBA and ZX using (1) 2" nail at each end.(Fig.D).

5

Secure PT and GKA with (1) 3" screw through side fascia trim nailer OY(Fig.B).

3

FINISH6 You are fi nished installing your rear fascia trim.

2" Screw

PT&GKA

Fig.A

PT

ZX

GKA

HBA

2" Nail

ZX&HBA

FlushFig.C

BACKOFSHED

3" Screw

Fig.BPTorGKA

OY

Fig.D

2" Nails

HBAorZX

ZT

Page 48: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x23/8 x 2 x 68-3/4" (0,9 x 5,1 x 174,6 cm)

x13/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)

x13/8 x 2 x 69-1/4" (0,9 x 5,1 x 175,8 cm)

46

BACK CORNER TRIMPARTSREQUIRED: x24

2" (5,1 cm)

BEGIN

1̧ Place68-3/4" back corner trim fl ush to bottom of back soffi t board (Fig.A,B,F) and fl ush with side panel along the length (Fig.A). Attach using (6) 2" fi nish nails into corner wall framing (Fig.A,C). Space nails equally (Fig.C).

You have attached your back corner trim.4

Repeat for other side.3

2

FINISH

Fig.C

68-3/4"(174,6cm)

69-1/4"(175,8cm)

(AngledEndup)

Place69-1/4" back side corner trim angled end up (Fig.E) fl ush up under side soffi t panel and fl ush with back corner trim along the length (Fig.E). Attach trim using (6) 2" fi nish nails into corner wall stud (Fig.D,C). Space nails equally (Fig.C).

Fig.DFig.E

2" Nail

69-1/4"(175,8cm)

Angled end Flush atsoffit.

Flushwithbackcornertrim.

Seamisflush.Caulkseambefore

paintingtrim.

Fig.AFig.B

68-3/4"(174,6cm)

2" Nail

Flush with side wall panel.

Flush at top

BACKOFSHED

Fig.F

Flush at soffitboard.

2"x68-3/4"CornerTrim

Page 49: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x13/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)

x13/8 x 2 x 93-1/4" (0,9 x 5,1 x 236,8 cm)

47

PARTSREQUIRED: x122" (5,1 cm)

SIDE CORNER TRIM

FINISHYou have fi nished attaching your side corner trim boards.2

Attach 93-1/4"side corner trims on both sides fl ush with front wall panel. Use (6) 2" fi nish nails to secure side trim to side wall (Fig.A,B,C).

BEGIN

FRONTWALLPANEL

Fig.A

Fig.C

Fig.B

Flush

2" Finish Nail

Flush

Page 50: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x13/8 x 2 x 72" (0,9 x 5,1 x 182,9 cm)

x13/8 x 2 x 73-3/8" (0,9 x 5,1 x 186,4 cm)

48

PARTSREQUIRED: x12

BEGIN

1̧ Attach72"and73-3/8"front horizontal frieze boards using 2" fi nish nails evenly spaced as shown (Fig.A). Note: The frieze boards will be fl ush with the side trim (Fig.B).

FRONT FRIEZE TRIM

FINISHYou have fi nished attaching your front frieze trim.2

Fig.A

Fig.B

2" (5,1 cm)

Flush

73-3/8"72"

Flush

2" Finish Nail

Flush

Flush

Page 51: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x23/8 x 2 x 91-1/4" (0,9 x 5,1 x 231,7 cm)

49

Fig.B

Fig.C

PARTSREQUIRED: x122" (5,1 cm)

FRONT CORNER TRIM

Attach both vertical 91-1/4"front corner trim on both sides, fl ush to edge of installed side trim using (6) 2" fi nish nails evenly spaced in each trim board (Fig.A,B,C).

FINISHYou have fi nished attaching your front corner trim boards.2

BEGIN

Flush

Flush

2" Finish Nail

Fig.A

91-1/4"(231,7cm)

Page 52: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)x1 GAA

50

Orient parts as shown on flat surface. 3/8"offsetistotop.Lookforred(right)andgreen(left)onhingeboard.

PARTSREQUIRED:

x1x1Left Door Right Door

BEGIN1

DOORS

1-1/4" (3,2 cm)

2

3

Attach temporary support OO with 3" screws in middle and at ends as shown. Tighten securely.

Attach temporary support GAA with two 1-1/4" screws as shown. Tighten securely.

HINT:Lookfor3/8"SPACERattachedtodoors.

OO

GAA

Makesurespacerisattached.

Tighten screws securely.

OFFSET

(4)3"(7,6cm) Screws

Screws 1-1/4"(3cm)

Bottomedgesflush.

NOTE: Screw hole will be used later.

3/8"(1 cm)3/8"

(1 cm)

3/8"(1 cm)

3/8"(1 cm)

OFFSETGREEN RED

3" (7,6 cm)OOx1

1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)

3/4" (1,9 cm)

23-1/2"(59,7 cm)

23-1/2"(59,7 cm)

3/4"(1,9 cm)

x2

x4

Page 53: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

51

PARTSREQUIRED: x133" (7,6 cm)

DOORS

Fig.C

Fig.D

Seam

Fig.B3/8"

(1 cm)

Angle 3" (7,6 cm)Screw

4

OO

Center doors on panel seam as shown (Fig.B).5

6

7 Remove temporary supports and check doors open properly.

FINISH8 You have fi nished installing your doors.

Attach temporary support OO as a ledger board fl ush under wall panels for doors to rest on using 3" screws (Fig.A).

Screw hinge boards into wall frame and fl oor using ten 3" screws as shown.Makesurescrewsgointoframingandfloor (Fig.C,D).

Checkledgerboardisstillflushunderpanels.

3"(7,6cm)Screws into the wall supportandfloorframe.

1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)x1 OO

OO

Fig.A

Flushagainst wall panels

Page 54: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x219/32 x 2-1/2 x 26-5/8" (1,5 x 6,3 x 67,6 cm)AH

x219/32 x 2-1/2 x 55-7/8" (1,5 x 6,3 x 141,9 cm)FDA

52

Fig.D(11)SpecialCoatingScrews

FINISH7 You have fi nished attaching your door trim and threshold.

DOOR TRIM

PARTSREQUIRED:

3/4" (1,9 cm)x54

Fig.B

Two Screws

EQUAL

CENTERCENTER

1

3

2

Position and square upper horizontal door rail AH at top of FDA.Secure with four 3/4" screws from inside of doors.

Position FDA centered and square with bottom door trim as shown. Secure with fi ve 3/4" screws from inside of doors (Fig.B).

Secure hinge boards from inside using 3/4" screws as shown (Fig.A).

5

Center metal threshold between doors and secure using (11) 3/4" special coating screws into fl oor (Fig.D).

6

Center trim ZJ over doors and secure using fi ve 2" nails into framing as shown.

4 Reinforce the door trim using 3/4" screws through door panel into trim (Fig.A).Locate screws as shown (Fig.B). Use two screws at seams.

BEGIN

x52" (5,1 cm)

CENTER2"(5,1)FinishNailsx5

AH

AH

FDAFDA

ZJ

Nailintoframing. 3/4"(1,9cm)Screwsfrombehind.

DoorTrim

HingeBoard

Fig.ADoorPanel

3/4"(1,9cm)Screws

Flush

Flush

x164" Metal Threshold

3/4" (1,9 cm) x11Bagged separately / special coating

Page 55: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

53

PARTSREQUIRED:x2

x102" (5,1 cm)

DOOR WEATHERSTRIP

OO

Fig.A

CenterOO in door opening.

12" (30,5 cm)

Approximately

1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)

OO x2

7/8"(2,2 cm)

5/8"(1,6 cm)

OFFSET Screws 2"(5,1cm)

Fig.B

ITISIMPORTANTTOHOLDTHESE

DIMENSIONS

You have fi nished installing your door stiffeners.

BEGIN

Center OO vertically on the left door in the door opening fl ush with the edge of door (Fig.A).1

FINISH4

Repeat Steps 1-2 to install OO on right door.3

Secure using (5) 2" screws through outside trim into OO (Fig.B)2

Page 56: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

54

TOPVIEW

DOOR HARDWARE

PARTSREQUIRED:

Re-drill hole with 1/2" drill (Fig.B).

Keep drilled hole square to trim to avoid breaking edge of 1-1/2" x 2-1/2" door stiffener.

BEGIN

1

2

Measure and mark location of hole on outside of right door as shown (Fig.A). Pre-drill hole with 1/4" drill.

1-3/4"(4,4 cm) 1/4"Pre-drilland

1/2"Drill-through

Fig.A

1/2" (13 mm) Drill Bit

1/4" (6 mm) Drill Bit

You have fi nished preparing your door for door handle.FINISH3

1-3/4" (4,4 cm)

35-3/4"(90 cm)

RIGHTDOOR.

1/2"1,3 cm

SIDEVIEW

Fig.B

Flush

Page 57: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

55

RIGHTDOOR

1/2”DRILLTHROUGH

DOOR HARDWARE

PARTSREQUIRED:

1/2" (13 mm) Drill Bit

1/4" (6 mm) Drill Bit

Backplate

x1

1-1/4” x2

1-1/4” x2

Handle(locking)with Screws

x1x4

3/4”TechScrewwithdrillpoint1-1/4” x8

3-PointDoorLockingMechanism

RIGHT

DOOR

Set Screw

1-1/4"WoodScrew

Pre drill for screws.

1-1/4" PanHead

Screw

1-3/4" (4,4 cm)

35-3/4"(90 cm)

1/2"1,3 cm

SIDEVIEW

Securebackplatewith1"screwsandhandlewith1-1/4"screwsasshown.

Page 58: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

56

DOOR HARDWARE

Seefollowingpagesformountinglocationsofbracketsandplates.

3/4"Tech Screw

Washer

Washer

UPPERBRACKET(withoffset)Orientbracketasshown.

Orientbracketasshown.

LOWERBRACKET(withoutoffset)

Washer

3/4"Tech Screw

Plate

1-1/4"PanHeadScrew

WasherPlate

1-1/4"PanHeadScrew

Page 59: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

57

45o

DOOR HARDWARE

2-1/4"

2-1/4"

TOPofDoor

RIGHTDOOR LEFTDOOR

Makesurerodsarestraight up and down

whenlocatingbrackets.

BOTTOMofDoor

Weatherstrip

IMPORTANT!This rod

to edge of weatherstrip

Page 60: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

58

DOOR HARDWARE

AlignPlateswithverticalrodpoints. Drill-thruwith3/8"drillbitto2"depthintoheaderandfloor.

FRAMING

PLATEFLOOR

VERTICALRODS

PLATEDrillwith3/8"bitto2"depth.

Page 61: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

59

x3 9" x 27" (22,8 x 68,5 cm)

PARTSREQUIRED:

FRONT WINDOWS

BEGIN

From outside of shed, position window in center of opening and level. Use two screws at top of windows.

Maintainequaldistanceonbothsidesofdoor.

Do not fully tighten screws.

2

Approximately1"(2,5cm)

EQUALEQUAL

2 Screws per window

Youmustcaulkaroundwindowstovalidatewarranty.

3/4" (1,9 cm) x6

Apply high quality exterior-grade caulk behind frame near edge before installing to seal window.

2 Screws per window

HINT: Caulk behind frame near edge before installing.

Page 62: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

19/32 x 2-1/2 x 91" (1,5 x 6,3 x 231,1 cm)x2 BSA

60

2" (5,1 cm)PARTSREQUIRED:

FRONT WINDOWS

Do not nail into window flange.

3

4

5

Center BSA over door. Secure using (7) 2" finish nails as shown.

Position EY at ends and in between window frame as shown. Secure using (8) 2" finish nails.Remove1-1/4"screws.

Position BSA centered on window frame as shown. Secure using (4) 2" finish nails.

x419/32 x 2-1/2 x 9" (1,5 x 6,4 x 22,9 cm)EY

x19

EYx4

26-1/2"(78,7cm)Centered

Removescrews Removescrews

MarkCenter

Flush

Flush

BSACentered

3/4"(1,9 cm)

BSACentered

FRAMINGBEYOND

FRAMINGBEYOND

Page 63: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

61

PARTSREQUIRED:

FRONT WINDOWS

x123/4" (1,9 cm)

6

You have fi nished installing your window.FINISH7

Install (12) 3/4" screws from inside, as shown.

Do not screw into window fl ange.

FRAMINGBEYOND

INSIDEOFSHED

Install3/4"(1,9cm)screwsfrominside.

Install3/4"(1,9cm)screwsfrominside.

Page 64: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

62

BEGIN

Seal windows with high-quality exterior-grade caulk before installing.

2

3

4

Attach windows using (8) 2" screws as shown. Ensure windows are level.

Measure up from bottom of panel 42-1/2" (Fig.A). Center JFA with panel seam. Level and secure with (4) 2" finish nails.

Mark center of window frames as shown.

2" Screws

2" Finish Nails

x2

Window16-1/4" x 22-1/4"(41,3 x 56,5 cm)

CENTERCENTER

PARTSREQUIRED:

SIDE WINDOWS

x82" (5,1 cm)

CENTERCENTER

2" (5,1 cm)x4

Caulkbehindframenearedge.

Fig.A

JFA

42-1/2"(108 cm)42-1/2"

(108 cm)

x119/32 x 2-1/2 x 41-1/4" (1,5 x 6,3 x 104,8 cm)

JFA

Page 65: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

x2 19/32 x 3-1/2 x 24-3/8" (1,5 x 8,8 x 61,9 cm)ZZ

x1 19/32 x 2-1/2 x 41-1/4" (1,5 x 6,3 x 104,8 cm)JFA

x2 19/32 x 2-1/2 x 24-1/2" (1,5 x 6,3 x 62,2 cm)CY

63

7

5

6

Center CY fl ush with JFA. Secure with (3) 2" fi nish nails.

Center ZZ between windows and fl ush with JFA. Secure with (3) 2" fi nish nails.

PARTSREQUIRED:

SIDE WINDOWS

2" (5,1 cm)x13

FINISH8 You have fi nished installing your side windows

CENTERCENTER

JFA

ZZ

CY

CY CY

JFA

JFA

Flush

Flush Flush

2" Finish Nails

2" Finish Nails

2" Finish NailsPosition JFA fl ush with CY. Secure with (4) 2" fi nish nails.

Flush Flush

Page 66: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

64

PARTSREQUIRED:

FINISH3

2

BEGIN

1̧ Locate and mark for two vents in side walls as shown. (1) at top and (1) at bottom

Cut out marked openings.

Caulk behind vent fl anges.

Secure using 1/2" (1,3 cm) screws.

You have fi nished installing your vents.

x121/2" (1,3 cm)

x28 x 16" (20,3 x 35,6 cm)

6"(15,2 cm)

3 – 5"(7,6 – 12,7 cm)

14"(35,6 cm)

Caulk

4"(10,1 cm)

Caulk

4"(10,1 cm)

4"(10,1 cm)

14"(35,6 cm)

6"(15,2 cm)

VENTS

Page 67: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

65

• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.

• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges

Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)

(Follow directions provided by manufacturer.)

Youmustinstalldripedgetovalidatewarranty.

PAINT & CAULK- NOT INCLUDED -

ROOF FELT- NOT INCLUDED -

DRIP EDGE- NOT INCLUDED -

• Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.

3"OVERLAP

Flush

Flush

Youmustinstallrooffelttovalidatewarranty.

DripEdgeflushtotrim.

• Install drip edge over roof felt on side of shed and under roof felt on back side (Fig.A). • Do not use nails on side of drip edge that hangs over side of building. • Only nail top of drip edge as shown.

RoofFelt

DripEdge

DripEdge

Fig.A

BACKOF

SHED

SIDEOF

SHED

Page 68: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

66

•Followdirectionsprovidedbymanufacturerandtheseinstructions.

SHINGLES - NOT INCLUDED -

NEVERDRIVEFASTENERSINTOORABOVESEALINGSTRIPS.

Familiarizeyourselfwitha3-TabShingle.

SHINGLE NAIL PATTERN

1"(2,5 cm)

NAILS

Sealing Strip 1"(2,5 cm)

1/2"(1,3 cm)

Full Rain Slot

Half A Rain Slot

NotchNotch

Install first starter row upside down, color up and flush to drip edge at bottom of roof panel. Use (4) nails per shingle. Starterrowmustbestraightandlevelallthewayacrosswithloweredgeofroofdeck.

Begin where indicated on image below, install first row of shingles with notch flush with drip edge.22

DripEdge

Notch

BACKOFSHED

STARTHERE

BACKOFSHED

TABSUP

BEGIN

Shingle overlaps roofdecking.

(4)Nails

Flushtodripedge.

Flushwithstarterrow.

1"(2,5cm)

Flushtodripedge.

DOOR

DOOR

BEGIN

Page 69: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

67

Continue installing rows of shingles by staggering at front.

Install second row of shingles flush at top of first row's rain slots. Ensure flush to drip edge at front side, stagger each row.

Continue installing rows of shingles to the front of the shed. At the front edge of the shed make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at front roof edge cut to roof edge with a utility knife.

1"(2,5 cm)

5"(12,7 cm)

5"(12,7 cm)or less.

BACKOFSHED

Flushwithrainslots.

Notch

Notch

Using your shingle hooked blade carefully cut shingles along chalk line.

3

5

4

6

SHINGLES continued...

•Ifmorethan5"torainslotyoumustinstallanotherrowofshingles.

BACKOFSHEDFlushwithrainslots.

Topofrainslot.

CutOff.Cut

DOOR

Page 70: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

68

SHINGLES - DRIP EDGE

1"(2,5cm)

Install drip edge over top shingle row with 1" overhang over roof edge.

Align remaining shingles with edge of the front drip edge.

Using your shingle hooked blade carefully cut shingles on a fl at surface along the rain slots, using a chalk line for reference.

You have fi nished shingling your roof.FINISH10

7

9

8

Page 71: Call Us First! DO NOT RETURN TO STORE. - Lowes Holidaypdf.lowes.com/installationguides/095317191794_install.pdf · Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly

LIMITED CONDITIONAL WARRANTY*Backyard Storage Solutions, LLC warrants the following:1. Every product is warranted from defects in workmanship and manufacturing for 1 year.2. All accessories, hardware and metal components are warranted for 2 years.3. All Oriented Strand Board (OSB) is warranted for 2 years4. Siding and Trim is warranted for:

10 years: Value Series / Solar Shed12 years: Classic Series / Architectural Series15 years: Big Buildings

5. Solar Shed windows are warranted for 1 year.6. Cedar lumber is warranted for 15 years.7. Preserved Pine is warranted for 10 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date of purchase.

CONDITIONSThe warranty is effective only when:1. The unit has been erected in accordance with the assembly instructions.2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.3. The failure occurs when the unit is owned by the original purchaser.4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and

notification of the failure in writing within the warranty period specified above.5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to

inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTSStorage BuildingsTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.

Gazebos & PergolasTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred to construct your unit.This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURETo make a claim under this warranty, you can either call 1-888-827-9056 or email: [email protected]. Please have ready the information below when you call or include the information in your email:1. The model and size of the product.2. A list of the part(s) for which the claim is made.3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.4. Run code: found on exterior product label or assembly instructions enclosed in the product package.

All other inquiries can be mailed to:Backyard Storage Solutions, LLCAttn: Customer Service1000 TernesMonroe, MI 48162 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.

IMPORTANT: This is your warranty certificate.

WARRANTY REGISTRATIONPlease complete your warranty registration to properly validate your warranty. Register your product online at: www.OnlineWarranty.net

LDR: 1/18/2016