Point of Connection Methodologyfor
Sharing of Transmission Charges
-
8/10/2019 Calculation of PoC Transmission Charges
2/78
-
8/10/2019 Calculation of PoC Transmission Charges
3/78
Tracing of Electricity Based on a paper published by Bialek in 1996
Requires base case load flow
Uses concept of proportional flows
Inconsistent with laws of physics
Attempts to identify which generators aresupplying which loads
-
8/10/2019 Calculation of PoC Transmission Charges
4/78
Marginal Participation
--- changes in line flows due to incremental1 MW change in generation/load at a nodeis used to determine the participation ofthe node on the lines
-
8/10/2019 Calculation of PoC Transmission Charges
5/78
The Procedure
Solve Base case LF on basicnetwork.truncate to 400 kv
Identification of responding buses-tracing
Increment 1 MW Marginal generation/Loadat desired bus absorbed/generated byresponding buses
Calculate line utilization factors
Allocate costs to nodes
Calculate poc rate/nodal prices
-
8/10/2019 Calculation of PoC Transmission Charges
6/78
slack
Generator #1
Bus 1Bus 2
Bus 4
Bus 5
Bus 3
Line 1
Line 2Line 3
Line 4
Line 5
Line 6
1
180 MW
0 Mvar
400 MW
0 Mvar
260 MW
0 Mvar
100 MW
0 Mvar
220 MW
0 Mvar
The LF studies have been done using Power World Simulator evaluation/student edition
-
8/10/2019 Calculation of PoC Transmission Charges
7/78
P out Records: One MW Marginal drawal at Bus2, Supplied by Generator at Bus 5Bus FlowsBUS 1 1 400.0 MW
GENERATOR 180.00TO 2 2 1 193.07 0 0.0TO 3 3 1 60.21 0 0.0TO 5 5 1 -73.28 0 0.0
BUS 2 2 400.0 MWLOAD 1 261.00TO 1 1 1 -193.07 0 0.0
TO 4 4 1 -67.93 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.21 0 0.0TO 5 5 1 -159.79 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.93 0 0.0TO 5 5 1 -167.93 0 0.0
BUS 5 5 400.0 MWGENERATOR 401.00TO 1 1 1 73.28 0 0.0TO 3 3 1 159.79 0 0.0TO 4 4 1 167.93 0 0.0
Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MW
GENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0
TO 4 4 1 -67.38 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
8/78
slack
Generator #1
Bus 1Bus 2
Bus 4
Bus 5
Bus 3
Line 1
Line 2Line 3
Line 4
Line 5
Line 6
1
180 MW
0 Mvar
400 MW
0 Mvar
260 MW
0 Mvar
100 MW
0 Mvar
220 MW
0 Mvar
60.38 MW
73 MW
192.62 MW
Contribution of 180 MW generator on line 4= 60.38*180/(180+73)= 42.96 MW
-
8/10/2019 Calculation of PoC Transmission Charges
9/78
-
8/10/2019 Calculation of PoC Transmission Charges
10/78
slack
Generator #1
Bus 1Bus 2
Bus 4
Bus 5
Bus 3
Line 1
Line 2Line 3
Line 4
Line 5
Line 6
1
180 MW
0 Mvar
400 MW
0 Mvar
260 MW
0 Mvar
100 MW
0 Mvar
220 MW
0 Mvar
P1=253
P2=260
P3=220
P4=167.38
P5=400
1-2=192.62
1-3=60.38
4-2=67.38
5-4=167.38
5-3=159.62
5-1=73.00
Pi = nodal power at node i = sum of injections = sum of withdrawals
-
8/10/2019 Calculation of PoC Transmission Charges
11/78
From The Tracing of Electricity J.Bialek, 1996
Contribution of Generator k in line outflowin line i-l emanating from node i=
|Pi-l|*[A
u
-1]ik*P
Gk/P
i
[Au] ij = 1 if i=j
-|Pj-i|/Pj if j belongs to set of
nodes directly supplyingto node i
0 otherwise
-
8/10/2019 Calculation of PoC Transmission Charges
12/78
Au Matrix
AuAuInv
1.000 0 0 0 -0.183 1.000 0 0 0 0.183
-0.759 1.000 0 -0.403 0 0.759 1.000 0 0.403 0.307
-0.239 0 1.000 0 -0.399 0.239 0 1.000 0 0.443
0 0 0 1.000 -0.418 0 0 0.000 1.000 0.418
0 0 0 0 1.000 0 0 0 0 1.000
-
8/10/2019 Calculation of PoC Transmission Charges
13/78
-
8/10/2019 Calculation of PoC Transmission Charges
14/78
From The Tracing of Electricity J.Bialek, 1996
Contribution of Load k in line inflow in linei-j into node i=
|Pi-l|*[A
d
-1]ik*P
Lk/P
i
[Ad] ij = 1 if i=j
-|Pj-i|/Pj if j belongs to set of
nodes directly suppliedfrom node i
0 otherwise
-
8/10/2019 Calculation of PoC Transmission Charges
15/78
Ad matrix
AdAdInv
1.000 -0.741 -0.274 0.000 0.000 1.000 0.741 0.274 0.000 0.000
0 1.000 0.000 0.000 0.000 0.000 1.000 0.000 0.000 0.000
0 0 1.000 0.000 0.000 0.000 0.000 1.000 0.000 0.000
0 -0.259 0.000 1.000 0.000 0.000 0.259 0.000 1.000 0.000
-0.289 0.000 -0.726 -1.000 1.000 0.289 0.473 0.805 1.000 1.000
-
8/10/2019 Calculation of PoC Transmission Charges
16/78
-
8/10/2019 Calculation of PoC Transmission Charges
17/78
Load line contributionLine1(1-2) Line2(4-2) Line3(5-1) Line4(1-3) Line5(5-3) Line6(5-4)
Load (bus2) 192.6 67.38 55.59 0 0 67.38
% 100 100 76 0 0 40
Load (bus 3) 0 0 17.41 60.38 159.62 0
% 0 0 24 100 100 0
load (bus 4) 0 0 0 0 0 100
% 0 0 0 0 0 60
192.6 67.38 73 60.38 159.62 167.38
-
8/10/2019 Calculation of PoC Transmission Charges
18/78
-
8/10/2019 Calculation of PoC Transmission Charges
19/78
Increase 1 MW load at Bus 2
and as per result of tracing
Generator 1 will respond with 53%that is 0.53 MW and Generator 2will respond with 47% that is 0.47
MW
-
8/10/2019 Calculation of PoC Transmission Charges
20/78
slack
Generator #1
Bus 1Bus 2
Bus 4
Bus 5
Bus 3
Line 1
Line 2Line 3
Line 4
Line 5
Line 6
1
181 MW
0 Mvar
400 MW
0 Mvar
261 MW
0 Mvar
100 MW
0 Mvar
220 MW
0 Mvar
-
8/10/2019 Calculation of PoC Transmission Charges
21/78
Calculation of Seasonal Index &Marginal Participation Factors
-
8/10/2019 Calculation of PoC Transmission Charges
22/78
Seasonal index (for node i line l):
Ue,i,l =(|Flei| - |Fle|).P ie
|Flei| - |Fle| must be >0
-
8/10/2019 Calculation of PoC Transmission Charges
23/78
Pout Records: Marginal 1 MW INCR at Bus 2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.53 0.0
TO 2 2 1 193.33 0 0.0TO 3 3 1 60.31 0 0.0TO 5 5 1 -73.11 0 0.0
BUS 2 2 400.0 MWLOAD 1 261.00TO 1 1 1 -193.33 0 0.0TO 4 4 1 -67.67 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.31 0 0.0TO 5 5 1 -159.69 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.67 0 0.0
TO 5 5 1 -167.67 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.47 0.0TO 1 1 1 73.11 0 0.0TO 3 3 1 159.69 0 0.0TO 4 4 1 167.67 0 0.0
Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
24/78
-
8/10/2019 Calculation of PoC Transmission Charges
25/78
Increase 1 MW load at Bus 1
-
8/10/2019 Calculation of PoC Transmission Charges
26/78
Pout Records Bus 1 INCR 1 MWBus FlowsBUS 1 1 400.0 MWGENERATOR 181.00 0.0TO 2 2 1 193.39 0 0.0TO 3 3 1 60.54 0 0.0TO 5 5 1 -72.93 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.76TO 1 1 1 -193.39 0 0.0TO 4 4 1 -67.37 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.24TO 1 1 1 -60.54 0 0.0TO 5 5 1 -159.70 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 67.37 0 0.0
TO 5 5 1 -167.37 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 72.93 0 0.0TO 3 3 1 159.70 0 0.0TO 4 4 1 167.37 0 0.0
Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
27/78
Line Marginalcase
Basecase
Ue1l
1-2 193.39 192.62 138.6 Ue1(1-2)
1-3 60.54 60.38 28.8 Ue1(1-3)
5-1 72.93 73.00 0 Ue1(5-1)
4-2 67.37 67.38 0 Ue1(4-2)
5-3 159.70 159.62 14.4 Ue1(5-3)
5-4 167.37 167.38 0 Ue1(5-4)
Seasonal Index for node 1
-
8/10/2019 Calculation of PoC Transmission Charges
28/78
-
8/10/2019 Calculation of PoC Transmission Charges
29/78
Pout Records: 1MW INCR in bus 3 (load)Bus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.20 0.0TO 2 2 1 192.48 0 0.0TO 3 3 1 60.81 0 0.0TO 5 5 1 -73.09 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.48 0 0.0TO 4 4 1 -67.52 0 0.0
BUS 3 3 400.0 MWLOAD 1 221.00TO 1 1 1 -60.81 0 0.0TO 5 5 1 -160.19 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 67.52 0 0.0TO 5 5 1 -167.52 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.80 0.0TO 1 1 1 73.09 0 0.0TO 3 3 1 160.19 0 0.0TO 4 4 1 167.52 0 0.0
Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
30/78
Line Marginalcase Basecase Ue3l
1-2 192.48 192.62 0 Ue3(1-2)
1-3 60.81 60.38 94.6 Ue3(1-3)
5-1 73.09 73.00 19.8 Ue3(5-1)
4-2 67.52 67.38 30.8 Ue3(4-2)
5-3 160.19 159.62 125.4 Ue3(5-3)
5-4 167.52 167.38 30.8 Ue3(5-4)
Seasonal Index for node 3
-
8/10/2019 Calculation of PoC Transmission Charges
31/78
Increase 1 MW load at Bus 4
-
8/10/2019 Calculation of PoC Transmission Charges
32/78
-
8/10/2019 Calculation of PoC Transmission Charges
33/78
Line Marginalcase Basecase Ue4l
1-2 193.01 192.62 39 Ue4(1-2)
1-3 60.23 60.38 0 Ue4(1-3)
5-1 73.24 73.00 24 Ue4(5-1)
4-2 66.99 67.38 0 Ue4(4-2)
5-3 159.77 159.62 15 Ue4(5-3)
5-4 167.99 167.38 61 Ue4(5-4)
Seasonal Index for node 4
-
8/10/2019 Calculation of PoC Transmission Charges
34/78
Increase 1 MW load at Bus 5
-
8/10/2019 Calculation of PoC Transmission Charges
35/78
Pout Records: bus 5 INCR 1MWBus FlowsBUS 1 1 400.0 MW
GENERATOR 180.00 0.0TO 2 2 1 192.75 0 0.0TO 3 3 1 60.46 0 0.0TO 5 5 1 -73.22 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.31TO 1 1 1 -192.75 0 0.0TO 4 4 1 -67.56 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.44TO 1 1 1 -60.46 0 0.0TO 5 5 1 -159.98 0 0.0
BUS 4 4 400.0 MW 1LOAD 1 100.25
TO 2 2 1 67.56 0 0.0TO 5 5 1 -167.81 0 0.0
BUS 5 5 400.0 MW 1GENERATOR 401.00 0.0TO 1 1 1 73.22 0 0.0TO 3 3 1 159.98 0 0.0TO 4 4 1 167.81 0 0.0
Pout RecordsBase CaseBus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 192.62 0 0.0TO 3 3 1 60.38 0 0.0TO 5 5 1 -73.00 0 0.0
BUS 2 2 400.0 MWLOAD 1 260.00TO 1 1 1 -192.62 0 0.0TO 4 4 1 -67.38 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -60.38 0 0.0TO 5 5 1 -159.62 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 67.38 0 0.0TO 5 5 1 -167.38 0 0.0
BUS 5 5 400.0 MWGENERATOR 400.00 0.0TO 1 1 1 73.00 0 0.0TO 3 3 1 159.62 0 0.0TO 4 4 1 167.38 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
36/78
Line Marginalcase Basecase Ue4l
1-2 192.75 192.62 52 Ue5(1-2)
1-3 60.46 60.38 32 Ue5(1-3)
5-1 73.22 73.00 88 Ue5(5-1)
4-2 67.56 67.38 72 Ue5(4-2)
5-3 159.98 159.62 144 Ue5(5-3)
5-4 167.81 167.38 172 Ue5(5-4)
Seasonal Index for node 5
-
8/10/2019 Calculation of PoC Transmission Charges
37/78
Marginal Participation Factor( of node i inline l):
Ueil / i Ueil
-
8/10/2019 Calculation of PoC Transmission Charges
38/78
Node/bus 1
Bus 2 Bus 3 Bus 4 Bus 5
Line
1-2
0.3346 0.4457 0 .0941 0.1255
1-3 0.1853 0 0.6088 0 0.2059
1-5 0 0.1783 0.1234 0.1496 0.5486
2-4 0 0.4231 0.1728 0 0.4040
3-5 0.0454 0.0574 0.3956 0.0473 0.4543
4-5 0 0.2223 0.0908 0.1798 0.5071
-
8/10/2019 Calculation of PoC Transmission Charges
39/78
Share Allocation of Generators
Load 1 Load 2 Load 3
Gen 1(bus1) % 30 20 50
Gen 2(bus2) %
40 25 35
-
8/10/2019 Calculation of PoC Transmission Charges
40/78
slack
Generator #1
Bus 1Bus 2
Bus 4
Bus 5
Bus 3
Line 1
Line 2Line 3
Line 4
Line 5
Line 6
1
180 MW
0 Mvar
400 MW
0 Mvar
260 MW
0 Mvar
100 MW
0 Mvar
220 MW
0 Mvar
Zone A
-
8/10/2019 Calculation of PoC Transmission Charges
41/78
-
8/10/2019 Calculation of PoC Transmission Charges
42/78
Calculation of Uniform Charges
= Total Transmission Charges/(Sum of approvedInjection+Sum of approved Withdrawal)
=803/(400+180+220+260+100)
=69.22 lakhs/MW
For bus 1 =(69.22*180)=125 Cr
For bus 2=(69.22*260) =180 Cr
For bus 3=(69.22*220) =152 CrFor bus 4=(69.22*100) = 69 Cr
For bus 5=(69.22*400) =277 Cr
-
8/10/2019 Calculation of PoC Transmission Charges
43/78
Cost allocation to nodes based
on marginal participationNodes Marginal
Participation
case
(Cost in Rs
Cr)
Uniform
Charges
(Cost in Rs
Cr)
50 % Marginal
Participation
50% Uniform
Charges
PoC rates
Rs Lakh
/MW/mont
h
Node/Bus1
75 125 100 4.62
Node/Bus2
185 180 182.5 5.85
Node/Bus
3
162 152 157 5.95
Node/Bus4
70 69 69.5 5.79
Node/Bus5
311 277 294 6.13
Total 803 803 803
-
8/10/2019 Calculation of PoC Transmission Charges
44/78
Generator shares
Generator
Loads
Generator Node 1
% share
Generator Node 5
% share
Load bus 2 10 50
Load bus 3 30 30
Load bus 4 60 20
-
8/10/2019 Calculation of PoC Transmission Charges
45/78
Node
s
MP-
Trace
UC 50 %
MP &
50%
UC
PoC
rates
Rs Lakh
/MW
/month
Monthly
Charges to
be paid Rs
Lakhs/mont
h based onshare
Monthly
Charges to
be paid Rs
Lakhs/month
based ontrace
Node/Bus 1
75 125 100 4.62(3.47)
Generatornode
Node/Bus 2
185 180 182.5 5.85(5.93)
2830
2905
Node/Bus 3
162 152 157 5.95(6.14)
2294
2596
Node/Bus 4
70 69 69.5 5.79(5.83)
1568
1192
Node/Bus 5
311 277 294 6.13(6.48)
Generatornode
Total 803 803 803
Charges to be paid = own drawal*drawal PoC of node+share*generator capacity*injectionPoC of generator bus(Figures in brackets are based on MP-Trace only)
-
8/10/2019 Calculation of PoC Transmission Charges
46/78
Present Issues
-
8/10/2019 Calculation of PoC Transmission Charges
47/78
There is no internationally adopted bestcommon method for allocation oftransmission costs.. All methods havetheir pros & cons
Worldwide a combination of methods is
used for allocation such as postage stamp,marginal/nodal pricing, marginalparticipation, average participation, MW-Mile, peak based, game theory etc
Requires not only technical expertise butalso Econimics concepts such as marginalprice, social welfare, etc
-
8/10/2019 Calculation of PoC Transmission Charges
48/78
-
8/10/2019 Calculation of PoC Transmission Charges
49/78
While we are rightly concerned withcongestion. What if there is overcapacity/stranded assets in a corridor?What if the constructed lines remain lightlyloaded for most part of the year due toerror in planning or change in load
generation scenario over time? What isthe limit of reliability costs?
-
8/10/2019 Calculation of PoC Transmission Charges
50/78
In Flow based methods the base case
load generation is very important.. Moreso when the tariff of assets vary widely
50 % Uniform charges distort thelocational signals
Slabbing further distorts the results ofmarginal participation
-
8/10/2019 Calculation of PoC Transmission Charges
51/78
Whether a generator/supplier or
Load/Consumer is to be penalized for itsgeographical location?
-----generation zones are predeterminedbased on availability of resources
----load zones/industrial belts are also resultof historical development, resourceavailability
Whether generator or Consumer bepenalized due to asymmetries intransmission network created duringhistorical development of ISTS ?
-
8/10/2019 Calculation of PoC Transmission Charges
52/78
Future Concerns
Integration of Renewables in the Grid
---run of the river hydro, wind and solar run
on very low PLF. However, transmissionmust be developed for entire capacity.
---higher transmission cost/unit due to lowPLF which is not under the control of
generator may result in disincentive forgrowth of renewables
-
8/10/2019 Calculation of PoC Transmission Charges
53/78
The issue of integration of renewables isbeing debated worldwide now
Can such transmission projects be fundedby Government under NAPCC?
-
8/10/2019 Calculation of PoC Transmission Charges
54/78
Changes in Sharing Regulations
contemplated in the thirdamendment regulations
-
8/10/2019 Calculation of PoC Transmission Charges
55/78
-
8/10/2019 Calculation of PoC Transmission Charges
56/78
Discontinuation of uniform charges
Discontinuation of slabbing
Computation based on full basic networkrather than truncated network
Proportional compensation for use of statelines carrying interstate power
-
8/10/2019 Calculation of PoC Transmission Charges
57/78
PoC charges under peak
conditions
-
8/10/2019 Calculation of PoC Transmission Charges
58/78
slack
Generator #1
Bus 1Bus 2
Bus 4
Bus 5
Bus 3
Line 1
Line 2Line 3
Line 4
Line 5
Line 6
1
180 MW
0 Mvar
530 MW
0 Mvar
390 MW
0 Mvar
100 MW
0 Mvar
220 MW
0 Mvar
-
8/10/2019 Calculation of PoC Transmission Charges
59/78
Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2---supplied by generator node 5Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 138.21 0 0.0TO 5 5 1 -238.21 0 0.0
BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
60/78
Load (bus2)
Load (bus3)
Load (bus4)
Gen1(bus1)
156.78 23.22 0
% 40 11 0
Gen2(bus5)
232.74 197.26 100
% 60 89 100
Total 390 220 100
-
8/10/2019 Calculation of PoC Transmission Charges
61/78
-
8/10/2019 Calculation of PoC Transmission Charges
62/78
Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 138.21 0 0.0TO 5 5 1 -238.21 0 0.0
BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0
Pout Records:: INCR 1 MW at bus 2Bus FlowsBUS 1 1 400.0GENERATOR 180.40 0.0TO 2 2 1 252.44 0 0.0TO 3 3 1 37.17 0 0.0TO 5 5 1 -109.21 0 0.0
BUS 2 2 400.0 MWLOAD 1 391.00TO 1 1 1 -252.44 0 0.0TO 4 4 1 -138.56 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.17 0 0.0TO 5 5 1 -182.83 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.56 0 0.0
TO 5 5 1 -238.56 0 0.0
BUS 5 5 400.0 MWGENERATOR 530.60 0.0TO 1 1 1 109.21 0 0.0TO 3 3 1 182.83 0 0.0TO 4 4 1 238.56 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
63/78
Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0
TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.21 0 0.0TO 5 5 1 -238.21 0 0.0
BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0
Pout Records:: 1 MW INCR at Bus 3Bus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.11 0.0TO 2 2 1 251.61 0 0.0TO 3 3 1 37.68 0 0.0TO 5 5 1 -109.18 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.61 0 0.0TO 4 4 1 -138.39 0 0.0
BUS 3 3 400.0 MWLOAD 1 221.00TO 1 1 1 -37.68 0 0.0TO 5 5 1 -183.32 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00
TO 2 2 1 138.39 0 0.0TO 5 5 1 -238.39 0 0.0
BUS 5 5 400.0 MWGENERATOR 1 530.89 0.0TO 1 1 1 109.18 0 0.0TO 3 3 1 183.32 0 0.0TO 4 4 1 238.39 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
64/78
Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.21 0 0.0
TO 5 5 1 -238.21 0 0.0
BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0
Pout RecordsBus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.00 0.0TO 2 2 1 252.19 0 0.0
TO 3 3 1 37.11 0 0.0TO 5 5 1 -109.30 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -252.19 0 0.0TO 4 4 1 -137.81 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.11 0 0.0TO 5 5 1 -182.89 0 0.0
BUS 4 4 400.0 MWLOAD 1 101.00TO 2 2 1 137.81 0 0.0TO 5 5 1 -238.81 0 0.0
BUS 5 5 400.0 MWGENERATOR 531.00 0.0TO 1 1 1 109.30 0 0.0TO 3 3 1 182.89 0 0.0TO 4 4 1 238.81 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
65/78
Pout Records: NEW BASE CASE::150% peak drawalat node/bus-2Bus FlowsBUS 1 1 400.0 MWGENERATOR 180.00 0.0
TO 2 2 1 251.79 0 0.0TO 3 3 1 37.27 0 0.0TO 5 5 1 -109.06 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.00TO 1 1 1 -251.79 0 0.0TO 4 4 1 -138.21 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.00TO 1 1 1 -37.27 0 0.0TO 5 5 1 -182.73 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.00TO 2 2 1 138.21 0 0.0
TO 5 5 1 -238.21 0 0.0
BUS 5 5 400.0 MWGENERATOR 530.00 0.0TO 1 1 1 109.06 0 0.0TO 3 3 1 182.73 0 0.0TO 4 4 1 238.21 0 0.0
Pout RecordsBus FlowsBUS 1 1 400.0 MWGENERATOR 1 180.00 0.0
TO 2 2 1 251.98 0 0.0TO 3 3 1 37.30 0 0.0TO 5 5 1 -109.29 0 0.0
BUS 2 2 400.0 MWLOAD 1 390.44TO 1 1 1 -251.98 0 0.0TO 4 4 1 -138.46 0 0.0
BUS 3 3 400.0 MWLOAD 1 220.37TO 1 1 1 -37.30 0 0.0TO 5 5 1 -183.07 0 0.0
BUS 4 4 400.0 MWLOAD 1 100.19TO 2 2 1 138.46 0 0.0
TO 5 5 1 -238.65 0 0.0
BUS 5 5 400.0 MWGENERATOR 531.00 0.0TO 1 1 1 109.29 0 0.0TO 3 3 1 183.07 0 0.0TO 4 4 1 238.65 0 0.0
-
8/10/2019 Calculation of PoC Transmission Charges
66/78
Node/bus 1
Bus 2 Bus 3 Bus 4 Bus 5
Line1-2 0.280 0.463 0.000 0.073 0.184
1-30.145 0.000 0.727 0.000 0.128
1-50.000 0.253 0.114 0.104 0.528
2-40.012 0.437 0.127 0.000 0.424
3-50.015 0.105 0.350 0.043 0.487
4-50.008 0.289 0.084 0.127 0.493
-
8/10/2019 Calculation of PoC Transmission Charges
67/78
Marginal Line Participation Factors peak case andearlier/average case for line 1--2
0
0.05
0.1
0.15
0.2
0.250.3
0.35
0.4
0.45
0.5
Node/bus 1 Bus 2 Bus 3 Bus 4 Bus 5
peak case
earlier case
-
8/10/2019 Calculation of PoC Transmission Charges
68/78
Total charges allocated to
nodes peak case earlier case
0
50
100
150
200
250
300
350
Node/bus 1 Bus 2 Bus 3 Bus 4 Bus 5
peak case
earlier case
-
8/10/2019 Calculation of PoC Transmission Charges
69/78
Tabulated data for earlier case
and peak caseNode Earliercost
allocated
to node
Peak
scenario
cost
%
change
Earlier
cost/
Lakh/MW
/month
MP
Earlier
cost/
Lakh/MW/
month
MP+UC
Peak
Scenario
cost/
Lakh/MW/mo
nth
1 75 61 18.66 3.47 4.62 2.82
2 185 218 17.83 5.93 5.85 4.66
3 162 157 3.08 6.14 5.95 5.94
4 70 51 27.14 5.83 5.79 4.25
5 311 316 1.61 6.48 6.13 4.97
While the load at bus 2 had increased 1.5 times the total cost allocated to the nodehas increased only 1.18 times( 1.19 for MP+UC)cost/MW/Month will go down (as MW increased). New entrants/ST customers incentivizedCharges allocated to a node will change only if due to it flow in different lines change.Otherwise the charge may remain same under peak scenario also. May also reduce.
-
8/10/2019 Calculation of PoC Transmission Charges
70/78
From CERC sharing of ISTS charges(third amendment) draft
-
8/10/2019 Calculation of PoC Transmission Charges
71/78
TABLE 2
DIC Withdrawal/LoadPoC Charges
Scaled PoCCharges
X 45,79,42,697 50,45,52,461
Y 18,96,39,554 20,89,41215
-
8/10/2019 Calculation of PoC Transmission Charges
72/78
TABLE 3
Zone Uniform Charges
(UC)\(Rs./Month)=Unifo
rm Rate*LTA
Scaled PoC
Charges
Rs/Month
50% UC and
50% PoC
Rs./Month
LTA (MW) Withdrawal
Charges
(Rs/MW/Month)
X 25,22,12,087 50,45,52,461 37,83,82,274 2,668 1,41,822
Y 16,44,90,088 20,89,41,215 18,66,46,847 1,741 1,07,280
50.46/20.89= 2.42 ; 37.84/18.66 = 2.07
-
8/10/2019 Calculation of PoC Transmission Charges
73/78
-
8/10/2019 Calculation of PoC Transmission Charges
74/78
TABLE-5
ZoneGeneration
(MW)
Load
(MW)
GenerationCharges
(Rs.)
LoadCharges
(MW)
LTA(Generation)
(MW)
LTA(Demand)
(MW)
GenerationPoC
(Rs./MW/Month)
LoadPoC
(Rs./MW/Month)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Z 194 2929160
16,64,638 2,160,51,386 280 4784 5945 45166
-
8/10/2019 Calculation of PoC Transmission Charges
75/78
TABLE-6
Zone
Generation
PoC
(Rs./MW/
Month)
Load
PoC
(Rs./MW
/Month)
Generation
PoC
(Rs./MW/
Month)
Load
PoC
(Rs./MW
/Month)
Generation
PoC
(Rs./MW/
Month)
Load
PoC
(Rs./MW/
Month)
Generation
PoC
(Rs./MW/
Month)
Load
PoC
(Rs./M
W/Mo
nth)
Software Computed LTA BasedAfter 50% Uniform
charge and 50% PoCapplication
After Slabs
Z 8,594 74,229 5,945 45,166 50,547 72,154 79,544 79,544
-
8/10/2019 Calculation of PoC Transmission Charges
76/78
TABLE-7
Sl.No. State /DIC % Allocation
1 BIHAR 42.89%
2 JHARKHAND 8.13%
3 DVC 0.31%
4 ODISHA 31.8% plus temp allocation
5 WEST BENGAL 9.1% plus temp allocation
6 SIKKIM 2.4
7 TAMIL NADU 0.85%
8 NER 3.22%
-
8/10/2019 Calculation of PoC Transmission Charges
77/78
TABLE-8
Sl.No. State /DIC % as per participation factor
1 ODISHA 82.97
3 DVC 12.1
5 WEST BENGAL 4.93
-