California Department of Education
-
Upload
daria-mcclure -
Category
Documents
-
view
23 -
download
0
description
Transcript of California Department of Education
![Page 1: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/1.jpg)
California Department of Education
Pre-State Allocation Board MeetingJuly 12, 2011
Presented By
![Page 2: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/2.jpg)
School Facility Program Funds Available
(in millions) June. 2011 July. 2011
Nov 2010 Bond Sale $78.8 $60.7
March 2010 Bond Sale 190.5 175.4
Nov/Dec 2009 Bond Sales 27.5 8.1
Oct/Nov 2009 Bond Sales 57.7 45.2
April 2009 Bond Sale 57.5 40.7
Total Funds Available $412.0 $330.1
![Page 3: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/3.jpg)
Status of Bond Authority
Propositions 1D, 55 & 47New Construction Bond Authority - $14.908 billion*
(in millions)
Remaining Bond Authority, $444.0
Unfunded Approvals, $614.8
Apportioned, $13,848.9
Prop 1D 1,668.0$ Seismic Repair 4.7$ Prop 55 5,268.1$ Prop 47 6,908.1$
Apportioned 13,848.9$ 92.9%Prop 1D 31.0$ Seismic Repair -$ Prop 55 511.8$ Prop 47 72.0$
Unfunded Approvals 614.8$ 4.1%Prop 1D 1.5$ Seismic Repair 194.8$ Prop 55** 209.7$ Prop 47 38.0$
Remaining Bond Authority 444.0$ 3.0%Grand Total 14,907.7$ 100.0%
New Construction Totals
![Page 4: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/4.jpg)
Agenda Highlights
•Additional Grant for General Site Development
•Status of School Facility Program Joint-Use Program Applications/Bond Authority"
•Project Information Worksheet
![Page 5: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/5.jpg)
Questions and Answers
![Page 6: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/6.jpg)
California Department of Education Update
School Facilities Planning Division
July 12, 2011
![Page 7: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/7.jpg)
Topics
• Pipeline Working Group
• Title 5 Design Principle
![Page 8: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/8.jpg)
Pipeline Working GroupTechnical users met on June 30
– Review technical concerns of 2007 CDE protocol
– Use for existing sites– Presention of information
Policy group meeting being scheduled
– Board members– Planners
![Page 9: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/9.jpg)
Title 5 Design Principle
• 14030(f) Placement of Buildings:
• Building Placement shall consider compatibility of the various functions on campus….Site layout of buildings…and physical education areas shall be adequate to meet the instructional, security and service needs of the educational program.”
– (3) Building Placement has favorable orientation to wind, sun, rain and natural light
![Page 10: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/10.jpg)
Title 5 Design PrincipleSample Urban Elementary School
![Page 11: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/11.jpg)
Title 5 Design PrincipleSample Urban Elementary School
![Page 12: California Department of Education](https://reader035.fdocuments.us/reader035/viewer/2022062517/56812cc3550346895d917ee7/html5/thumbnails/12.jpg)
Title 5 Design PrincipleSample Urban Elementary School