CABLE-STAYED BRIDGES
� GENERAL DESIGN
� DEVELOPMENT OF CONSTRUCTION TECHNOLOGY
OF BRIDGE AND TRANSPORT STRUCTURES
� DEVELOPMENT OF PROJECTS FOR SPECIAL AUXILIARY
STRUCTURES AND DEVICES (SAS&D)
� DEVELOPMENT OF METHOD STATEMENTS (MS)
� DEVELOPMENT OF CONSTRUCTION METHOD STATEMENTS (CMS)
� DEVELOPMENT OF PROJECTS FOR RENOVATION AND
REPAIR OF BRIDGE AND TRANSPORT STRUCTURES
� DESIGN OF MONITORING SYSTEMS FOR COMPLEX
ENGINEERING STRUCTURES
� SOPHISTICATED ENGINEERING ANALYSiS
� AERODYNAMIC ANALYSiS
� DEVELOPMENT OF TECHNICAL AND ECONOMIC FEASIBILITY STUDY
� FINANCIAL ESTIMATES
� PREPARATION OF TENDER DOCUMENTATION
� ENGINEERING SUPERVISION
� PROTECTION OF INTELLECTUAL PROPERTY ARTICLES
� CONSTRUCTION
� Design of technological solutions for objects of nuclear
power engineering and industry and its complexes
� Development of justification of radiation and nuclear protection
� highway bridges
� railway bridges
� combined bridges
� highways
� streets and road interchanges
� viaducts и flyovers
� transport tunnels
� underground structures
� embankments and mooring berths
� retaining walls
� reinforced mounds
� buildings and structures of different heights
� sophisticated floors of buildings and structures
� foundations in complex environment
� DESIGN
OUR EXPERTISE
3
NORTH-WEST
OKTYABRSKIY CABLE-STAYED BRIDGEOVER THE SHEKSNA RIVER, CHEREPOVETS
DESCRIPTIONCity Bridge is being connected Industrial and Zashernin-skiy districts of Cherepovets city. It is the first ever built cable-stayed Bridge in Russian Federation. Bridge deck structure presented by steel girder structure with ca-ble-stayed system, with five fan type RC approaches. Sin-gle A-shaped steel pylon with six pairs of stay cables, lo-cated on Pier 2 between spans of 194.2 m and 136.5 m.
� Bridge diagram:
53.0 + 194.25 + 136.5+ 68.65 + 4 х 68.25 + 52.5 m
� total length of bridge structure - 709.25 m
� A-shaped pylon
� pylon height – 83.5 m
� weight of stay cables – 510 t
� length of stay cables – 16 km
� clearance – 28.4 m
SCOPE OF WORKS
� design of SAS&D
� design of work technology
� development of Method Statements (MS)
� field supervision
CLIENT
Cherepovetskiy Metallurgical Plant
GENERAL CONTRACTOR
‘Mostootryad 61’; JSC ‘Mostostroy 6’
DESIGN PERIOD
1972 - 1976
CONSTRUCTION PERIOD
1976 – 1979
126.00
194000
24000
2480510056951205
2425 1500
24202480
9292445 2715
29313484
3431
382000
86044
28923
174000 1740002х66000=132000 2х66000=132000
1 2
126.00
194000
382000
86044
28923
174000 1740002х66000=132000 2х66000=132000
1 2
cross-section
elevation
5
SAINT-PETERSBURG
BOLSHOY OBUHOVSKIY CABLE-STAYED BRIDGEOVER THE NEVA RIVER, SAINT-PETERSBURG
DESCRIPTIONTwin bridge crossing the Neva River on ring road around Saint-Petersburg, on site between Priozerskoe motorway and up to Highway ‘Russia’.
Bolshoy Obuhovskiy Cable -Stayed Bridge is the only one not fixed bridges over the Neva River, connecting Pros-pect Obuhovskoy Oborony with Oktyabrskaya Embank-ment.
First bridge crossing was inaugurated on December 15th 2004 and the second one on October 19th 2007
� Bridge diagram: 2 х 66+174+382+174+2х66 m
� deck width is 25 m with a height of 2.5m, deck
structure composed of two longitudinal boxed
girders with bracing
� deck clearance is 30 m
Four lanes of carriageway conceived as one way crossing with two technological passages for maintenance pur-poses (pedestrian crossing was not considered). Distance within main bridge axis is 36.4 m
Spans connected with steel pylons by height 120.5 m via stay cables. Pylon Foundation presented by bored piles with a length from 30 up to 40 m long. Total length of strands is 900 km long.
Stay cables from parallel strand manufactured on mon-ostrand technology. Each stay cable is formed from series straining strand immediately during construction.
SCOPE OF WORKS
� definition of bridge crossing conception
� structural design
� technology of construction
� design of SAS&D plus DDPE
� structural monitoring of construction
and service periods
� field supervision
Client Road Administration of Saint-Petersburg Institute Stroyproekt
GENERAL CONTRACTOR
‘Mostootriad- 19’
DESIGN PERIOD
2000 - 2007
CONSTRUCTION PERIOD
2002 - 2007
7
VIADUCT ALEXANDROVSKAYA FERMA, SAINT-PETERSBURG
SAINT-PETERSBURG
DESCRIPTION Overpass over RR stations SPb -Sortirovochniy - Mosk-ovskiy Prospekt along Alexandrovskaya Ferma.
Structure of overpass fulfilled as acontinuous steel span of box section with orthotropic slab, steel structure of mid-dle span and back spans out of reinforced concrete. Via-duct has curved form with radius of 400 m. Cable-stayed trusses are within plane along overpass axis.
� diagram of cable-stayed span:
51.2+70.0+182.3+70.0+51.2 m
� total length - 713.24 m
� length of Cable-stayed spans - 424.7 m
� width of carriageway - 23.7 m
� A-shaped RC pylons
� height of pylons - 65 m
SCOPE OF WORKS
� bridge crossing conception
� design of main structures of overpass
� technology of construction
� design of SAS&D
� development of Method Statements (MS)
� structural monitoring during construction
stage and service period
� field supervision
client Road Administration of Saint-Petersburg
GENERAL CONTRACTORJSC ‘Lengiprotrans’
DESIGN PERIOD 2006 - 2008
CONSTRUCTION PERIOD
2008
8
CABLE-STAYED BRIDGES
1 - 1
390390 390 750
2250 8600 8600 3902000
23760
2 - 2
390390 390 750
2250 8600 8600 3902000
23760
3 - 3
4 - 4
390390
390
390 7502250 8600 8600 3902000
23760
23940
450 2250 8000 8000 750 4502000
1 - 1
390390 390 750
2250 8600 8600 3902000
23760
2 - 2
390390 390 750
2250 8600 8600 3902000
23760
3 - 3
4 - 4
390390
390
390 7502250 8600 8600 3902000
23760
23940
450 2250 8000 8000 750 4502000
780 7801
2 2
14500
31000 31000
3200
64446
19107 7Х1500
5106
38119
7220 1040 10403660
14500
13672
780 7801
2 2
14500
31000 31000
3200
64446
19107 7Х1500
5106
38119
7220 1040 10403660
14500
13672
182300
424700
70000 7000051200 51200
1 2 3
2
4
3 41
cross-section
elevation
pylon
1388090
737000100000 100000
5
2
231
4
68
1
90000 9000090000 41940
225.750 225.750
9000041940
11
FAR EAST
elevation
cross-section
2810 2810 28102810 40003500
31003048433293
310012142 12142
333018
41
3000
30620
350035004000 3500 400035003000
30620
350035004000 3500
2810 2810 28102810 40003500
31003048433293
310012142 12142
333018
41
3000
30620
350035004000 3500 400035003000
30620
350035004000 3500158270
64150
2450
3000
3426
43570(54700)
15480
3000
16050
4х3000
18650
70007000 61954
29500
65000
13355
48619
15000
pylon
DESCRIPTIONCable-Stayed Bridge Crossing on federal highway M60 ‘Ussuri’ Khabarovsk - Vladivostok toward Russkiy Island.
Bridge structure located in the central part of Vlad-ivostok nearby Gogolya and Nekrasovskaya streets on Northern side as well as Kalinina, Fastovskaya and Nadibaidze streets on Southern side. Total length of bridge crossing is 2.1 km
� Bridge diagram:
45+100+2 х 90+737+2 х 90+100+45 m
� center span – steel structure of 737 m
� back span – prestressted RC
� bridge length – 1,387 m
� pylon height – 225 m
� clearance – 60 m
� width of main girder – 29.4 m
� height of main girder – 3.5 m
� weight of stay cables – 1,845 t
� total area – 43,030 m2
SCOPE OF WORKS
� definition of bridge crossing conception
� structural design
� technology of assembling design
� design of SAS&D
� structural monitoring during stage of
construction and service period
� field supervision
CLIENT
Road Administration of Primorskiy Kray
GENERAL CONTRACTOR
TMK Ltd
DESIGN PERIOD
2006 – 2008
CONSTRUCTION PERIOD
2008 – 2012
12541254
25960
12760 66006600
11600
54005050 500 10005880 6180
245
1770
3200
1185
245
1770
3200
1185
580 580
12293 1229360601229312293 60
25960
12760 66006600
11600580 580
1254
12541254
25960
12760 66006600
11600
54005050 500 10005880 6180
245
1770
3200
1185
245
1770
3200
1185
580 580
12293 1229360601229312293 60
25960
12760 66006600
11600580 580
1254
2х90000 2х9000011000001920000
2х85000 2х8500060000 60000
13
FAR EAST
elevation
cross-section
DESCRIPTION
Cable-stayed bridge on Russkiy island, Vladivostok. One
of the world biggest cable-stayed crossing of 1,104 m
with the highest pylons and longest stay cables ever build
currently.
� brige diagram: 60+72+3х84+1104+3х84+72+60 m
� total bridge length — 1, 885.53 m
� total length with approaches — 3,100 m
� main span — 1,104 m
� deck width — 29.5 m
� carriageway width — 23.8 m
� number of lanes — 4 (2 per one way)
� clearance — 70 m
� number of pylons — 2
� pylon’s height — 320.9 m
� number of stays — 168 pcs
� longest stay cable — 578.08 m
� shortest stay cable — 181.32 m
SCOPE OF WORKS
� design of project stage
� design of SAS&D, main structures
� aerodynamic tests
� control of technical decisious
� verification analysis
CLIENT
Road Administration of Primorskiy Kray
Rosavtodor, ‘Mostovik’
GENERAL CONTRACTOR
JSC ‘USK Most’
DESIGN PERIOD
2008 – 2012
CONSTRUCTION PERIOD
2009 – 2012
15
MOSCOW
DESCRIPTION
Bridge Crossing the Moscow River in Serebrianiy Bor nearby Krasnopresnyanskiy Prospekt from MKAD up to Prospekt Marshal Jukov.
The task of picturesque bridge design was to insure com-fortable and steady vehicles movement along highway with a speed of 100 km per hour.
Pylon was conceived as a huge arch structure with fan type crown of stay cables placed via sharp angle on both banks of Moscow River.
The upper part of the arch has cozy ellipse shaped res-taurant with amazing view
� bridge diagram:
15х25+2х105+409.5+2х105+84+82+42 m
� total bridge length -1,460 m
� clearance - 37 m
� cable-stayed bridge with arch pylon
� boxed steel girder
� height of the arch - 105 m
� weight of stay cables - 400 t
� weight of arched pylon - 4,000 t
� weight of main girder -12,000 t
SCOPE OF WORKS
� initial aerodynamic analytical assessment.
� analytical assessment and recommendations
subsequent to test in aerodynamic tube
� dynamic calculation
CLIENT
‘Organizator Ltd’
GENERAL CONTRACTOR
JSC ‘Metrogiprotrans’; JSC ‘Giprotransmost’
DESIGN PERIOD
2004 - 2007
CONSTRUCTION PERIOD
2004 - 2007
CABLE-STAYED BRIDGE SEREBRIANIY BOR, MOSCOW
16
CABLE - STAYED BRIDGES
CABLE-STAYED BRIDGE
OVER THE SHEKSNA RIVER, CHEREPOVETS
DESCRIPTION
Two H-type pylon Cable-Stayed Bridge Crossing is being
connected Zarechenskiy and Zashekninskiy districts on
Arkhangelskaya street in Cherepovets City.
� bridge diagram:
4х63+63+64+98+220+98+64+63+3х63+42 m
� design length – 2,000 m
� total bridge length – 1,166.85 m
� pylon height from the carriageway - 91 m
� RC pylons
� length of Stay Cables - 5, 428 m
� weight of stays – 325 t
� clearance of navigable span -180 m
� RC deck
� number of lanes – 6
� clearance – 17 m
� pavement - 2x 3.0 m
SCOPE OF WORKS
� General Design
� design of main structures (bridge and flyover)
� complex design
� architectural desicions
� design of SAS&D, construction method statement
� design of illumination
� design of navigation bridge warning
� design of aeronautical bridge warning
� improvement design
� field supervision
CLIENT
Road Administration of Cherepovets
DESIGN PERIOD
2010 - 2011
elevation
96.687
3х630004х63000 630006400064000630005100 9800098000 220000
1166850
215.1655000
7000
42000 5300
cross-section
550 5501300013000 3000
13100
hcm
p =
2855
13100
32000 32000
32000
30000
33600
320003000
130002450 245013000
1280
65
9489
014
690
1248
060
00
УВВ 1% 102.640
pylon
17
NORTH-WEST
elevation
9000
0 5180
016
200
3000
1500
040
00
13440
17797
159634003902390234001596
6720 6720
9000
0 5180
016
200
3000
1500
040
00
13440
17797
159634003902390234001596
6720 6720
45000 126000
6800
0
126000300000
cross-section
pylon
CABLE-STAYED BRIDGE ON HIGHWAY ADLER-MOUNTAIN RESORT ‘ALPICA-SERVICE’
DESCRIPTION Composite road (highway together with RR) Adler – moun-tain resort ‘Alpica – Service.’
Two pylons Cable-Stayed Bridge Crossing nearby North-ern part of Tunnel Complex N3.
� bridge diagram: 126+300 +126 m
� total length – 552 m
� main span – 300 m
� number of lanes - 2
� total weight of steel – 4, 900 t
� total weight of RC – 8, 900 t
� weight of cable stays – 150 t
� pylon height from the carriageway – 68 m
� pylon height from the foundation – 86 m
SCOPE OF WORKS
‘Project’ stage:
� basic calculations
� analytical assessments for wind tunnel tests
� wind tunnel tests analysis
� dynamic analysis
CLIENT
Road Administration of Sochi;
Institute Giprostroymost, Moscow
DESIGN PERIOD
2010
19
KRASNODAR TERRITORY
TECHNOLOGICAL CABLE-STAYED VIADUCT OVER THE DUDERGOFSKIY CANAL IN SAINT-PETERSBURG
SCOPE OF WORKS
� design of pylon construction technology
� design of SAS&D
� Method Statement of pylon construction
CLIENT
Petrokom Ltd, Saint-Petersburg
CONSTRUCTION PERIOD
2011
DESCRIPTION Cable-Stayed Technological Viaduct with main span of 130 m is being crossing Dudergofskiy Channel with sibling heating tubes of 1,020 mm above with single inclined pylon. The structure of cable-stayed bridge supporting heating main has no analogues in Russia. Pylon by height 58 m is inclined to the ground.
Bridge Crossing presented as follows:
� height of pylon – 58 m
� length of span – 130 m
� technological load – Two heating tubes 1.2 m
21
SAINT-PETERSBURG
2 – 2
50000
50000
45214
23260 23260
20100
7000 7000 7675 76753700 3700
20100
490022550 22550
20100 5600
5600
3480
20100
0,020
0,020
0,0139
0,020
0,020
0,0212
3 – 3
4 – 4
110000
94650
60000
4
2
1
1
3
32 166000 6000 80000
17000
-3,320
-40,320 -38,000
4
4400
-38,000 -40,320
-1,450 -3,3201,760
15000 8х13000=104000
580000240000 110000 60000
8х13000=104000
4865 4865114,000
124,600
4000
950950
17500
24000
20000
2432
0
2556
6800
1239
20
5000
17500
1 – 1
elevation
cross-section
pylon
CABLE STAYED BRIDGE OVER THE PETROVSKY CHANNEL, SAINT-PETERSBURG, RUSSIA
DESCRIPTION The Bridge Crossing was conceived as a part of the im-portant city Motorway Western High Speed Diameter. The structure is located on convex curve of 10,000 m.
Projection of upstream clearance is 166х25 m and downstream clearance is 80х25 m. Foundations of piers were fulfilled as bored piles diameter 1,500 mm. Deck cross-section is presented as a structure of four main girders of 1.76 m height within stay ca-ble system. Bridge girders were connected via beams on distance of 65 m. (3 m per edge piers). Compos-ite monolithic carriageway slab thickness is 220 mm. SSI2000 was an option of stay cable system with gal-vanized strands individually greased and coated with a high-density polyethylene sheath. The strands are used in accordance with the EN10138 standard. Total strands are seven wire 15.7 mm diameter. Designated distance within stays is 13 m.
TECHNICAL FEATURES
� Bridge schema: 60+110+240+110+60 m
� Total length — 580 m
� Carriageway clearance 2 х (Г-17.5)
� RC pylons
� Pylon heights — 124 m
SCOPES OF WORKS
� Architectural conception design
� Main structures design
� Working Documentation per Cable Stayed Bridge
� SAS&D per the bridge structure
� MS development and issue
� Technical Supervision
CLIENT & GENERAL CONTRACTORJSC WHSD
CONTRACTORICA Astaldi Ictas
OWNERNorthern Capital Highways, Ltd
DESIGN PERIOD2013 – 2014
CONSTRUCTION PERIOD2016
23
SAINT-PETERSBURG
CABLE-STAYED BRIDGE OVER THE VOLGA RIVER, NIZHNIY NOVGOROD
DESIGN PROPOSAL
DESCRIPTIONDesign decision relating reconstruction bridge over the Volga River on the highway P-159 Nizhniy Novgo-rod-Shahuniya – Kirov with carriageway widening. Com-bined Bridge upper deck presented as RR way and lower deck as a highway. Existed bridge was built in 1965.
� total bridge length (motorway) – 1,608.8 m
� Bridge design conception presented as follows:
� 12х18 + 55 + 2х159 + 55 + 53 +13х18 m including:
� 12х18 – right bank approaches for highway
� 55 + 2х159 +55 – middle span for combined way
� 12х18 - left bank approaches for highway
SCOPE OF WORKS
� predesign of bridge reconstruction
by carriageway widening which uses one pylon cable-
stayed system
CLIENT
Road Administration of Nizhniy Novgorod, JCS ‘Avtomost’
DESIGN PERIOD
2007
24
CABLE-STAYED BRIDGES
25
VOLGA REGION
CABLE-STAYED BRIDGE CROSSING IN ULYANOVSK
DESIGN PROPOSAL
DESCRIPTION
� Bridge diagram: 221 + (205 + 610 + 221) + 221 m
SCOPE OF WORKS
� technical proposal on concept of object
CLIENT
JSC ‘Baltic Construction Company-SPb’
26
CABLE-STAYED BRIDGES
CABLE-STAYED OVERPASS ON CHERNYAHOVSKOGO STREET IN SAINT-PETERSBURG
DESIGN PROPOSAL
DESCRIPTIONCity highway cable-stayed overpass on Chernyahovskogo Street and Kremenchugskaya Street in SPb.
Cable-Stayed part should cross RR toward Moscow direction.
Basic features:
� continuous irregular span by length - 252 m
� cable-stayed span - 252 m
SCOPE OF WORKS
� project design
� investment justification
CLIENTSaint-Petersburg Road Administration Direction of transport construction Lengiproinzproekt, SPb
DESIGN PERIOD 2006
URAL
DESCRIPTION
Two pylons cable-stayed Bridge Crossing over the Kama
River connecting Northern and Eastern parts of the city
of Perm.
� Bridge crossing presented as follows
250+520+250 m
� pylons – A-shaped
� main span – 520 m
� locations of cable stays – fan type in two planes
� heights of pylons – 160 m
CABLE-STAYED BRIDGE CROSSING OVER THE KAMA RIVER IN PERM
DESIGN PROPOSAL
� total length of bridge – 1,256 m
SCOPE OF WORKS
� general design
� predesign
CLIENT
Road Administration of Perm City
Perm improvement
DESIGN PERIOD
2008
Yablochkova str. 7, Saint-Petersburg, Russia, 197198; e-mail: [email protected]; www.gpsm.ru
bridges
general design
tunnels
design of constructions
civil engineering design
construction technology
footbridges
monitoring of structures
embankments & berths
field supervision
sport structures
sophisticated engineering
analysis
SC INSTITUTE GIPROSTROYMOST - SAINT-PETERSBURG