7/31/2019 Caliber Industrial Bldg Questionaire.xls
1/9
DOC. NO.
ISSUE DATE
I) GENERAL INFORMATION :
DOC. NO.
9. Brief Discription of the Project (You may attach a separate write up/Brochure etc)
CAL/TEND/F/01
15/12/05
00
BUILDING SPECIFICATION-QUESTIONAIRE
8. e-mail7. Mobile
REV NO.
1 0F 9Caliber Construction Company Pvt Ltd.
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
Date :
1. Name of the Customer
PAGE NO
5. Telephone - Office 6. Fax
2. Office Address
3. Contact Person
4. Designation
FOR THE OFFICE USE ONLY
3. Enquiry Number
1. Questionaire Received Date
2. Received By
10. Time frame for Delivery : No. of days from the time of
finalization of Engineering specifics or Lease agreements,
whichever is later
CAL/TEND/F/01
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
2/9
ISSUE DATE
II) SPACE REQUIREMENT
DOC. NO.
ISSUE DATE
Caliber Construction Company Pvt Ltd. PAGE NO 2 0F 9
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
15/12/05
REV NO. 00
REMARKS
1 Land required (Tick Mark the unit) Acres/Sq.Mtr
SR.NO. DESCRIPTION UNIT INFORMATION
3 Car Park-No.of cars Nos.
2 Construction Coverage % Maximum
5 Parking Space for trucks(Others) Nos.
4 Bus Park-No.of Buses Nos.
7 Total Manufacturing Area required Sq.Mtr
6 Total built up area considered Sq.Mtr
9 Ratio of office vs. manufacturing area Ratio
8 No.of floors considered Nos.
11 Area required for Ware House Sq.Mtr
10 Is there any control rooms required Yes/No
13 Height of rack Mtr.
12 Material storage type Rack/Bins
15 Weigh Bridge capacity Capacity
14 Weigh Bridge requirement Yes/No
Kindly furnish various itemwise detail
16 Specify total area required for Utilities Sq.Mtr
16.2 Chilling Plant Sq.Mtr
16.1 Boiler House Sq.Mtr
16.4 Air Compressors Sq.Mtr
16.3 Nitrogen Plant Sq.Mtr
16.5.1 No.of MCC Nos.
16.5 Electrical Panels
16.5.3 Area for PCC Sq.Mtr
16.5.2 Area for MCC Sq.Mtr
16.7 Area for DG room Sq.Mtr
16.6 Area for server Sq.Mtr
Caliber Construction Company Pvt Ltd. PAGE NO 3 0F 9
16.8 Area for cooling tower Sq.Mtr
CAL/TEND/F/01
15/12/05
REV NO. 00
16.9 Area for any Other utility requirement Sq.Mtr
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
3/9
16.11Whether separate space required for
Liquid fuel/GasYes/No
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
SR.NO. DESCRIPTION UNIT INFORMATION REMARKS
16.11.1 If yes, then furnish itemwise details
16.10 Area for Fuel/solvent storage facility Sq.Mtr
16.11.3 Gas 1 Name
16.11.2 Area for LDO
16.11.5 Gas 2 Name
16.11.4 Storage Capacity M3
16.11.7 Area for Gas Storage Sq.Mtr
16.11.6 Storage Capacity M3
16.11.9 Storage Capacity M3
16.11.8 Solvent 1 Name
16.13 Max.no. of persons dining at any time No.
16.12 Area Required for cafeteria Sq.Mtr
Kindly furnish various itemwise detail
16.14 Area rquired for any ancilliary units Sq.Mtr
16.14.2 Area for unit-1 Sq.Mtr
16.14.1 Ancilliary unit -1 Name
16.14.4 Area for unit-2 Sq.Mtr
16.14.3 Ancilliary unit -2 Name
PAX
16.14.5 Ancilliary unit -3 Name
16.7 Male to female ratio Ratio
16.6 Occupancy
Type of structure desired (RCC
framed structure/Pre-engineered
Steel Building with RCC Columns and
Walls)
16.5RCC/Pre-
Eng.Str
16.14.6 Area for unit-3 Sq.Mtr
16.8 Space for loading/unloading bay Sq.Mtr
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
4/9
DOC. NO.
ISSUE DATE
19 Column spacing Grid of ______Mtrs X _____Mtrs
27.11 Staircases
27.9 Reception Area
27.10 Utility areas
27.6 Toilets
27.9 Server Room
27.4 Assembly
27.8 Cafeteria
27.2 Ware House
27.5 Office Area
27 Type of flooring
27.3 Change rooms
25 Area for Change rooms/Locker room Sq.Mtr
27.1 Manufacturing Area
23 EOT Requirement Yes/No
26 Foundation Type
21 Area of False ceiling requirement Sq.Mtr
24 Capacity of EOT Ton
Live load on the floor Kg/Sq.Mtr
22 Hoistway provision Yes/No
18 Floor height (Clear upto the services) Mtrs
20
SR.NO. DESCRIPTION UNIT INFORMATION
REV NO. 00
PAGE NO 4 0F 9
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
REMARKS
CAL/TEND/F/01
15/12/05
Caliber Construction Company Pvt Ltd.
17 Provision for future expansion Sq.Mtr
27.12 Any Other information
PLEASE ATTACH A FLOW CHART / ASSEMBLY LINE SCHEMATIC OF THE PRODUCTION LAYOUT Yes/No
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
5/9
DOC. NO.
ISSUE DATE
III) ELECTRICAL REQUIREMENT
IV) VENTILATION
2 Attach all the details of process load Yes/No
1 Total connected load KVA
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
SR.NO. DESCRIPTION UNIT INFORMATION REMARKS
REV NO. 00
Caliber Construction Company Pvt Ltd. PAGE NO 5 0F 9
CAL/TEND/F/01
15/12/05
4 Attach load details for UPS power Yes/No
3
Attach brief details of equipments
(Including voltage and frequency
rating of machine)
Yes/No
5.1 By Overhead cable tray
5 Power distribution to process loads
5.3 By floor trenches
5.2 By overhead bus bar trunking
7 Illumination requirement Lux
6Attach socket configuration of
assembly tables
9 Requirement of stand by power by DG KVA
8 Attach Colour of lights at various areas
11 UPS batter (lead acid type/SMF)
10 Auto/manual start of stand by power
13 Any other informations
12 Any special earthing required
2 Filtration Area (10 Micronrecommended)
Micron
1Attach areas requiring ventilation
system
3 Static pressure requirement MMWC
4 Any other informations
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
6/9
DOC. NO.
ISSUE DATE
V) H V A C
VI) SECURITY SYSTEM : ACCESS CONTROL/CCTV
4 Any Other Informations
3 Location of CCTV Nos.
2 Emergency Exits Nos.
1 Proximity card readers Nos.
12 Any Other Informations
10Any equipment needs process cooling.
Kindly furnish details
8 Is sound level of 55 DB acceptable Yes/No
11 Any specific refrigent choiceR134A/
A470C/R22A
a) Equipment
9Is 20 CFM/Person as per ASHRAE
STANDARD acceptableYes/No
6 Relative humidity in the various areas % RH
b) Lighting
4 Number of hours per day-Functional
7 Internal loads for
2 Cleanliness levels-Filtration level
5 Temperature levels considered oC
SR.NO. DESCRIPTION UNIT INFORMATION
3Any localized exhaust system required
in hot work area
Caliber Construction Company Pvt Ltd. PAGE NO 6 0F 9
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
REMARKS
1 Attach layout with process load Yes/No
15/12/05
REV NO. 00
CAL/TEND/F/01
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
7/9
DOC. NO.
ISSUE DATE
VII) MECHANICAL SERVICES
VIII) FIRE PROTECTION SYSTEM
4 Any other information
1 Design code applicable NBC/NFPA/FM
3.1 Automatic Fire Hydrant-Internal/Extern
3 Type of system required
8 Any other information
2 Any corporate standard
3.3Automatic sprinkler system-Production
block-Above and below false ceiling
3.5Gas based fire suppression system for
HUB/Server Room
3.4
Fire alarm and detection system -
Conventional/Analogue addressablesystem
7 Type of compressor Screw/Recipr
6 Any additional outlets for cleaning
CFM at Outlet
5 Type of piping Copper/GI/SS
4Location of outlets on machinery
layout
Dew Point
3 Pressure Bar
2 Flow requirement
c) Model of compressor
b) Drier
Caliber Construction Company Pvt Ltd. PAGE NO 7 0F 9
CAL/TEND/F/01
15/12/05
REV NO. 00
1 Quality of air
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
SR.NO. DESCRIPTION UNIT INFORMATION REMARKS
a) Oil content PPM of oil
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
8/9
DOC. NO.
ISSUE DATE
IX) VACUUM PUMP REQUIREMENT
X) WATER REQUIREMENT
XI) SEWEGE/EFFLUENT TREATMENT
Any other information
1 Specify type of discharge
6
5 Period of storage quantity desired
3
4
Quantity of water required per day
(Other than that of humanconsumption)
M3/Hr
3 Quality of water
2Whether required for process
application
1 Specify usuage of water
2 Quantity of discharge M3/Hr
6 Any other information
4 Type of treatment desired
Type of disposal desired
6 Any other information
5Attch list of machines requiring
vacuum
4 Speed of motor RPM
3 Vacuum MM of Hg
2 Suction air rate M3/Hr
REMARKS
1 Model of pump
SR.NO. DESCRIPTION UNIT INFORMATION
CAL/TEND/F/01
15/12/05
REV NO. 00
Caliber Construction Company Pvt Ltd. PAGE NO 8 0F 9
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
-
7/31/2019 Caliber Industrial Bldg Questionaire.xls
9/9
DOC. NO.
ISSUE DATE
XII) GAS REQUIREMENT
6 Any other information
7 Storage - Cylinder/Bulk storage tanks
6 List of probable machines using gases
ConsumptionCuM/Month or
SCFH
5 Type of Piping PP/SS/Copper
Type of gases
4 Desired operating pressure Kg/cm2
3
2 Form of gas and Purity %
1
CAL/TEND/F/01
15/12/05
REV NO. 00
Caliber Construction Company Pvt Ltd. PAGE NO 9 0F 9
No. 235/12, 1st
Floor, Suraj Centre, 27th
Cross, Jayanagar 7th
Block, Bangalore 560011.
SR.NO. DESCRIPTION UNIT INFORMATION REMARKS