CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Cable Channel tests
____________________________________________________________17/Apr/07 Pisa Group
•Four configurations of insulation has been tested in the following condition:•T fluid -23 0C power off•T fluid -13 0C power off•T fluid -23 0C power on (1 watt/m)•T fluid -13 0C power on (1 watt/m)•Next tests:
•Mechanical e thermal Considerations in the real channel.
•Summary
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
____________________________________________________________17/Apr/07 Pisa Group
9 mm space loft in a packaging bagRadius of Tubes 38mmMin radius of cableBundle 75 mm
The box is isolated from the table of 20 mm
•Conf. 1
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 1 test results no power
____________________________________________________________17/Apr/07 Pisa Group
conf1 run1 4/4/07 no power
-22.70
-7.25
0.20
14.60
14.40
12.00
20.50
temp fluid
temp ext cables
avg temp in box
temp ext box top
temp ext box vert
temp ext box bottom
temp tair
-25.00
-20.00
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
t cable 15.45 0C t insul. 19 0Ct total 36.4 0C
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
____________________________________________________________17/Apr/07 Pisa Group
Conf. 2
The box is isolated from the table
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 2 test results no power
____________________________________________________________17/Apr/07 Pisa Group
temp fluid
temp ext cables
avg temp in box
temp ext box top
temp ext box vert
temp ext box bottom
temp tair
t cable 11.3 0C t insul. 23.5 0Ct insul. 34.8 0C
conf2 run2 5/4/07 no power
-22.60
-11.30
7.70
11.60
13.70
11.30
19.30
-25.00
-20.00
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
0 1 2 3 4 5 6 7 8
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 3 test results no power
____________________________________________________________17/Apr/07 Pisa Group
temp fluid
temp ext cables
avg temp in box
temp ext box top
temp ext box vert
temp ext box bottom
temp tair
t cable 11.6 0C t insul. 23.5 0Ct insul. 34.1 0C
-22.60
-11.00
10.00
13.10
14.20
10.40
20.70
-25.00
-20.00
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
0 1 2 3 4 5 6 7 8
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 4/5 test results no power
____________________________________________________________17/Apr/07 Pisa Group
The configuration 4 is isolated from the table.
3 mm of armeflex is installed around cables.
The cooling pipes were rapped with a foil of 50 m of aluminum
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 4 test results no power
____________________________________________________________17/Apr/07 Pisa Group
temp fluid
temp ext cables
avg temp in box
temp ext box top
temp ext box vert
temp ext box bottom
temp tair
t cable 12.1 0C t insul. 23.7 0Ct insul. 34.8 0C -25.00
-20.00
-15.00
-10.00
-5.00
0.00
5.00
10.00
15.00
20.00
25.00
0 1 2 3 4 5 6 7 8
-22.400
-10.300
4.000
16.000
14.100
10.100
19.200
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 4 test results with power
____________________________________________________________17/Apr/07 Pisa Group
temp fluid
temp ext cables
avg temp in box
temp ext box top
temp ext box vert
temp ext box bottom
temp tair
c4 run9 13/4/07
-21.700
4.300
13.600
21.700
21.200
17.300
20.700
-25.000
-20.000
-15.000
-10.000
-5.000
0.000
5.000
10.000
15.000
20.000
25.000
0 1 2 3 4 5 6 7 8
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 5 test results no power
____________________________________________________________17/Apr/07 Pisa Group
temp fluid
temp ext cables
avg temp in box
temp ext box top
temp ext box vert
temp ext box bottom
temp tair
t cable 12.6 0C t insul. 26.8 0Ct insul. 39.4 0C
-22.200
-9.600
6.200
19.200
17.600
14.800
20.400
-25.000
-20.000
-15.000
-10.000
-5.000
0.000
5.000
10.000
15.000
20.000
25.000
0 1 2 3 4 5 6 7 8
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Conf. 5 test results with power I=9A V=15
____________________________________________________________17/Apr/07 Pisa Group
temp fluid
temp ext cables
avg temp in box
temp ext box top
temp ext box vert
temp ext box bottom
temp tair
conf5 tf-13 power
-14.700
9.400
17.650
23.600
23.100
21.400
22.100
-20.000
-15.000
-10.000
-5.000
0.000
5.000
10.000
15.000
20.000
25.000
30.000
0 1 2 3 4 5 6 7 8
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Next tests:
____________________________________________________________17/Apr/07 Pisa Group
•We were trying to improve the uniformity of temperature.•For this reason we are adding on the cable bundle an aluminum foils of 0.2 mm •The test will be done on conf5.
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Mechanical e thermal Considerations in the real channel.
____________________________________________________________17/Apr/07 Pisa Group
•Several sections have been found.•The channel are taper. The section of cable and tube must be adapted at the different sections
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Mechanical e thermal Considerations in the real channel.
____________________________________________________________17/Apr/07 Pisa Group
CMS – Silicon BarrelMechanical Engineering Division
_____________________________________________________________________________________________________________
Summary
____________________________________________________________17/Apr/07 Pisa Group
1. For the connector there is no problems of condensation.2. Internal flow must be assured to keep the channel dry for safety3. In the condition of -13 0C and max power the plate was at 22.1
+/- 0.2 0C and no variation with no power and min temperature -22 0C. This was placed underneath the channel. These are the extreme condition.