Caliber Industrial Bldg Questionaire.xls

download Caliber Industrial Bldg Questionaire.xls

of 9

Transcript of Caliber Industrial Bldg Questionaire.xls

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    1/9

    DOC. NO.

    ISSUE DATE

    I) GENERAL INFORMATION :

    DOC. NO.

    9. Brief Discription of the Project (You may attach a separate write up/Brochure etc)

    CAL/TEND/F/01

    15/12/05

    00

    BUILDING SPECIFICATION-QUESTIONAIRE

    8. e-mail7. Mobile

    REV NO.

    1 0F 9Caliber Construction Company Pvt Ltd.

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    Date :

    1. Name of the Customer

    PAGE NO

    5. Telephone - Office 6. Fax

    2. Office Address

    3. Contact Person

    4. Designation

    FOR THE OFFICE USE ONLY

    3. Enquiry Number

    1. Questionaire Received Date

    2. Received By

    10. Time frame for Delivery : No. of days from the time of

    finalization of Engineering specifics or Lease agreements,

    whichever is later

    CAL/TEND/F/01

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    2/9

    ISSUE DATE

    II) SPACE REQUIREMENT

    DOC. NO.

    ISSUE DATE

    Caliber Construction Company Pvt Ltd. PAGE NO 2 0F 9

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    15/12/05

    REV NO. 00

    REMARKS

    1 Land required (Tick Mark the unit) Acres/Sq.Mtr

    SR.NO. DESCRIPTION UNIT INFORMATION

    3 Car Park-No.of cars Nos.

    2 Construction Coverage % Maximum

    5 Parking Space for trucks(Others) Nos.

    4 Bus Park-No.of Buses Nos.

    7 Total Manufacturing Area required Sq.Mtr

    6 Total built up area considered Sq.Mtr

    9 Ratio of office vs. manufacturing area Ratio

    8 No.of floors considered Nos.

    11 Area required for Ware House Sq.Mtr

    10 Is there any control rooms required Yes/No

    13 Height of rack Mtr.

    12 Material storage type Rack/Bins

    15 Weigh Bridge capacity Capacity

    14 Weigh Bridge requirement Yes/No

    Kindly furnish various itemwise detail

    16 Specify total area required for Utilities Sq.Mtr

    16.2 Chilling Plant Sq.Mtr

    16.1 Boiler House Sq.Mtr

    16.4 Air Compressors Sq.Mtr

    16.3 Nitrogen Plant Sq.Mtr

    16.5.1 No.of MCC Nos.

    16.5 Electrical Panels

    16.5.3 Area for PCC Sq.Mtr

    16.5.2 Area for MCC Sq.Mtr

    16.7 Area for DG room Sq.Mtr

    16.6 Area for server Sq.Mtr

    Caliber Construction Company Pvt Ltd. PAGE NO 3 0F 9

    16.8 Area for cooling tower Sq.Mtr

    CAL/TEND/F/01

    15/12/05

    REV NO. 00

    16.9 Area for any Other utility requirement Sq.Mtr

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    3/9

    16.11Whether separate space required for

    Liquid fuel/GasYes/No

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    SR.NO. DESCRIPTION UNIT INFORMATION REMARKS

    16.11.1 If yes, then furnish itemwise details

    16.10 Area for Fuel/solvent storage facility Sq.Mtr

    16.11.3 Gas 1 Name

    16.11.2 Area for LDO

    16.11.5 Gas 2 Name

    16.11.4 Storage Capacity M3

    16.11.7 Area for Gas Storage Sq.Mtr

    16.11.6 Storage Capacity M3

    16.11.9 Storage Capacity M3

    16.11.8 Solvent 1 Name

    16.13 Max.no. of persons dining at any time No.

    16.12 Area Required for cafeteria Sq.Mtr

    Kindly furnish various itemwise detail

    16.14 Area rquired for any ancilliary units Sq.Mtr

    16.14.2 Area for unit-1 Sq.Mtr

    16.14.1 Ancilliary unit -1 Name

    16.14.4 Area for unit-2 Sq.Mtr

    16.14.3 Ancilliary unit -2 Name

    PAX

    16.14.5 Ancilliary unit -3 Name

    16.7 Male to female ratio Ratio

    16.6 Occupancy

    Type of structure desired (RCC

    framed structure/Pre-engineered

    Steel Building with RCC Columns and

    Walls)

    16.5RCC/Pre-

    Eng.Str

    16.14.6 Area for unit-3 Sq.Mtr

    16.8 Space for loading/unloading bay Sq.Mtr

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    4/9

    DOC. NO.

    ISSUE DATE

    19 Column spacing Grid of ______Mtrs X _____Mtrs

    27.11 Staircases

    27.9 Reception Area

    27.10 Utility areas

    27.6 Toilets

    27.9 Server Room

    27.4 Assembly

    27.8 Cafeteria

    27.2 Ware House

    27.5 Office Area

    27 Type of flooring

    27.3 Change rooms

    25 Area for Change rooms/Locker room Sq.Mtr

    27.1 Manufacturing Area

    23 EOT Requirement Yes/No

    26 Foundation Type

    21 Area of False ceiling requirement Sq.Mtr

    24 Capacity of EOT Ton

    Live load on the floor Kg/Sq.Mtr

    22 Hoistway provision Yes/No

    18 Floor height (Clear upto the services) Mtrs

    20

    SR.NO. DESCRIPTION UNIT INFORMATION

    REV NO. 00

    PAGE NO 4 0F 9

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    REMARKS

    CAL/TEND/F/01

    15/12/05

    Caliber Construction Company Pvt Ltd.

    17 Provision for future expansion Sq.Mtr

    27.12 Any Other information

    PLEASE ATTACH A FLOW CHART / ASSEMBLY LINE SCHEMATIC OF THE PRODUCTION LAYOUT Yes/No

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    5/9

    DOC. NO.

    ISSUE DATE

    III) ELECTRICAL REQUIREMENT

    IV) VENTILATION

    2 Attach all the details of process load Yes/No

    1 Total connected load KVA

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    SR.NO. DESCRIPTION UNIT INFORMATION REMARKS

    REV NO. 00

    Caliber Construction Company Pvt Ltd. PAGE NO 5 0F 9

    CAL/TEND/F/01

    15/12/05

    4 Attach load details for UPS power Yes/No

    3

    Attach brief details of equipments

    (Including voltage and frequency

    rating of machine)

    Yes/No

    5.1 By Overhead cable tray

    5 Power distribution to process loads

    5.3 By floor trenches

    5.2 By overhead bus bar trunking

    7 Illumination requirement Lux

    6Attach socket configuration of

    assembly tables

    9 Requirement of stand by power by DG KVA

    8 Attach Colour of lights at various areas

    11 UPS batter (lead acid type/SMF)

    10 Auto/manual start of stand by power

    13 Any other informations

    12 Any special earthing required

    2 Filtration Area (10 Micronrecommended)

    Micron

    1Attach areas requiring ventilation

    system

    3 Static pressure requirement MMWC

    4 Any other informations

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    6/9

    DOC. NO.

    ISSUE DATE

    V) H V A C

    VI) SECURITY SYSTEM : ACCESS CONTROL/CCTV

    4 Any Other Informations

    3 Location of CCTV Nos.

    2 Emergency Exits Nos.

    1 Proximity card readers Nos.

    12 Any Other Informations

    10Any equipment needs process cooling.

    Kindly furnish details

    8 Is sound level of 55 DB acceptable Yes/No

    11 Any specific refrigent choiceR134A/

    A470C/R22A

    a) Equipment

    9Is 20 CFM/Person as per ASHRAE

    STANDARD acceptableYes/No

    6 Relative humidity in the various areas % RH

    b) Lighting

    4 Number of hours per day-Functional

    7 Internal loads for

    2 Cleanliness levels-Filtration level

    5 Temperature levels considered oC

    SR.NO. DESCRIPTION UNIT INFORMATION

    3Any localized exhaust system required

    in hot work area

    Caliber Construction Company Pvt Ltd. PAGE NO 6 0F 9

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    REMARKS

    1 Attach layout with process load Yes/No

    15/12/05

    REV NO. 00

    CAL/TEND/F/01

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    7/9

    DOC. NO.

    ISSUE DATE

    VII) MECHANICAL SERVICES

    VIII) FIRE PROTECTION SYSTEM

    4 Any other information

    1 Design code applicable NBC/NFPA/FM

    3.1 Automatic Fire Hydrant-Internal/Extern

    3 Type of system required

    8 Any other information

    2 Any corporate standard

    3.3Automatic sprinkler system-Production

    block-Above and below false ceiling

    3.5Gas based fire suppression system for

    HUB/Server Room

    3.4

    Fire alarm and detection system -

    Conventional/Analogue addressablesystem

    7 Type of compressor Screw/Recipr

    6 Any additional outlets for cleaning

    CFM at Outlet

    5 Type of piping Copper/GI/SS

    4Location of outlets on machinery

    layout

    Dew Point

    3 Pressure Bar

    2 Flow requirement

    c) Model of compressor

    b) Drier

    Caliber Construction Company Pvt Ltd. PAGE NO 7 0F 9

    CAL/TEND/F/01

    15/12/05

    REV NO. 00

    1 Quality of air

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    SR.NO. DESCRIPTION UNIT INFORMATION REMARKS

    a) Oil content PPM of oil

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    8/9

    DOC. NO.

    ISSUE DATE

    IX) VACUUM PUMP REQUIREMENT

    X) WATER REQUIREMENT

    XI) SEWEGE/EFFLUENT TREATMENT

    Any other information

    1 Specify type of discharge

    6

    5 Period of storage quantity desired

    3

    4

    Quantity of water required per day

    (Other than that of humanconsumption)

    M3/Hr

    3 Quality of water

    2Whether required for process

    application

    1 Specify usuage of water

    2 Quantity of discharge M3/Hr

    6 Any other information

    4 Type of treatment desired

    Type of disposal desired

    6 Any other information

    5Attch list of machines requiring

    vacuum

    4 Speed of motor RPM

    3 Vacuum MM of Hg

    2 Suction air rate M3/Hr

    REMARKS

    1 Model of pump

    SR.NO. DESCRIPTION UNIT INFORMATION

    CAL/TEND/F/01

    15/12/05

    REV NO. 00

    Caliber Construction Company Pvt Ltd. PAGE NO 8 0F 9

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

  • 7/31/2019 Caliber Industrial Bldg Questionaire.xls

    9/9

    DOC. NO.

    ISSUE DATE

    XII) GAS REQUIREMENT

    6 Any other information

    7 Storage - Cylinder/Bulk storage tanks

    6 List of probable machines using gases

    ConsumptionCuM/Month or

    SCFH

    5 Type of Piping PP/SS/Copper

    Type of gases

    4 Desired operating pressure Kg/cm2

    3

    2 Form of gas and Purity %

    1

    CAL/TEND/F/01

    15/12/05

    REV NO. 00

    Caliber Construction Company Pvt Ltd. PAGE NO 9 0F 9

    No. 235/12, 1st

    Floor, Suraj Centre, 27th

    Cross, Jayanagar 7th

    Block, Bangalore 560011.

    SR.NO. DESCRIPTION UNIT INFORMATION REMARKS