    Point of Connection Methodologyfor

    Sharing of Transmission Charges

  • 8/10/2019 Calculation of PoC Transmission Charges

    2/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    3/78

    Tracing of Electricity Based on a paper published by Bialek in 1996

    Requires base case load flow

    Uses concept of proportional flows

    Inconsistent with laws of physics

    Attempts to identify which generators aresupplying which loads

  • 8/10/2019 Calculation of PoC Transmission Charges

    4/78

    Marginal Participation

    --- changes in line flows due to incremental1 MW change in generation/load at a nodeis used to determine the participation ofthe node on the lines

  • 8/10/2019 Calculation of PoC Transmission Charges

    5/78

    The Procedure

    Solve Base case LF on basicnetwork.truncate to 400 kv

    Identification of responding buses-tracing

    Increment 1 MW Marginal generation/Loadat desired bus absorbed/generated byresponding buses

    Calculate line utilization factors

    Allocate costs to nodes

    Calculate poc rate/nodal prices

  • 8/10/2019 Calculation of PoC Transmission Charges

    6/78

    slack

    Generator #1

    Bus 1Bus 2

    Bus 4

    Bus 5

    Bus 3

    Line 1

    Line 2Line 3

    Line 4

    Line 5

    Line 6

    1

    180 MW

    0 Mvar

    400 MW

    0 Mvar

    260 MW

    0 Mvar

    100 MW

    0 Mvar

    220 MW

    0 Mvar

    The LF studies have been done using Power World Simulator evaluation/student edition

  • 8/10/2019 Calculation of PoC Transmission Charges

    7/78

    P out Records: One MW Marginal drawal at Bus2, Supplied by Generator at Bus 5Bus FlowsBUS 1 1 400.0 MW

    GENERATOR 180.00TO 2 2 1 193.07 0 0.0TO 3 3 1 60.21 0 0.0TO 5 5 1 -73.28 0 0.0

    BUS 2 2 400.0 MWLOAD 1 261.00TO 1 1 1 -193.07 0 0.0

    TO 4 4 1 -67.93 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.21 0 0.0TO 5 5 1 -159.79 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.93 0 0.0TO 5 5 1 -167.93 0 0.0

    BUS 5 5 400.0 MWGENERATOR 401.00TO 1 1 1 73.28 0 0.0TO 3 3 1 159.79 0 0.0TO 4 4 1 167.93 0 0.0

    Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MW

    GENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0

    TO 4 4 1 -67.38 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    8/78

    slack

    Generator #1

    Bus 1Bus 2

    Bus 4

    Bus 5

    Bus 3

    Line 1

    Line 2Line 3

    Line 4

    Line 5

    Line 6

    1

    180 MW

    0 Mvar

    400 MW

    0 Mvar

    260 MW

    0 Mvar

    100 MW

    0 Mvar

    220 MW

    0 Mvar

    60.38 MW

    73 MW

    192.62 MW

    Contribution of 180 MW generator on line 4= 60.38*180/(180+73)= 42.96 MW

  • 8/10/2019 Calculation of PoC Transmission Charges

    9/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    10/78

    slack

    Generator #1

    Bus 1Bus 2

    Bus 4

    Bus 5

    Bus 3

    Line 1

    Line 2Line 3

    Line 4

    Line 5

    Line 6

    1

    180 MW

    0 Mvar

    400 MW

    0 Mvar

    260 MW

    0 Mvar

    100 MW

    0 Mvar

    220 MW

    0 Mvar

    P1=253

    P2=260

    P3=220

    P4=167.38

    P5=400

    1-2=192.62

    1-3=60.38

    4-2=67.38

    5-4=167.38

    5-3=159.62

    5-1=73.00

    Pi = nodal power at node i = sum of injections = sum of withdrawals

  • 8/10/2019 Calculation of PoC Transmission Charges

    11/78

    From The Tracing of Electricity J.Bialek, 1996

    Contribution of Generator k in line outflowin line i-l emanating from node i=

    |Pi-l|*[A

    u

    -1]ik*P

    Gk/P

    i

    [Au] ij = 1 if i=j

    -|Pj-i|/Pj if j belongs to set of

    nodes directly supplyingto node i

    0 otherwise

  • 8/10/2019 Calculation of PoC Transmission Charges

    12/78

    Au Matrix

    AuAuInv

    1.000 0 0 0 -0.183 1.000 0 0 0 0.183

    -0.759 1.000 0 -0.403 0 0.759 1.000 0 0.403 0.307

    -0.239 0 1.000 0 -0.399 0.239 0 1.000 0 0.443

    0 0 0 1.000 -0.418 0 0 0.000 1.000 0.418

    0 0 0 0 1.000 0 0 0 0 1.000

  • 8/10/2019 Calculation of PoC Transmission Charges

    13/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    14/78

    From The Tracing of Electricity J.Bialek, 1996

    Contribution of Load k in line inflow in linei-j into node i=

    |Pi-l|*[A

    d

    -1]ik*P

    Lk/P

    i

    [Ad] ij = 1 if i=j

    -|Pj-i|/Pj if j belongs to set of

    nodes directly suppliedfrom node i

    0 otherwise

  • 8/10/2019 Calculation of PoC Transmission Charges

    15/78

    Ad matrix

    AdAdInv

    1.000 -0.741 -0.274 0.000 0.000 1.000 0.741 0.274 0.000 0.000

    0 1.000 0.000 0.000 0.000 0.000 1.000 0.000 0.000 0.000

    0 0 1.000 0.000 0.000 0.000 0.000 1.000 0.000 0.000

    0 -0.259 0.000 1.000 0.000 0.000 0.259 0.000 1.000 0.000

    -0.289 0.000 -0.726 -1.000 1.000 0.289 0.473 0.805 1.000 1.000

  • 8/10/2019 Calculation of PoC Transmission Charges

    16/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    17/78

    Load line contributionLine1(1-2) Line2(4-2) Line3(5-1) Line4(1-3) Line5(5-3) Line6(5-4)

    Load (bus2) 192.6 67.38 55.59 0 0 67.38

    % 100 100 76 0 0 40

    Load (bus 3) 0 0 17.41 60.38 159.62 0

    % 0 0 24 100 100 0

    load (bus 4) 0 0 0 0 0 100

    % 0 0 0 0 0 60

    192.6 67.38 73 60.38 159.62 167.38

  • 8/10/2019 Calculation of PoC Transmission Charges

    18/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    19/78

    Increase 1 MW load at Bus 2

    and as per result of tracing

    Generator 1 will respond with 53%that is 0.53 MW and Generator 2will respond with 47% that is 0.47

    MW

  • 8/10/2019 Calculation of PoC Transmission Charges

    20/78

    slack

    Generator #1

    Bus 1Bus 2

    Bus 4

    Bus 5

    Bus 3

    Line 1

    Line 2Line 3

    Line 4

    Line 5

    Line 6

    1

    181 MW

    0 Mvar

    400 MW

    0 Mvar

    261 MW

    0 Mvar

    100 MW

    0 Mvar

    220 MW

    0 Mvar

  • 8/10/2019 Calculation of PoC Transmission Charges

    21/78

    Calculation of Seasonal Index &Marginal Participation Factors

  • 8/10/2019 Calculation of PoC Transmission Charges

    22/78

    Seasonal index (for node i line l):

    Ue,i,l =(|Flei| - |Fle|).P ie

    |Flei| - |Fle| must be >0

  • 8/10/2019 Calculation of PoC Transmission Charges

    23/78

    Pout Records: Marginal 1 MW INCR at Bus 2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.53 0.0

    TO 2 2 1 193.33 0 0.0TO 3 3 1 60.31 0 0.0TO 5 5 1 -73.11 0 0.0

    BUS 2 2 400.0 MWLOAD 1 261.00TO 1 1 1 -193.33 0 0.0TO 4 4 1 -67.67 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.31 0 0.0TO 5 5 1 -159.69 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.67 0 0.0

    TO 5 5 1 -167.67 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.47 0.0TO 1 1 1 73.11 0 0.0TO 3 3 1 159.69 0 0.0TO 4 4 1 167.67 0 0.0

    Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    24/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    25/78

    Increase 1 MW load at Bus 1

  • 8/10/2019 Calculation of PoC Transmission Charges

    26/78

    Pout Records Bus 1 INCR 1 MWBus FlowsBUS 1 1 400.0 MWGENERATOR 181.00 0.0TO 2 2 1 193.39 0 0.0TO 3 3 1 60.54 0 0.0TO 5 5 1 -72.93 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.76TO 1 1 1 -193.39 0 0.0TO 4 4 1 -67.37 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.24TO 1 1 1 -60.54 0 0.0TO 5 5 1 -159.70 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.37 0 0.0

    TO 5 5 1 -167.37 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 72.93 0 0.0TO 3 3 1 159.70 0 0.0TO 4 4 1 167.37 0 0.0

    Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    27/78

    Line Marginalcase

    Basecase

    Ue1l

    1-2 193.39 192.62 138.6 Ue1(1-2)

    1-3 60.54 60.38 28.8 Ue1(1-3)

    5-1 72.93 73.00 0 Ue1(5-1)

    4-2 67.37 67.38 0 Ue1(4-2)

    5-3 159.70 159.62 14.4 Ue1(5-3)

    5-4 167.37 167.38 0 Ue1(5-4)

    Seasonal Index for node 1

  • 8/10/2019 Calculation of PoC Transmission Charges

    28/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    29/78

    Pout Records: 1MW INCR in bus 3 (load)Bus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.20 0.0TO 2 2 1 192.48 0 0.0TO 3 3 1 60.81 0 0.0TO 5 5 1 -73.09 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.48 0 0.0TO 4 4 1 -67.52 0 0.0

    BUS 3 3 400.0 MWLOAD 1 221.00TO 1 1 1 -60.81 0 0.0TO 5 5 1 -160.19 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 67.52 0 0.0TO 5 5 1 -167.52 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.80 0.0TO 1 1 1 73.09 0 0.0TO 3 3 1 160.19 0 0.0TO 4 4 1 167.52 0 0.0

    Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    30/78

    Line Marginalcase Basecase Ue3l

    1-2 192.48 192.62 0 Ue3(1-2)

    1-3 60.81 60.38 94.6 Ue3(1-3)

    5-1 73.09 73.00 19.8 Ue3(5-1)

    4-2 67.52 67.38 30.8 Ue3(4-2)

    5-3 160.19 159.62 125.4 Ue3(5-3)

    5-4 167.52 167.38 30.8 Ue3(5-4)

    Seasonal Index for node 3

  • 8/10/2019 Calculation of PoC Transmission Charges

    31/78

    Increase 1 MW load at Bus 4

  • 8/10/2019 Calculation of PoC Transmission Charges

    32/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    33/78

    Line Marginalcase Basecase Ue4l

    1-2 193.01 192.62 39 Ue4(1-2)

    1-3 60.23 60.38 0 Ue4(1-3)

    5-1 73.24 73.00 24 Ue4(5-1)

    4-2 66.99 67.38 0 Ue4(4-2)

    5-3 159.77 159.62 15 Ue4(5-3)

    5-4 167.99 167.38 61 Ue4(5-4)

    Seasonal Index for node 4

  • 8/10/2019 Calculation of PoC Transmission Charges

    34/78

    Increase 1 MW load at Bus 5

  • 8/10/2019 Calculation of PoC Transmission Charges

    35/78

    Pout Records: bus 5 INCR 1MWBus FlowsBUS 1 1 400.0 MW

    GENERATOR 180.00 0.0TO 2 2 1 192.75 0 0.0TO 3 3 1 60.46 0 0.0TO 5 5 1 -73.22 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.31TO 1 1 1 -192.75 0 0.0TO 4 4 1 -67.56 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.44TO 1 1 1 -60.46 0 0.0TO 5 5 1 -159.98 0 0.0

    BUS 4 4 400.0 MW 1LOAD 1 100.25

    TO 2 2 1 67.56 0 0.0TO 5 5 1 -167.81 0 0.0

    BUS 5 5 400.0 MW 1GENERATOR 401.00 0.0TO 1 1 1 73.22 0 0.0TO 3 3 1 159.98 0 0.0TO 4 4 1 167.81 0 0.0

    Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0

    BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0

    BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    36/78

    Line Marginalcase Basecase Ue4l

    1-2 192.75 192.62 52 Ue5(1-2)

    1-3 60.46 60.38 32 Ue5(1-3)

    5-1 73.22 73.00 88 Ue5(5-1)

    4-2 67.56 67.38 72 Ue5(4-2)

    5-3 159.98 159.62 144 Ue5(5-3)

    5-4 167.81 167.38 172 Ue5(5-4)

    Seasonal Index for node 5

  • 8/10/2019 Calculation of PoC Transmission Charges

    37/78

    Marginal Participation Factor( of node i inline l):

    Ueil / i Ueil

  • 8/10/2019 Calculation of PoC Transmission Charges

    38/78

    Node/bus 1

    Bus 2 Bus 3 Bus 4 Bus 5

    Line

    1-2

    0.3346 0.4457 0 .0941 0.1255

    1-3 0.1853 0 0.6088 0 0.2059

    1-5 0 0.1783 0.1234 0.1496 0.5486

    2-4 0 0.4231 0.1728 0 0.4040

    3-5 0.0454 0.0574 0.3956 0.0473 0.4543

    4-5 0 0.2223 0.0908 0.1798 0.5071

  • 8/10/2019 Calculation of PoC Transmission Charges

    39/78

    Share Allocation of Generators

    Load 1 Load 2 Load 3

    Gen 1(bus1) % 30 20 50

    Gen 2(bus2) %

    40 25 35

  • 8/10/2019 Calculation of PoC Transmission Charges

    40/78

    slack

    Generator #1

    Bus 1Bus 2

    Bus 4

    Bus 5

    Bus 3

    Line 1

    Line 2Line 3

    Line 4

    Line 5

    Line 6

    1

    180 MW

    0 Mvar

    400 MW

    0 Mvar

    260 MW

    0 Mvar

    100 MW

    0 Mvar

    220 MW

    0 Mvar

    Zone A

  • 8/10/2019 Calculation of PoC Transmission Charges

    41/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    42/78

    Calculation of Uniform Charges

    = Total Transmission Charges/(Sum of approvedInjection+Sum of approved Withdrawal)

    =803/(400+180+220+260+100)

    =69.22 lakhs/MW

    For bus 1 =(69.22*180)=125 Cr

    For bus 2=(69.22*260) =180 Cr

    For bus 3=(69.22*220) =152 CrFor bus 4=(69.22*100) = 69 Cr

    For bus 5=(69.22*400) =277 Cr

  • 8/10/2019 Calculation of PoC Transmission Charges

    43/78

    Cost allocation to nodes based

    on marginal participationNodes Marginal

    Participation

    case

    (Cost in Rs

    Cr)

    Uniform

    Charges

    (Cost in Rs

    Cr)

    50 % Marginal

    Participation

    50% Uniform

    Charges

    PoC rates

    Rs Lakh

    /MW/mont

    h

    Node/Bus1

    75 125 100 4.62

    Node/Bus2

    185 180 182.5 5.85

    Node/Bus

    3

    162 152 157 5.95

    Node/Bus4

    70 69 69.5 5.79

    Node/Bus5

    311 277 294 6.13

    Total 803 803 803

  • 8/10/2019 Calculation of PoC Transmission Charges

    44/78

    Generator shares

    Generator

    Loads

    Generator Node 1

    % share

    Generator Node 5

    % share

    Load bus 2 10 50

    Load bus 3 30 30

    Load bus 4 60 20

  • 8/10/2019 Calculation of PoC Transmission Charges

    45/78

    Node

    s

    MP-

    Trace

    UC 50 %

    MP &

    50%

    UC

    PoC

    rates

    Rs Lakh

    /MW

    /month

    Monthly

    Charges to

    be paid Rs

    Lakhs/mont

    h based onshare

    Monthly

    Charges to

    be paid Rs

    Lakhs/month

    based ontrace

    Node/Bus 1

    75 125 100 4.62(3.47)

    Generatornode

    Node/Bus 2

    185 180 182.5 5.85(5.93)

    2830

    2905

    Node/Bus 3

    162 152 157 5.95(6.14)

    2294

    2596

    Node/Bus 4

    70 69 69.5 5.79(5.83)

    1568

    1192

    Node/Bus 5

    311 277 294 6.13(6.48)

    Generatornode

    Total 803 803 803

    Charges to be paid = own drawal*drawal PoC of node+share*generator capacity*injectionPoC of generator bus(Figures in brackets are based on MP-Trace only)

  • 8/10/2019 Calculation of PoC Transmission Charges

    46/78

    Present Issues

  • 8/10/2019 Calculation of PoC Transmission Charges

    47/78

    There is no internationally adopted bestcommon method for allocation oftransmission costs.. All methods havetheir pros & cons

    Worldwide a combination of methods is

    used for allocation such as postage stamp,marginal/nodal pricing, marginalparticipation, average participation, MW-Mile, peak based, game theory etc

    Requires not only technical expertise butalso Econimics concepts such as marginalprice, social welfare, etc

  • 8/10/2019 Calculation of PoC Transmission Charges

    48/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    49/78

    While we are rightly concerned withcongestion. What if there is overcapacity/stranded assets in a corridor?What if the constructed lines remain lightlyloaded for most part of the year due toerror in planning or change in load

    generation scenario over time? What isthe limit of reliability costs?

  • 8/10/2019 Calculation of PoC Transmission Charges

    50/78

    In Flow based methods the base case

    load generation is very important.. Moreso when the tariff of assets vary widely

    50 % Uniform charges distort thelocational signals

    Slabbing further distorts the results ofmarginal participation

  • 8/10/2019 Calculation of PoC Transmission Charges

    51/78

    Whether a generator/supplier or

    Load/Consumer is to be penalized for itsgeographical location?

    -----generation zones are predeterminedbased on availability of resources

    ----load zones/industrial belts are also resultof historical development, resourceavailability

    Whether generator or Consumer bepenalized due to asymmetries intransmission network created duringhistorical development of ISTS ?

  • 8/10/2019 Calculation of PoC Transmission Charges

    52/78

    Future Concerns

    Integration of Renewables in the Grid

    ---run of the river hydro, wind and solar run

    on very low PLF. However, transmissionmust be developed for entire capacity.

    ---higher transmission cost/unit due to lowPLF which is not under the control of

    generator may result in disincentive forgrowth of renewables

  • 8/10/2019 Calculation of PoC Transmission Charges

    53/78

    The issue of integration of renewables isbeing debated worldwide now

    Can such transmission projects be fundedby Government under NAPCC?

  • 8/10/2019 Calculation of PoC Transmission Charges

    54/78

    Changes in Sharing Regulations

    contemplated in the thirdamendment regulations

  • 8/10/2019 Calculation of PoC Transmission Charges

    55/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    56/78

    Discontinuation of uniform charges

    Discontinuation of slabbing

    Computation based on full basic networkrather than truncated network

    Proportional compensation for use of statelines carrying interstate power

  • 8/10/2019 Calculation of PoC Transmission Charges

    57/78

    PoC charges under peak

    conditions

  • 8/10/2019 Calculation of PoC Transmission Charges

    58/78

    slack

    Generator #1

    Bus 1Bus 2

    Bus 4

    Bus 5

    Bus 3

    Line 1

    Line 2Line 3

    Line 4

    Line 5

    Line 6

    1

    180 MW

    0 Mvar

    530 MW

    0 Mvar

    390 MW

    0 Mvar

    100 MW

    0 Mvar

    220 MW

    0 Mvar

  • 8/10/2019 Calculation of PoC Transmission Charges

    59/78

    Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2---supplied by generator node 5Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 138.21 0 0.0TO 5 5 1 -238.21 0 0.0

    BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    60/78

    Load (bus2)

    Load (bus3)

    Load (bus4)

    Gen1(bus1)

    156.78 23.22 0

    % 40 11 0

    Gen2(bus5)

    232.74 197.26 100

    % 60 89 100

    Total 390 220 100

  • 8/10/2019 Calculation of PoC Transmission Charges

    61/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    62/78

    Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 138.21 0 0.0TO 5 5 1 -238.21 0 0.0

    BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0

    Pout Records:: INCR 1 MW at bus 2Bus FlowsBUS 1 1 400.0GENERATOR 180.40 0.0TO 2 2 1 252.44 0 0.0TO 3 3 1 37.17 0 0.0TO 5 5 1 -109.21 0 0.0

    BUS 2 2 400.0 MWLOAD 1 391.00TO 1 1 1 -252.44 0 0.0TO 4 4 1 -138.56 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.17 0 0.0TO 5 5 1 -182.83 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.56 0 0.0

    TO 5 5 1 -238.56 0 0.0

    BUS 5 5 400.0 MWGENERATOR 530.60 0.0TO 1 1 1 109.21 0 0.0TO 3 3 1 182.83 0 0.0TO 4 4 1 238.56 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    63/78

    Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0

    TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.21 0 0.0TO 5 5 1 -238.21 0 0.0

    BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0

    Pout Records:: 1 MW INCR at Bus 3Bus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.11 0.0TO 2 2 1 251.61 0 0.0TO 3 3 1 37.68 0 0.0TO 5 5 1 -109.18 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.61 0 0.0TO 4 4 1 -138.39 0 0.0

    BUS 3 3 400.0 MWLOAD 1 221.00TO 1 1 1 -37.68 0 0.0TO 5 5 1 -183.32 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00

    TO 2 2 1 138.39 0 0.0TO 5 5 1 -238.39 0 0.0

    BUS 5 5 400.0 MWGENERATOR 1 530.89 0.0TO 1 1 1 109.18 0 0.0TO 3 3 1 183.32 0 0.0TO 4 4 1 238.39 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    64/78

    Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.21 0 0.0

    TO 5 5 1 -238.21 0 0.0

    BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0

    Pout RecordsBus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.00 0.0TO 2 2 1 252.19 0 0.0

    TO 3 3 1 37.11 0 0.0TO 5 5 1 -109.30 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -252.19 0 0.0TO 4 4 1 -137.81 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.11 0 0.0TO 5 5 1 -182.89 0 0.0

    BUS 4 4 400.0 MWLOAD 1 101.00TO 2 2 1 137.81 0 0.0TO 5 5 1 -238.81 0 0.0

    BUS 5 5 400.0 MWGENERATOR 531.00 0.0TO 1 1 1 109.30 0 0.0TO 3 3 1 182.89 0 0.0TO 4 4 1 238.81 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    65/78

    Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0

    TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.21 0 0.0

    TO 5 5 1 -238.21 0 0.0

    BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0

    Pout RecordsBus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.00 0.0

    TO 2 2 1 251.98 0 0.0TO 3 3 1 37.30 0 0.0TO 5 5 1 -109.29 0 0.0

    BUS 2 2 400.0 MWLOAD 1 390.44TO 1 1 1 -251.98 0 0.0TO 4 4 1 -138.46 0 0.0

    BUS 3 3 400.0 MWLOAD 1 220.37TO 1 1 1 -37.30 0 0.0TO 5 5 1 -183.07 0 0.0

    BUS 4 4 400.0 MWLOAD 1 100.19TO 2 2 1 138.46 0 0.0

    TO 5 5 1 -238.65 0 0.0

    BUS 5 5 400.0 MWGENERATOR 531.00 0.0TO 1 1 1 109.29 0 0.0TO 3 3 1 183.07 0 0.0TO 4 4 1 238.65 0 0.0

  • 8/10/2019 Calculation of PoC Transmission Charges

    66/78

    Node/bus 1

    Bus 2 Bus 3 Bus 4 Bus 5

    Line1-2 0.280 0.463 0.000 0.073 0.184

    1-30.145 0.000 0.727 0.000 0.128

    1-50.000 0.253 0.114 0.104 0.528

    2-40.012 0.437 0.127 0.000 0.424

    3-50.015 0.105 0.350 0.043 0.487

    4-50.008 0.289 0.084 0.127 0.493

  • 8/10/2019 Calculation of PoC Transmission Charges

    67/78

    Marginal Line Participation Factors peak case andearlier/average case for line 1--2

    0

    0.05

    0.1

    0.15

    0.2

    0.250.3

    0.35

    0.4

    0.45

    0.5

    Node/bus 1 Bus 2 Bus 3 Bus 4 Bus 5

    peak case

    earlier case

  • 8/10/2019 Calculation of PoC Transmission Charges

    68/78

    Total charges allocated to

    nodes peak case earlier case

    0

    50

    100

    150

    200

    250

    300

    350

    Node/bus 1 Bus 2 Bus 3 Bus 4 Bus 5

    peak case

    earlier case

  • 8/10/2019 Calculation of PoC Transmission Charges

    69/78

    Tabulated data for earlier case

    and peak caseNode Earliercost

    allocated

    to node

    Peak

    scenario

    cost

    %

    change

    Earlier

    cost/

    Lakh/MW

    /month

    MP

    Earlier

    cost/

    Lakh/MW/

    month

    MP+UC

    Peak

    Scenario

    cost/

    Lakh/MW/mo

    nth

    1 75 61 18.66 3.47 4.62 2.82

    2 185 218 17.83 5.93 5.85 4.66

    3 162 157 3.08 6.14 5.95 5.94

    4 70 51 27.14 5.83 5.79 4.25

    5 311 316 1.61 6.48 6.13 4.97

    While the load at bus 2 had increased 1.5 times the total cost allocated to the nodehas increased only 1.18 times( 1.19 for MP+UC)cost/MW/Month will go down (as MW increased). New entrants/ST customers incentivizedCharges allocated to a node will change only if due to it flow in different lines change.Otherwise the charge may remain same under peak scenario also. May also reduce.

  • 8/10/2019 Calculation of PoC Transmission Charges

    70/78

    From CERC sharing of ISTS charges(third amendment) draft

  • 8/10/2019 Calculation of PoC Transmission Charges

    71/78

    TABLE 2

    DIC Withdrawal/LoadPoC Charges

    Scaled PoCCharges

    X 45,79,42,697 50,45,52,461

    Y 18,96,39,554 20,89,41215

  • 8/10/2019 Calculation of PoC Transmission Charges

    72/78

    TABLE 3

    Zone Uniform Charges

    (UC)\(Rs./Month)=Unifo

    rm Rate*LTA

    Scaled PoC

    Charges

    Rs/Month

    50% UC and

    50% PoC

    Rs./Month

    LTA (MW) Withdrawal

    Charges

    (Rs/MW/Month)

    X 25,22,12,087 50,45,52,461 37,83,82,274 2,668 1,41,822

    Y 16,44,90,088 20,89,41,215 18,66,46,847 1,741 1,07,280

    50.46/20.89= 2.42 ; 37.84/18.66 = 2.07

  • 8/10/2019 Calculation of PoC Transmission Charges

    73/78

  • 8/10/2019 Calculation of PoC Transmission Charges

    74/78

    TABLE-5

    ZoneGeneration

    (MW)

    Load

    (MW)

    GenerationCharges

    (Rs.)

    LoadCharges

    (MW)

    LTA(Generation)

    (MW)

    LTA(Demand)

    (MW)

    GenerationPoC

    (Rs./MW/Month)

    LoadPoC

    (Rs./MW/Month)

    (1) (2) (3) (4) (5) (6) (7) (8) (9)

    Z 194 2929160

    16,64,638 2,160,51,386 280 4784 5945 45166

  • 8/10/2019 Calculation of PoC Transmission Charges

    75/78

    TABLE-6

    Zone

    Generation

    PoC

    (Rs./MW/

    Month)

    Load

    PoC

    (Rs./MW

    /Month)

    Generation

    PoC

    (Rs./MW/

    Month)

    Load

    PoC

    (Rs./MW

    /Month)

    Generation

    PoC

    (Rs./MW/

    Month)

    Load

    PoC

    (Rs./MW/

    Month)

    Generation

    PoC

    (Rs./MW/

    Month)

    Load

    PoC

    (Rs./M

    W/Mo

    nth)

    Software Computed LTA BasedAfter 50% Uniform

    charge and 50% PoCapplication

    After Slabs

    Z 8,594 74,229 5,945 45,166 50,547 72,154 79,544 79,544

  • 8/10/2019 Calculation of PoC Transmission Charges

    76/78

    TABLE-7

    Sl.No. State /DIC % Allocation

    1 BIHAR 42.89%

    2 JHARKHAND 8.13%

    3 DVC 0.31%

    4 ODISHA 31.8% plus temp allocation

    5 WEST BENGAL 9.1% plus temp allocation

    6 SIKKIM 2.4

    7 TAMIL NADU 0.85%

    8 NER 3.22%

  • 8/10/2019 Calculation of PoC Transmission Charges

    77/78

    TABLE-8

    Sl.No. State /DIC % as per participation factor

    1 ODISHA 82.97

    3 DVC 12.1

    5 WEST BENGAL 4.93

  • 8/10/2019 Calculation of PoC Transmission Charges

    78/78

    Thank you