CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

12
CAE-IF : R3S and Pilot #3 RESULTS SUMMARY JM Crepel, CITRAN/AFNeT March 12, 2019

Transcript of CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

Page 1: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

CAE-IF : R3S and Pilot #3

RESULTS SUMMARY

JM Crepel, CITRAN/AFNeT

March 12, 2019

Page 2: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

•Same simple test suite than R1S : • Beam modeled with rod, bar, shell or solid elements

• Lumped and/or distributed applied forces

•But process extended to the FEA round trip :• Focused on input data regeneration in CAE solver format

• The rerun sequence will be executed by the LOTAR EAS_WG

and is not due by the participants

• In addition to R1S :• New statistics added

• FEA validation properties to be assigned

2

R3S scope

Sept 26, 2018

ATS1 ATS2 ATS3 ATS4

Postponed

CAE-IF R3S results

Page 3: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

3

R3S schedule and milestones

March 12, 2019

• Kickoff : PDES/LOTAR meeting

• Conf call every 3 weeks

• Re-run trials

• From Oct, 31 to Nov, 28 Feb 28, 2019

3 trial loops

Extended by 2,5 months

CAE-IF R3S results

Page 4: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

4

CAE-IF R3S : round trip process focusing on input translated data

CAESAR

Input FEA data

(original)

Input STEP

(native)

Input FEA data

(regenerate)Output FEA data

(rerun)

Input STEP

(target)

Input STEP

(native)

Input STEP

(target)

Input/

native statistics

Input target

statistics

Input FEA data

(regenerated)Output FEA data

(rerun)

Output FEA data

(original)

Statistics

checkVisual check

(sampled)

Actual :

Visual check

March 12, 2019 CAE-IF R3S results

Page 5: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

• SFA : RAS

• EDM check : 3 remaining errors

• uniqueness rules violations (ATS1, ATS2, ATS3,ATS4)

• -> dummy nodes v/ nodes name attribute

• WHERE rule violations (ATS2, ATS3, ATS4)

• -> FEA_PARAMETRIC_POINT

• unset mandatory attributes (ATS4)

• ->VOLUME_3D_ELEMENT_LOCATION_POINT_VARIABLE_VALUES

5

STEP translation results

March 12, 2019 CAE-IF R3S results

Under investigation

Being fixed soon

Page 6: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

• 100% passed (unless metadata and VP)

• No more error captured

6

R3S statistics

March 12, 2019 CAE-IF R3S results

Need to further analyze

Nastran regenerated

files

Page 7: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

7

Nastran regenerated files

From

STEP

Regenerated by ATS1 ATS2 ATS3 ATS4

Re-run

completed

A

->A ok ok ok ok

->B ok ok ok ok

B

->A ok ok Bad prop_id

management

ok

->B ok ok Ok ok

Equivalent

results

A

->A ok ok PLOAD2 Sign error ok

->B ok ok ok Fixed field issue

B

->A ok ok ---- ok

->B ok ok ok Fixed field issue

March 12, 2019 CAE-IF R3S results

Page 8: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

CAE-IF R3S : Nastran regenerated files statistics

Remaining issues

• Critical (not equivalent model)

• Formatting issues : Fixed field management

• Element property id management

• Surface loads orientation

• Non critical (equivalent model)

• Title and load case identifiers

• Element numbering

• Element property numbering

• To be considered later

• Multi coordinate system management

• Output request (PBAR : location of stress recovery)

8

ATS1 ATS2 ATS3 ATS4 % passed

Re-run completed 4/4 4/4 3/4 4/4 94%

Results OK 4/4 4/4 2/3 2/4 75%

CAE-IF R3S results

Conclusions

• Critical issues being fixed soon

• Big improvement thanks to extension of R3S

• Efficient cooperation between participants

• Further items to be addressed in future test rounds

Page 9: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

• AP209 EXPRESS Schema corrected

• Calculation of resultant moment fixed

• Opened discussion on :

• « equivalent FEA model »

• Titles and identifiers translation

• Output request : point location for stress recovery

9

R3S : lessons learnt

March 12, 2019 CAE-IF R3S results

Page 10: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

• General• Big improvement since last offsite meeting in Darmstadt

• Very efficient cooperation between participants

• Statistics• Metadata (title & other ids) and FEA validation properties have been postponed to R4S

• All other statistics are OK. Calculation of resultant moment has been fixed.

• Still some (minor) syntax issues in the STEP files for 1 participant

• Regeneration of Nastran files• 75% round trip processed with correct results regeneration

• Remaining critical issues identified will be fixed quickly

• But still further items to be addressed

10

R3S results : conclusion

CAE-IF R3S resultsMarch 12, 2019

On track for the Live Demo @ NAFEMS WC19

→ Task will be monitored task by EAS_WG

Page 11: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

APPENDIX

11March 6, 2019 CAE-IF Round 4S Kick-Off Meeting

Page 12: CAE-IF : R3S and Pilot #3 RESULTS SUMMARY

LOTAR Offsite meetings WS@Jacksonville WS@Darmstadt WS@Asheville WS@Toulouse WS@Atlanta

LOTAR EAS

pilot study #3 initial TM

actual

pilot study #4

NAFEMS WC - Live demo NAFEMS WC19

CAE-IF

CAE-IF meetings KO CC CC CC TM CC CC KO CC CC CC TM

CAE-IF Round tests

M1 M4 M1 M4

M2 M5 M2 M5

M3 M3

R3S Kickoff meeting R3S Technical meeting R4S Kickoff meeting R4S Technical meeting

M1 Test suite and relevant Rec Pract. Release

M2 initial STEP files and native Stats due

M3 release of checked STEP files for testing

M4 initial target stats due

M5 preliminary results available

Pilot study #4

2018-Q3 2018-Q4 2019-Q1 2019-Q2 2019-Q3

Sept Oct June Jul Aug Sept

Actual planning (tentative)

Dec Jan Feb March Apr MayNov

Live Demo preparation

Milestones

Fall CAE round test #3 Spring CAE round test #4

End of development

CAE-IF / EAS master planning and concurrent tasks

12CAE-IF statusFeb 13, 2019

Hand Over