Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B

Transcript of Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14,...

Page 1: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Cabrillo Boulevard Bridge Over Mission Creek Replacement

Cabrillo Boulevard Bridge Over Mission Creek Replacement

COASTAL DEVELOPMENT PERMIT HEARINGMay 14, 2014 Agenda Item W 22B

Page 2: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Applicant PresentationApplicant Presentation

Project Location

Existing and New Bridge

Project Improvements

Bridge Design

Construction

Special Conditions

Conclusion

City of Santa Barbara • Public Works Department 2

Page 3: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Reapply For Coastal PermitReapply For Coastal Permit

Project previously approved by Commission in April 2008

Extensions were granted until 2013

Permit expired due to delay in project

Project right of way delay now resolved

Reapplied for essentially the same project

City of Santa Barbara • Public Works Department 3

Page 4: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Project LocationProject Location

Cabrillo Blvd (primary arterial)

Waterfront near downtown State St

Adjacent to Stearns Wharf

Over Mission Creek Estuary

City of Santa Barbara • Public Works Department 4

Page 5: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Existing BridgeExisting Bridge

Constructed 1913, widened in1928, beachway added 1977

Structurally deficient, RC girders

Historical barrier rail downstream

Deteriorated walls/banks

City of Santa Barbara • Public Works Department 5

Page 6: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Existing BridgeExisting Bridge

City of Santa Barbara • Public Works Department 6

Page 7: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

New BridgeNew Bridge

City of Santa Barbara • Public Works Department 7

Page 8: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Project ImprovementsProject Improvements

Complete structural replacement

Increased flood capacity and remove part building over creek upstream, coordinated with Lower Mission Creek Flood Control Project

Bank protection/restoration downstream

Reconstruction of creek walls upstream

Increased sidewalk widthsCity of Santa Barbara • Public Works Department 8

Page 9: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

New Bridge View from WharfNew Bridge View from Wharf

City of Santa Barbara • Public Works Department 9

Photo zoomed in to show architectural features, not representative of bulk and scale from public viewing locations

Page 10: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Bridge DesignBridge Design

Maintains110 foot width and location

Length increased from 122 to 131 feet

(4) vehicle lanes, turning lane, 9 & 17 foot sidewalks, and 18 foot beachway

Precast concrete bridge deck on piles

Cast-in-place faux sandstone walls

Bioengineered revetment and native riparian plantings

City of Santa Barbara • Public Works Department 10

Page 11: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Bridge DesignBridge Design

City of Santa Barbara • Public Works Department 11

Page 12: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Architectural DetailsArchitectural Details

Barrier rail matches historic architecture while maintaining water views

Mission creek walls with faux sandstone pattern, texture, and color

City of Santa Barbara • Public Works Department 12

Page 13: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Downstream Creek

Restoration Downstream Creek

Restoration

City of Santa Barbara • Public Works Department 13

Page 14: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

ConstructionConstruction

Broken into three stages to maintain traffic in both directions and satisfy environmental requirements

Two years starting in fall 2014

Stage 1: Drill center piles, bldg demo

Stage 2: North side bridge, walls, temporary beachway bridge, utilities

Stage 3: South side bridge, creek banks

City of Santa Barbara • Public Works Department 14

Page 15: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Construction Stage 1-Fall 2014Construction Stage 1-Fall 2014

City of Santa Barbara • Public Works Department 15

Page 16: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Construction Stage 2-2015Construction Stage 2-2015

City of Santa Barbara • Public Works Department 16

Page 17: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Construction Stage 3-2016Construction Stage 3-2016

City of Santa Barbara • Public Works Department 17

Page 18: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Special ConditionsSpecial Conditions

Compliance with mitigation measures Air/water quality, biological, traffic, etc.

Permits received from ACOE, RWQCB, CDFW, SHPO, USFWS, NMFS, City HLC, CEQA MND, NEPA CE

Timing of operations – built into stages

Completed tidewater goby and aquatic species management plan

City of Santa Barbara • Public Works Department 18

Page 19: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Special ConditionsSpecial Conditions

Biological surveys and construction monitoring Tidewater goby preconstruction monitoring

has been occurring since 2008

Other nearby projects confirmed method

Protection of water quality – erosion control plans completed

Excavated material – to be disposed in TBD location outside Coastal Zone

City of Santa Barbara • Public Works Department 19

Page 20: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Special ConditionsSpecial Conditions

Habitat Enhancement and Revegetation Monitoring Program Completed, revisions to be discussed with

staff regarding certain plant species

Herbicide use to be avoided or restricted use to HabitatTM (aquatic)

Special Conditions nearly identical to those in 2008 and acceptable to City

City of Santa Barbara • Public Works Department 20

Page 21: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Project Stakeholders/SupportProject Stakeholders/Support

City Public Works, Parks & Recreation, Waterfront , Creeks

County Flood Control, Caltrans, FHWA

Arts & Crafts Show, Wharf Merchants

Nearby hotel, retail, restaurants

Transit District, Tour Buses, Chamber of Commerce Visitor’s Center

City of Santa Barbara • Public Works Department 21

Page 22: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

ConclusionConclusion

Staff has found that the development as conditioned will be in conformity with the Coastal Act

We request your approval of the Coastal Development Permit before you today

Thank you

City of Santa Barbara • Public Works Department 22

Page 23: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Sea Level Rise/Wave UprushSea Level Rise/Wave Uprush

City of Santa Barbara • Public Works Department 23

Page 24: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Sea Level Rise/Wave UprushSea Level Rise/Wave Uprush

City of Santa Barbara • Public Works Department 24

Page 25: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Sea Level Rise/Wave UprushSea Level Rise/Wave Uprush

City of Santa Barbara • Public Works Department 25

Page 26: Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.

Sea Level Rise/Wave UprushSea Level Rise/Wave Uprush

City of Santa Barbara • Public Works Department 26