CALEXICO HIGH SCHOOLCALEXICO HIGH SCHOOLMODERNIZATION / EXPANSIONMODERNIZATION / EXPANSION
PROJECT STATUS REPORT # 1PROJECT STATUS REPORT # 1
Superintendent
David Alvarez
Board Members
Gloria J. Rodriguez, President
Jaime Duron, Vice President
Dr. Reynaldo Ayala, Clerk
Rita Huerta, Member
Salvador Pacheco, Jr., Member
JUNE 23, 2004JUNE 23, 2004
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
SCHOOL SITE ANALAYSIS PHASE I STUDY (ESA Environmental Site Assessment) IN PROCESS
Submitted to DTSC (Department of Toxic Substances Control) for review
PHASE II STUDY (ESA Environmental Site Assessment) PENDING FOR DTSC RECOMMENDATION
CEQA STUDY (California Environmental Quality Act) PENDING
PROJECT STATUS REPORT
SITE ENGINEERING STUDIES R.F.P. HAVE BEEN REQUESTED:
TOPOGRAPHICAL MAP GEOLOGICAL STUDY DSA INSPECTOR LABOR COMPLIANCE PROGRAM
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
PROJECT SITE LOCATION
SITE LOCATION
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
EDUCATIONAL SPECIFICATIONS ARCHITECTS TO DEVELOP SPECIFICATIONS. ARCHITECTS HAVE HAD SEVERAL MEETINGS WITH INDIVIDUAL DEPARTMENTS:
STUDENT FOCUS GROUP PARENTS AND COMMUNITY PRINCIPAL & TEACHERS COACHES DISTRICT ADMINISTRATIVE STAFF
1ST DRAFT WILL BE SUBMITTED FOR REVIEW.
EDUCATIONAL SPECIFICATIONS
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
CDE GUIDELINES(EDUCATIONAL SPECIFICATIONS)
CDE GUIDELINES – (EDUCATIONAL SPECIFICATIONS)
SITE RELATIONSHIPS
VISUAL SECURITY
STUDENT / STAFF CIRCULATION
VEHICULAR CIRCULATION
PARENT / BUS DROP OFF DEFINITION
RECOMMENDED CLASSROOM SIZE
RESTROOM AND DRINKING FOUNTAIN COUNT
CEQA ISSUES
GAS LINE ISSUES
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
PRELIMINARY SITE PLAN LAYOUT
PRELIMINARY SITE PLAN LAYOUT
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
PRELIMINARY CAMPUS VIEW
PRELIMINARY CAMPUS VIEW
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
PRELIMINARY MULTI-USE CENTER VIEW
PRELIMINARY MULTI-USE CENTER VIEW
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
PRELIMINARY FUNCTIONS PROGRAM
PRELIMINARY FUNCTIONS PROGRAM
Multi-Use Center
Multi-use space for sports, games, gathering, etc. Stage Serving Kitchen
Administration Building
Media Center Building
Library
Classrooms / Teaching Stations
(42) New General Classrooms (28) Existing Classrooms to be
modernized (7) Portables
Science Laboratories
(6) New Classrooms (4) Existing Classrooms to be
modernized
Special Education Classrooms
(4) New Classrooms (1) Existing Classroom to be modernized
Classrooms for Future Growth(500 Students)
(18) New Classrooms
Gymnasium Modernization #1
Gymnasium Modernization #2
Performing Arts Center – Joint Use
Sports Facilities – Fields
Restroom Facilities – Girls
Restroom Facilities – Boys
Restroom Facilities – Staff
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
DESIGN PHASE BUDGETING GUIDELINES
DESIGN PHASE BUDGETING GUIDELINES
MULTI-USE CENTER $160 / sq. ft.
KITCHEN (FOOD PREPARATION) $315 / sq. ft.
KITCHEN (SERVING LINE) $180 / sq. ft.
ADMINISTRATION $190 / sq. ft.
LIBRARY $165 / sq. ft.
SPECIALIZED CLASSROOMS $175 / sq. ft.
REGULAR CLASSROOMS $160 / sq. ft.
HALLWAYS & SUPPORT SPACES $130 / sq. ft.
LUNCH SHELTERS $100 / sq. ft.
RESTROOMS exterior $540 / sq. ft. interior $300 / sq.
ft.
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
MARKET DEVELOPMENTS
MARKET DEVELOPMENTS
SKY ROCKET COST OF COMMODITIES
Steel-based products Lumber Petroleum-based products Labor Shortage
SATURATED MARKET CONDITIONS
ESCALATED WORKER’S COMPENSATION INSURANCE
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
COST CONTAINMENT STRATEGIES
COST CONTAINMENT STRATEGIES
Xeriscape landscape and site development Design efficient administration and library buildings Design efficient multi-use center Eliminate covered walkways between buildings Postpone gymnasium and shower / locker rooms Design efficient classroom building Use alternate project delivery method Use manufactured classroom buildings
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATESARCHITECTS
TENTATIVE OPSC SFP 50 FUNDING
TENTATIVE OPSC SFP 50 FUNDINGELEGIBILITY CALCULATIONS
POTENTIAL STATE FUNDING AT THE HIGH SCHOOL SITE:
DESCRIPTION STUDENTS (GRANTS)
TOTALBUDGET
LOCAL SHARE
CURRENT MODERNIZATION 918 (34 CR) $5,978,108 $2,391,243
FUTURE MODERNIZATION (PORTABLES)
243 (9 CR) $1,582,440 $632,976
NEW CONSTRUCTION 1,111 (41 CR) $18,865,447 $9,432,723
TWO-STORY BUILDINGS 1,111 (15%) $2,829,817 $1,414,909
FACILITY HARDSHIP (12 CR, 17409 SQ. FT.) $4,058,038 $2,029,019
TOTALSTOTALS $33,313,850$33,313,850 $15,900,870$15,900,870